Tender For Providing Recharge Arrangements To The Functioning Borewell At Chettimankurichi Panchayat ( 5 Works) Head Of Chettimankurichi Panchayat Panchayat At Edappadi Block In Salem District Panchayat General Fund - 2026-27
Tender Overview
Project Description
Tender for Providing Recharge Arrangements To The Functioning Borewell At Chettimankurichi Panchayat ( 5 Works) Head Of Chettimankurichi Panchayat Panchayat At Edappadi Block In Salem District Panchayat General Fund - 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Providing Recharge Arrangements to the Functioning borewell at Ammankovil VPRC Building near H/O Chettimankurichi |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 1cum. |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 23cm x 11cm x 7cm and conveyance of all materials to site and all labour charges etc complete |
| 5 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 6 | Towards Cost and supply of 750mm dia RCC Rings including all charges etc., complete. |
| 7 | Collection and supply of 40mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 8 | Collection and supply of 40mm Brick jelly and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 9 | Collection and supply of 20mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 10 | Collection and supply of Coal and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 11 | Collection and supply of Coarse Sand (2.36 down the grade upto 1mm size) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 12 | Collection and supply of stone chips (6.7mm down the grade upto 2.36 mm) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 13 | Collection and supply of pebbles and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 14 | Refilling of excavated earth around the RCC Rings including all labour charges for filling as per standard specifications |
| 15 | Provision for supply & fixing of 75mm pvc pipe including labour charges etc complete |
| 16 | Provision for partition arrangement in the collection chamber to arrest the grits and floating materials |
| 17 | Provision for Labour charges for Erection of 750mm dia RCC Rings around Bore well etc complete |
| 18 | Supply, delivery and fixing of RCC cover slabs for RCC Rings & Collection chamber |
| 19 | Provision for Cost & supply,fixing charges for Sponge with green mesh, making perforations in casing pipe etc complete |
| 20 | Provision for protection works like lining walls around the rings and other activities |
| 21 | Provision for Leading Inlet Channel to the collection chamber (Earthen channel) |
| 22 | Provision for Net-type materials provided between course of layers |
| 23 | Providing Recharge Arrangements to the Functioning borewell at Ammankovil Amma Park near H/O Chettimankurichi |
| 24 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 25 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 1cum. |
| 26 | Brick work in cement mortar 1:5 mix using country bricks 23cm x 11cm x 7cm and conveyance of all materials to site and all labour charges etc complete |
| 27 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 28 | Towards Cost and supply of 750mm dia RCC Rings including all charges etc., complete. |
| 29 | Collection and supply of 40mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 30 | Collection and supply of 40mm Brick jelly and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 31 | Collection and supply of 20mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 32 | Collection and supply of Coal and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 33 | Collection and supply of Coarse Sand (2.36 down the grade upto 1mm size) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 34 | Collection and supply of stone chips (6.7mm down the grade upto 2.36 mm) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 35 | Collection and supply of pebbles and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 36 | Refilling of excavated earth around the RCC Rings including all labour charges for filling as per standard specifications |
| 37 | Provision for supply & fixing of 75mm pvc pipe including labour charges etc complete |
| 38 | Provision for partition arrangement in the collection chamber to arrest the grits and floating materials |
| 39 | Provision for Labour charges for Erection of 750mm dia RCC Rings around Bore well etc complete |
| 40 | Supply, delivery and fixing of RCC cover slabs for RCC Rings & Collection chamber |
| 41 | Provision for Cost & supply,fixing charges for Sponge with green mesh, making perforations in casing pipe etc complete |
| 42 | Provision for protection works like lining walls around the rings and other activities |
| 43 | Provision for Leading Inlet Channel to the collection chamber (Earthen channel) |
| 44 | Provision for Net-type materials provided between course of layers |
| 45 | Providing Recharge Arrangements to the Functioning borewell at Ammankovil Sellappan House near H/O Chettimankurichi |
| 46 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 47 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 1cum. |
| 48 | Brick work in cement mortar 1:5 mix using country bricks 23cm x 11cm x 7cm and conveyance of all materials to site and all labour charges etc complete |
| 49 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 50 | Towards Cost and supply of 750mm dia RCC Rings including all charges etc., complete. |
| 51 | Collection and supply of 40mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 52 | Collection and supply of 40mm Brick jelly and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 53 | Collection and supply of 20mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 54 | Collection and supply of Coal and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 55 | Collection and supply of Coarse Sand (2.36 down the grade upto 1mm size) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 56 | Collection and supply of stone chips (6.7mm down the grade upto 2.36 mm) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 57 | Collection and supply of pebbles and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 58 | Refilling of excavated earth around the RCC Rings including all labour charges for filling as per standard specifications |
| 59 | Provision for supply & fixing of 75mm pvc pipe including labour charges etc complete |
| 60 | Provision for partition arrangement in the collection chamber to arrest the grits and floating materials |
| 61 | Provision for Labour charges for Erection of 750mm dia RCC Rings around Bore well etc complete |
| 62 | Supply, delivery and fixing of RCC cover slabs for RCC Rings & Collection chamber |
| 63 | Provision for Cost & supply,fixing charges for Sponge with green mesh, making perforations in casing pipe etc complete |
| 64 | Provision for protection works like lining walls around the rings and other activities |
| 65 | Provision for Leading Inlet Channel to the collection chamber (Earthen channel) |
| 66 | Provision for Net-type materials provided between course of layers |
| 67 | Providing Recharge Arrangements to the Functioning borewell at Panankadu Kottapuliyur Pirivu road near H/O Chettimankurichi |
| 68 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 69 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 1cum. |
| 70 | Brick work in cement mortar 1:5 mix using country bricks 23cm x 11cm x 7cm and conveyance of all materials to site and all labour charges etc complete |
| 71 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 72 | Towards Cost and supply of 750mm dia RCC Rings including all charges etc., complete. |
| 73 | Collection and supply of 40mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 74 | Collection and supply of 40mm Brick jelly and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 75 | Collection and supply of 20mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 76 | Collection and supply of Coal and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 77 | Collection and supply of Coarse Sand (2.36 down the grade upto 1mm size) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 78 | Collection and supply of stone chips (6.7mm down the grade upto 2.36 mm) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 79 | Collection and supply of pebbles and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 80 | Refilling of excavated earth around the RCC Rings including all labour charges for filling as per standard specifications |
| 81 | Provision for supply & fixing of 75mm pvc pipe including labour charges etc complete |
| 82 | Provision for partition arrangement in the collection chamber to arrest the grits and floating materials |
| 83 | Provision for Labour charges for Erection of 750mm dia RCC Rings around Bore well etc complete |
| 84 | Supply, delivery and fixing of RCC cover slabs for RCC Rings & Collection chamber |
| 85 | Provision for Cost & supply,fixing charges for Sponge with green mesh, making perforations in casing pipe etc complete |
| 86 | Provision for protection works like lining walls around the rings and other activities |
| 87 | Provision for Leading Inlet Channel to the collection chamber (Earthen channel) |
| 88 | Provision for Net-type materials provided between course of layers |
| 89 | Providing Recharge Arrangements to the Functioning borewell at Alamarathupatty Kulanthai house near H/O Chettimankurichi |
| 90 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 91 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 1cum. |
| 92 | Brick work in cement mortar 1:5 mix using country bricks 23cm x 11cm x 7cm and conveyance of all materials to site and all labour charges etc complete |
| 93 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 94 | Towards Cost and supply of 750mm dia RCC Rings including all charges etc., complete. |
| 95 | Collection and supply of 40mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 96 | Collection and supply of 40mm Brick jelly and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 97 | Collection and supply of 20mm HBG Metal and filling in to the pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 98 | Collection and supply of Coal and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 99 | Collection and supply of Coarse Sand (2.36 down the grade upto 1mm size) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 100 | Collection and supply of stone chips (6.7mm down the grade upto 2.36 mm) and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications |
| 101 | Collection and supply of pebbles and filling in to the pits including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 102 | Refilling of excavated earth around the RCC Rings including all labour charges for filling as per standard specifications |
| 103 | Provision for supply & fixing of 75mm pvc pipe including labour charges etc complete |
| 104 | Provision for partition arrangement in the collection chamber to arrest the grits and floating materials |
| 105 | Provision for Labour charges for Erection of 750mm dia RCC Rings around Bore well etc complete |
| 106 | Supply, delivery and fixing of RCC cover slabs for RCC Rings & Collection chamber |
| 107 | Provision for Cost & supply,fixing charges for Sponge with green mesh, making perforations in casing pipe etc complete |
| 108 | Provision for protection works like lining walls around the rings and other activities |
| 109 | Provision for Leading Inlet Channel to the collection chamber (Earthen channel) |
| 110 | Provision for Net-type materials provided between course of layers |
| 111 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender