Tender For Canal Service Road Sikandarpur Rajwah Marg (Reach 18.80 To 20.10) Repair/Renovation Work (Length-1.30 Km) (Including 05 Years Maintenance). (As Per Box)
Tender Value
60.46 Lakhs
Estimated cost
Bid Submission
17 Nov 2026
2 days left
EMD
6.05 Lakhs
Bank guarantee accepted
Document Fee
10800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ballia → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Canal Service Road Sikandarpur Rajwah Marg (Reach 18.80 To 20.10) Repair/Renovation Work (Length-1.30 Km) (Including 05 Years Maintenance). (As Per Box)
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8\\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100\\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee. |
| 2 | WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 3 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 4 | Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 5 | Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat |
| 8 | Brick edging on both sides of roads of 1st class brick 8cm(3\\")wide & 12 cm (4.50\\")deep laid with mud mortor including labour & suplly of brick finished to required templete and in proper alignment and also includingdressing & ramming the excavated earth including all labour T&P sudries required for comption of work with material |
| 9 | Providing and fixing of typical informatory sign board as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25 mm x 5 mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25 mm x 5 mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos 75 mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 600 mm, 600 mm below ground level. All M.S. will be stove enameled on both sides. Lettering and printing arrows, enamel paints of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 (As per Banda SOR Dt. 26.04.2018 Ch- 10 Item No 10.16) |
| 10 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 % |
| 11 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 % |
| 12 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @1.50 % |
| 13 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 % |
| 14 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 % |
| 15 | Excavation in foundation in ordenary soil including lift up to 1.50M and lead upto30 Meter excavation earth in to the space between the building and the side of foundation trenches o in to the plainth and removal and disposal of surface earth as directed by E/I upto distance of 30 m from the foundation trenches (S.I.No.251A) |
| 16 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 17 | P/L of Cement Concreet in 1:6:12 (1 Cement :6 Fine sand :12 Brick Ballast 40 mm)Including all Supply And matriales.Si 273 |
| 18 | Class M-150Brick work in 1:4 in Cement and Coarse sand In Foundation and Plinth Including all Supply of all materials, labour and t&p. Si No.305(b) |
| 19 | Cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5 F.M. and cement proportion of M20 (1:1.5:3) including supply of all materials labour and T&P required for proper completion of work (Road Slab) |
| 20 | supply and laying of 125 micron pollythene sheet including supply of all material labour and T&P etc complete required for proper completion of works. |
| 21 | supply and Applying C.C Cutting in joints of C.C. road including supply of all materials labour and T&P etc.(10X6cm) |
| 22 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 % |
| 23 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25 % |
| 24 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50 % |
| 25 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75 % |
| 26 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysNov 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.