Tender For Notice Inviting Tender For Replacement Of Existing 11Kv Switchgear Assembly At 110Kv Sub Station In Csez, Kakinada
Tender Value
2.21 Crore
Estimated cost
Bid Submission
26 Nov 2026
12 days left
EMD
4.43 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Notice Inviting Tender For Replacement Of Existing 11Kv Switchgear Assembly At 110Kv Sub Station In Csez, Kakinada
BOQ
| Sl. No. | Item Description |
| 1 | Comprehensive design, detailed engineering, precision manufacturing, routine and type testing at manufacturer’s works, factory acceptance testing (FAT), and supply of metal-clad, indoor type factory made 11kV, 1250A, 40kA, 3 Sec., 3-phase Vacuum Circuit Breaker (VCB) switchgear panel assembly, complete with relays, metering, control, protection, and interlocking devices, suitable for integration into a 110kV substation. The system shall comply with relevant IS/IEC standards, such as IEC 62271-100 and IS 3427, and as per project-specific technical specifications and approved design documents. Switchgear panels shall be four-side internally arc fault tested at 40kA-1sec |
| 2 | Supplyof OEM-recommended spares for the supplied 11kV VCB panel, including but not limited to: vacuum interrupters, control relays, auxiliary contacts, trip coils, closing coils, and other critical spare parts necessary for reliable operation and long-term maintenance as per the attached specification and list. |
| 3 | Charges associated with third-party inspection, testing, and certification of the VCB panels at the manufacturer’s facility, inclusive of inspection coordination, test reports, quality assurance documentation, and witness testing as per QA/QC plan. |
| 4 | The scope of work comprises the complete replacement of the existing 11 kV VCB panels, including dismantling and removal of existing panels, erection and alignment of new panels, electrical connections, numerical relay configuration and testing, integration with the existing 110 kV substation infrastructure, including SCADA/RTU, auxiliary circuits, protection, control and metering systems, followed by comprehensive testing and commissioning.Mandatory Shutdown Requirement: The entire replacement work, including installation, testing, commissioning and restoration of power supply, shall be completed within a maximum total shutdown period of 24 hours. The contractor shall undertake all possible preparatory works in advance, including panel assembly checks, relay configuration, material arrangement and manpower deployment, and submit a detailed, time-bound execution plan for approval. Adequate skilled manpower, tools and testing equipment shall be deployed to ensure safe and uninterrupted execution, timely commissioning and restoration of power supply within the stipulated shutdown period. |
| 5 | Provision of adequate, secure, and weatherproof temporary storage facilities at site for the VCB panels and associated accessories until installation, including all necessary material handling, internal transportation, site logistics, and safety measures in accordance with applicable standards, wherever the existing shed is found insufficient. The contractor shall also be responsible for clearing and making the existing shed available for storage, as required. Please Enable Macros to View BoQ information |
| 6 | Provision of adequate, secure, and weatherproof temporary storage facilities at site for the VCB panels and associated accessories until installation, including all necessary material handling, internal transportation, site logistics, and safety measures in accordance with applicable standards, wherever the existing shed is found insufficient. The contractor shall also be responsible for clearing and making the existing shed available for storage, as required. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.