Tender For Providing 110/33-11 Kv Yard Equipment, Plinth, Cable Trench, Quarry Dust Filling. Metal Spreading Work, Road Works And Allied Other Civil Works For The ‘Establishment Of 110/33-11 Kv Ss At Madavilagam.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Nov 2026
3 days left
EMD
2.06 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chennai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Providing 110/33-11 Kv Yard Equipment, Plinth, Cable Trench, Quarry Dust Filling. Metal Spreading Work, Road Works And Allied Other Civil Works For The ‘Establishment Of 110/33-11 Kv Ss At Madavilagam.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing heavy jungle including all cost of labour ,lead, lift etc., complete, and as directed by the Engineer at site. |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B |
| 3 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting |
| 4 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting |
| 5 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape Removal of hard rock by wedging and chiselling and trimming to proper shape where blasting is prohibited 9 Previous Sanctioned rate similar item) |
| 6 | Supplying and filling in foundation and basement filling with M. sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification and as directed by the Engineer at site |
| 7 | Transporting the surplus excavated earth, debris etc away from the site to a lead of 2km including cost of all lead, lift, conveyance , loading, unloading etc. complete and as per the Engineer at site. |
| 8 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. |
| 9 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete and as per the Engineer at site.. |
| 10 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, machine mix, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 11 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 12 | PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification and as per the Engineer at site.. |
| 13 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 14 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 315 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- RCC wall |
| 15 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 315 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- Precast slab |
| 16 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 315 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- Culvert slab |
| 17 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete and as per the Engineer at site. |
| 18 | Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site |
| 19 | Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete and as per the Engineer at site. |
| 20 | Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site |
| 21 | Providing, Transporting and fixing of 90 LBS Rail in correct position and level as directed by the Department Engineer at site including cost of rail, cutting charges, transport to site, etc., complete and as per the Engineer at site. |
| 22 | Plastering with cm 1:5 mix using 12mm thick for inside & outside walls including cost of all materials, labour, lead, lift etc complete and as per the Engineer at site. |
| 23 | Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 32mm and as per the Engineer at site. |
| 24 | Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 25mm and as per the Engineer at site. |
| 25 | Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 20mm and as per the Engineer at site. |
| 26 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 32MM DIA PVC PIPE |
| 27 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 25MM DIA PVC PIPE |
| 28 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 20MM DIA PVC PIPE |
| 29 | Levelling the ups and downs of the location by engaging JCB for marking of foundations, etc., with all hire charges etc complete. |
| 30 | Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete. |
| 31 | Dismantling PCC met with below ground level during execution including labour, tools etc. complete and as directed by the Engineer at site. |
| 32 | Dismantling RCC met with below ground level during execution including labour, tools etc.complete and as directed by the Engineer at site. |
| 33 | Dismantling brick/ stone masonry in cement mortar met with below ground level during execution including labour, tools etc. complete and as directed by the Engineer at site. |
| 34 | Supplying and fixing GI angle channel etc, wherever required as directed by the Engineer at site, including the cost of all lead lift etc, complete. |
| 35 | Supplying and fixing of chain link fencing of size 50x50mm using 10 Gauge Galvanised Iron Wire, 1.80m ht including cost of all materials, labour, lead, lift etc.complete and as directed by the Engineer-in-charge at site. |
| 36 | Filling with good quality gravel including cost of material, labour all lead and lift etc . Complete., and as directed by the Engineer-in-charge at site. |
| 37 | Filling with stone dust including cost of metal ,labour all lead and lift etc. Complete and as directed by the Engineer-in-charge at site.. |
| 38 | Filling with 20 mm B.G metal including cost of metal ,labour all lead and lift etc . Complete and as directed by the Engineer-in-charge at site. |
| 39 | Forming berms on either sides of the road to a width of 0.60m to an average thickness 22.5 cm well consolidation by Power roller including packing and bringing the surface to camber etc.complete. |
| 40 | Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification. |
| 41 | CGST in % (For Bidders inside TamilNadu) |
| 42 | SGST in % (For Bidders inside TamilNadu) |
| 43 | IGST in % (For Bidders outside TamilNadu) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender