Tender For Construction Of 33/11Kv Yard Equipment Plinths, Cable Duct, Filling With Quarry Dust , Metal Spreading And Allied Other Civil Works Etc. For The Up Gradation Of Existing 33/11Kv Ss Into 110/33-11Kv Ss At Naidumangalam With 1X16 Mva, 110/33
Tender Overview
Project Description
Tender for Construction Of 33/11Kv Yard Equipment Plinths, Cable Duct, Filling With Quarry Dust , Metal Spreading And Allied Other Civil Works Etc. For The Up Gradation Of Existing 33/11Kv Ss Into 110/33-11Kv Ss At Naidumangalam With 1X16 Mva, 110/33Kv Power Transformers And 2X10 Mva, 110/11Kv Power Transformers
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting |
| 3 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete and as per the Engineer at site.. |
| 4 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, machine mix, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 5 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 6 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- RCC wall |
| 7 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. Precast Cover Slabs |
| 8 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. |
| 9 | PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification and as per the Engineer at site.. |
| 10 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete and as per the Engineer at site. |
| 11 | Brick work in CM 1:5 using all ll Class Ground Moulded Chamber Burnt bricks for Basement including the cost of all materilas , lead, lift, labour, Centering Charges T&P etc., complete as directed by the Engineers at site. Foundation & basement |
| 12 | Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site |
| 13 | Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete and as per the Engineer at site. |
| 14 | Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site |
| 15 | Plastering with cm 1:5 mix using 12mm thick for inside & outside walls including cost of all materials, labour, lead, lift etc complete and as per the Engineer at site. |
| 16 | Supplying and fixing GM wheel valve of approved brand ISI quality including cost of all materials, labour etc. complete 32mm and as per the Engineer at site. |
| 17 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 40MM DIA PVC PIPE |
| 18 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 32MM DIA PVC PIPE |
| 19 | Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 25MM DIA PVC PIPE |
| 20 | Levelling the ups and downs of the location by engaging JCB for marking of foundations, etc., with all hire charges etc complete. |
| 21 | Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete. |
| 22 | Supplying and fixing MS grill gates, MS grills, name bord, hand rail, lader etc.at various levels as per approved drawing using channel, squar rods, ornamentel grill parts and flat including fixing in position with suitable hold fast locking arrangements etc.complete as per standard specification |
| 23 | Supplying and fixing GI angle channel etc, wherever required as directed by the Engineer at site, including the cost of all lead lift etc, complete. |
| 24 | Filling with good quality gravel including cost of material, labour all lead and lift etc . Complete., and as directed by the Engineer-in-charge at site. |
| 25 | Filling with stone dust including cost of metal ,labour all lead and lift etc. Complete and as directed by the Engineer-in-charge at site. |
| 26 | Filling with 20 mm B.G metal including cost of metal ,labour all lead and lift etc . Complete and as directed by the Engineer-in-charge at site. |
| 27 | Dismantling PCC met with below ground level during execution including labour, tools etc. complete, and as directed by the Engineer-in-charge at site. |
| 28 | Dismantling RCC met with below ground level during execution including labour, tools etc. complete and as directed by the Engineer-in-charge at site. |
| 29 | Dismantling brick/ stone masonry in cement mortar met with below ground level during execution including labour, tools etc. complete and as directed by the Engineer-in-charge at site. |
| 30 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification. MORTH No. 111,112, 406, 900. |
| 31 | Forming berms on either sides of the road to a width of 0.60m to an average thickness 22.5 cm well consolidation by Power roller including packing and bringing the surface to camber etc.complete. |
| 32 | Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification. |
| 33 | CGST in % (For Bidders inside TamilNadu) |
| 34 | SGST in % (For Bidders inside TamilNadu) |
| 35 | IGST in % (For Bidders outside TamilNadu) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.