Tender For Repair/ Maintenance Of Ht Cables, Switch Gears Incl Connected Items Under Ge (West) Colaba, Mumbai
Tender Value
45 Lakhs
Estimated cost
Bid Submission
05 Dec 2026
13 days left
EMD
90000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance Of Ht Cables, Switch Gears Incl Connected Items Under Ge (West) Colaba, Mumbai
BOQ
| Sl. No. | Item Description |
| 1 | Material and labour of Opening the bus -bar chamber,CT chamber, PT Chamber and Meter chamber of HT 11KV, panel board and carry out following activities as mentioned below complete all as directed and specified by Engineer-in-Charge. (Note: spare parts shall be measured and paid seperately.) :-(i) Inspecting/cleaning/overhauling of bus bar chamber by checking of bus bars, spout insulators, space heaters and removing dust with vacuum cleaner/Blower and moisture by hot air blower and checking tightness of bus bars, insulators and applying STRIPPEX(A), STRIPPEX(B) and HT tape and test with High Voltage(DC) and meggering before and after high voltage test complete.(ii) Inspecting/cleaning/overhauling of CT/PT chamber by checking of Bus bars, spout insulators, space heaters and checking of wiring system and removing dust with vacuum cleaner/blower and moisture by hot air blower and checking tightness of bus bars, insulators and applying anti tracking paint on CT's and insulators and HT Tape.(iii) Inspecting/cleaning/overhauling metering chamber by checking of entire wiring system, all meters, selector switches, control fuses and removing dust with vacuum cleaner/blower and moisture by hot air blower and checking tightness of wiring system. |
| 2 | Disconnecting and dismantling the existing indoor type, 11 KV horizontal draw out type VCB trolly of rupturing capacity 250/350 MVA, 400/630/800 Amps from location and repair /overhauling and carrying out with the following activities as mentioned below and replacement of unserviceable following items as and where required complete all as specified and directed by Engineer-in-Charge. (Note: spare parts will be measured and paid separately.) (i) Inspecting / overhauling of manual / motorised spring drive mechanism by checking mechanism, motor and gear assembly, big gear assembly, stop bolt assembly, main shaft interlocking assembly, closing spring assembly, small cam with screw, motor cut -off limit switch, butter fly switch assembly and apply multi grease lubricant to function smoothly.(ii) Inspecting / overhauling of tripping assembly,earthfault release assembly, tripping coil, auxiliary switch and checking of electrical wiring system.(iii) Inspecting / overhauling /cleaning and inspecting through insulators, vacuum interuptors by carbon cleaner solution and apply dry graphite conductive sealant for electrical contacts to avoid carbon deposits on contact surfaces.(iv) Assembling all items/components parts to the respective postion and testing the breaker with High Voltage(DC) and meggering before and after high voltage test complete. |
| 3 | Dismantling of Old Damaged/burnt spare parts from VCB and Supply and fixing in repair of following Spare parts suitable for - VCB 11 KV , 630/800 Amps indoor type of Make Schnieder(PIX -MV)/ABB(VD4) /CG/AREVA(VMX) all as specified and directed by Engineer-in-Charge. |
| 4 | Isolating Contacts flat type |
| 5 | Vaccum InterupterVG2 |
| 6 | Insulating Rod |
| 7 | Closing coil 110V /24V DC |
| 8 | Tripping Coil 110V /24V DC |
| 9 | Spring Charging Motor 110V-230V AC/DC |
| 10 | Breaker Auxiliary Switch 6NO +6NC |
| 11 | Motor Cut-off switch |
| 12 | Main Drive Shaft assembly |
| 13 | Trip Fork Linkage Assembly |
| 14 | Rachet Wheel |
| 15 | Pin for Rachet |
| 16 | Handle Block Assembly |
| 17 | Closing coil assembly without coil |
| 18 | Trip coil assembly without coil |
| 19 | Motor cutt off Lever assembly |
| 20 | Trip Proper support assembly |
| 21 | Release lever |
| 22 | Pin for Release lever |
| 23 | Auxiary switch drive Assembly |
| 24 | Charging Pawl |
| 25 | Buffer for Spring |
| 26 | Over Rid Stop |
| 27 | Over Rid Stop Pin |
| 28 | 24 Pin Plu and Socket Assembly |
| 29 | Bus Bar Spout Insulator with CC parts for R Phase |
| 30 | Bus Bar Spout Insulator with CCparts for Y Phase |
| 31 | Bus Bar Spout Insulator with CC parts for B Phase |
| 32 | Circuit Spout Insulator with CC Parts |
| 33 | 3Phase Spout Insulator assembly Bus bar /Circuit side. |
| 34 | Half Collar (Pair) |
| 35 | Raising and lowering Handle |
| 36 | TNC Switch,16Amps Recom |
| 37 | Ammeter, digital type,DM3110 Schneider |
| 38 | Voltmeter, digital type DM3210 Schneider |
| 39 | Multifunction meter digital typeEM6400NG Schneider |
| 40 | Indicating Lamps 24/110V DC LED type |
| 41 | Dismantling, overhauling and testing Potential transformer capacity 11 KV / 110 volts AC and replacement of worn out spares such as contacts, bushing, control wiring fibre plates, gaskets , transformer oil and applying multi grease to the mechanical parts and dry graphite conductive sealant to contacts etc and re-assembling the same and commissioning complete all as specified and directed by Engineer-in-Charge. (Note : Spare parts and oil will be measured and paid seperately) |
| 42 | Material and labour for painting of HT VCB capacity 250/350MVA,11KV, 400/630/800Amps, with one coat of synthetic enamel paint over a coat of red oxide primer after cleaning, scraping, and filling of cavities for out side surface and in side surface of VCB and writing the details such as MES No/ SM No etc on the new metallic plate of size 30x15cm and fixing the metallic plate firmy on VCB all as specified and as directed by Engineer-in-charge. |
| 43 | S&F, testing commissioning of current transformer 50-30, 5+5Amps, Class1 and 5p10,15VA,18.3kA/3Sec for 11 KV horizontal draw out type VCB trolly of rupturing capacity 250/350 MVA, 400/630/800 Amps, panel board complete all as directed and specified by Engineer-in-Charge. |
| 44 | T&P for Testing of primary injection by artificial load through CT’s, on each multiple setting of over current and earth fault relay, testing polarities, ammeter and selector switch and as directed by Engineer-in-Charge. |
| 45 | T&P for Testing /Overhauling and secondary injection of over current earth fault relays/release on each multiple setting readjustment by artificial load complete all as specified including testing complete. |
| 46 | Repair/Overhauling Indoor type, 11 KV, SF 6, RMU Panel and carrying with following and all as specified and directed by engineer in Charge. Note :- (i) Including fixing of spare parts to function RMU smoothly and rate to be included. Notes :- Spare parts and SF6 Gas will be measured and paid seperately. (i) Inspecting/overhauling of Manual/motorised spring drive mechanism by checking mechanism, Motor and gear assembly, Big gear assembly, stop bolt assembly, Main shaft interlocking assembly, closing spring assembly, Small Cam with screw, motor cut -off limit switch, Butter fly switch assembly and apply multi grease lubricant to function smoothly.(ii)Inspecting / overhauling of assembly, earth fault release assembly, tripping coil, auxiliary switch and checking of electrical wiring system.(iii)Inspecting / overhauling /cleaning and inspecting insulators, Gas Chamber by carbon cleaner solution and apply dry graphite conductive sealant for electrical contacts to avoid carbon deposits on contact surfaces. (iv) Inspecting of Gas SF6 leakage and Re filling SF6 gas as required and all as directed.(v) Overhauling/testing of Metering Panel with PT (vi) Assembling all items/components parts to the respective postion and testing the breaker with High Voltage(DC) and meggering before and after high voltage test complete.(vii) Cleaning all busbar by rubbing and by CRC liquid cleaner.(viii)Spraying two coat of anti track paint on CTs.(ix) Applying insulating boots for busbar and cables. (x) Supply and fixing all missing nut bolts for panels. |
| 47 | S&F 11 KV, SF 6,RMU Panel Spring Charging Motor, with complete mechanisim 230/110/24 Volts of existing make. |
| 48 | S&F 11 KV, SF 6,RMU Panel SF 6 Gas filling up to the indication mark complete all as specified and as directed. |
| 49 | Repair/ Maintenance Battery Charger Circuit 240 V AC to 110 V DC 20 A (with range from 10A to 20A) with inbuilt short circuit protection supply for control circuit of 11 KV VCB/RMU complete incliuding replacement of defective parts all as specified and as directed. |
| 50 | Repair/ Maintenance DC to DC Converter 110 V DC to 24 Volt dc 20 A (with range from 10A to 20A) with inbuilt short circuit protection supply for control circuit of 11 KV VCB/RMU complete incliuding replacement of defective parts all as specified and as directed |
| 51 | S&F battery SMF EP 100-12 (12V/100AH) complete all as specified and as directed. |
| 52 | Dismantling old burnt Heaters and Supply Fixing Space Heater 80 Watt capacity suitable for VCB,s /OCB' in existing panel including hard ware, wiring and all as directed. |
| 53 | T&P for fault finding on HT cables of any size and any length with fault detective machine by thumbing method and suitable high voltage and all as and directed by Engineer-in-charge. |
| 54 | T&P for route tracing of HT cables of any size and any length with fault detective machine by thumbing method and suitable high voltage and all as and directed by Engineer-in-charge. |
| 55 | Supply and fix cable jointing kit for 11 KV (earthed) grade cable for indoor termination Heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured alumunium conductor cable of size 120 sqmm to 185 sqmm all as specified. |
| 56 | Supply and fix cable jointing kit for 11 KV (earthed) grade cable for indoor termination Heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured alumunium conductor cable of size 240 sqmm to 300 sqmm all as specified. |
| 57 | Supply and fix cable jointing kit for 11 KV (earthed) grade cable for straight through Heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured alumunium conductor cable of size 120 sqmm to 185 sqmm all as specified. |
| 58 | Supply and fix cable jointing kit for 11 KV (earthed) grade cable for straight through Heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured alumunium conductor cable of size 240sqmm to 300 sqmm all as specified. |
| 59 | Supply, Installation, testing ON LOAD & commissioning of Compact motor protection relay flush mounting with display MM-10 with 110-240V AC/DC aux supply, having following protections with required mechanical cutout arrangement and required control wiring modification work to suitable new relay to existing system making good to the disturbed surface all as specified and directed. (a) Thermal over load and short circuit . (b) Earth fault and phase loss, unbalance, phase reversal. (c) Prolong starting, locked rotor and last trip data recording. MAKE: L&T /ASHIDA /SCHNEIDER |
| 60 | Supply, Installation, testing and commissioning of Under Over Voltage relay single phase system voltage 20-110 Volt AC/DC with required mechanical cutout arrangement and required control wiring modification work to suitable new relay to existing system including making to the disturbed surface all as specified and directed. MAKE: L&T /ASHIDA /SCHNEIDER |
| 61 | Material and labour for loading into truck of old OCB/VCB with the help of Crain and shifting from site to store/ substation premises and unloading complete all as specified and directed. |
| 62 | Material and labour Disconnecting, dismantling and restabilising the existing indoor type, 11 KV horizontal draw out type VCB trolly of rupturing capacity 250/350 MVA, 400/630/800 Amps from location and repair /overhauling and carrying out with the following activities as mentioned below and replacement of unserviceable following items as and where required complete all as specified and directed by Engineer-in-Charge. (Note: spare parts will be measured and paid seperately.) (i) Inspecting / overhauling of manual / motorised spring drive mechanism by checking mechanism, motor and gear assembly, big gear assembly, stop bolt assembly, main shaft interlocking assembly, closing spring assembly, small cam with screw, motor cut -off limit switch, butter fly switch assembly and apply multi grease lubricant to function smoothly.(ii) Inspecting / overhauling of tripping assembly,earthfault release assembly, tripping coil, auxiliary switch and checking of electrical wiring system.(iii) Inspecting / overhauling /cleaning and inspecting through insulators, vacuum interuptors by carbon cleaner solution and apply dry graphite conductive sealant for electrical contacts to avoid carbon deposits on contact surfaces.(iv) Assembling all items/components parts to the respective postion & testing the breaker with High Voltage(DC) and meggering before and after high voltage test complete. |
| 63 | Excavating in trenches, n exc1.5 m wide and n exc 1.5 m indepth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. nexc 10 sq m on plan and n exc 1.5 m in depth and getting out complete in soft/loose soil all as specified. |
| 64 | All as per sl. item No.63 above but in hard/dense soil. |
| 65 | Excavation in trenches not exc. 1.5 m wide and not exc. 1.5 in depth for foundation of poles, stay assembly and laying of U/G cables etc. and getting out in soft disintegrated rocks/road cutting/RCC/PCC complete all as specified and directed. |
| 66 | Supply and laying High density poly-ethylene pipes (HDPE) of pressure 6 kgf/cm2 pipe, 110mm dia for laying of cable protection complete to walls/ trenches/floor/ceilings all as specified and directed by Engineer-in-Charge. |
| 67 | Supply and laying tubes light grade, galvanized, 100 mm bore laid in trenches or under floor or fixed with poles/walls for protection of electric cable all as directed. |
| 68 | Returning, filling in soft/loose soil including spreading, levelling, watering ,well ramming in layers n.exc 25 cm complete all as specified. |
| 69 | Removing of excavated material not exc. 50m away from starting point and depositing where directed at a level not exc. 1.5m above the starting point.in soft /loose soil. |
| 70 | Removing of excavated material from the site of work and transporting out of MD land complete all as specified and directed. |
| 71 | Supply, laying in trench, in duct on wall, and testing in replacement for XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy-duty) with aluminium conductor, 11000 volts, grade cross sectional area 240 sq. mm X 3 core all as specified and as directed. |
| 72 | Supply, laying in trench, in duct on wall, and testing in replacement for XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy-duty) with aluminium conductor, 11000 volts, grade cross sectional area 185 sq. mm X 3 core all as specified and as directed. |
| 73 | Supply, laying in trench, in duct on wall, and testing in replacement for XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy-duty) with aluminium conductor, 11000 volts, grade cross sectional area 120 sq. mm X 3 core all as specified and as directed. |
| 74 | Manufacturing, supplying and fixing at various sub stations for SOP (Standard Operating Procedure) for VCB/ RMU Operation on frame board of size 600 mm x 900mm having fully covered by suitable plain glass as approved . Letter ,symbols, MES Logo ,borders etc.on A-1 Size paper all as required colour scheme in all respects as per direction of Engineer-in-charge. |
| 75 | T&P for fault finding, confirmation and route tracing on LT cables of any size and any length with fault detective machine by thumping method and suitable high voltage and all as and directed by Engineer-in-charge. |
| 76 | Material & labour for cable jointing kit, in repair, for LT 1.1 KV grade cable for straight through joint M-Seal type for underground PVC/XLPE armoured heavy duty cable aluminum conductor of size 3.5/4 core 50 Sqmm complete including testing and commissioning complete all as specified and directed. Make: XICON/Raychem/3M/Mahindra and Mahindra. |
| 77 | All as per item No 76 herein before but cable 3.5 core 70 Sq mm |
| 78 | All as per item No 76 herein before but cable 3.5 core 95 Sq mm |
| 79 | All as per item No 76 herein before but cable 3.5 core 120 Sq mm |
| 80 | All as per item No 76 herein before but cable 3.5 core 185 Sq mm |
| 81 | All as per item No 76 herein before but cable 3.5 core 240 Sq mm |
| 82 | Material & Labour for repairs/ Overhauling/Servicing to Existing LT electric panels by taking shut down from appropiate authority including T&P for Attending Faults/Trippings and rectifieng /repairing the faults in HT/LT Panels Boards/Capacitor Panels Boaeds/ MCCB's/ACB's /Change Over switches/Cable Connections/Bus Bar etc including PVC insulating Tapes/Nut bolts and all as specified and directed by Engineer-In-Charge. (i) Tightning the loose connections and cleaning inside/out side complete replacing all cable glands, thimbles and lugs as per the size of existing cable, applying petrolium jelly on the contactors ,providing new insulation tape to bus bars, repair to broken /hanging doors by fixing hinges or welding the door to make it servicable, spray painting as pproved colour and testing the entire panel board after the completion of servicing up to the satisfication of Engr-in-charge complete all as specified and directed . (Note : MCCB,ACB, measured and paid separately under relevant items of this schedule.) |
| 83 | Dismantling of Damaged/Burnt out lugs and Supply and fixing of Aluminum Lugs with PVC Insulation Tape of size 240 Sqmm to 300 Sqmm x 3.5 core complete all as specified and directed by Engr-in-charge. |
| 84 | Dismantling of Damaged/Burnt out lugs and Supply and fixing of Aluminum Lugs with PVC Insulation Tape of size 120Sqmm to 240Sqmm x 3.5 core complete all as specified and directed by Engr-in-charge. |
| 85 | Dismantling of old damaged halogen fitting Supply and fixing in repairs 500 watt Incandescent/ GLS lamp halogen Lamps with holder with aluminum cover 230Volts AC for substation heating to avoid moisture complete all as specified and directed. Make:Wipro/ Surya, crompton |
| 86 | S&F of Room Heater 1000 Watt coil type in substation to avoid moisture in HT installation room complete all as specified and directed by Engr-in-charge. |
| 87 | Dismantling of old damaged Lamps and Supply and fixing in repairs 200 watt Incandescent/ GLS lamp 230Volts AC for substation heating to avoid moisture complete all as specified and directed. Make: Wipro/ Surya, crompton |
| 88 | M&L for Maint of Multi functional meter digital type 5000 LCD CI with RS485 including necessary alteration in existing panel as required for retrofit after wiring work complete all as specified and directed. |
| 89 | M&L for Maint of Multi functional meter digital type 5000 LCD CI with RS485 including necessary alteration in existing panel, SMARTCOMN EMS Energy Management System software with multiple features suitable for minimum 10 meters at existing dashboard/ computer and shall capture and provide following data for 12 months peroid: 1) 30 min instantaneous data from all the meters for seven parameters- cumulative Energy, Power, Current, Voltage, Power factor and frequency. 2) Multiple combination of device and parameters for analysis and monthly and quaterly billing survey dattion a for cumulative energy and max demand. 3) Specific Energy Consumption (SEC) Report and assess to features defined by user levels. 4) Monitor ON, OFF, TRIP, Ready to close status of circuit breaker through E and A's UNCO Module with on premise solution. 5) Provision for Breaker ON and TRIP counter, Last 20 trips date and time 6) Email and SMS notification and Excel reports with charts. |
| 90 | M&L for Maint of MQTT GPRS Converter Outdoor (LoRa) Long Range Communication Accumulator suitable for communicating with multifunctional digital Meter with LoRa communication protocol and the data transfer to the software complete all as required on existing ground position as specified and directed. Make: L&T/ EL Measure/ Secure. |
| 91 | M&L for Maint and recharge topup for 12 months peroid of 4G/5G Router all as required as on existing ground position including necessary data cable (low impedance ) suitable to existing ground position including necessary data cable (low impedance) suitable to transmit data of energy meter port and CAT-6 (Patch Cord) all as directed by Engr-in-Charge. |
| 92 | M & L and fabrication work with Cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint all as specified and directed by Engr-in-charge. |
| 93 | M&L electrical earthing complete with GI plate Electrode of size 60 Cm X 60 Cm X 6 mm thick burried directly in ground vertically at a depth not less than 2.25 mtr. below normal ground level, with top edge of earth plate at a depth not less than 1.5 mtr. below normal ground level, connected to GI earth strip 32mm x 6mm earth lead by means of bolts, nuts and washers of galvanised iron, earth lead strip protected by means of 32 mm bore dia light grade GI pipe up to switch board/panel board , all as specified and shown in MES schedule Electrical Plate No-5 of SSR Part I, including excavation and earth work in any type of soil, PCC 1:3:6 type C1 in chamber, RCC 1:2:4 type B1, 40 mm thick cover slab with 6 mm dia MS bars at 100 mm centre to centre both ways, with 6 mm dia MS hook, Charcoal dust, salt, funnel for watering complete and testing the Earth resistence and writing on the chamber by paint all as specified and as directed. Note : Value of earth resistance shall not be more than 2 Ohm. |
| 94 | M&L in repairs galvanised iron strip 32x6mm earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles in roof of high rise bldg and as required by saddles not more than distance of 50 cm between two saddles with jointing nuts, bolts /washers to wall/surface or recess of high rised buildings or burried in ground or any situation for loop all as specified and directed by the Engineer-in-Charge. |
| 95 | Supply and fixing substation insulation rubber floor mats not less than 2.5 mm thickness suitable for operation on 11 KV panels confirming to IS 15652 : 2006 all as specified and directed by Engineer-Incharge. |
| 96 | S&F of fire bucket stand with 4 buckets constructed from durable mild steel (MS) or galvanized iron (GI) covered with MS sheet of size 6'x3\\", these stands are finished with a red, powder-coated paint to resist corrosion and ensure high visibility covered with MS canopy all as directed and specified by Engineer in Charge. |
| 97 | M&L for PCC type B2 (1:2:4) using 40 mm graded stone aggregate in foundation, filling and mass concrete for foundation type C2 (1:3:6) for fire fighting stand of size 1.8x0.8x0.3 meter. all as directed and specified by Engineer in Charge. |
| 98 | Supply & Fixing fire beater with bamboo 10' long all as directed and specified by Engineer in Charge. |
| 99 | Supply fire hook with bamboo 10' long all as directed and specified by Engineer in Charge. |
| 100 | M & L for painting of all fore fighting equipment (stand , 4 buckets shed etc ) with red oxide, thinner all as directed and specified by Engineer in Charge. |
| 101 | S&F colorful shock treatment chart depicting proper drill required in case of emergency situation duly framed in glass clearly readable from distance of atleast 10 meter as directed and specified by Engineer in charge. |
| 102 | S&F first aid kit boxes cointaing all necessary treatment items required in case of electrical shock emergency and fire emergency approved by licenced medical prectitioner/ reputed pharmasuetical company as directed and specified by Engineer in charge. |
| 103 | S&F MS chequered plated of thickness not less than 3mm for coving cable ducts in all sub stations all as specified and directed by Engr-in-charge. |
| 104 | Supply and laying of HT High Voltage insulation mat size 2Mx1M made od ilastimeric polymers material having a high insulation reistance thus imparting total safety to human beings from any leakage current having high insulation resistance of class A of size not less than 2.5mm thick, 2M length and 1M width suitable for 11 KV conforming to IS-15652:2006 (supeseding IS5424) including pasting of mat with SR-998 by adding thinner as per requirement suitable for elcetrical shock safety complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 11, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender