Short Dated Tender - Tender For Repair/Renewal Work On The Road From Bhujaini Bridge Via Bhujaini Deeh Sthan And Brahma Ji Sthan To Bagahi Tola (Length: 0.83 Km), Including Five Years Of Maintenance
Tender Overview
Project Description
Short Dated Tender - Tender For Repair/Renewal Work On The Road From Bhujaini Bridge Via Bhujaini Deeh Sthan And Brahma Ji Sthan To Bagahi Tola (Length: 0.83 Km), Including Five Years Of Maintenance
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Nov-2026 | date | Date | 17-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8\\") layers, including ramming & dressing the surface to required levels and slopes and also including1.5 metre (5ffs) liíts and 30m. (100\\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee. |
| 2 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 3 | Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 4 | Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 5 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat |
| 7 | S/F of signboard as per direction of engineer in charge |
| 8 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 % |
| 9 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 % |
| 10 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @1.50 % |
| 11 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 % |
| 12 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender