Short Dated Tender - Tender For Repair/Renewal Work From Raniganj-Bairia Road Up To Sonbarsa-Ibrahimabad Road (Length: 0.50 Km) (Including 05-Year Maintenance). (As Per Boq)
Tender Overview
Project Description
Short Dated Tender - Tender For Repair/Renewal Work From Raniganj-Bairia Road Up To Sonbarsa-Ibrahimabad Road (Length: 0.50 Km) (Including 05-Year Maintenance). (As Per Boq)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Nov-2026 | date | Date | 17-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in foundation in ordinarysoil (loan clay or sand) including lift up to 1.5m and lead up to 30m and dressing for sides and ramming of bottom and disposal of surplus excavated earth as directed by the E/I within a lead of 50m (Si. No. 251) |
| 2 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 3 | Providing and laying in cement concrete 1:6:12(1cement:6fine sand:12 graded brickaggregate 40mm nominal size) and curing complete , including cost of formwork in foundation and floors.(S.I. No-273) |
| 4 | M-150 Class brick work 1:4 cement and Coarse sand of 1.25 mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work (S.I. No-305 b) |
| 5 | Cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5 F.M. and cement proportion of M20 (1:1.5:3) including supply of all materials labour and T&P required for proper completion of work (Road Slab) |
| 6 | supply and laying of 125 micron pollythene sheet including supply of all material labour and T&P etc complete required for proper completion of works. |
| 7 | supply and Applying C.C Cutting in joints of C.C. road including supply of all materials labour and T&P etc.(10X6cm) |
| 8 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 % |
| 9 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 % |
| 10 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @1.50 % |
| 11 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 % |
| 12 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender