Bids Are invited for Sitc Of 2X200kva Ups Including Aicmc For 06 Years
Tender Overview
Project Description
Bids Are invited for Sitc Of 2X200kva Ups Including Aicmc For 06 Years Item 1 , Item 2 , Item 3 , Item 4 , Item 5 , Item 6 , Item 7 , Item 8 - Item 1 - Supplying, Installation, Testing And Commissioning Of 200Kva Capacity At Full Load Unity Power Factor At 0 To 40 Deg C, Rh 0 To 95 Percent, Online Double Conversion True Sine Wave Uninterrupted Modular Power Supply Ups System. The Ups Shall Include Rectifier, Inverter With Static Bypass And Manual Bypass, Isolation Transformer, And Inbuilt Phase Sequence Correction. Hot-Swappable N Plus 1 Module Configuration Each Module 50 Kva Or Higher, 3-Level Igbt With Pwm, Microprocessor Control. Compliance With Iec Or En Or Vde, Is 16242, Iec 62040-1, 2 And 3. Operating Efficiency Greater Than 95 Percent On Battery Mode, Input Ithd Less Than 3 Percent At Rated Load, Input Pf 0.99, Output Pf Unity Suitable For 0.7 Lagging To 0.7 Leading Pf Loads. Input Ac 3-Phase 400V Plus Minus 15 Percent, 50 Hz Plus Minus 5 Hz, Output Ac- 3-Phase 415V, 50 Hz Plus Minus 0.2Hz. Overload 110 Percent 60 Mins, 125 Percent 10 Mins, 150 Percent 1 Min. Noise Level Less Than 65 Dba At 1 Meter. Protections- Input And Output Under Or Over Voltage, Over Current, Short Circuit, Battery Overcharging. Ports- Rs232, Rs485, Snmp Open Protocol For Bms Integration, Iot Hardware And Software, Display Panel, Event Logging Up To 3000 Events, Audible Alarms, Battery Racks, Interlinks, And Copper Cables. Detailed Technical Specifications As Per Tender Atc Document. , Item 2 - Supply Of Battery Bank Suitable For 30 Minutes Back Up (Battery Vah Capacity Shall Not Be Less Than 1600 Vah Per Kva Of Ups Rating Per Hour Backup Time) On Full Load (Battery Shall Be Vrla, Smf In Abs Container). , Item 3 - Aicmc - During 1St Year (In 5.00 Percent ) After Dlp , Item 4 - Aicmc - During 1St Year (In 5.25 Percent ) After Dlp , Item 5 - Aicmc - During 1St Year (In 5.51 Percent ) After Dlp , Item 6 - Aicmc - During 1St Year (In 5.79 Percent ) After Dlp , Item 7 - Aicmc - During 1St Year (In 6.08 Percent ) After Dlp , Item 8 - Aicmc - During 1St Year (In 6.38 Percent ) After Dlp
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Item 1 | Supplying, installation, Testing and Commissioning of 200KVA capacity at full load Unity Power Factor at 0 to 40 deg C, RH 0 to 95 percent, Online double conversion true sine wave Uninterrupted modular Power Supply UPS system. The UPS shall include Rectifier, Inverter with Static Bypass and manual bypass, isolation transformer, and inbuilt phase sequence correction. Hot-swappable N plus 1 module configuration each module 50 kVA or higher, 3-level IGBT with PWM, microprocessor control. Compliance with IEC or EN or VDE, IS 16242, IEC 62040-1, 2 and 3. Operating efficiency greater than 95 percent on battery mode, input ITHD less than 3 percent at rated load, input PF 0.99, output PF unity suitable for 0.7 lagging to 0.7 leading PF loads. Input AC 3-Phase 400V plus minus 15 percent, 50 Hz plus minus 5 Hz, Output AC- 3-Phase 415V, 50 Hz plus minus 0.2Hz. Overload 110 percent 60 mins, 125 percent 10 mins, 150 percent 1 min. Noise level less than 65 dBA at 1 meter. Protections- input and output under or over voltage, over current, short circuit, battery overcharging. Ports- RS232, RS485, SNMP open protocol for BMS integration, IoT hardware and software, display panel, event logging up to 3000 events, audible alarms, battery racks, interlinks, and copper cables. Detailed technical specifications as per tender ATC document. |
| 2 | Item 2 | Supply of Battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container). |
| 3 | Item 3 | AICMC - During 1st year (in 5.00 percent ) after DLP |
| 4 | Item 4 | AICMC - During 1st year (in 5.25 percent ) after DLP |
| 5 | Item 5 | AICMC - During 1st year (in 5.51 percent ) after DLP |
| 6 | Item 6 | AICMC - During 1st year (in 5.79 percent ) after DLP |
| 7 | Item 7 | AICMC - During 1st year (in 6.08 percent ) after DLP |
| 8 | Item 8 | AICMC - During 1st year (in 6.38 percent ) after DLP |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender