Defence Statutory Bodies & Commissions/Committees Closing in 7 days TDR #58473385

Bids Are invited for Soil Investigation Work For The Security Perimeter With Concertina Coil

Issued by Statutory Bodies & Commissions/Committees · Visakhapatnam, Andhra Pradesh
Tender Value
4.72 Lakhs
Estimated cost
Bid Submission
20 Nov 2026
7 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
13

Project Description

Bids Are invited for Mobilization - Mobilization And Demobilization Of All Necessary Drilling Equipment, Machinery, Tools, Materials, Manpower And Personnel To And From The Project Site, Including Transportation, Loading, Unloading, Shifting And Removal Of The Drilling And Associated Equipment Complete In All Respects (Bore Hole Location As Per Site Plan Attached In Ps) , Jungle Clearance - Jungle Clearance And Preparation Of Approach Or Access To Each Borehole Location Including Removal Of Minor Vegetation And Site Obstructionism Preparation Of A Suitable Working Platform As Required, Shifting Of The Drilling Rig To The Designate Borehole Locations And Fixing, Positioning Leveling And Erection Of The Drilling Reg, Complete In All Respects. , Lab Tests - Conducting The Relevant Labtest, As Per The Applicable Is Sand Project Requirements, On The Soil And Rock Samples Collected During The Field Investigation, Including Sample Preparation, Testing, Calculations And Reporting Of Test Results Preparation And Submission Of Comprehensive Geotechnical Investigation Report Containing Complete Records Of The Field Investigations, Boreholes, Locks, Spt Results, Soil And Rocks Samples Details, Lab Test Report Relevant Calculations, Analysis Interpretation Of Subsurface Conditions, Conclusions And Geotechnical Recommendations, Duly Completed And Presented In A Clear And Systematic Manner Complete In All Respects. , Earthwork - Working Out Of Earthwork Calculation Cutting, Filling, With Approved Earth In The Proposed 20.85 Acres Site To Achieve The Required Formation Levels As Directed By Engr-In-Charge, Data Obtain From Existing Topographical Sheet, Level Sheet And & Contour Map Including All Leads, Lifts, Labor, Machinery And Incidental Works Complete In All Respects As Directed. , Vetting Of Geotechnical Investigation Report - Vetting Of The Geotechnical Investigations Report And Earth Work Calculation By An Authorized And Competent Institution Agency, Such As Iit, Nit And Andhra University Including Review Of The Field Investigation Data Boreholes Logs, Spt Results, Laboratory Test Results, Geotechnical Analysis Interpretation, Conclusions And Recommendation And Incorporation Of Observations/Comments, If Any, Lairing From The Vetting Process Complete In All Respects , Drilling Of Nx Diameter - Drilling Of Nx Diameter Boreholes Through Soil By Rotary Drilling Method, Including Conducting Standard Penetration Test Spt At 1.5Meter Intervals And Collection Of Disturbed Soil Samples Ds, Continuing Until Any One Of The Fwg Termination Criteria Is Met Whichever Occurs First, Sptn Value Less Than 100 Is Obtained At Three Consecutive Depths, Or 3 Mrs Of Rock Is Encountered Or A Max Depth Of 8M In Soils Reached

BOQ

Sl. No. Item TitleItem Description
1MobilizationMobilization and demobilization of all necessary drilling equipment, machinery, tools, materials, manpower and personnel to and from the project site, including transportation, loading, unloading, shifting and removal of the drilling and associated equipment complete in all respects (Bore hole location as per site plan attached in PS)
2Jungle ClearanceJungle clearance and preparation of approach or access to each borehole location including removal of minor vegetation and site obstructionism preparation of a suitable working platform as required, shifting of the drilling rig to the designate borehole locations and fixing, positioning leveling and erection of the drilling reg, complete in all respects.
3Lab TestsConducting the relevant labtest, as per the applicable IS sand project requirements, on the soil and rock samples collected during the field investigation, including sample preparation, testing, calculations and reporting of test results preparation and submission of comprehensive geotechnical investigation report containing complete records of the field investigations, boreholes, locks, SPT results, soil and rocks samples details, lab test report relevant calculations, analysis interpretation of subsurface conditions, conclusions and Geotechnical recommendations, duly completed and presented in a clear and systematic manner complete in all respects.
4EarthworkWorking out of earthwork calculation cutting, filling, with approved earth in the proposed 20.85 Acres site to achieve the required formation levels as directed by Engr-in-charge, data obtain from existing topographical sheet, level sheet and & contour map including all leads, lifts, labor, machinery and incidental works complete in all respects as directed.
5Vetting of Geotechnical Investigation ReportVetting of the geotechnical investigations report and earth work calculation by an authorized and competent institution agency, such as IIT, NIT and Andhra University including review of the field investigation data boreholes logs, SPT results, laboratory test results, geotechnical analysis interpretation, conclusions and recommendation and incorporation of observations/comments, if any, lairing from the vetting process complete in all respects
6Drilling of NX diameterDrilling of NX diameter boreholes through soil by rotary drilling method, including conducting standard penetration test SPT at 1.5meter intervals and collection of disturbed soil samples DS, continuing until any one of the fwg termination criteria is met whichever occurs first, SPTN value less than 100 is obtained at three consecutive depths, or 3 mrs of rock is encountered or a max depth of 8m in soils reached

AI Tender Summary

OUR REF NO 58473385
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 4.72 Lakhs
LAST DATE 20-11-2026
Authority
Authority Name Indian Army
Work Description Bids Are invited for Mobilization - Mobilization And Demobilization Of All Necessary Drilling Equipment, Machinery, Tools, Materials, Manpower And Personnel To And From The Project Site, Including Transportation, Loading, Unloading, Shifting And Removal Of The Drilling And Associated Equipment Complete In All Respects (Bore Hole Location As Per Site Plan Attached In Ps) , Jungle Clearance - Jungle Clearance And Preparation Of Approach Or Access To Each Borehole Location Including Removal Of Minor Vegetation And Site Obstructionism Preparation Of A Suitable Working Platform As Required, Shifting Of The Drilling Rig To The Designate Borehole Locations And Fixing, Positioning Leveling And Erection Of The Drilling Reg, Complete In All Respects. , Lab Tests - Conducting The Relevant Labtest, As Per The Applicable Is Sand Project Requirements, On The Soil And Rock Samples Collected During The Field Investigation, Including Sample Preparation, Testing, Calculations And Reporting Of Test Results Preparation And Submission Of Comprehensive Geotechnical Investigation Report Containing Complete Records Of The Field Investigations, Boreholes, Locks, Spt Results, Soil And Rocks Samples Details, Lab Test Report Relevant Calculations, Analysis Interpretation Of Subsurface Conditions, Conclusions And Geotechnical Recommendations, Duly Completed And Presented In A Clear And Systematic Manner Complete In All Respects. , Earthwork - Working Out Of Earthwork Calculation Cutting, Filling, With Approved Earth In The Proposed 20.85 Acres Site To Achieve The Required Formation Levels As Directed By Engr-In-Charge, Data Obtain From Existing Topographical Sheet, Level Sheet And & Contour Map Including All Leads, Lifts, Labor, Machinery And Incidental Works Complete In All Respects As Directed. , Vetting Of Geotechnical Investigation Report - Vetting Of The Geotechnical Investigations Report And Earth Work Calculation By An Authorized And Competent Institution Agency, Such As Iit, Nit And Andhra University Including Review Of The Field Investigation Data Boreholes Logs, Spt Results, Laboratory Test Results, Geotechnical Analysis Interpretation, Conclusions And Recommendation And Incorporation Of Observations/Comments, If Any, Lairing From The Vetting Process Complete In All Respects , Drilling Of Nx Diameter - Drilling Of Nx Diameter Boreholes Through Soil By Rotary Drilling Method, Including Conducting Standard Penetration Test Spt At 1.5Meter Intervals And Collection Of Disturbed Soil Samples Ds, Continuing Until Any One Of The Fwg Termination Criteria Is Met Whichever Occurs First, Sptn Value Less Than 100 Is Obtained At Three Consecutive Depths, Or 3 Mrs Of Rock Is Encountered Or A Max Depth Of 8M In Soils Reached
Basic Detail
Tender No GEM/2026/B/8260111
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 10 Nov 2026
Submission Date 20 Nov 2026
Open Date 21 Nov 2026
Finance
Tender Value 4.72 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
e738025c-5f67-4ee6-8969-1120dc179235.pdf
86tender8555merged_2026-11-10-15-23-35_79274ecbbc99e0a57b67c92e90e0b2a8.pdf
10149851_Boq_1.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Nov 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
pdf

e738025c-5f67-4ee6-8969-1120dc179235.pdf

pdf

86tender8555merged_2026-11-10-15-23-35_79274ecbbc99e0a57b67c92e90e0b2a8.pdf

xlsx

10149851_Boq_1.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender