Water Resources and Irrigation Government Departments Closing in 14 days TDR #58472212

Tender For Construction Of Bhrigu Bund Fis Under Sopd-G For The Year 2026-27 Under Tamulpur Division (Irrigation) (Package No. 7)

Issued by Government Departments · Baksa, Assam
Tender Value
16.19 Crore
Estimated cost
Bid Submission
03 Dec 2026
14 days left
EMD
32.39 Lakhs
Bank guarantee accepted
Document Fee
20000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Baksa → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of Bhrigu Bund Fis Under Sopd-G For The Year 2026-27 Under Tamulpur Division (Irrigation) (Package No. 7)

BOQ

Name of Work:- Construction of Bhrigu Bund FIS under SOPD-G for the year 2026-27 under Tamulpur Division (Irrigation) (Package no. 7)
Sl. No. Item Description
1Construction of Head workConstruction of Cross Regulator
2Earthwork in excavation in foundation of canal structures in all types of soils asper design and drawing including dressing the foundation, shoring etc. removingthe surplus spoils by head load to safe distance from the working place anddepositing the required spoils in uniform layers, dressing, watering, breakingclods to not more than 10 mm cube with compensation, completeas directed atsite. (Including bailing out stagnant rain water where necessary). (A) In all types of soils (except soil mixed with gravel and boulders)
3CC work in proportion 1:4:8 in foundation/ abutment/piers/ wing walls etc. with hard river shingles of size 13mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
4RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
5Centering and shuttering including propping etc where necessary and removalof forms after completion of CC and RCC works, complete as directed.(Measurement to be taken on the face area timbered)
6Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
712 mm cement plastering including clearing surface and curing, complete as directed.
8Supplying 1 1/2\\" dia GI pipe for hand railing including fitting & fixing the same inposition etc, complete as directed
9Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mm for shutter frame, Horizontal girders and vertical stiffeners , fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 12 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , ‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed.
10Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement for Regulator gate with manually operated Spur/Worm Gearbox made of Aluminium Bronze/ Grey Cast Iron of size 200mm or above with reduction ratio 10(minimum)at 50 RPM and vertical lifting speed upto 0.50 Mtr per minute capable to lift 3.0 Ton suitable for Screw Shaft hoisting including supply of M.S. Screw shaft of 40 mm/ 50mmdiacomplete with operating wheel made, securely fixed with tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
11Earthwork in back filling of structures, obtained from outside borrow pits fillingin 15 cm layers, ramming, dressing, watering, including paying compensation ofland if any (with lead up to 30 M and lift 1.5 M).
12Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, completed as directed.
13Carriage of boulders, gravels, metal screening, stacking in measurable stacks atsite, complete as directed. (A) For Normal road up to 25.00 KM (ii) With contractor profit & GST
14Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper site and slope, pitching etc.with locall carriage of boulders from a distance of 60 m with lift upto 3 m , complete as directed.
15Construction of Head Regulator
16Earthwork in excavation in foundation of canal structures in all types of soils asper design and drawing including dressing the foundation, shoring etc. removingthe surplus spoils by head load to safe distance from the working place anddepositing the required spoils in uniform layers, dressing, watering, breakingclods to not more than 10 mm cube with compensation, completeas directed atsite. (Including bailing out stagnant rain water where necessary). (A) In all types of soils (except soil mixed with gravel and boulders)
17CC work in proportion 1:4:8 in foundation/ abutment/piers/ wing walls etc. with hard river shingles of size 13mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
18CC work in proportion 1:3:6 in foundation / abutment/piers / wing walls etc. with hard broken stone aggregate of size 13mm to 38 mm including curing with dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
19RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
20Centering and shuttering including propping etc where necessary and removalof forms after completion of CC and RCC works, complete as directed.(Measurement to be taken on the face area timbered)(i)With 19 mm plyboard
2112 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
22Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement for Regulator gate manually operated including M.S. Screw shaft of 40 mm/ 50mmdia along with C.I. Boss of size 150 mm x 200 mm , thrust bearing of 45 mm/55 mm (ID) ,operating wheel made of GI Pipes of 25 mm dia , securely fixed with lock plate & tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
23Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mm for shutter frame, Horizontal girders and vertical stiffeners , fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 12 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , ‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed.
24Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
25Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation ofland if any (with lead up to 30 M and lift 1.5 M).
26Construction of Abutment wall
27Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary).All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
28Supplying, fitting, fixing & laying M.S./ Tor Steel of all sizes in position as per design and drawing as required including cutting, cranking & making hooks with necessary lappages & tying with wire (black) complete as directed including cost of all materials.
29RCC work in slab, abutment cap and above abutment,pier cap, pedestal, dirt wall etc. in proportion 1:2:4 withhard river shingles of size 6 mm to 20 mm with properreinforcement as per design including necessary curingetc. with necessary timber shuttering, scaffolding etc.where necessary, complete as directed. (Shuttering,scaffolding cost will be paid separately).
30Centering and shuttering including propping, nailing,bolting with earth oiling inside face etc and removal offorms after completion of CC and RCC works etc,complete as directed. measurement to be taken on theface area timbered).(Abutment / Return Wall / Piers / Pedestal etc.) (i) With 19 mm thick plyboard
31CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13mm to 38 mm including curing with necessary timbershuttering, scaffolding etc. where necessary, completeas directed. (Shuttering, scaffolding cost will be paid separately). i) Without shuttering - with dewatering
32Supplying and mixing Rapidite with C.C./ R.C.C. work under sub- surface level complete.
33Earth work in back filling of structure with earth obtained from out side borrow pits & filling in 15 cm. layers, ramming, dressing & competition and watering including paying compensation of land if any (with lead up to 3M and lift 1.50M).Backside of retaining wall
34Construction of Closing bund
35Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
36Construction of whole bamboo single pallasiding with matured bhaluka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 M to 1.8 M above ground and 1 M to 1.2 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied with galvanized wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies, complete as directed
37Supply and laying of cement bags filled with sand/ earth (as locally available) including stitching the mouth, laying, fixing in position as directed complete with supply of bags, sutlies etc, all complete as directed.
38Construction of Afflux bundh
39Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
40Construction of 1.00 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder
41Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed.
42Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.(A) For Normal Road upto 25.00 KM. (ii) With Contractor's Profit & GST
43Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed
44Construction of Guide bundh
45Cutting jungles and trees upto 50 cm girth including uprooting roots and stumps and removing them from site of work etc. complete as directed. (Medium jungles)
46Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any, loading, unloading spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 cm cubes ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed. (12.5% shrinkage allowance to be considered).
47Collection & supply of one man size hard Boulder of size 23 cm. to 30 cm including loading, unloading, stacking in measurable stacks at site not more than 1 m height including paying forest royalty sales tax etc. including local carriage to work site (Distance from Quarry to work site = 57 k.m.)
48Construction of boulder sausage work of size 1.00m x 1.00m including supplying of all materials with 23cm to 30cm size boulders collecting from a lead of 50Km encased in 15cmx15cm mesh of 8G/10G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18cm in size tied with 10G/18G galvanised tying wire at 30cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 no. of whole jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50m apart driven at least 0.60m below ground and tying with sausage etc, all complete as directed.
49Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. with local carriage of Boulders from a distance of 50M with lift up to 3 M complete as directed.
50Construction of RCC canal
51Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto1.50 M, complete as directed.
52Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (A) In ordinary Soil
53Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
54Carriage of boulders, gravels, metal screening, stackingin measurable stacks at site, complete as directed. A) For Normal Road upto 25.00 KM ii) With Contractor's Profit & GST
55Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc.including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
56C. C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
57R.C.C work in slab, abutment cap and above abutment,pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
58Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
59Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). i) With 19 mm thick plyboard
60Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming,dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
61Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed. A) With ordinary Soil
62Construction of approach road
63Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.A) Ordinary soil
64Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m including payment of forest royality etc.
65Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30.00 M and lift 1.50 M. Complete as directed.
66Construction of cattle crossing slab (21 Nos.)
67Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). i) For normal lead of 30 M and lift of 1.50 M
68C. C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
69R.C.C work in slab, abutment cap and above abutment,pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
70Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
71Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). i) With 19 mm thick plyboard
72Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
73Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For Normal Road upto 25.00 KM, (ii) With Contractor's Profit & GST
74Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
75Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed. A) With ordinary Soil
76Construction of PVC Outlet (61 Nos.)
77Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). i) For normal lead of 30 M and lift of 1.50 M
78C. C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
79C.C work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
80Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). i) With 19 mm thick plyboard
81Supplying, fitting, fixing PVC pipes (IS12818,6kg/cm2 ), joining pipeswith relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately).
82Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M). Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58472212
AUTHORITY Government Departments
TENDER VALUE 16.19 Crore
LAST DATE 03-12-2026
Authority
Authority Name Irrigation Department
Work Description Tender for Construction Of Bhrigu Bund Fis Under Sopd-G For The Year 2026-27 Under Tamulpur Division (Irrigation) (Package No. 7)
Basic Detail
Tender No 04 (SOPD-G) 2026-27 Date_ 02_11_2026
Bidding Type Tender
Location
City Baksa
State Assam
Key Dates
Publish Date 10 Nov 2026
Submission Date 03 Dec 2026
Open Date 03 Dec 2026
Finance
Tender Value 16.19 Crore
Tender Fee 20000
EMD 32.39 Lakhs
Exemption Available
Document List
a181a3ac-ee71-465d-97e1-5d5e0d4e5c75.html
bid7.pdf
BOQ_86011.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Dec 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
html

a181a3ac-ee71-465d-97e1-5d5e0d4e5c75.html

pdf

bid7.pdf

xls

BOQ_86011.xls

pdf

Tendernotice_1.pdf