Tender For Construction Of Multi Storey Market Building At Dihangi, (Phase-I) Under Pradhan Mantri Khanij Kshetra Kalyan Yojana (Pmkkky) For The Year 2025-26.
Tender Value
81.57 Lakhs
Estimated cost
Bid Submission
01 Dec 2026
12 days left
EMD
1.63 Lakhs
Bank guarantee accepted
Document Fee
1630
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dima Hasao → Assam
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Multi Storey Market Building At Dihangi, (Phase-I) Under Pradhan Mantri Khanij Kshetra Kalyan Yojana (Pmkkky) For The Year 2025-26.
BOQ
| Sl. No. | Item Description |
| 1 | SURFACE DRESSING AND JUNGLE CLEANINGClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. All kinds of soil |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 3 | Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. All kinds of soil. |
| 4 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. |
| 5 | Diluting and injecting chemical emulsion for PRE-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration. |
| 6 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil |
| 7 | DEMOLITION WORKDemolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 8 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 9 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar |
| 10 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): In cement mortar |
| 11 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : Of sectional area 40 square centimetres and above |
| 12 | EXCAVATION WORKSEarth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil |
| 13 | BRICK SOILINGDry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with local sand, with common burnt clay non modular bricks. |
| 14 | BACKFILLINGFilling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing anddirection of Engineer -in - charge. |
| 15 | PLINTH FILLINGSupplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 16 | PCC & RCCPCC Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 17 | R.C.CProviding and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 18 | REINFORCEMENTSteel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 19 | CENTERING & SHUTTERING WORKSCentering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, walls,Posts and Struts |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers |
| 22 | BRICKWORKBrickwork with common burnt clay F.P.S (non modular) brick of class designation 10 in foundation and plinth in : Cement mortar 1:4 (1 cement :4 coarse sand) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysDec 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender