Tender For repair renovation Damages On 72.00 Mtrs Span Bridge Over Sun Khad On Baroti Rakhera Kamlah Gallo Road ( Sh :- Providing And Laying Wet Mix Macadam, 50 Mmthick Bitumen Macadam , 30 Mm Thick Bitumenious Concrete And V-Shape Drain In Km 0/00
Tender Overview
Project Description
Tender for repair renovation Damages On 72.00 Mtrs Span Bridge Over Sun Khad On Baroti Rakhera Kamlah Gallo Road ( Sh :- Providing And Laying Wet Mix Macadam, 50 Mmthick Bitumen Macadam , 30 Mm Thick Bitumenious Concrete And V-Shape Drain In Km 0/00 To 0/570 On Kandapattan Side Approach Road) Pdna 25
BOQ
| Sl. No. | Item Description |
| 1 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 kN ( eighty into hundred Killo neweton )weight to achieve the desired density including lighting, barricading and maintenance of diversion, etcetra as per Tables 400.11 and 400.12 and MORD Technical Specification 2014Clause 406 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 2 | Providing and applying evenly of priming coat with bitumen Emulsion (SS-1) made of HPCL/ BPCL on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 to 1.00kg/sqm (Zero point seven zero to one point zero kilogram per square metre ) using mechanical means as per MORD Technical Specification 2014 Clause 502 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 3 | Providing and applying evenly of tack coat with bitumen emulsion (RS-1) made of HPCL/ BPCL using emulsion distributor at the rate of 0.25 Kg to 0.30 Kg per sqm (Zero point two five to zero point three zero kilogram per square metre )on prepared granular surface treated with primer and cleaned with hydraulic broom as per MORD technical specification 2014 clause 503 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 4 | Providing and laying 50 mm( Fifty Millimetre) thick bituminous macadam using Bitumen VG-30 (Thirty) with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder 3.3% (three point three percent) transported to site upto all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 5 | Providing and laying 30 mm (thirty millimetre) thick bituminious concrete with 100-120 (one hundred dash to one hundred twenty ) tonne per hour batch type hot mix plant producing an average output of 75 tonnes(seventy five tonnes) per hour using crushed aggregates of specified grading premixed with bituminious binder and fillar specified material VG-30(thirty)at the rate minimum 5.5% ( five point five per cent) of mix prepared with addition of silance nenotechlogy (Zycotham) at the rate of 2% (two percent) job mix formula by weight of bitumen mixed as per the , transporting the hot mix material to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the desired compaction as per MORD spoecification clause 507 complete in all respect including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 6 | Construction of un-reinforced and construction joint only, plain cement concrete pavement in 1:1.5:3 (one cement : one and half sand : three graded stone aggregate 20 mm ( Twenty millimetre)nominal size), thickness as per design, over a prepared sub base, with 43 ( Forty three) grade cement or any other type as per Clause 1501.2.2 to be ensure minimum strength of 25N/mn2 and minimum cement not less then 400 kg/ cum( Four hundred kilogramme per cubic metre) ( with plasticizer) , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,( Twenty five millimetre) mixed in a concrete mixer of not less than 0.2 cum ( Zero point two cubic metre) capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, , wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound ( where specified ) and wa ter finishing to lines and grade as per drawing and Technical specification clause 1501 including hauling of material within all leads and lifts and other incidental charges and as per direction of Engineer-In-Charge. The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax , GST or other taxes imposed by the Government. |
| 7 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and technical specification clause 305.1 and as per direction of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm (One hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 8 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in drains and open foundation for all type of structures complete of plain cement concrete nominal mix 1:3:6 (One cement : three sand : six graded crushed stone aggregate 40 (forty) millimetres ) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and MORD technical specification2014 clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender