Housing Urban and Rular Development Local Bodies Closing in 1 days TDR #58469466

Tender For maintenance of Boundary Wall In Dda Vacant Land Under Na-Ii.Sub Head : Hiring Of Equipment, Manpower And Transport Etc. For Demolition Programme In Narela Zone.

Issued by Local Bodies · Delhi, Delhi
Tender Value
71.22 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
1 days left
EMD
1.42 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for maintenance of Boundary Wall In Dda Vacant Land Under Na-Ii.Sub Head : Hiring Of Equipment, Manpower And Transport Etc. For Demolition Programme In Narela Zone.

BOQ

Name of Work:- M/O boundary wall in DDA vacant land under NA-II.Sub Head : Hiring of equipment, manpower and transport etc. for demolition programme in Narela Zone.
Sl. No. Item Description
1Hiring and running of tractor with trolley complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Tractor should be make of Mahindra or Swaraj or Sonalika with minimum 45HP capacity or equivalent to this.
2Hiring and running of tractor with trolley complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Tractor should be make of Mahindra or Swaraj or Sonalika with minimum 45HP capacity or equivalent to this..
3Hiring and running of 6T Diesel Truck to site capacity or equivalent complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: 6T Diesel truck should be make of Tata or Ashok Leyland or BharatBenz with 6Ton payload capacity or equivalent to this.
4Hiring and running of 6T Diesel Truck to site capacity or equivalent complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: 6T Diesel truck should be make of Tata or Ashok Leyland or BharatBenzwith 6Ton payload capacity or equivalent to this.
5Hiring and running of Hydraulic excavator (30T) with operator and fuel complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Hydraulic excavator should be make of JCB or Tata Hitachi or Komatsu having 30 Ton operating weight or equivalent to this.
6Hiring and running of Hydraulic excavator (30T) with operator and fuel complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Hydraulic excavator should be make of JCB or Tata Hitachi or Komatsu having 30 Ton operating weight or equivalent to this.
7Hiring and running of Hydraulic cutter/Hammer with air compressor and operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Hydraulic cutter/hammer should be make of Epiroc or Atlas Copco or Furukawa having following specifications -1. Hydraulic Breaker/Hammer: Heavy-duty hydraulic breaker suitable for demolition of RCC/PCC, masonry and other structural elements.2. Operating Weight of Breaker: Minimum 500 kg.3. Carrier/Excavator Compatibility: Suitable for hydraulic excavator of approximately 20–30 tonne operating weight.4. Impact Energy: Minimum 1,000 Joules per blow or equivalent manufacturer-rated performance.5. Operating Pressure: Suitable for the hydraulic system of the carrier, generally 150–200 bar or as recommended by the manufacturer.6. Hydraulic Flow: Approximately 80–150 LPM, or as required for proper operation of the proposed breaker and carrier.
8Hiring and running of Hydraulic cutter/Hammer with air compressor and operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Hydraulic cutter/hammer should be make of Epiroc or Atlas Copco or Furukawa having following specifications -1. Hydraulic Breaker/Hammer: Heavy-duty hydraulic breaker suitable for demolition of RCC/PCC, masonry and other structural elements.2. Operating Weight of Breaker: Minimum 500 kg.3. Carrier/Excavator Compatibility: Suitable for hydraulic excavator of approximately 20–30 tonne operating weight.4. Impact Energy: Minimum 1,000 Joules per blow or equivalent manufacturer-rated performance.5. Operating Pressure: Suitable for the hydraulic system of the carrier, generally 150–200 bar or as recommended by the manufacturer.6. Hydraulic Flow: Approximately 80–150 LPM, or as required for proper operation of the proposed breaker and carrier.
9Hiring and running of Gas cutter/Hammer with air compressor and operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Gas cutter/hammer should be make of Esab or Messer or Hypertherm having Industrial oxy- fuel cutting set, complete with oxygen/fuel gas cylinders, regulators, hoses and cutting torch.
10Hiring and running of Gas cutter/Hammer with air compressor and operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Gas cutter/hammer should be make of Esab or Messer or Hypertherm having Industrial oxy- fuel cutting set, complete with oxygen/fuel gas cylinders, regulators, hoses and cutting torch..
11Hiring and running of crane with operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note:crane should be make of ACE or SANY or Escorts Kubota with minimum 10 Ton lifting capacity or equivalent to this.
12Hiring and running of crane with operator complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note:crane should be make of ACE or SANY or Escorts Kubota with minimum 10 Ton lifting capacity or equivalent to this.
13Hiring of Cameraman for Photography & Videography and making 3 nos. of CD/USB & 20 nos. of Photograph ( soft copy) of Demolition programme as per direction of Engineer-in-Charge.
14Providing and deploying manpower in demolition programme in Narela Zone as per direction of Engineer-in-Charge: Labour/Coolie without hammer.
15Providing and deploying manpower in demolition programme in Narela Zone as per direction of Engineer-in-Charge: Labour/Coolie with hammer.
16Hiring and running of mobile crane with operator and fuel complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Mobile crane should be make of ACE or Liebherr or Tadano with minimum 20 to 25 Ton lifting capacity or equivalent to this.
17Hiring and running of mobile crane with operator and fuel complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Mobile crane should be make of ACE or Liebherr or Tadano with minimum 20 to 25 Ton lifting capacity or equivalent to this.
18Hiring and running of Loader or equivalent complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme carried out successfully.Note: Loader should be make of JCB or Caterpillar or Komatsu having minimum 2.0 cum bucket capacity or equivalent to this .
19Hiring and running of Loader or equivalent complete in all respect to DDA and its deployment as per direction of Engineer-in-Charge for demolition programmes in Narela Zone. When demolition programme failed/could not be carried out due to any reason at site.Note: Loader should be make of JCB or Caterpillar or Komatsu having minimum 2.0 cum bucket capacity or equivalent to this.
20Total ₹ 73,20,020.00
21C.F. @ 0.973 =₹ 71,22,379.00
22Special Conditions:1 That the agency shall supply, on demand, equipment for demolition programmes as well as manpower for carrying out demolitions, at the quoted/ awarded rates, which have been described in schedule of rates here to.2 The Engineer-in-charge shall be the competent authority to take a decision for forfeiting the security deposit or any part thereof, because of non-compliance of any instructions/orders issued by him.3 That the agency shall, simultaneously after signing of the agreement, submit a certificate along with agreement with equipment supplier if any to the Engineer-in-charge That all demolitions items, equipments as well as manpower whenever required for the demolitions shall be kept readily available at shortest time gap and the contractor shall be informed about the demolition programme either through letter, telephonically, Whatsapp, E-mail or by any other means.4 It is specifically agreed That in case of any failure/ non-compliance on the part of the agency, in respect of the supply of any equipments, manpower, the Engineer-in-charge shall be entitled to arrange requisite demolition equipments, and manpower at the risk and cost of the agency. It is further specifically agreed That any loss or damages suffered by the authority because of any non-fulfilment of the agencies obligations under the agreement or violations of the terms and conditions of the agreement by the agency shall be recovered from the agency.5 That while making payments, the authority shall abide by all the fiscal legislation including deduction of tax at source as applicable, as per prevalent government orders.6 That the agency shall carry the demolition items, equipments, instruments and manpower required for carrying out the same to the site of demolition at its own expenses. Nothing extra shall be payable by the authority to the agency in this behalf.7 That the labour/ manpower employed by the agency shall always be employees of the agency and under no circumstances the authority shall have to do anything with the labour/ manpower. Any injury caused to the manpower, or damage to the demolitions items/ equipments/ instruments shall be the sole and exclusive responsibility of the agency8 That the agency is required to carry out an insurance of all its demolition items/equipments and instruments which shall cover the third party claim also. Further the agency is required to get itself insurance protection in respect of any injury to the labour/manpower employed by the agency for the purpose of carrying out any requisite demolition. It is specifically agreed That any claim on the insurance company in respect of any damage to the demolition items/ equipments/ instruments or claim in respect of any injury to the labour employed, shall be borne by the agency exclusively and the authority shall have no concern with the same. The demolition equipment wherever required to be operated manually, shall be operated by persons employed by the agency and the authority shall have no concern in respect of the terms or incidents of employment of such persons.9 Recovery at double the agreement /accepted rate or market rate whichever is more per machinery/per day shall be made if agency fails to provide requisite machinery tools & manpower on the day of demolition programme.10 In case any equipment or machinery becomes unserviceable, during the execution of demolition programme, the rates/ reduced rates be paid to the agency as per the recommendations of the Engineer-in-charge.. 11 Executive Engineer ensure That all the dismantled material received during the course of demolition at site will be the property of DDA and same shall be kept in record & will be auctioned in open market to bear the cost of demolition.13 The contractor shall provide personnel safety equipment to all the manpower engaged on work.14 Agency will carry out photography & videography of all demolition carried out. In absence of videography & photography, no payment will be made to agency.15 Agency may be asked to carryout up to three programmes in a day depending on job requirements as decided by Engineer-in-charge. In case of failure to supply equipment and manpower etc., punitive action shall be taken under relevant terms and conditions described above. 16GPS photographs of T & P deployment to be uploaded on E- Mb Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58469466
AUTHORITY Local Bodies
TENDER VALUE 71.22 Lakhs
LAST DATE 16-11-2026
Authority
Authority Name Delhi Development Authority
Work Description Tender for maintenance of Boundary Wall In Dda Vacant Land Under Na-Ii.Sub Head : Hiring Of Equipment, Manpower And Transport Etc. For Demolition Programme In Narela Zone.
Basic Detail
Tender No 40/EE/NPD-4/DDA/2026-27
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 09 Nov 2026
Submission Date 16 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value 71.22 Lakhs
Tender Fee Ref. Documents
EMD 1.42 Lakhs
Exemption Not Available
Document List
a0303f77-75aa-4c81-9b06-6a15bf1322e3.html
BOQ_981201.xls
NIT.pdf
NIT40.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

a0303f77-75aa-4c81-9b06-6a15bf1322e3.html

xls

BOQ_981201.xls

pdf

NIT.pdf

pdf

NIT40.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender