Tender For Works Contract For Ht/Lt/Line And Other Allied Extension Works In Rural Gobi Subdivision Of Gobi Division
Tender Value
25 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
8 days left
EMD
25000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Erode → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Works Contract For Ht/Lt/Line And Other Allied Extension Works In Rural Gobi Subdivision Of Gobi Division
BOQ
| Sl. No. | Item Description |
| 1 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual |
| 2 | Excavation of Stay pit 4.5' to 5' by using JCB or manual |
| 3 | Excavation of pole pit size above 8 Mts PSC/RCC/RSJ Pole by using JCB or manual |
| 4 | Erection of RCC poles/PSC Poles /metal poles upto 27'(8.0m) pole by using JCB or manual |
| 5 | Erection of RCC poles/PSC Poles/metal poles above 8 mtrs pole by using JCB or manual |
| 6 | Erection of RSJ ,Rail and fabricated poles above 9.0m pole by using JCB or manual |
| 7 | Erection of stay set complete |
| 8 | Fixing of HT \\"V\\" cross arms (all types)/Channel cross arms/Guarding Cross arms |
| 9 | Fixing of LT 3 phase cross arms |
| 10 | Fixing of LT Single phase ph X arm |
| 11 | Fixing of Tapping Xarm |
| 12 | Fixing of HT/LT TI fittings |
| 13 | Fixing of HT Pin insulator 11 KV |
| 14 | Fixing of HT 11KV strain Disc |
| 15 | Fixing of LT pin insulators |
| 16 | Fixing of LT shackle |
| 17 | Fixing of Aluminium Knob |
| 18 | Earthing of pole with pin including burying ,looping and binding |
| 19 | Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/4.09 mm |
| 20 | Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor |
| 21 | Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/2.59 mm or AAAC 7/2.50mm conductor |
| 22 | Sleeve concreting including materials (Cement + river sand/M sand and Blue metals and watering). |
| 23 | Erection of Double pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle including concreting and painting (Expect erection of Transformer) |
| 24 | Erection of Double poleTransformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle including concreting excluding painting (Expect erection of Transformer) |
| 25 | Dismantling of Double Pole Transformer Structure |
| 26 | Erection of Double Pole D.P structure with AB Switch,Top channel,Earthing,Providing stay including concreting and excluding painting |
| 27 | Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure including concreating and painting (Expect erection of Transformer) |
| 28 | Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure including concreating Excluding painting (Expect erection of Transformer) |
| 29 | Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms HT/LT |
| 30 | Transport of poles/Materials/ conductors /DT/Metering Set and other materials( excluding loading and unloading charges.) below 8 Kms (Plains) |
| 31 | Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for above 8 Kms for addl. Kms( Irrespective of weight in Tonage/KM |
| 32 | Loading of metal poles ( all sizes) |
| 33 | Unloading of metal poles ( all sizes) |
| 34 | Loading of poles up to 8 M and Above 8.0M RCC/PSC poles |
| 35 | UnLoading of poles up to 8 M and Above 8.0M RCC/PSC poles |
| 36 | Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 100 m |
| 37 | Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100 m |
| 38 | Loading or unloading of Transformer upto 100 KVA |
| 39 | Loading or unloading of Transformer above 100 KVA upto 250 KVA |
| 40 | Loading or unloading of Transformer above 250 KVA |
| 41 | Resagging of HT/LT line with ACSR 7/4.09mm |
| 42 | Re-sagging of HT / LT line with ACSR 7/3.35mm or AAAC 7 /3.15 mm conductor |
| 43 | Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7 /2.50 mm conductor |
| 44 | Erection of street light including fixture fitting |
| 45 | Erection of street light service |
| 46 | Agriculture service fixing/service |
| 47 | Releasing of single phase service wire and re-fixing. |
| 48 | Releasing of 3 phase service wire (upto 50 HP) and re-fixing. |
| 49 | Releasing of 3 phase service wire (above 50 HP) and re-fixing. |
| 50 | Releasing of grills from RCC poles |
| 51 | Erection of all capacities HT metering set |
| 52 | Erection of new transformer for all capacities . |
| 53 | Labour charges for alteration of Back clamps/Stay Clamp to suit for the works |
| 54 | Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.) |
| 55 | Cutting of coconut leaves /per tree |
| 56 | Cleaning of branches of tree per tree |
| 57 | Drilling of hole in channel only 3/4\\" & 1\\" per hole |
| 58 | Set right the leaning of poles |
| 59 | Engaging of JCB/Crane for first 1Hrs |
| 60 | Engaging of JCB/Crane for Every additional Hrs |
| 61 | Painting of metal poles including cross arm (excluding cost of paint) |
| 62 | Cutting of RSJ poles |
| 63 | T.I.Fitting welding with clamps |
| 64 | Cutting of flat |
| 65 | Cutting of channel |
| 66 | Cutting of Angle |
| 67 | Cutting of pipe |
| 68 | Dismantling of pole above 8.0 mtr |
| 69 | Dismandling of pole up to 8.0 mtr |
| 70 | Dismantling of 'V' X arm(all types),channel X arm,guarding X arm |
| 71 | Dismandling of LT 3 phase X arm |
| 72 | Dismantling of LT single phase X arm |
| 73 | Dismantling of HT/LT TI fitting |
| 74 | Dismantling of 11KV strain disc |
| 75 | Dismantling of 11 KV/22KV pin insulator |
| 76 | Dismantling of LT shackle |
| 77 | Dismantling of LT pin insulator |
| 78 | Dismantling of Aluminium knob |
| 79 | Dismantling of stay set |
| 80 | Dismantling of ACSR 7/3.35mm orAAAC 7/3.15 conductor |
| 81 | Dismantling of ACSR 7/2.59mm or 7/2.11mm conductor |
| 82 | Dismandling of street light service |
| 83 | Loading of materials |
| 84 | Unloading of materials |
| 85 | Leading and stacking of materials |
| 86 | Dismantling of including of Street light fittings |
| 87 | Provision of Earth pit collar |
| 88 | Providing LT bus bar arrangement in distn.Trs structure location |
| 89 | Painting of all clamps and other materials and painting of structure pole for double pole structure.(including cost of all materials ) |
| 90 | Painting of all clamps and other materials and painting of structure pole for single pole structure (including cost of all materials ) |
| 91 | Painting of all clamps and other materials and painting of structure pole for DP structure (including cost of all materials ) |
| 92 | Feeder arrangements with Open Type fuse Units per 1 Feeder |
| 93 | LT cable arrangements Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysNov 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.