Tender For Strengthening Of Road From Kanankadu Pachakali Amman Koil Salai Km 0/0 - 1/650 (R-328) In Rishivandiyam Block Of Kallakurichi District
Tender Value
95 Lakhs
Estimated cost
Bid Submission
24 Nov 2026
5 days left
EMD
95000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kallakurichi → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Strengthening Of Road From Kanankadu Pachakali Amman Koil Salai Km 0/0 - 1/650 (R-328) In Rishivandiyam Block Of Kallakurichi District
BOQ
| Sl. No. | Item Description |
| 1 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., |
| 2 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A |
| 3 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compactionKm 0/0 - 1/0 |
| 4 | Km 1/0 - 1/650 |
| 5 | Plant Mix Method : Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Km 1/430 - 1/650 |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 7 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 |
| 8 | Providing and laying Tack Coat over BM surface using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 |
| 9 | BITUMINOUS CONCRETE 25MM Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 10 | Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre,250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble strips =3 X 3.75 X 0.25 = 2.81 |
| 11 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface |
| 12 | Provision for Kilometer stone |
| 13 | Provision for Hectometer Stone |
| 14 | Provision for Circular Sign Board |
| 15 | Provision for Octagon Sign Board |
| 16 | Provision for Name Board and Citizen Board Charges |
| 17 | Cost for documentation of Photograpic Charges |
| 18 | 1.50m Span of RCC Slab Culvert @ Km 1/350Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL) |
| 19 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (ABOVE GROUND LEVEL) |
| 20 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
| 21 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 22 | Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 23 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 24 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum |
| 25 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum |
| 26 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum |
| 27 | Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications |
| 28 | Providing and fixing Tar Paper including labour etc complete. |
| 29 | Providing and fixing weepholes of 100 mm dia. PVC pipes of required lengths including cost and conveyance of all materials to work site, cost and labour etc complete |
| 30 | Retaining Wall @ Km 0/750(Left side)Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 31 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum |
| 32 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum |
| 33 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL) |
| 34 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (ABOVE GROUND LEVEL) |
| 35 | CC PavementSupplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL) |
| 36 | Construction of un-reinforeced, dowel jointed at expansion andconstruction joint only, plain cement concrete pavement,thickness as per design, over a prepared sub base, with 43grade cement or any other type as per clause 1501.2.2. M30(Grade), coarse and fine aggregaes conforming to IS:383,maximum size of coarse aggregate not exceeding 25mm, mixedin a concrete mixer of not less than 0.2cum capacity andappropriate weigh batcher using approved mix design, lain inapproved fixed side form work (steel channel, laying and fixing of25 micron thick polythene film, wedges, steel plates includinglevelling the formwork a sper drawing), spreading the concretewith sholves, rakes, compacted using needle, screed and platevibrators and finished in continous operation including includingprovsion of contraction and expansion, construction joints,applying debonding strips, primer, sealant, dowel bars, nearapproaches to bridge/culvert and construciton joints, admixturesas approved, curing of concrete slabs for 14-days, using curingcompound (where specified) and water finishing to lines andgrade as per drawing and technical Specification Clause 1501. |
| 37 | Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications |
| 38 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 39 | Basic cost of value put to tender as per estimate |
| 40 | Add GST at 18% |
| 41 | Total Value put to Tender |
| 42 | Quoted value |
| 43 | Final Quoted Value |
| 44 | Add GST at 18% of Final Quoted Value |
| 45 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 46 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.