Tender For Renovation And Interior Furnishing Work And Installation Of 8 Passenger Lift For Division Office Cuttack For The Year 2026-27_Building
Tender Value
53.06 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
3 days left
EMD
53062
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Renovation And Interior Furnishing Work And Installation Of 8 Passenger Lift For Division Office Cuttack For The Year 2026-27_Building
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling and removing cement concrete including stacking the useful materials for resue and removing the debris within 50 m lead etc. complete. |
| 2 | Dismantling and removing R.C.C columns, beams, slab, staircase, landing, lintels including stacking the useful materilas for reuse and removing the debrises within 50m lead etc. complete as per specification and direction of the Engineer-in-Charge.a). Chajja - Ground Floor |
| 3 | b). Chajja - First Floor |
| 4 | c). Chajja - Second Floor |
| 5 | Dismantlling and removing doors, windows and ventilators including removing the frames hinges fastening and stacking the same for reuse and refixing them after necessary repair etc. complete as per specification and direction of the Engineer-in-Charge.a). Ground Floor |
| 6 | b). First Floor |
| 7 | c). Second Floor |
| 8 | Dismentalling of brick or stone masonary in lime or cement mortar under 3mtr. Height including stacking the useful materilas for reuse and removing the debrises within 50m lead etc. complete as per specification and direction of the Engineer-in-Charge.a). Second Floor |
| 9 | b). Third Floor |
| 10 | Earth work in excavation of foundation in hard soil including dressing of sides and levelling the bed upto the required depth and depositing the excavated materials away from the work site within 50mm initial lead & 1.5m intitial lift including cost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge.a). Ground Floor |
| 11 | Supplying and filling in foundation trenches and plinth with sand, well watered and rammed in layers not exceeding 23cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.a). Ground Floor |
| 12 | Plain Cement concrete (1:3:6) in foundation and floors using 40 mm size clean hard broken granite metal of approved quality from approved quarry with cost convenyeance, cost of all labour, ramming, curing including hoisting and laying concrete in layer not exceeding 0.15 m depth etc. complete as directed by the Engineer-in-Charge. a). Ground Floor |
| 13 | Masonry work using Flyash Bricks of size 250mm X 125mm X 80mm having crushing strength not less than 75 kgs/ cm2 in cement mortar (1:4) in Foundation with portland slag cement (PSC) immersing the bricks for minimum 6 hours in water before use with necessary projections, splays, cutting, circular moulding, corbelling etc. including cost, conveyance, royalties, loading and unloading of all materials and all labour for scaffolding, watering and curing, sundries, T&P etc complete as per direction of the Engineer-in-charge as per approved specification.a). Ground Floor |
| 14 | R.C.C of design mix M-25 having minimum cube strength of 250Kg./sqcm. on 150mm. cube at 28 days with clean crusher broken hard granite chips of 20mm and downgraded size of approved quality from approved quarry using minimum quantity of cement as per clause 303.5 of IRC-21/2000 & IS-456/2000 including hoisting,lowering & laying concrete in layers not exceeding 15cm in thick to the required thickness & compacting each layer by means of vibrator as per direction of the Engineer-in-Charge including watering & curing for 28 days including water tight shutterng & finishing the exposed surface smooth, providing grooves & beads where necessary with working of pumps, dewatering if required & other T&P machineries as may be required for the work including cost, conveyance royality of all materials with all leads and lifts required for the work complete in all respect including cost of all labour but excluding cost, conveyance of MS/Tor Steel labour for straightening, cutting, bending, binding & tying the grills & placing in proper position as per specification & approved drawing(to be paid separately as required for R.C.C. works) .a). Column Footing |
| 15 | b).ColumnGround Floor |
| 16 | ColumnFirst Floor |
| 17 | ColumnSecond Floor |
| 18 | ColumnThird Floor |
| 19 | ColumnFourth Floor |
| 20 | c). Plinth BeamGround Floor |
| 21 | d). Roof BeamGround Floor |
| 22 | Roof BeamFirst Floor |
| 23 | Roof BeamSecond Floor |
| 24 | Roof BeamThird Floor |
| 25 | Roof BeamFourth Floor |
| 26 | e). Roof slabGround Floor |
| 27 | Roof slabFirst Floor |
| 28 | Roof slabSecond Floor |
| 29 | Roof slabThird Floor |
| 30 | Roof slabFourth Floor |
| 31 | f). Staircase Ground Floor |
| 32 | g). Lintel Ground Floor |
| 33 | Lintel First Floor |
| 34 | Lintel Second Floor |
| 35 | Lintel Third Floor |
| 36 | h).ChajjaSecond Floor |
| 37 | ChajjaThird Floor |
| 38 | Cutting, straightening coiled or bent up M.S. rods, HYSD steel or Tor Steel of grade Fe-500-D confirming to I.S.-1786 - 1985 welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading of M.S. rods, HYSD steel or Tor steel and binding wires of 18 to 20 gauge required for the work including cost of all materials, labour charges, sundries, T&P etc. and scaffolding complete in all respect as per specification and direction of the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod or HYSD steel or Tor steel & binding work consumed in the work) a). Ground Floor |
| 39 | b). First Floor |
| 40 | c) Second Floor |
| 41 | d). Third Floor |
| 42 | e). Fourth Floor |
| 43 | Masonry work using Flyash Bricks of size 250mm X 125mm X 80mm having crushing strength not less than 75 kgs/ cm2 in cement mortar (1:4) in Super Structure with portland slag cement (PSC) immersing the bricks for minimum 6 hours in water before use with necessary projections, splays, cutting, circular moulding, corbelling etc. including cost, conveyance, royalties, loading and unloading of all materials and all labour for scaffolding, watering and curing, sundries, T&P etc complete as per direction of the Engineer-in-charge as per approved specification. a). Ground Floor |
| 44 | b). First Floor |
| 45 | c). Second Floor |
| 46 | d). Third Floor |
| 47 | e). Fourth Floor |
| 48 | Providing 6mm thick cement plaster with cement mortar of mix (1:4) with portland slag cement (IS 455) to ceiling of roof slabs, stair, landings, chajja, shelf and lofts etc. including roughening chiseling, scraping and cleaning and finishing smooth as per direction of the Engineer-in-charge including cost of all materials, conveyance and royalties, scaffolding, watering and curing, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification.a). Ground Floor |
| 49 | b). First Floor |
| 50 | c). Second Floor |
| 51 | d). Third Floor |
| 52 | e). Fourth Floor |
| 53 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with approved grade cement and with screened and washed sharp sand for mortar and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge a). Ground Floor |
| 54 | b). First Floor |
| 55 | c). Second Floor |
| 56 | d). Third Floor |
| 57 | e). Fourth Floor |
| 58 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with approved grade cement and with screened and washed sharp sand for mortar and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing, rounding of corners etc. complete with cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge.a). Ground Floor |
| 59 | b). First Floor |
| 60 | c). Second Floor |
| 61 | d). Third Floor |
| 62 | e). Fourth Floor |
| 63 | Supplying, fitting & fixing of Granite Tiles of minimum Above 0.40 sqm. (20mm thick) of approved make in floors laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-chargea). Ground Floor |
| 64 | b). First Floor |
| 65 | c) Second Floor |
| 66 | d). Third Floor |
| 67 | Providing and fittings of Modified Clay Minerals MCM custom 1200 x 600 mm thickness 2.5 mm to 3 mm (PHOMI) make, as per company standard dimension, pattern, Colour as specified, manufactured through infired patented etc. complete as per direction by the Engineer-in-charge.a). Ground Floor |
| 68 | b). First Floor |
| 69 | c). Second Floor |
| 70 | d). Third Floor |
| 71 | Supplying, fitting & fixing of M.S.grills / M.S.shutters/ M.S angle choukath / M.S.Plate shutter / M.S.Grill gate in proper position including priming with red oxide primer making holes in walls or RCC structures and window grills with cost, conveyance of all materials, labour charges,T&P etc. required for the work complete as per the specification and direction of Engineer-in-charge.a). Second Floor |
| 72 | Priming one coat with water bound cement primer to the plastered surface walls in all floors and all heights including preparing the surface, watering and curing with cost, conveyance, royalties of all materials and cost of all labour, scaffolding, sundries and T&P. etc. required for the work etc. complete as directed by the Engineer in charge.a). Ground Floor |
| 73 | b). First Floor |
| 74 | c). Second Floor |
| 75 | d). Third Floor |
| 76 | e). Fourth Floor |
| 77 | Finishing surface of wall with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging charges with cost of all materials, labour,T&P etc complete as per direction of Engineer in charge.a). Ground Floor |
| 78 | b). First Floor |
| 79 | c). Second Floor |
| 80 | d). Third Floor |
| 81 | e). Fourth Floor |
| 82 | Painting over interior plastered surfaces with two coats of plastic emulsion paint of approved quality and shade using the required quantity of paint as specified by the manufacturer to give an even shade on new plastered wall surface primed with water bound wall cement primer and watering the surface before applying and curing for the required period as directed by the Engineer-in-charge including cost of all materials with transportation, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.a). Ground Floor |
| 83 | b). First Floor |
| 84 | c). Second Floor |
| 85 | d). Third Floor |
| 86 | e). Fourth Floor |
| 87 | Painting two coats with Synthetic Enamel paint over iron/wooden doors and windows, grills, Grill Gate etc. with sand papering, polishing the surface with cost, conveyance of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-charge.b). Second Floor |
| 88 | Painting over exterior plastered surfaces with two coats of synthetic weather coat paint of approved quality and shade using the required quantity of paint as specified by the manufacturer to give an even shade including providing a primer coat with water bound wall cement primer as directed by the Engineer-in-charge including cost of all materials and transportation, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification..a). Second Floor |
| 89 | b). Third Floor |
| 90 | c). Fourth Floor |
| 91 | Providing and Fixing Structural Glazing approved make to be febricated from roll formed sections made of prepainted steel (base steel as per IS-513 of 0.60 mm thick 'D' quality galvanized as per IS-277 with zinc of 120 gm per sqm) with primder of 5-75.7 microns thick and finished paint with po-lyster paint) (Black / Pearl white / Chocolate brown ) as 12-16 microns along with the alkydbacker at the back of 5-7 microns and thesizes of outer frmae being 46 x 52 mm with cost, conveyance of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-charge.a). Ground Floor |
| 92 | b). First Floor |
| 93 | c). Second Floor |
| 94 | d). Third Floor |
| 95 | Providing & fixing UPVC (FINESTA / NCL / VEKALTD etc three track three panell sliding window 60 series duly manufactured using UPVC reinforced profile of 108 mm x 45 mm x 2.5mm for outer frame and window sash 39 mm x 58 mm x 2.500 profile capable of mounting single glazing system including cost of all materials cost of all labour, conveyance, taxes loadig, unloading, T&P etc. complete as per direction by the Engineer-in-charge.a). Second Floor |
| 96 | E.I. WorkRecessed wiring to light point with 1.5 sq.mm FR PVC insulatedsingle core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5Amp, 250 V piano type modular switch ISI marked and ceiling rose ISI marked mounted on MS box having front Modular base & cover of suitable size , MS box with 1 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels /HPL/ V Guard )-do- Group B |
| 97 | -do- Group C |
| 98 | Recessed wiring to Fan Point in... -do- Group B |
| 99 | Recessed wiring to Exhaust Fan Point in-do- Group C |
| 100 | Swich BoardS/F of 5A. Modular Switch & 5A. Modular Socket outlet of ISI marked on existing board (Make of Switch & Socket: Anchor / Cona/ Greatwhite/ Havells/ HPL/ Preeti) |
| 101 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 5 pin 15/16 amp. piano type Modular switch & Socket, connection, painting etc as required (Make of Switch & Socket: Anchor / Cona/ Greatwhite/ Havells/ HPL/ Preeti) |
| 102 | S/F of 18 SWG Modular metal box of following sizes (Nominal size) in recess with suitable size of Modular base & cover in front including cutting the wall and making good the same in case of recessed conduit as required. 12 Modular box with base & cover |
| 103 | Sub-MainWiring for circuit / sub-main wiring along with earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20mm dia non metalic heavy duty flexible conduit 1.6mm in recessed PVC conduit as required (Make of wire: Finolex/ L&T / Anchor / Havels /HPL / V Guard/ KEI/ Greatwhite/ Polycab)2x2.5+1x1.5 (1.8.2) |
| 104 | 4x10+2x4(1:8:11) |
| 105 | Circuit BreakersS/F of 'C' series SP MCB of 6A -10 A amp rating (As per direction of engineer in charge) 440Volt for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 106 | S/F of 'C' series 4P MCB of 63A amp rating (As per direction of engineer in charge) 440Volt for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 107 | S/F of 8 Way SPN Double Door Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 108 | S/L of 25mm x 5mm Cu. earth strip in 40 mm dia G.I.Pipe(3.11) |
| 109 | Item No.4. EARTHING-Provision of maintenance free Chemical Earthing with 250 micron non corrosive copper bonded rod (CPRI Certified) of 2.4 mtr length and minimum 17.2 mm dia with provision of 25kg x 2=50kg back filling ground resistance improvement compound with ROHS certified including supply and installation of heavy duty envionmental friendly poly plastic earth pit chamber with cover as per I.E Rules .The earthing should be minimum 1.5 mtr. away from the building and the two earthings must be 10 feet apart from each other as per I.E Rules . |
| 110 | Supply, Installation, Testing & Commissioning of 1No. automatic 8 PASS-4STOP-SSH-MRL-1MPS (G+2) (3 Stop), including , speed 1m/s, Stainless Steel Hairline Finish with ARD system with inspection certificate from electrical inspector and as per Direction of Engineer-in-charge complete in all respects as per Technical Specification Attached. 1.Elevetor Grouping Simplex Full coollective Control2.Full collective Control3. Well Dimension 1750mm width and 1750mm depth (required)4. Head Room height 3800mm (required)5. Pit Height 1400mm (required)6. MAP Floor position Topmost floor (Top)7.Car dimensions 1100mm wide x 1300mm dep x 2300mm high8. Hoistway dimensions 1850 mm W x 1700mm D9. Door type Two panel centre opening plain panelFinishes:-Rear Mid Panel-Glass PanelRear Corner Panels-Glass PanelSide Mid Panels-Polka DeliteFront Panel-Polka DeliteFalse Ceiling Finish -Stainless stell Mirror FinishVentillation-Cross flow fanMachine-PM Geraless (Located in shaft on top of guide rails)Door opening-800 mm W x 2100 mm H (Make: OTIS / Kone /JOHNSON / Thyssenkrup). |
| 111 | Supply and fixing of 300mm double ball bearing with metal body Exhust fan Copper Winding having Air Deleivery 1600m3/min with all accessories and connections (Make:Usha-Aero Clean Plus DBB/Crompton- Trans Air 12 reversiable /Havells-Venti Air DS (HS)/Anchor- Anmol delux R/ Orient-Power Flow DBB/ Pollycab -Fresh on DBB )(Replacement warranty will be 2 years) |
| 112 | S/F of 18-25Watt L.E.D Tube light fitting with all accessories and connections ( Make- Crompton/ HPL/ Polycab/ Havells/Orient / Panasonic/ RR/K-lite ) |
| 113 | SITC of 1200mm Sweep A.C Ceiling fan (1 star) Copper Winding with Aluminium Blades having Air Deleivery 225m3/min with out fan regulator (Make:Usha-Striker neo HS/Crompton- HS/Havells-Samrat ES/Anchor- Turbo Speed Star/Orient-Summer Breeze Pro/ Great White - Aldous/ Pollycab - Vital HS ) including wiring,the down rod of standard length (up to 30cm) with 1.5 sq mm PVC insulated single core Multistrand copper conductor etc. as required as per direction of Engineer-in-Charge,(Replacement warranty will be 2 years) |
| 114 | S/F step type modular fan regulator |
| 115 | Supply & fixing of superior type Led bulk head fitting general domestic use ISI marked square / oval type including necessary connections. ( M-5 ) (Make: Havells/ Bajaj/Equivallent Make) |
| 116 | Provision of Armoured cable size 3 1/2 x 25sqmm (24) Make: Gloster/ KEI/ Finolex/ Anchor/ Havells/ V-Guard/ HPL/ L&T/ Greatwhite/ Pollycab) |
| 117 | Laying of MV cable upto 25sqmm on surface (5.5.1) |
| 118 | S/M of end termination of LV/MV cable size 3 1/2 x25 sqmm (5.8.20) |
| 119 | Supply & fixing of 63A TPN Panel board 1. 63A MCCB (Make : Legrand / Hager / Scheider / Seimens)-1No.2. TPN Busbar-1set with DC Gland for 25mmsq aluminium armoured cable and 3. 4Pole Spreaders link (63A-200A)4. Digital Volt meter & Ameter three phase 5. All accesories & Connection (Rating & Danger borad) |
| 120 | P.H. Work10 user septic tank Earthwork in all kinds of soil in excavation of foundation trenches within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc all complete as per direction of the E.I.C.Initial lift upto 1.5 mtr3.05 m x 1.95 m x 1.50 m |
| 121 | From 1.5 mtr to 3.0 mtr depth3.05 m x 1.95 m x 0.70 m |
| 122 | Supplying all materials, labour, T&P and filling in foundation and plinth with river sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per the direction of the E.I.C.3.05 m x 1.95 m x 0.15 m |
| 123 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 40mm H.G metal including watering, curing and conveyance of all materials to site payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.3.05 m x 1.95 m x 0.20 m = 0.594 Cum |
| 124 | Supplying all materials, labour, T&P and providing plain cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 125 | Supplying all materials,labour, T&P and providing Brick work with K.B.Brick having crushing strength not less than 75 Kg/CM2 with dimensional tolerence of +/- 8% in C.M including watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.In Foundation and Plinth in C:M (1:4) |
| 126 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.12 mm thick C.P in C:M (1:3) |
| 127 | Supplying all materials, labour, T&P and providing cement punning on plastered surface including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.Same as above item 20mm C.P in 1:3 |
| 128 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 129 | Supplying all materials, labour, T&P and providing M.S.reinforcements for RCC work including cutting, bending, binding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 130 | Supplying all materials, labour, T&P and providing Reinforced cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.2.50 m x 1.40 m x 0.10 m=0.35 cum |
| 131 | Supplying all materials, labour, T&P and making M.S. Step Iron in 20mm Dia M.S Steel bars and fixing into walls of Manhole/ Septic Tanks duly embeded in C.C(1:2:4) etc all complete as per P.H specification and direction of the E.I.C. |
| 132 | Supplying all materials, labour, T&P and providing 50mm thick pre-cast R.C.C. baffle wall in R.C.C(1:1.5:3) including reinforcement cage using 12mm size HG chips fitted and fixed in position, finished smooth etc. complete including cutting grooves and mending good the damages etc all complete as per P.H specification and direction of the E.I.C.1.15 m x 0.45 m |
| 133 | Supplying all materials, labour, T&P and providing 160mm dia P.V.C Tee inside the septic tank including cutting holes and duly embeded in P.C.C(1:1.5:3) using 12mm size HG chips fitted and fixed in position and mending good the damages etc all complete as per P.H specification and direction of the E.I.C. |
| 134 | Supplying all materials, labour,T&P and providing 12mm thick cement flush pointing in C:M (1:3) to Brick Masonry works including watering curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 135 | Supplying all materials, labour,T&P and filling Foundation and Plinth with excavated earth including watering, ramming etc all complete as per direction of the E.I.C. |
| 136 | Supplying all materials labour T&P and providing precast RCC manhole cover with cc (1:12:3) of 12mm hg chips including conveyance of all materials to site after payment of royalty and taxes etc. all complete as per PH specification and direction of EIC-(size 550mmx550mmx76mm) |
| 137 | Supplying all materials,labour,T&P and fixing the PVC door frames to be made up of PVC profiles of size 40x48mm,the vertical profiles to be joined with the horizontal ones,after inserting MS/Fibre 'L' angles of size 200x100mm and self tapping screws,One meter long reinforcement to be provided along the side of the frame where the door is to be hung,to be fixed to the wall with steel screws and PVC royal plugs etc. all complete as per specification and direction of the E.I.CDoor - Frame |
| 138 | Supplying all materials,labour,T&P and fixing the Factory made single leaf rigid PVC sand witch composite door shutter of 32mm thick laminated with two PVC screens with wood grain finish plastic door shutters to be made up of selected PVC profiles, the stiles and the rails to be made up of sections measuring 24x59mm the pannels to be provided of size 200x20mm, lockrail to be provided horizontally at the required place for strength and firmness,measuring approximately 24x100mm,all four corners to be provided with M.S/Fibre 'L' Angles of the size 200x100mm fitted with steel screws,the door to be hung to the frames with the help of 100mm SS. hinges and self tapping screws,etc. all complete as per specification and direction of the E.I.CDoor - Shutter |
| 139 | Supplying all materials labour T&P and fixing porcelain glazed tiles/Marble tiles /Kota /Kodappa tiles in walls / dados skirting on 12mm thick cp (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles including rub bins and polishing complete as per direction of EIC. Ground Floor Wall |
| 140 | Supplying all materials labour T&P and fixing Ceramic tiles in floors. Treads and landing on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigments to match the3 shades of the tiles including rub bins and dir of EIC. Ground Floor |
| 141 | Supplying all materials labour T&P and cutting holes through brick/stone masonry works including making good the damages in cm (1:4) for taking H.C.I/PVC pipes and fittings etc. all complete as per PH specification and direction of EIC.250mm thick wall |
| 142 | 375mm thick wall |
| 143 | Supplying all materials, labour, T&P and cutting holes through brick/stone masonary works including making good the damages in c.m. (1:4) for taking P.V.C. pipes & fittings etc. all complete as per P.H. specification and direction of E.I.C. |
| 144 | Supplying all materials, labour, T&P and cutting grooves in pucca floors and walls for taking G.I./P.V.C. pipes and making good the damages as per direction of the E.I.C. |
| 145 | Supplying all materials, labour, T&P and fixing water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan) duly embedded in cement concrete (1:4:8) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x30mm footrest etc all complete as per specification and direction of the E.I.C.(Neycer/ Parry ware/ Cerra) |
| 146 | Supplying all materials, labour T&P and fixing Wash Down Water Closet(Europeon type W.C. pan) with Integral S trap to the floor with wooden plug and C.P.screws including jointing the trap with soil pipe in C.M.(1:1) etc. all complete as per specification & direction of E.I.CE..W.C. with S trap plain(Neycer/ Parry ware/ Cerra) |
| 147 | Supplying all materials, labour, T&P fitting and fixing Plastic Seat and cover for E.W.C. with chromium plated brass hinges and rubber buffers all complete as perr specification and direction of E.I.C. (Neycer/ Parry ware/ Cerra) |
| 148 | Supplying all materials labour T&P and fitting & fixing UPVC SWR soil waste ventilating pipes and fittings of the following OD conforming to ISI No.13591/1992 to walls with nails bobbins and wooden plugs or laying in trenches including jointing with supply of approved rubber lubricant by non-heat application method as per manufacturers specification testing e. w. in excavation in all kinds of soil and refilling of trenches as per direction of EIC 110mm dia UPVC SWR Pipe with rain water piping (.Ashirvad / Supreem / Oriplast / Hariplast)110mm dia UPVC SWR Pipe |
| 149 | 110mm dia U-PVC S. Trap |
| 150 | 110mm dia U-PVC P. Trap |
| 151 | 110mm U-PVC S/J with Door |
| 152 | 110mm U-PVC door bend |
| 153 | 110mm dia U-PVC Plain bend |
| 154 | 110mm U-PVC Plain Tee |
| 155 | 110mm U-PVC Cowl |
| 156 | 125mm dia CP Grating |
| 157 | 75mm dia U-PVC SWR Pipe |
| 158 | 75mm dia U-PVC Plain Tee |
| 159 | 75mm U-PVC Door Bend |
| 160 | 75mm U-PVC Plain Bend |
| 161 | Supplying all materials labour T&P and fixing wash basins with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc .all compt. As per PH sp. And dir. Of EIC.550x400mm WHB-( Paryware/Nycer/ cerra ) |
| 162 | Supplying all materials labour T&P and fixing mirror of superior glass mounted on 6mm thick AC sheet or plywood sheet and fixed to wooden plugs with cp screws and washers compt. As per PH specification and direction of EIC.Rectangular Plastic Frame Mirror Good quality |
| 163 | Supplying all materials labour T&P and fixing standard size cp towel rail/ring compt. with cp brass brackets fixed to wooden plugs with cp screws as per PH specification and direction of EIC.CP Towel rail (20x600) heavy Stainless steel with Ambar make . |
| 164 | CP Towel ring heavy Stainless steel with mousoumi make . |
| 165 | Supplying all materials labour T&P and fixing standard size cp soap holder compt. With cp brass brackets fixed to wooden plugs with cp screws as per PH specification and direction of EIC Stainless steel with heavy good quality |
| 166 | Supplying all materials, labour T&P and fitting and fixing Acraylic shelf including polishing all complete as per P.H. specification and direction of EIC. 450mmx125mm size Plate Acraylic Shelf with heavy good quality |
| 167 | Supplying all materials labour T&P and fitting and fixing 10 ltr capacity low level flushing cistern with a pair of cast iron or m.s. brackets complete with fittings such as siphonic arrangements 15mm nominal size brass/pvc ball valve with polythene float, c.p. brass handle, unions and couplings for connection with inlet, outlet and overflow pipes, 32mm dia cp foush bend, 15mm dia pvc inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cistern and closet and connecting inlet pipe with supply main etc. all complete as per specification and direction of EIC. 10ltr Capacity Cistern ( Paryware/Nycer/ cerra ) |
| 168 | Supplying all materials labour T&P and constructing gully trap chamber of the following inside size with 8cm thick RCC precast cover slab in cc (1:1.5:3) using 12mm size hg chips foundation concre3te(1:3:6) using 40mm size hg metal on bed and around trap FLY ASH Brick work in cm (1:6) in F&P and inside 12mm thick cp (1:3) finished with a floating coat of neat cement including fixing 100mm size HCI gully trap and grating etc. all complete as per approved drawing specification and dir of EIC.Inside size 250mmx250mm gully trap |
| 169 | Supplying all materials, labour T&P and construction of Inspection chamber of the following sizes with c.c.(1:3:6) using 40mm size hg metal on bed, FLY ASH Brick work in cm(1:6) moulding and shaping the channel inside and benching with c.c. (1:1.5:3) with punning to inside cement flush pointing (1:3) to outside RCC cover slab in cc (1:1.5:3) using 12mm size hg chips with RCC m. h. cover, e. w. in excavation in all kinds if soil and refilling the cavity around the chamber including watering, curing, conveyance of all materials to site payment of royalty taxes etc. all complete as per approved specification and direction of EIC.Inside size : 760 x 760 x 460mm Inspection Chamber |
| 170 | Supplying all materials labour, T&P and constructing soak way pit of the following sizes with precast RCC rings joined loose gravel backing in the rear of well staining, precast RCC cover slab in c.c. (1:2:4) USING 2mm size hg chips fitted with iron lifting handles including e. w. in open well excavation in all kinds of soil and refilling the cavity around the pit and painting the iron works watering, curing, conveyance of all materials to work site payment of royalty, taxes etc. all complete as per approved drawing, specification and direction of EIC.0.91m dia x 2.10m deep |
| 171 | Supplying all materials labour T&P and construction soak way pit of the following sizes with dry brick walling from bottom upto invert of inlet pipe and FLY ASH Brick work in cm(1:6) for the remaining height at top 12mm thick cp (1:4) inside and outside over masonry brick work gravel packing the rear of well staining RCC cover slab in c.c. (1:1.5:3) using 12mm size hg chips fitted with iron lifting handles including e.w. in open well excavation in all kinds if soil and refilling the cavity around the pit and painting the iron works, watering, curing, conveyance of all materials to work site payment royalty, taxes etc. complete as per approved drawing specification and direction of EIC. 1.20m dia x 2.00m deep soak way pit |
| 172 | Supplying all labour materials T&P and laying of UPVC soil waste pipe of the fo0llowing internal diameter confirming to IS in trenches of the depth upto 1.2mtr including jointing with supply of approved rubber, lubricant by non heat application method on bending with 150mm thick cc (1:3:6) using hg metal of 25mm to 40mm and then making all-round encasing including earth work excavation in all kinds of soil, refilling the trenches watering, curing, conveyance of all materials to site payment of royalty, taxes etc. & testing all complete as per PH sp and dir of EIC.110mm dia with allround encasing |
| 173 | Supplying all materials, labour, T&P and providing and fixing to wall or ceiling and floor pvc pipes conforming to ASTM-D-1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and floor testing all complete as per specification and dir of EIC.20mm dia PVC Pipe (internal) |
| 174 | 25mm dia PVC Pipe (external) |
| 175 | Supplying all Materials labour T&P and fitting and fixing brass/CP Fittings of the following nominal bore with supply of all jointing materials etc. complete as per PH Specification and Direction of EIC. 15mm dia CP pillar cock Plaza/Amber Deluxe |
| 176 | 15mm dia cp angle stop cock Plaza/Amber Deluxe |
| 177 | 15mm dia cp bib cock S.B. Plaza/Amber Deluxe |
| 178 | 15mm dia cp bib cock L.B. Plaza/Amber Deluxe |
| 179 | 15mm dia CP Two way bib Cock Plaza/Amber Deluxe |
| 180 | Health Fuccet Plaza/Amber Deluxe |
| 181 | 15mm dia CP flange Plaza/Amber Deluxe |
| 182 | 15mm dia CP Extension piece Plaza/Amber Deluxe |
| 183 | 25mm dia Brass Ball Valve Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents