Tender For Construction Of R.I Office Cum Residence Building At S Plus 2 At Odangi_Building
Tender Value
77.72 Lakhs
Estimated cost
Bid Submission
17 Nov 2026
2 days left
EMD
77726
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baleshwar → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of R.I Office Cum Residence Building At S Plus 2 At Odangi_Building
BOQ
| Sl. No. | Item Description |
| 1 | CIVIL WORKS Earthwork in excavation of |
| 2 | Supplying and filling approved sand as per IS : 383including cost of sand, |
| 3 | Providing cast in situ reinforced cement concretebored single under reamed |
| 4 | Providing cast in situ reinforced cement concretebored single under reamed |
| 5 | Providing and laying plaincement concrete 1: 3 : 6 ( 1 part cement : 3 parts coarse |
| 6 | Providing Cement concrete (1:2:4) with 12mm sizeH.G.chip of approved quality |
| 7 | Construction of un-reinforced plain cementconcrete pavement, |
| 8 | Providing R.C.C. M-25 using 20mm & down graded sizeh.g. chips of approved quality |
| 9 | In Column & Roof Beam In Ground Floor |
| 10 | In First floor |
| 11 | In Second floor |
| 12 | In Window Sill In Ground Floor |
| 13 | In First floor |
| 14 | In Staircase In Ground Floor |
| 15 | In First floor |
| 16 | In Lintel In Ground Floor |
| 17 | In First floor |
| 18 | In Window Chajja In Ground Floor |
| 19 | In First floor |
| 20 | In Roof Slab In Ground Floor |
| 21 | In First floor |
| 22 | In Second floor |
| 23 | Supplying and placing in position High yielddeformed bars |
| 24 | In First floor |
| 25 | In Second floor |
| 26 | Providing and laying Fly ash brick masonry work incement mortar 1 : 6( 1 |
| 27 | In Ground Floor |
| 28 | In super structure In Ground Floor |
| 29 | In First floor |
| 30 | In Second floor |
| 31 | Providing and laying Fly ash brick masonry work incement mortar 1 : 4( 1 |
| 32 | In super structure In Ground Floor |
| 33 | In First floor |
| 34 | Filling foundation and plinth with excavated materials wellwatered and rammed |
| 35 | Providing 12mm thick cement plaster (1:4) over brick workincluding cement punning for |
| 36 | Providing 12 mm. thick cementplaster in mortar 1: 6 ( 1 cement :6 coarse sand ) on |
| 37 | In First floor |
| 38 | In Second floor |
| 39 | Providing 6mm thick cement plaster (1:4) to RCC surfacesfinished smooth including |
| 40 | In First floor |
| 41 | In Second floor |
| 42 | Providing 16mm. thick cementplaster in mortar 1: 6 ( 1 cement :6 coarse sand ) on |
| 43 | In First floor |
| 44 | In Second floor |
| 45 | Supplying, fitting & fixing Dressed Seasoned Salwoodwork Framed fixed in |
| 46 | In First floor |
| 47 | In Second floor |
| 48 | Supplying, fitting & fixing of 32mm thick flush door shutterwith approved quality of 30mm |
| 49 | In First floor |
| 50 | In Second floor |
| 51 | Supplying, fitting & Fixing of two track UPVC slidingwindow of approved make with |
| 52 | In First floor |
| 53 | Factory made FRP(alternately called GRP) door frame of size75mmx100mm fabricated |
| 54 | In First floor |
| 55 | Factory made single leaf rigid FRP(alternately called GRP)sandwich composite door |
| 56 | In First floor |
| 57 | Providing and Painting wallSurface one coat with wall Primer to give an even shed |
| 58 | In First floor |
| 59 | In Second floor |
| 60 | Wall painting two coats withany approved quality made by Dulux/Asian/Nerolac/Berger of |
| 61 | In First floor |
| 62 | In Second floor |
| 63 | Finishing wall surface of wall with cement based wall putty(water based) of approved |
| 64 | In First floor |
| 65 | In Second floor |
| 66 | Providing two coats of plasticemulsion paint of approved shade on new work to give an |
| 67 | In First floor |
| 68 | In Second floor |
| 69 | Supplying,fitting and fixing ofM.S. iron grill /gate made out of structure steel angle,sheet |
| 70 | In First floor |
| 71 | Providing & laying two coats of synthetic enamel paint on newsteel surface over a coat of |
| 72 | In First floor |
| 73 | Providing, Fitting and Fixing of vitrified colour/ printed inFloor over 25mm thick Cement |
| 74 | In First floor |
| 75 | Providing & fixing glazed wall tiles confirming to IS 13753 inwall, dado,skirting,rises of |
| 76 | In First floor |
| 77 | Providing, Fitting and Fixing of Granites in Floor over 25mmthick Cement mortar ( 1:1) |
| 78 | In First floor |
| 79 | Providing, Fitting and Fixing of industrial vitrified tiles in Floorover 25mm thick Cement |
| 80 | In First floor |
| 81 | Providing & fixing Chequeredtiles of approved thickness (300mmx300mm) size in |
| 82 | Providing, Fitting and Fixing of ceramic floor tiles in Floor over25mm thick Cement mortar ( |
| 83 | In First Floor |
| 84 | Providing 2.5cm thick Damp Proof course with cc (1:2:4) using 12mm size CBHG chips In Ground floor |
| 85 | Supplying, fitting afixing of stainless steel of 304 grade inhand railing in all floors using |
| 86 | In First floor |
| 87 | Providing and injecting chemical emulsion forPRE_CONSTUCTIONAL anti- |
| 88 | E.I. WORKS |
| 89 | -do-Group B |
| 90 | -do-Group C |
| 91 | Recessed wiring to Fan Point in...-do- Group B |
| 92 | Recessed wiring to Call Bell Point in...-do- Group C |
| 93 | Recessed wiring to Exhaust Fan Point in...-do- Group C |
| 94 | -do-Group B |
| 95 | -do-Group C |
| 96 | Swich |
| 97 | S/F of extension board of 6 modular Metal box withmodular base & cover in |
| 98 | S/F of Power point with 4 modular metal box withmodular base & cover in |
| 99 | S/F of Power point with 4 modular & 2 modular metalbox with modular base & cover |
| 100 | S/F of computer board of 12 modular metal box withmodular base & cover in |
| 101 | S/F of 1 no of 5 pin 15/16 amp. Socket , 1 no of switch& 1 no of 15/16A top with |
| 102 | S/F of 18 SWG Modular metal box of following sizes(Nominal size) in recess with |
| 103 | 4 Modular box with base & cover |
| 104 | 6 Modular box with base & cover |
| 105 | 8 Modular box with base & cover |
| 106 | 12 Modular box with base & cover |
| 107 | Sub-Main Wiring for circuit / sub-main wiring along |
| 108 | 2x2.5+1x1.5 (1.8.2) |
| 109 | 2x4+1x1.5 (1.8.3) |
| 110 | 2x6+1x2.5 (1.8.4) |
| 111 | Inverter wiring (1x1.5smm) Copper wire (1.19.1) |
| 112 | Circuit BreakersS/F of 'B/C/D' series SP MCB |
| 113 | Supply, Installation testing & commissioning of MainSwitches (IS13940 part |
| 114 | Main switchesSupply, Installation testing & |
| 115 | Earthing Earthingwith G.I. Earth pipe 3 mtr Long |
| 116 | Supply & laying 6 SWG G.I. wire in recess for loop earthingas required (3.17) |
| 117 | Fittings Supply and fixing of 300mm double ball |
| 118 | S/F of Call bell/Buzzer(Ding dong type) ISI marked suitablefor DC/AC single phase 230 |
| 119 | S/F of 18-25Watt L.E.D Tube light fitting with allaccessories and connections ( |
| 120 | SITC of 1200mm Sweep BLDC A.C Ceiling fan (5star)Copper Winding with |
| 121 | Supply and fixing of 30-35 Watt Single LED Street LightFitting with LED & Electronic |
| 122 | Supply and fixing of 45-48 Watt Single LED Street LightFitting with LED & Electronic |
| 123 | S/F of 15w Watt LED Bulb (Make- Crompton/ Phillips/Havells/ Panasonic/Orient/K- |
| 124 | S/F of 2000 VA/24V Inverter with 2 nos. 180Ah batteryincluding trolley arrangement |
| 125 | AIO Solar |
| 126 | PH WORKSEarth work in all kinds of soil |
| 127 | 2nd depth upt 3.00 mtr |
| 128 | Supplying all materials, labour T&P and filling in F&P withriver sand well watered and |
| 129 | Supplying all materials, labourT&P and providing c.c (1:3:6) using 4cm h.g. metal including |
| 130 | Supplying all materials, labour T&P and providing c.c(1:1.5:3) using 12 mm h.g. |
| 131 | First floor |
| 132 | Supplying all materials, labour,T&P and providing brick work with Fly Ash bricks |
| 133 | Supplying all materials, labour, T &P and providing C.C (1:1.5:3 ) using 12mm h.g. chips for |
| 134 | Supplying all materials, labour, T&P and providing M.S.reinforcement for R.C.C. |
| 135 | Supplying all materials, labour, T&P and providing rigid &smooth centering & shuttering |
| 136 | Supplying all materials, labour, T&P and providing cementplaster on brick/stone work |
| 137 | 20mm thick C.P with C.M. (1:4) |
| 138 | Supplying all materials, labour,T&P and providing cement punning including watering, |
| 139 | Supplying all materials, labour, T&P and providing cementflush pointing to brick |
| 140 | Supplying all labour, materialsT&P and fixing of R.C.C. Baffle wall pre-cast with C.C. |
| 141 | Supplying all materials, labour, T&P Providing and fixing PVCTee in all including supply of |
| 142 | Supplying all materials, labour, T&P and providing pre-castR.C.C. Manhole cover with |
| 143 | Supplying all labour, materials T&P and fixing of M.S.Stepiron in 12mm dia M.S. Steel |
| 144 | Filling F&P with excavated materials, including wateringand ramming as per direction |
| 145 | Supplying all materials, labour T&P and fixing Ceramic Tilesin floors on 25mm thick bed of |
| 146 | First Floor |
| 147 | Supplying all materials, labour T&P and fixing Granite Tilesin floors on 25mm thick bed of |
| 148 | Supplying all materials, labour T&P and fixing porcelainglazed tiles in dados skirting, |
| 149 | First Floor |
| 150 | Factory made FRP(alternately called GRP) door frame of size75mmx100mm fabricated |
| 151 | Factory made single leaf rigid FRP(alternately called GRP)sandwich composite door |
| 152 | Supplying all materials, labour T&P and fixing water closet,(Orissa pattern squating pan) |
| 153 | Supplying all materials, labourT&P and fixing Wash Down Water Closet(European type |
| 154 | Supplying all materials, labour, T&P fitting and fixing PlasticSeat and cover for E.W.C. |
| 155 | Supplying all materials, labour T&P and fitting & fixing SWRventilating pipes and fittings of |
| 156 | 110 mm dia SWR P Trap |
| 157 | 110 mm dia SWR Door Tee |
| 158 | 110 mm dia SWR Door Bend |
| 159 | 110 mm dia SWR Plain Bend |
| 160 | 110 mm dia SWR Plain Tee |
| 161 | 110 mm dia SWR Cowl |
| 162 | 110 mm dia SWR Offset |
| 163 | 125 mm dia C.P.grating |
| 164 | 75 mm dia SWR Pipes |
| 165 | 75 mm dia SWR Plain bend |
| 166 | 75 mm dia SWR Door bend |
| 167 | 75 mm dia SWR Plain Tee |
| 168 | Supplying all materials, labour T&P and cutting holesthrough brick/stone masonary |
| 169 | Supplying all materials, labour T&P and fixing wash basinswith hole for pillar taps with |
| 170 | Supplying all materials, labour T&P and fixing padestrial forwash basin complete recessed |
| 171 | Supplying all materials, labour T&P and fixing mirror ofsuperior glass mounted on |
| 172 | Supplying all materials, labour T&P and fixing standard sizeC.P. towel rail / ring complete |
| 173 | C.P. Towel Ring (St.) |
| 174 | Supplying all materials, labour T&P and fixing standard sizeC.P. soap holder complete |
| 175 | Supplying all , labour T&P and fitting, fixing of standard sizeGlass shelf with CP brass |
| 176 | Supplying all labour, T&P, materials & fixing washKitchen sink with M.S |
| 177 | Supplying all materials, labourT&P and fixing bowl pattern urinal including the connecting |
| 178 | Supplying all materials, labour T&P and costructing gully trapchamber of the following |
| 179 | Supplying all materials, labour T&P and constructingInspection chamber of the |
| 180 | Supplying all materials, labourT&P and constructing man hole chamber of the following |
| 181 | Supplying all materials, labour, T&P and laying 110 mm diaSWR pipes of the following |
| 182 | Supplying all materials, labour T&P and constructing soakway pit of the following sizes |
| 183 | 1.00mtrs.dia x 2.0mtr.deep soak way pit |
| 184 | Supplying all materials, labour, T&P and fixing rotationalmoulded polyethylene |
| 185 | Supplying all materials, labour, T&P and Construction ofmasonary stagging with |
| 186 | Supplying all materials, labour,T&P and providing and fixing to wall or ceiling and floor PVC |
| 187 | 25 mm dia PVC (ASTM) Pipe [Internal] |
| 188 | 25 mm dia PVC (ASTM) Pipe) [External] |
| 189 | 32 mm dia PVC (ASTM) Pipe) [External] |
| 190 | 32mm dia HDPE Pipe)[Inside Tube Well] |
| 191 | 32mm dia HDPE Pipe)[Inside Trench] |
| 192 | Supplying all materials, labour, T&P and cutting holes throughbrick/stone masonary works |
| 193 | Supplying all materials, labour, T&P and cutting grooves inpucca floors and walls for |
| 194 | Supplying all materials, labour, T&P and fitting & fixing brass/C.P. fittings of the following |
| 195 | 15 mm dia C .P L.B. Bib Cock [Jaquar] |
| 196 | 20 mm dia C .P (c) Stop Cock [Jaquar] |
| 197 | 15 mm dia C .P Angle Stop Cock [Jaquar] |
| 198 | 15 mm dia C .P Pillar Cock [Jaquar] |
| 199 | 15mm dia C.P. Two Way Bib cock [Jaquar] |
| 200 | 15mm dia C.P. Health Faucet [Jaquar] |
| 201 | 15 mm dia C .P Extension Piece |
| 202 | 25 mm dia PVC Ball Valve (Good Quality] |
| 203 | 32 mm dia PVC Ball Valve (Good Quality] |
| 204 | Supplying all materials, labour,T&P and fitting and fixing C.P. shower with 15 mm or 20 mm |
| 205 | Supplying all materials, labour T&P and fitting & fixing 10Litres capacity low level |
| 206 | Sinking of 125x100mm dia tube well through Hand boringMethod Supplying all |
| 207 | Supplying all labour, T&P & transportation of boring pipes,top casing, grouping pipes, |
| 208 | Supplying all labour, T&P and drilling pilot bore not less than102mm dia without casing |
| 209 | Supplying all required laboyur for logging the bore through departmental team (till logging team arrives at the site, the contractor is to keep the bore intact by cirulating mud through the mud circulating system) and when the logging team arrives at the site, the contractor will withdraw the boring pipe with cutter etc. and keep the bore suitable for logging and supply required labour to carry out the logging operation. |
| 210 | Supplying all labour, T&P & reaming the pilot bore to the following sizes and depths without casing pipes including withdrawing the boring pipes, washing the bore by means of pipe cylinder etc. all complete as per direction of E.I.C. -100 mm ot 150 mm dia( 00 mtr to 360 mtr) |
| 211 | 150 mm to 200 mm dia( 00 mtr to 360 mtr) |
| 212 | 200 mm to 250 mm dia( 00 mtr to 360 mtr) |
| 213 | Supplying all labour, Tools and plant and lowering the 300mm dia top casing pipe into position and removing the same after use as per the direction of Engineer-in-charge. |
| 214 | Supplying all labour, T&P and jointing materials and lowering the PVC casing pipes fitting and well screens in position including fitting of centralizer cutter plugs and washing the bore as per the direction of E.I.C.(Including cost of Materials) 125 mm dia PVC Pipe (Schedule-80) |
| 215 | 50 mm dia PVC Pipe (Schedule-80) |
| 216 | 50 mm dia PVC strainer |
| 217 | 125x50 mm dia PVC R/S |
| 218 | 50 mm dia C.I.Plug Cutter |
| 219 | Lowering of 125/100mm dia PVC Pipe |
| 220 | Lowering of 50mm dia PVC Pipe |
| 221 | Rubber Packer |
| 222 | Supplying all labour, T &P and grouting with cement betonite slurry for saline sealing in the bore over the Rubber Packer etc. all complete as per the direction of Engineer-in-charge ( Exxcluding cost of Cement .) |
| 223 | Cost of Cement for Saline Sealing including transportation |
| 224 | Supplying all labour, T&P materials and providing sanitary sealing by cement slurry grouting around the uppermost 3.00 mtrs. of 125 mm dia PVC casing pipe . including cost of cement all complete as per direction of E.I.C (including cost of 2 bags of Cement) |
| 225 | Cleaning the developing the tube well using compressor continuously to get clear and adequate discharge from the tube well including the supply and use of all necessary equipment and labour as per direction of E.I.C(Labour Charges) |
| 226 | Supplying all labour, T&P, materials & Providing Annabond-666 at the thread of the pipe to avoid saline leakage as per direction of EIC |
| 227 | Supplying of ISI Mark 1.00 HP Single Phase Vertical Submersible Pump Set with Discharge of 900-1000 liter/hour and a head of 50-60 mtr of reputed make like KSB/Texmo & Equivalent including all cost, conveyance and taxes etc. all complete as per direction of Engineer-in-charage. |
| 228 | Supplying all labour, T&P and fitting and fixing of 1.00 HP Single phase vertical Submersible Pump Set with commissioning and testing etc. all complete as per direction of Engineer-in-charge. |
| 229 | Supplying and fitting and fixing of ISI Mark DOL Starter of reputed make like BCH or Equivalent for 1.00 HP Single Phase Submersible Pump including all cost, conveyance and taxes etc. all complete as per direction of Engineer-in-charge. |
| 230 | Supplying and fitting and fixing of three core flat cable (2.5mm2) of ISI Make of reputed company line BCH/Finolex or Equivalent and connecting the pump and starter including all cost, conveyance and taxes etc. all complete as per direction of Engineer-in-charge. |
| 231 | Supplying and fitting & fixing of Plastic rope, M.S. Well Cover, M.S. Clamp, Stainless Steel Short piece, Bend & Socket including all const, conveyance and taxes etc. all complete as per direction of engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysNov 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender