Tender For Repair Work Of Link Road From Kakod To Araura Via Saidampur At Nmy Sikandrabad.

Issued by Government Departments · Bulandshahr, Uttar Pradesh
Tender Value
87.33 Lakhs
Estimated cost
Bid Submission
23 Nov 2026
2 days left
EMD
5.87 Lakhs
Bank guarantee accepted
Document Fee
16520
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bulandshahr → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Repair Work Of Link Road From Kakod To Araura Via Saidampur At Nmy Sikandrabad.

BOQ

Name of Work:- lEidZ ekxZ ^^ddksM ls vjkSjk ok;k lSneiqj** rd dh ejEer dk dk;Z
Sl. No. Item Description
1Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead, including its loading, unloading, carriage and all labour and T&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge.
2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
3Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 to 1-0 kg/sqm using mechanical means as per Technical Specification Clause 502
4Providing and applying tack coat with bitumen VG-10 grade using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5Providing, laying and rolling of open-graded premix carpet of 20 mm thickness by manual means composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat as per Technical Specification Clause 508.
6Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
7Supply and laying 350 mm dia R.C.C. Hume Pipe MP3 with coller 2.cm supply of all material labour and T&P complete Page No.10 S.O.R. Moradabad Chapter No.1 R.C.C. Hume Pipe
8Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work.
9BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)
10PART-A The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]% For PC
11The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75% For PC
12The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 1.50% For PC
13The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 2.25% For PC
14The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 3.00% For PC
15Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead, including its loading, unloading, carriage and all labour and T&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge.
16Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
17Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels.rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc. (M-30). Chapter No. 20 item no. 9(1)
18Excavation in foundation in ordinry soil (Loam Clay or sand) including lift upto 1.50 meter and lead upto 30 m all completion of the work (Sl No.251)
19Concrete with the 4.00 cm gauge Stone ballast fine sand of 1.25 finess modulus and cement in the proporation 12:6:1 in foundation and under floor including supply and material all completion of the work (SI No.273a)
20M- 150 brick work in 1:4 cement and approved Coarse Sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. Required for the proper completion of the work. (SI. No. 307A)
21Cement concrete with 2.00Cm gauge approved stone grit, approved coarse sand & cement in the proportion of 4:2:1 including supply of all mateirals, labour and T&P etc. Required for the proper completion of the work.(S.I. 279A) Top
2212 MM THICK PLASTER OVER BRICK IN 1:4 CEMENT AND C-SAND MORTAR
23BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)
24PART-B The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]% For CC
25The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% For CC
26The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 0.50% For CC
27The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 0.75% For CC
28The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 1.00% For CC Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58465373
AUTHORITY Government Departments
TENDER VALUE 87.33 Lakhs
LAST DATE 23-11-2026
Authority
Authority Name Rajya Krishi Utpadan Mandi Parishad
Work Description Tender For Repair Work Of Link Road From Kakod To Araura Via Saidampur At Nmy Sikandrabad.
Basic Detail
Tender No 2026/REPAIR ROAD/MANDI SIKANDRABAD
Bidding Type Tender
Location
City Bulandshahr
State Uttar Pradesh
Key Dates
Publish Date 07 Nov 2026
Submission Date 23 Nov 2026
Open Date 24 Nov 2026
Finance
Tender Value 87.33 Lakhs
Tender Fee 16520
EMD 5.87 Lakhs
Exemption Available
Document List
769efbdc-8af9-447e-a895-5ea1f4a26abc.html
BOQ_2287509.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Nov 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

769efbdc-8af9-447e-a895-5ea1f4a26abc.html

xls

BOQ_2287509.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender