Tender For Work Of Attending Breakdowns, Construction, Re-Arrangement, Shifting, Replacement/Repairing Of Damaged Poles Etc. Of Lines And Apparatus Against Maintenance and repair, Small S.I. And Deposit Works Of 11 Kv And Lt O.H. & U.G. Lines Includi
Tender Overview
Project Description
Tender for Work Of Attending Breakdowns, Construction, Re-Arrangement, Shifting, Replacement/Repairing Of Damaged Poles Etc. Of Lines And Apparatus Against Maintenance and repair, Small S.I. And Deposit Works Of 11 Kv And Lt O.H. & U.G. Lines Including Loading, Unloading, Carriage And All Related Works Of 14 No Substations Under The Area Of Assistant Engineer-2Nd Of Executive Engineer- 2Nd 11 Kv & Lt Network, Kesco. Kanpur.
BOQ
| Sl. No. | Item Description |
| 1 | Electrical Items : |
| 2 | Dismentalling of X-Arm/L.T. brackets and insulators etc. from the damaged pole/pole to be replaced/shifted. |
| 3 | Erection of ALL HEIGHT PCC poles along with stone pad for LT overhead line by providing and installing danger plate, anticlimbing devices (barbed wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per scope of work, approved drawings and specifications: |
| 4 | Excavation of foundation and taken out the damaged pole/pole to be replaced/shifted from the ground. |
| 5 | Repairing of damaged S.T. Pole by providing M.S. ANGLE 65x65x6 mm(3 METER), Ms pole Clamp with Nut & Bolt(Clamping of both Ends), Concreting for Grouting and Muffing of pole with all material (2FEET Grouting And 1 feet Muffuing) and its welding including its all related work. |
| 6 | Loading, Carriage and unloading of STP poles from store to work site. |
| 7 | Loading, Carriage and unloading of damaged poles from work site to store. |
| 8 | Loading, Carriage and unloading of PCC Poles from store to work site. |
| 9 | Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification. |
| 10 | Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings. |
| 11 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 12 | Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications. |
| 13 | Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials. |
| 14 | Erection of Tri-Pole structure including fitting of channels etc. and proper alignment. |
| 15 | Painting of pole after rubbing cleaning with emery paper and coating with one coat of red oxide on full length of pole and then two coat of aluminum paint. |
| 16 | Excavation of foundation and taken out the damaged PCC pole to be replaced. |
| 17 | Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe with all Material |
| 18 | Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection. |
| 19 | Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 20 | Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles. |
| 21 | Loading, carriage and unloading of conductor from store to work site and vice versa |
| 22 | Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. |
| 23 | Laying, stringing, tensioning and binding of Old & New Weasal conductor for H.T./L.T. O.H. |
| 24 | Laying, stringing, tensioning and binding of Old & New Dog conductor for H.T./L.T. O.H. |
| 25 | Fixing of guarding angle/guarding channel for laying of guarding Old & New |
| 26 | Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire Old & New |
| 27 | Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span) |
| 28 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 29 | Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work. |
| 30 | Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. |
| 31 | Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections. |
| 32 | Fabrication/modifications of M.S. Items as per requirement of site conditions. |
| 33 | Jumpering of H.T. Lines from the existing H.T.O.H. line. |
| 34 | Jumpering of L.T. Lines from the existing L.T.O.H. line. |
| 35 | Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines. |
| 36 | Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line. |
| 37 | Loading, carriage and unloading of Aearial Bunched Cable from store to work site and vice versa. |
| 38 | Laying of Old & New Aearial Bunched Cable for Erection of L.T. O/H Line. |
| 39 | Mounting & Erection of single phase distribution box Old & New. |
| 40 | Mounting & Erection of three phase distribution box. Old & New |
| 41 | Opening and reconnection of consumer connections for shifted/replaced of pole. |
| 42 | Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.) |
| 43 | Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends With pipe (3Mtr. Long MS pipe will be provided by KESCo) |
| 44 | Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends Without pipe |
| 45 | Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line Single Core L.T. Cable |
| 46 | Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 3 ½ Core L.T. Cable |
| 47 | Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 11 KV H.T. Cable |
| 48 | Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:3:6 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth. |
| 49 | Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa. |
| 50 | Erection of Distribution T/F on plinth/D/pole structure. |
| 51 | Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer. |
| 52 | Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B. |
| 53 | Connection of L.T. cable from L.T.D.B to L.T.O.H. |
| 54 | To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust. |
| 55 | Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust. |
| 56 | Reparing of T/F plinth, Size of the plinth will be 1.2 x 1.2 x 1.2 Cubic Mtr including civil matrial will be solid with brick work 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast with step. |
| 57 | Digging of pit and making of 300x300x450 mm chamber with brick & sand work covered with RCC surrounding the GI Pipe with Cover. all material shall be provided by contractor with cost of all material. |
| 58 | Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia, Thickness minimum 3 mm, B-Class 80 feet long with socket cutter and connection of pipe to distribution T/F Neutral or Body with 25x3mm G.I. Strip of length 80 feet inside the GI pipe, 100 Kg Salt and 100 Kg charcoal Powder for each earthing. all material shall be provided by contractor with cost of all material. |
| 59 | Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth. |
| 60 | Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion. |
| 61 | Taking out new/old cable from cable drum and then after tranportation from store to work site or vice-versa. |
| 62 | H.T. Cable |
| 63 | L.T. Cable |
| 64 | Digging of cable trench in size of 30cm. Wide and 60 to 90 Cm. meter deep as per site requirement for laying of cable- |
| 65 | Normal Soil |
| 66 | Kharanja Road |
| 67 | Metallic Road |
| 68 | Laying of cable in the above digging, trench, covering with bricks, sand and back filling. |
| 69 | H.T. Cable |
| 70 | L.T. Cable |
| 71 | Laying of cable H.T. cable through Hume/C.I./MS. Pipe in digged trench and back filling. |
| 72 | H.T. Cable |
| 73 | L.T. Cable |
| 74 | Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles. |
| 75 | H.T. Cable |
| 76 | L.T. Cable |
| 77 | Restoration of Metallic/RCC road after proper reparing with appropriate materials. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender