Tender For Annual Plan-2026-2027 Site Levelling For The Construction Of Maithra Kuthuparambu Panambilaavu Poovathikkal Subcentres Project No-382/27-Ugty Gp-General Civil Work
Tender Value
6.77 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
4 days left
EMD
16942
Bank guarantee accepted
Document Fee
1495
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Malappuram → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Plan-2026-2027 Site Levelling For The Construction Of Maithra Kuthuparambu Panambilaavu Poovathikkal Subcentres Project No-382/27-Ugty Gp-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | kuthuparambu sub centre |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | OD249755/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. Details of |
| 4 | OD249756/2026-2027:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site. |
| 5 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 7 | OD258852/2026-2027:DRY RUBBLE MASONRY with Departmental stone- - Dry rubble without concrete levellingcourse using departmental rubble including packing to compactness to lines and levels. labour charges etc. complete as per direction of Departmental officers at site. |
| 8 | maithra subcentre |
| 9 | OD265853/2026-2027:DISMANTLING laterite masonry - Dismantling , clearing away and carefully stackingmaterials useful for reuse for any thickness of walls in laterite masonry in cement mortardisposal of debris within a distance of 150m. |
| 10 | OD265846/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. Details of |
| 11 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 12 | OD278840/2026-2027:DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted departmental rubble including packing to compactness to lines and levels cost and convenyance of all materials labour charges etc.complete as per direction of Departmental officers at site (modified 60.7.1 with departmental rubble) |
| 13 | OD279718/2026-2027:DRY RUBBLE MASONRY with Departmental stone- - Dry rubble without concrete levellingcourse using departmental rubble including packing to compactness to lines and levels. labour charges etc. complete as per direction of Departmental officers at site. |
| 14 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 16 | poovathikkal subcentre |
| 17 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 18 | OD278748/2026-2027:DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted departmental rubble including packing to compactness to lines and levels cost and convenyance of all materials labour charges etc.complete as per direction of Departmental officers at site (modified 60.7.1 with departmental rubble) |
| 19 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 20 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 21 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 22 | panambilave sub centre |
| 23 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 24 | OD258991/2026-2027:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site. |
| 25 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 26 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender