Tender For Construction Of R.I Office Cum Residence Building At S Plus 2 At Nagram_Building
Tender Value
76.93 Lakhs
Estimated cost
Bid Submission
17 Nov 2026
6 days left
EMD
76935
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baleshwar → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of R.I Office Cum Residence Building At S Plus 2 At Nagram_Building
BOQ
| Sl. No. | Item Description |
| 1 | CIVIL WORKS Earthwork in excavation of |
| 2 | Supplying and filling approved sand as per IS : 383including cost of sand, |
| 3 | Providing cast in situ reinforced cement concretebored single under reamed |
| 4 | Providing cast in situ reinforced cement concretebored single under reamed |
| 5 | Providing and laying plaincement concrete 1: 3 : 6 ( 1 part cement : 3 parts coarse |
| 6 | Providing Cement concrete (1:2:4) with 12mm sizeH.G.chip of approved quality |
| 7 | Construction of un-reinforced plain cementconcrete pavement, |
| 8 | Providing R.C.C. M-25 using 20mm & down graded sizeh.g. chips of approved quality |
| 9 | In Column & Roof Beam In Ground Floor |
| 10 | In First floor |
| 11 | In Second floor |
| 12 | In Window Sill In Ground Floor |
| 13 | In First floor |
| 14 | In Staircase In Ground Floor |
| 15 | In First floor |
| 16 | In Lintel In Ground Floor |
| 17 | In First floor |
| 18 | In Window Chajja In Ground Floor |
| 19 | In First floor |
| 20 | In Roof Slab In Ground Floor |
| 21 | In First floor |
| 22 | In Second floor |
| 23 | Supplying and placing in position High yielddeformed bars |
| 24 | In First floor |
| 25 | In Second floor |
| 26 | Providing and laying Fly ash brick masonry work incement mortar 1 : 6( 1 |
| 27 | In super structure In Ground Floor |
| 28 | In First floor |
| 29 | In Second floor |
| 30 | Providing and laying Fly ash brick masonry work incement mortar 1 : 4( 1 |
| 31 | In super structure In Ground Floor |
| 32 | In First floor |
| 33 | Filling foundation and plinth with excavated materials wellwatered and rammed |
| 34 | Providing 12mm thick cement plaster (1:4) over brick workincluding cement punning for |
| 35 | Providing 12 mm. thick cementplaster in mortar 1: 6 ( 1 cement :6 coarse sand ) on |
| 36 | In First floor |
| 37 | In Second floor |
| 38 | Providing 6mm thick cement plaster (1:4) to RCC surfacesfinished smooth including |
| 39 | In First floor |
| 40 | In Second floor |
| 41 | Providing 16mm. thick cementplaster in mortar 1: 6 ( 1 cement :6 coarse sand ) on |
| 42 | In First floor |
| 43 | In Second floor |
| 44 | Supplying, fitting & fixing Dressed Seasoned Salwoodwork Framed fixed in |
| 45 | In First floor |
| 46 | In Second floor |
| 47 | Supplying, fitting & fixing of 32mm thick flush door shutterwith approved quality of 30mm |
| 48 | In First floor |
| 49 | In Second floor |
| 50 | Supplying, fitting & Fixing of two track UPVC slidingwindow of approved make with |
| 51 | In First floor |
| 52 | Factory made FRP(alternately called GRP) door frame of size75mmx100mm fabricated |
| 53 | In First floor |
| 54 | Factory made single leaf rigid FRP(alternately called GRP)sandwich composite door |
| 55 | In First floor |
| 56 | Providing and Painting wallSurface one coat with wall Primer to give an even shed |
| 57 | In First floor |
| 58 | In Second floor |
| 59 | Wall painting two coats withany approved quality made by Dulux/Asian/Nerolac/Berger of |
| 60 | In First floor |
| 61 | In Second floor |
| 62 | Finishing wall surface of wall with cement based wall putty(water based) of approved |
| 63 | In First floor |
| 64 | In Second floor |
| 65 | Providing two coats of plasticemulsion paint of approved shade on new work to give an |
| 66 | In First floor |
| 67 | In Second floor |
| 68 | Supplying,fitting and fixing ofM.S. iron grill /gate made out of structure steel angle,sheet |
| 69 | In First floor |
| 70 | Providing & laying two coats of synthetic enamel paint on newsteel surface over a coat of |
| 71 | In First floor |
| 72 | Providing, Fitting and Fixing of vitrified colour/ printed inFloor over 25mm thick Cement |
| 73 | In First floor |
| 74 | Providing & fixing glazed wall tiles confirming to IS 13753 inwall, dado,skirting,rises of |
| 75 | In First floor |
| 76 | Providing, Fitting and Fixing of Granites in Floor over 25mmthick Cement mortar ( 1:1) |
| 77 | In First floor |
| 78 | Providing, Fitting and Fixing of industrial vitrified tiles in Floorover 25mm thick Cement |
| 79 | In First floor |
| 80 | Providing & fixing Chequeredtiles of approved thickness (300mmx300mm) size in |
| 81 | Providing, Fitting and Fixing of ceramic floor tiles in Floor over25mm thick Cement mortar ( |
| 82 | In First Floor |
| 83 | Providing 2.5cm thick Dampproof course with c.c (1:2:4 ) using 12mm size CBHG Chips |
| 84 | Supplying, fitting afixing of stainless steel of 304 grade inhand railing in all floors using |
| 85 | In First floor |
| 86 | Providing and injecting chemical emulsion forPRE_CONSTUCTIONAL anti- |
| 87 | E.I. WORKS |
| 88 | -do-Group B |
| 89 | -do-Group C |
| 90 | Recessed wiring to Fan Point in...-do- Group B |
| 91 | Recessed wiring to Call Bell Point in...-do- Group C |
| 92 | Recessed wiring to Exhaust Fan Point in...-do- Group C |
| 93 | -do-Group B |
| 94 | -do-Group C |
| 95 | Swich |
| 96 | S/F of extension board of 6 modular Metal box withmodular base & cover in |
| 97 | S/F of Power point with 4 modular metal box withmodular base & cover in |
| 98 | S/F of Power point with 4 modular & 2 modular metalbox with modular base & cover |
| 99 | S/F of computer board of 12 modular metal box withmodular base & cover in |
| 100 | S/F of 1 no of 5 pin 15/16 amp. Socket , 1 no of switch& 1 no of 15/16A top with |
| 101 | S/F of 18 SWG Modular metal box of following sizes(Nominal size) in recess with |
| 102 | 4 Modular box with base & cover |
| 103 | 6 Modular box with base & cover |
| 104 | 8 Modular box with base & cover |
| 105 | 12 Modular box with base & cover |
| 106 | Sub-Main Wiring for circuit / sub-main wiring along |
| 107 | 2x2.5+1x1.5 (1.8.2) |
| 108 | 2x4+1x1.5 (1.8.3) |
| 109 | 2x6+1x2.5 (1.8.4) |
| 110 | Inverter wiring (1x1.5smm) Copper wire (1.19.1) |
| 111 | Circuit BreakersS/F of 'B/C/D' series SP MCB |
| 112 | Supply, Installation testing & commissioning of MainSwitches (IS13940 part |
| 113 | Main switchesSupply, Installation testing & |
| 114 | Earthing Earthingwith G.I. Earth pipe 3 mtr Long |
| 115 | Supply & laying 6 SWG G.I. wire in recess for loop earthingas required (3.17) |
| 116 | Fittings Supply and fixing of 300mm double ball |
| 117 | S/F of Call bell/Buzzer(Ding dong type) ISI marked suitablefor DC/AC single phase 230 |
| 118 | S/F of 18-25Watt L.E.D Tube light fitting with allaccessories and connections ( |
| 119 | SITC of 1200mm Sweep BLDC A.C Ceiling fan (5star)Copper Winding with |
| 120 | Supply and fixing of 30-35 Watt Single LED Street LightFitting with LED & Electronic |
| 121 | Supply and fixing of 45-48 Watt Single LED Street LightFitting with LED & Electronic |
| 122 | S/F of 15w Watt LED Bulb (Make- Crompton/ Phillips/Havells/ Panasonic/Orient/K- |
| 123 | S/F of 2000 VA/24V Inverter with 2 nos. 180Ah batteryincluding trolley arrangement |
| 124 | AIO Solar |
| 125 | PH WORKSEarth work in all kinds of soil |
| 126 | 2nd depth upt 3.00 mtr |
| 127 | Supplying all materials, labour T&P and filling in F&P withriver sand well watered and |
| 128 | Supplying all materials, labourT&P and providing c.c (1:3:6) using 4cm h.g. metal including |
| 129 | Supplying all materials, labour T&P and providing c.c(1:1.5:3) using 12 mm h.g. |
| 130 | First floor |
| 131 | Supplying all materials, labour,T&P and providing brick work with Fly Ash bricks |
| 132 | Supplying all materials, labour, T &P and providing C.C (1:1.5:3 ) using 12mm h.g. chips for |
| 133 | Supplying all materials, labour, T&P and providing M.S.reinforcement for R.C.C. |
| 134 | Supplying all materials, labour, T&P and providing rigid &smooth centering & shuttering |
| 135 | Supplying all materials, labour, T&P and providing cementplaster on brick/stone work |
| 136 | 20mm thick C.P with C.M. (1:4) |
| 137 | Supplying all materials, labour,T&P and providing cement punning including watering, |
| 138 | Supplying all materials, labour, T&P and providing cementflush pointing to brick |
| 139 | Supplying all labour, materialsT&P and fixing of R.C.C. Baffle wall pre-cast with C.C. |
| 140 | Supplying all materials, labour, T&P Providing and fixing PVCTee in all including supply of |
| 141 | Supplying all materials, labour, T&P and providing pre-castR.C.C. Manhole cover with |
| 142 | Supplying all labour, materials T&P and fixing of M.S.Stepiron in 12mm dia M.S. Steel |
| 143 | Filling F&P with excavated materials, including wateringand ramming as per direction |
| 144 | Supplying all materials, labour T&P and fixing Ceramic Tilesin floors on 25mm thick bed of |
| 145 | First Floor |
| 146 | Supplying all materials, labour T&P and fixing Granite Tilesin floors on 25mm thick bed of |
| 147 | Supplying all materials, labour T&P and fixing porcelainglazed tiles in dados skirting, |
| 148 | First Floor |
| 149 | Factory made FRP(alternately called GRP) door frame of size75mmx100mm fabricated |
| 150 | Factory made single leaf rigid FRP(alternately called GRP)sandwich composite door |
| 151 | Supplying all materials, labour T&P and fixing water closet,(Orissa pattern squating pan) |
| 152 | Supplying all materials, labourT&P and fixing Wash Down Water Closet(European type |
| 153 | Supplying all materials, labour, T&P fitting and fixing PlasticSeat and cover for E.W.C. |
| 154 | Supplying all materials, labour T&P and fitting & fixing SWRventilating pipes and fittings of |
| 155 | 110 mm dia SWR P Trap |
| 156 | 110 mm dia SWR Door Tee |
| 157 | 110 mm dia SWR Door Bend |
| 158 | 110 mm dia SWR Plain Bend |
| 159 | 110 mm dia SWR Plain Tee |
| 160 | 110 mm dia SWR Cowl |
| 161 | 110 mm dia SWR Offset |
| 162 | 125 mm dia C.P.grating |
| 163 | 75 mm dia SWR Pipes |
| 164 | 75 mm dia SWR Plain bend |
| 165 | 75 mm dia SWR Door bend |
| 166 | 75 mm dia SWR Plain Tee |
| 167 | Supplying all materials, labour T&P and cutting holesthrough brick/stone masonary |
| 168 | Supplying all materials, labour T&P and fixing wash basinswith hole for pillar taps with |
| 169 | Supplying all materials, labour T&P and fixing padestrial forwash basin complete recessed |
| 170 | Supplying all materials, labour T&P and fixing mirror ofsuperior glass mounted on |
| 171 | Supplying all materials, labour T&P and fixing standard sizeC.P. towel rail / ring complete |
| 172 | C.P. Towel Ring (St.) |
| 173 | Supplying all materials, labour T&P and fixing standard sizeC.P. soap holder complete |
| 174 | Supplying all , labour T&P and fitting, fixing of standard sizeGlass shelf with CP brass |
| 175 | Supplying all labour, T&P, materials & fixing washKitchen sink with M.S |
| 176 | Supplying all materials, labourT&P and fixing bowl pattern urinal including the connecting |
| 177 | Supplying all materials, labour T&P and costructing gully trapchamber of the following |
| 178 | Supplying all materials, labour T&P and constructingInspection chamber of the |
| 179 | Supplying all materials, labourT&P and constructing man hole chamber of the following |
| 180 | Supplying all materials, labour, T&P and laying 110 mm diaSWR pipes of the following |
| 181 | Supplying all materials, labour T&P and constructing soakway pit of the following sizes |
| 182 | 1.00mtrs.dia x 2.0mtr.deep soak way pit |
| 183 | Supplying all materials, labour, T&P and fixing rotationalmoulded polyethylene |
| 184 | Supplying all materials, labour, T&P and Construction ofmasonary stagging with |
| 185 | Supplying all materials, labour,T&P and providing and fixing to wall or ceiling and floor PVC |
| 186 | 25 mm dia PVC (ASTM) Pipe [Internal] |
| 187 | 25 mm dia PVC (ASTM) Pipe) [External] |
| 188 | 32 mm dia PVC (ASTM) Pipe) [External] |
| 189 | 32mm dia HDPE Pipe)[Inside Tube Well] |
| 190 | 32mm dia HDPE Pipe)[Inside Trench] |
| 191 | Supplying all materials, labour, T&P and cutting holes throughbrick/stone masonary works |
| 192 | Supplying all materials, labour, T&P and cutting grooves inpucca floors and walls for |
| 193 | Supplying all materials, labour, T&P and fitting & fixing brass/C.P. fittings of the following |
| 194 | 15 mm dia C .P L.B. Bib Cock [Jaquar] |
| 195 | 20 mm dia C .P (c) Stop Cock [Jaquar] |
| 196 | 15 mm dia C .P Angle Stop Cock [Jaquar] |
| 197 | 15 mm dia C .P Pillar Cock [Jaquar] |
| 198 | 15mm dia C.P. Two Way Bib cock [Jaquar] |
| 199 | 15mm dia C.P. Health Faucet [Jaquar] |
| 200 | 15 mm dia C .P Extension Piece |
| 201 | 25 mm dia PVC Ball Valve (Good Quality] |
| 202 | 32 mm dia PVC Ball Valve (Good Quality] |
| 203 | Supplying all materials, labour,T&P and fitting and fixing C.P. shower with 15 mm or 20 mm |
| 204 | Supplying all materials, labour T&P and fitting & fixing 10Litres capacity low level |
| 205 | Sinking of 125x100mm dia tube well through Hand boringMethod Supplying all |
| 206 | Supplying all labour, T&P & transportation of boring pipes,top casing, grouping pipes, |
| 207 | Supplying all labour, T&P and drilling pilot bore not less than102mm dia without casing |
| 208 | Supplying all labour, T&P & reaming the pilot bore to thefollowing sizes and depths |
| 209 | 150 mm to 200 mm dia( 00 mtrto 360 mtr) |
| 210 | 200 mm to 250 mm dia( 00 mtrto 360 mtr) |
| 211 | Supplying all labour, Tools andplant and lowering the 300mm dia top casing pipe into |
| 212 | Supplying all labour, T&P and jointing materials and loweringthe PVC casing pipes fitting |
| 213 | 100 mm dia PVC Pipe (Schedule-80) |
| 214 | 100 mm dia PVC strainer |
| 215 | 125x100 mm dia PVC R/S |
| 216 | Lowering of 125mm/100mm dia PVC Pipe |
| 217 | Supplying all labour, T & P and packing the bore withwashed gravel ( size-P-6) |
| 218 | Cost of Gravel |
| 219 | Supplying all labour, T&P materials and providingsanitary sealing by cement |
| 220 | Cleaning the developing the tube well using compressorcontinuously to get clear and |
| 221 | Supplying all labour, T&P and materials for fitting and fixingof India Mark-II Deep well |
| 222 | Supplying all labour, T&P and materials for Construction ofMasonary Platform for India |
| 223 | Supplying all materials, labour,T&P and construction of 100mm wide waste water |
| 224 | Supplying of ISI Mark 1.00 HP Single Phase VerticalSubmersible Pump Set with |
| 225 | Supplying all labour, T&P and fitting and fixing of 1.00 HPSingle phase vertical |
| 226 | Supplying and fitting and fixingof ISI Mark DOL Starter of reputed make like BCH or |
| 227 | Supplying and fitting and fixing of three core flat cable(2.5mm2) of ISI Make of |
| 228 | Supplying and fitting & fixing of Plastic rope, M.S. Well Cover,M.S. Clamp, Stainless Steel Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysNov 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender