Tender For Operation And Maintenance Of The Following 2 Nos Of Cwss In Salem And Namakkal Districts Under Maintenance Division, Edappadi Including Repairs, Rectification Works And Supply Of Chemicals For 27 Months Period From 01.01.2027 To 31.03.2029
Tender Overview
Project Description
Tender for Operation And Maintenance Of The Following 2 Nos Of Cwss In Salem And Namakkal Districts Under Maintenance Division, Edappadi Including Repairs, Rectification Works And Supply Of Chemicals For 27 Months Period From 01.01.2027 To 31.03.2029 (2026-2029) - Package 2A
BOQ
| Sl. No. | Item Description |
| 1 | TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD CHIEF ENGINEER, COIMBATORE. Name of work:- Operation and maintenance of the following 2 Nos of CWSS in Salem and Namakkal Districts under Maintenance Division, Edappadi including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) - PACKAGE 2A PRICE BID (COVER -II) BILL OF QUANTITY BILL OF QUANTITIES 1) The Bill of Quantities shall contain items for the construction, installation, testing, commissioning and maintenance of the Works to be carried out by the Contractor 2) The Bill of Quantities will be used to calculate the Contract Price. The contractor shall be paid for the quantum of work done at the rate quoted for each item in the Bill of Quantities. 3) The bidder shall fill in rates and prices and line item total (both in figures and words) for all items of works described in the Bill of quantities along with total bid price (both in figures and words). Items for which no rate or price is entered by the bidder will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities 4) The rates quoted in the BOQ shall be for carrying out the work in conformity to the BIS, TNBP and Technical Specifications and other Terms and Conditions set out in the Bid Document. 5) All pages in the BOQ should be signed without omission. All corrections/over writing should be properly attested by the Bidder. Changes in the Probable of Probable of Quantity 6) If the final Quantity of the work done differs from the Probable of Quantity in the Bill of Quantities for the particular item/items, the rates as in the agreement for the relevant items shall be paid. Goods & Service Tax 7) The bid value is inclusive of GST @ 18% (or) at the rates as may be notified by the Government from time to time. The bidder should quote basic price of each item in the Bill of Quantity. The GST amount should be arrived for the Total basic cost of all the items. TDS - GST 8) From every individual periodic payment made to the firm/Contractor, TDS - GST will be deducted at the rates as may be notified from time to time by the Government 9) The Executive Engineer has to show restraint in execution of works under the following category by duly observance of procedure. i. Items quoted with violent excess percentage i.e.,(+) 25% and above over the departmental rate should not ordinarily exceed the departmental quantity during execution. Departement rates shall only be allowed for the excess quantity if any involved during execution on these items. ii. The items quoted with violent less percentage i.e., (-) 10 % and below than the departmental value shall not be ordinarily omitted or reduced during execution. Name of Work: Operation and maintenance of the following 2 Nos of CWSS in Salem and Namakkal Districts under Maintenance Division, Edappadi including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) - PACKAGE 2A Sl. No. Description of work Probable quantity Figures TNBP No. Other specification Units in Rates in Amount in figures Figures Words 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Vide separate sheets attached. Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: The Chief Engineer, TWAD Board, Coimbatore Name of Work: Operation and maintenance of the following 2 Nos of CWSS in Salem and Namakkal Districts under Maintenance Division, Edappadi including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) - PACKAGE 2A Contract No: 06 to 10/F. O&M of CWSS - Salem, Edappadi & Namakkal / SDO(T6) / CE / CBE / 2026 / Dated.04.11.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Work Item Code / Make Probable quantity Figures Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Operation and maintenance of the following 2 Nos of CWSS in Salem and Namakkal Districts under Maintenance Division, Edappadi including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) - PACKAGE 2A |
| 3 | Part :- 1 - Operation and Maintenance of CWSS to Iruppali, 236 Fluoride Affected Habitations and 1237 wayside habitations in 7 Unions of Salem District including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) |
| 4 | Part :- 2 - Operation and Maintenance of CWSS to 378 Rural Habitations in Edapadi, Konganapuram and Magudanchavadi Unions of Salem District including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) |
| 5 | Add GST 18% Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only |
| 6 | Operation and Maintenance of CWSS to Iruppali, 236 Fluoride Affected Habitations and 1237 wayside habitations in 7 Unions of Salem District including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) |
| 7 | Operation and Maintenance of CWSS |
| 8 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protecton of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure -I, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity . |
| 9 | For a period from 01.01.2027 to 31.03.2027(20.230 MLD x 90 days = 1820.700 ML) |
| 10 | For a period from 01.04.2027 to 31.03.2028(20.396 MLD x 366 days = 7464.936 ML) |
| 11 | For a period from 01.04.2028 to 31.03.2029(20.562 MLD x 365 days = 7505.130 ML) |
| 12 | Repairs and Renewals for the period 01.01.2027 to 31.03.2027 |
| 13 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 14 | Burst Pipe replacement |
| 15 | 500 mm DI Pipe |
| 16 | 450 mm DI Pipe |
| 17 | 400 mm DI Pipe |
| 18 | 350 mm DI Pipe |
| 19 | 300 mm DI Pipe |
| 20 | 250 mm DI Pipe |
| 21 | 200 mm DI Pipe |
| 22 | 150 mm DI Pipe |
| 23 | 100 mm DI Pipe |
| 24 | Leak-single MJ Collar |
| 25 | 500 mm DI Pipe |
| 26 | 450 mm DI Pipe |
| 27 | 400 mm DI Pipe |
| 28 | 350 mm DI Pipe |
| 29 | 300 mm DI Pipe |
| 30 | 250 mm DI Pipe |
| 31 | 200 mm DI Pipe |
| 32 | 150 mm DI Pipe |
| 33 | 100 mm DI Pipe |
| 34 | Leak- cut Barrel & MJ Collar |
| 35 | 500 mm DI Pipe |
| 36 | 450 mm DI Pipe |
| 37 | 400 mm DI Pipe |
| 38 | 350 mm DI Pipe |
| 39 | 300 mm DI Pipe |
| 40 | 250 mm DI Pipe |
| 41 | 200 mm DI Pipe |
| 42 | 150 mm DI Pipe |
| 43 | 100 mm DI Pipe |
| 44 | Leak- specials Cement Joint |
| 45 | 500 mm DI Pipe |
| 46 | 450 mm DI Pipe |
| 47 | 400 mm DI Pipe |
| 48 | 350 mm DI Pipe |
| 49 | 300 mm DI Pipe |
| 50 | 250 mm DI Pipe |
| 51 | 200 mm DI Pipe |
| 52 | 150 mm DI Pipe |
| 53 | 100 mm DI Pipe |
| 54 | Leak-Gasket Joint |
| 55 | 500 mm DI Pipe |
| 56 | 450 mm DI Pipe |
| 57 | 400 mm DI Pipe |
| 58 | 350 mm DI Pipe |
| 59 | 300 mm DI Pipe |
| 60 | 250 mm DI Pipe |
| 61 | 200 mm DI Pipe |
| 62 | 150 mm DI Pipe |
| 63 | 100 mm DI Pipe |
| 64 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 65 | Using MS Step Collar Leak |
| 66 | 200 mm AC pipe |
| 67 | 250 mm AC pipe |
| 68 | Using MS barrel pipe |
| 69 | 200 mm AC pipe |
| 70 | 250 mm AC pipe |
| 71 | AC pipe coupler burst using MS plain coller |
| 72 | 200 mm AC pipe |
| 73 | 250 mm AC pipe |
| 74 | AC pipe coupler leak |
| 75 | 200 mm AC pipe |
| 76 | 250 mm AC pipe |
| 77 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 78 | USING MS STEP COLLAR |
| 79 | 700mm PSC pipe |
| 80 | 800mm PSC pipe |
| 81 | 900mm PSC pipe |
| 82 | 1000mm PSC pipe |
| 83 | USING MS BARREL PIPE |
| 84 | 700mm PSC pipe |
| 85 | 800mm PSC pipe |
| 86 | 900mm PSC pipe |
| 87 | 1000mm PSC pipe |
| 88 | PSC pipe leak using MS plain coller |
| 89 | 700mm PSC pipe |
| 90 | 800mm PSC pipe |
| 91 | 900mm PSC pipe |
| 92 | 1000mm PSC pipe |
| 93 | PSC Cement joint leak |
| 94 | 700mm PSC pipe |
| 95 | 800mm PSC pipe |
| 96 | 900mm PSC pipe |
| 97 | 1000mm PSC pipe |
| 98 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 99 | LEAK HDPE FUSION JOINT |
| 100 | 63 mm HDPE - PN 6 Pipe |
| 101 | 75 mm HDPE - PN 6 Pipe |
| 102 | 90 mm HDPE - PN 6 Pipe |
| 103 | 110 mm HDPE - PN 6 Pipe |
| 104 | 125 mm HDPE - PN 6 Pipe (110mm) |
| 105 | 140 mm HDPE - PN 6 Pipe |
| 106 | 160 mm HDPE - PN 6 Pipe |
| 107 | 180 mm HDPE - PN 6 Pipe (160mm) |
| 108 | 200 mm HDPE - PN 6 Pipe |
| 109 | LEAK HDPE COUPLER JOINT |
| 110 | 63 mm HDPE - PN 6 Pipe |
| 111 | 75 mm HDPE - PN 6 Pipe |
| 112 | 90 mm HDPE - PN 6 Pipe |
| 113 | 110 mm HDPE - PN 6 Pipe |
| 114 | 125 mm HDPE - PN 6 Pipe (110mm) |
| 115 | 140 mm HDPE - PN 6 Pipe |
| 116 | 160 mm HDPE - PN 6 Pipe |
| 117 | 180 mm HDPE - PN 6 Pipe (160mm) |
| 118 | 200 mm HDPE - PN 6 Pipe |
| 119 | BURST HDPE |
| 120 | 63 mm HDPE - PN 6 Pipe |
| 121 | 75 mm HDPE - PN 6 Pipe |
| 122 | 90 mm HDPE - PN 6 Pipe |
| 123 | 110 mm HDPE - PN 6 Pipe |
| 124 | 125 mm HDPE - PN 6 Pipe (110mm) |
| 125 | 140 mm HDPE - PN 6 Pipe |
| 126 | 160 mm HDPE - PN 6 Pipe |
| 127 | 180 mm HDPE - PN 6 Pipe (160mm) |
| 128 | 200 mm HDPE - PN 6 Pipe |
| 129 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 130 | Leak PVC |
| 131 | 63 mm OD PVC - 6 Ksc Pipe |
| 132 | 75 mm OD PVC - 6 Ksc Pipe |
| 133 | 90 mm OD PVC - 6 Ksc Pipe |
| 134 | 110 mm OD PVC - 6 Ksc Pipe |
| 135 | 140 mm OD PVC - 6 Ksc Pipe |
| 136 | 160 mm OD PVC - 6 Ksc Pipe |
| 137 | Burst in PVC Pipes |
| 138 | 63 mm OD PVC - 6 Ksc Pipe |
| 139 | 75 mm OD PVC - 6 Ksc Pipe |
| 140 | 90 mm OD PVC - 6 Ksc Pipe |
| 141 | 110 mm OD PVC - 6 Ksc Pipe |
| 142 | 140 mm OD PVC - 6 Ksc Pipe |
| 143 | 160 mm OD PVC - 6 Ksc Pipe |
| 144 | Towards the charges for attending Repair and Reconditioning of various size of Sluice Valves |
| 145 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials. |
| 146 | Sluice Valve - 80 mm |
| 147 | Sluice Valve - 100 mm |
| 148 | Sluice Valve - 150 mm |
| 149 | Sluice Valve - 200 mm |
| 150 | Sluice Valve - 250 mm |
| 151 | Sluice Valve - 300 mm |
| 152 | Reconditining of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., |
| 153 | Sluice Valve - 80 mm |
| 154 | Sluice Valve - 100 mm |
| 155 | Sluice Valve - 150 mm |
| 156 | Sluice Valve - 200 mm |
| 157 | Sluice Valve - 250 mm |
| 158 | Sluice Valve - 300 mm |
| 159 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials and as directed by the TWAD Board officers. |
| 160 | Sluice Valve - 80 mm |
| 161 | Sluice Valve - 100 mm |
| 162 | Sluice Valve - 150 mm |
| 163 | Sluice Valve - 200 mm |
| 164 | Sluice Valve - 250 mm |
| 165 | Sluice Valve - 300 mm |
| 166 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials and as directed by TWAD borad officers. |
| 167 | Sluice Valve - 80 mm |
| 168 | Sluice Valve - 100 mm |
| 169 | Sluice Valve - 150 mm |
| 170 | Sluice Valve - 200 mm |
| 171 | Sluice Valve - 250 mm |
| 172 | Sluice Valve - 300 mm |
| 173 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc.,and as directed by TWAD borad officers |
| 174 | Sluice Valve - 80 mm |
| 175 | Sluice Valve - 100 mm |
| 176 | Sluice Valve - 150 mm |
| 177 | Sluice Valve - 200 mm |
| 178 | Sluice Valve - 250 mm |
| 179 | Sluice Valve - 300 mm |
| 180 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc.,and as directed by TWAD borad officers. |
| 181 | Sluice Valve - 80 mm |
| 182 | Sluice Valve - 100 mm |
| 183 | Sluice Valve - 150 mm |
| 184 | Sluice Valve - 200 mm |
| 185 | Sluice Valve - 250 mm |
| 186 | Sluice Valve - 300 mm |
| 187 | Repair and Reconditioning of the Double Air Valve/ Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the departmental Officers |
| 188 | 200 mm |
| 189 | 150 mm |
| 190 | 100 mm |
| 191 | 80 mm |
| 192 | 50 mm |
| 193 | 25 mm |
| 194 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete and as directed by the departmental Officers |
| 195 | 100 mm |
| 196 | 80 mm |
| 197 | 65 mm |
| 198 | 50 mm |
| 199 | Supply and delivery of following sizes of GI specials / G.M valves with ISI marking for jointing with GI Pipes including loading, freight unloading, stacking, insurance etc., complete and as directed by the TWAD Board officers. |
| 200 | 50 mm G.M. Non Return valves |
| 201 | 65 mm G.M. Non Return valves |
| 202 | 80 mm G.M. Non Return valves |
| 203 | Supply and delivery of CI SINGLE AIR VALVE as per ISI 14845/ 2000 and with 5 years warranty etc., complete and as directed by TWAD Board officers (25mm CI Air valve) |
| 204 | Attending the Repair and Renewal works of various capacities of VT Pumpset |
| 205 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump etc., complete and as directed by TWAD Board officers |
| 206 | 380 HP VT (375 HP) |
| 207 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works etc., complete and as directed by TWAD Board officers |
| 208 | 380 HP VT (375 HP) |
| 209 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers |
| 210 | 380 HP VT (375 HP) |
| 211 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing the Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lathe works etc., complete and as directed by TWAD Board officers. |
| 212 | 380 HP VT (375 HP) |
| 213 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc., complete and as directed by TWAD Board officers |
| 214 | 380 HP VT (375 HP) |
| 215 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers (380 HP VT (375 HP) |
| 216 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by TWAD Board officers |
| 217 | 380 HP VT (375 HP) |
| 218 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc., complete and as directed by TWAD Board officers |
| 219 | 380 HP VT (375 HP) |
| 220 | VT Pumpset |
| 221 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 222 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 223 | 380 HP VT(310 hp) |
| 224 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 225 | 380 HP VT(310 HP) |
| 226 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly etc., complete and as directed by TWAD Board officers |
| 227 | 380 HP VT (310 HP) |
| 228 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 229 | 380 HP VT (310 HP) |
| 230 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) etc., complete and as directed by TWAD Board officers |
| 231 | 380 HP VT (310 HP) |
| 232 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 233 | 380 HP VT (310 HP) |
| 234 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 235 | 380 HP VT (310 HP) |
| 236 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 237 | 380 HP VT (310 HP) |
| 238 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 239 | 380 HP VT (310 HP) |
| 240 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 241 | 380 HP VT (310 HP) |
| 242 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 243 | 380 HP VT (310 HP) |
| 244 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 245 | 380 HP VT (310 HP) |
| 246 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 247 | 380 HP VT (310 HP) |
| 248 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components etc., complete and as directed by TWAD Board officers |
| 249 | 380 HP VT (310 HP) |
| 250 | VT Motor |
| 251 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 252 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 253 | 380 HP VT (375 HP) |
| 254 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 255 | 380 HP VT(375 HP) |
| 256 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by TWAD Board officers |
| 257 | 380 HP VT(375 HP) |
| 258 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 259 | 380 HP VT(375 HP) |
| 260 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., complete and as directed by TWAD Board officers |
| 261 | 380 HP VT(375 HP) |
| 262 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by TWAD Board officers |
| 263 | 380 HP VT(375 HP) |
| 264 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 265 | 380 HP VT(375 HP) |
| 266 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by TWAD Board officers |
| 267 | 380 HP VT(375 hp) |
| 268 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 269 | 380 HP VT(375 HP) |
| 270 | HSC Pumpsets |
| 271 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 272 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 273 | 220 HP (200HP) |
| 274 | 170 HP |
| 275 | 110 HP |
| 276 | 100 HP |
| 277 | 75 HP |
| 278 | 35 HP |
| 279 | 30 HP |
| 280 | 22.5 HP (20HP) |
| 281 | 17.5 HP(15 HP) |
| 282 | 12.5 HP (10 HP) |
| 283 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 284 | 220 HP (200 HP) |
| 285 | 170 HP (150 HP) |
| 286 | 110 HP |
| 287 | 100 HP |
| 288 | 75 HP |
| 289 | 35 HP |
| 290 | 30 HP |
| 291 | 22.5 HP (20HP) |
| 292 | 17.5 HP(15 HP) |
| 293 | 12.5 HP (10 HP) |
| 294 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings etc., complete and as directed by TWAD Board officers |
| 295 | 220 HP (200HP) |
| 296 | 170 HP |
| 297 | 110 HP |
| 298 | 100 HP |
| 299 | 75 HP |
| 300 | 35 HP |
| 301 | 30 HP |
| 302 | 22.5 HP (20HP) |
| 303 | 17.5 HP(15 HP) |
| 304 | 12.5 HP (10 HP) |
| 305 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking etc., complete and as directed by TWAD Board officers, |
| 306 | 220 HP (200HP) |
| 307 | 170 HP |
| 308 | 110 HP |
| 309 | 100 HP |
| 310 | 75 HP |
| 311 | 35 HP |
| 312 | 30 HP |
| 313 | 22.5 HP (20HP) |
| 314 | 17.5 HP(15 HP) |
| 315 | 12.5 HP (10 HP) |
| 316 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 317 | 220 HP (200HP) |
| 318 | 170 HP |
| 319 | 110 HP |
| 320 | 100 HP |
| 321 | 75 HP |
| 322 | 35 HP |
| 323 | 30 HP |
| 324 | 22.5 HP (20HP) |
| 325 | 17.5 HP(15 HP) |
| 326 | 12.5 HP (10 HP) |
| 327 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine etc., complete and as directed by TWAD Board officers |
| 328 | 220 HP(200HP) |
| 329 | 170 HP |
| 330 | 110 HP |
| 331 | 100 HP |
| 332 | 75 HP |
| 333 | 35 HP |
| 334 | 30 HP |
| 335 | 22.5 HP (20HP) |
| 336 | 17.5 HP(15 HP) |
| 337 | 12.5 HP (10 HP) |
| 338 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 339 | 220 HP(200HP) |
| 340 | 170 HP (170HP) |
| 341 | 110 HP |
| 342 | 100 HP |
| 343 | 75 HP |
| 344 | 35 HP |
| 345 | 30 HP |
| 346 | 22.5 HP (20HP) |
| 347 | 17.5 HP(15 HP) |
| 348 | 12.5 HP (10 HP) |
| 349 | Supply and delivery of Driven End and Non Driven End bearings etc., complete and as directed by TWAD Board officers |
| 350 | 220 HP(200HP) |
| 351 | 170 HP |
| 352 | 110 HP |
| 353 | 100 HP |
| 354 | 75 HP |
| 355 | 35 HP |
| 356 | 30 HP |
| 357 | 22.5 HP (20HP) |
| 358 | 17.5 HP(15 HP) |
| 359 | 12.5 HP (10 HP) |
| 360 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 361 | 220 HP(200HP) |
| 362 | 170 HP |
| 363 | 110 HP |
| 364 | 100 HP |
| 365 | 75 HP |
| 366 | 35 HP |
| 367 | 30 HP |
| 368 | 22.5 HP (20HP) |
| 369 | 17.5 HP(15 HP) |
| 370 | 12.5 HP (10 HP) |
| 371 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 372 | 220 HP(200HP) |
| 373 | 170 HP |
| 374 | 110 HP |
| 375 | 100 HP |
| 376 | 75 HP |
| 377 | 35 HP |
| 378 | 30 HP |
| 379 | 22.5 HP (20HP) |
| 380 | 17.5 HP(15 HP) |
| 381 | 12.5 HP (10 HP) |
| 382 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 383 | 220 HP(200HP) |
| 384 | 170 HP |
| 385 | 110 HP |
| 386 | 100 HP |
| 387 | 75 HP |
| 388 | 35 HP |
| 389 | 30 HP |
| 390 | 22.5 HP (20HP) |
| 391 | 17.5 HP(15 HP) |
| 392 | 12.5 HP (10 HP) |
| 393 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 394 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 395 | 220 HP (200 HP) |
| 396 | 170 HP |
| 397 | 110 HP |
| 398 | 100 HP |
| 399 | 75 HP |
| 400 | 35 HP |
| 401 | 30 HP |
| 402 | 22.5 HP (20HP) |
| 403 | 17.5 HP(15 HP) |
| 404 | 12.5 HP (10 HP) |
| 405 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 406 | 220 HP (200 HP) |
| 407 | 170 HP |
| 408 | 110 HP |
| 409 | 100 HP |
| 410 | 75 HP |
| 411 | 35 HP |
| 412 | 30 HP |
| 413 | 22.5 HP (20HP) |
| 414 | 17.5 HP(15 HP) |
| 415 | 12.5 HP (10 HP) |
| 416 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings etc., complete and as directed by TWAD Board officers |
| 417 | 220 HP (200 HP) |
| 418 | 170 HP |
| 419 | 110 HP |
| 420 | 100 HP |
| 421 | 75 HP |
| 422 | 35 HP |
| 423 | 30 HP |
| 424 | 22.5 HP (20HP) |
| 425 | 17.5 HP(15 HP) |
| 426 | 12.5 HP (10 HP) |
| 427 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 428 | 220 HP (200 HP) |
| 429 | 170 HP |
| 430 | 110 HP |
| 431 | 100 HP |
| 432 | 75 HP |
| 433 | 35 HP |
| 434 | 30 HP |
| 435 | 22.5 HP (20HP) |
| 436 | 17.5 HP(15 HP) |
| 437 | 12.5 HP (10 HP) |
| 438 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking,etc., complete and as directed by TWAD Board officers |
| 439 | 220 HP (200 HP) |
| 440 | 170 HP |
| 441 | 110 HP |
| 442 | 100 HP |
| 443 | 75 HP |
| 444 | 35 HP |
| 445 | 30 HP |
| 446 | 22.5 HP (20HP) |
| 447 | 17.5 HP(15 HP) |
| 448 | 12.5 HP (10 HP) |
| 449 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor etc., complete and as directed by TWAD Board officers |
| 450 | 220 HP (200 HP) |
| 451 | 170 HP |
| 452 | 110 HP |
| 453 | 100 HP |
| 454 | 75 HP |
| 455 | 35 HP |
| 456 | 30 HP |
| 457 | 22.5 HP (20HP) |
| 458 | 17.5 HP(15 HP) |
| 459 | 12.5 HP (10 HP) |
| 460 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 461 | 220 HP (200 HP) |
| 462 | 170 HP |
| 463 | 110 HP |
| 464 | 100 HP |
| 465 | 75 HP |
| 466 | 35 HP |
| 467 | 30 HP |
| 468 | 22.5 HP (20HP) |
| 469 | 17.5 HP(15 HP) |
| 470 | 12.5 HP (10 HP) |
| 471 | Transportation charges for conveying the motor from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 472 | 220 HP (200 HP) |
| 473 | 170 HP |
| 474 | 110 HP |
| 475 | 100 HP |
| 476 | 75 HP |
| 477 | 35 HP |
| 478 | 30 HP |
| 479 | 22.5 HP (20HP) |
| 480 | 17.5 HP(15 HP) |
| 481 | 12.5 HP (10 HP) |
| 482 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 483 | 220 HP (200 HP) |
| 484 | 170 HP |
| 485 | 110 HP |
| 486 | 100 HP |
| 487 | 75 HP |
| 488 | 35 HP |
| 489 | 30 HP |
| 490 | 22.5 HP (20HP) |
| 491 | 17.5 HP(15 HP) |
| 492 | 12.5 HP (10 HP) |
| 493 | OWS Pumpsets & Motors |
| 494 | Attending the Repair and Renewal works in Submersible Pumpset |
| 495 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 496 | 60 HP (50 HP) |
| 497 | 25 HP |
| 498 | 20 HP |
| 499 | 15 HP |
| 500 | 12.5 HP |
| 501 | 12 HP (10 HP) |
| 502 | 10 HP |
| 503 | 8 HP (7.5 HP) |
| 504 | 7.5 HP |
| 505 | 7 HP (5 HP) |
| 506 | 6 HP (5 HP) |
| 507 | 4 HP (3 HP) |
| 508 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 509 | 60 HP (50 HP) |
| 510 | 25 HP |
| 511 | 20 HP |
| 512 | 15 HP |
| 513 | 12.5 HP |
| 514 | 12 HP (10 HP) |
| 515 | 10 HP |
| 516 | 8 HP (7.5 HP) |
| 517 | 7.5 HP |
| 518 | 7 HP (5 HP) |
| 519 | 6 HP (5 HP) |
| 520 | 4 HP (3 HP) |
| 521 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 522 | 60 HP (50 HP) |
| 523 | 25 HP |
| 524 | 20 HP |
| 525 | 15 HP |
| 526 | 12.5 HP |
| 527 | 12 HP (10 HP) |
| 528 | 10 HP |
| 529 | 8 HP (7.5 HP) |
| 530 | 7.5 HP |
| 531 | 7 HP (5 HP) |
| 532 | 6 HP (5 HP) |
| 533 | 4 HP (3 HP) |
| 534 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 535 | 60 HP (50 HP) |
| 536 | 25 HP |
| 537 | 20 HP |
| 538 | 15 HP |
| 539 | 12.5 HP |
| 540 | 12 HP (10 HP) |
| 541 | 10 HP |
| 542 | 8 HP (7.5 HP) |
| 543 | 7.5 HP |
| 544 | 7 HP (5 HP) |
| 545 | 6 HP (5 HP) |
| 546 | 4 HP (3 HP) |
| 547 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 548 | 60 HP (50 HP) |
| 549 | 25 HP |
| 550 | 20 HP |
| 551 | 15 HP |
| 552 | 12.5 HP |
| 553 | 12 HP (10 HP) |
| 554 | 10 HP |
| 555 | 8 HP (7.5 HP) |
| 556 | 7.5 HP |
| 557 | 7 HP (5 HP) |
| 558 | 6 HP (5 HP) |
| 559 | 4 HP (3 HP) |
| 560 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 561 | 60 HP (50 HP) |
| 562 | 25 HP |
| 563 | 20 HP |
| 564 | 15 HP |
| 565 | 12.5 HP |
| 566 | 12 HP (10 HP) |
| 567 | 10 HP |
| 568 | 8 HP (7.5 HP) |
| 569 | 7.5 HP |
| 570 | 7 HP (5 HP) |
| 571 | 6 HP (5 HP) |
| 572 | 4 HP (3 HP) |
| 573 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 574 | 60 HP (50 HP) |
| 575 | 25 HP |
| 576 | 20 HP |
| 577 | 15 HP |
| 578 | 12.5 HP |
| 579 | 12 HP (10 HP) |
| 580 | 10 HP |
| 581 | 8 HP (7.5 HP) |
| 582 | 7.5 HP |
| 583 | 7 HP (5 HP) |
| 584 | 6 HP (5 HP) |
| 585 | 4 HP (3 HP) |
| 586 | Towards the charges for attending the repair works in Star Delta Starter |
| 587 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 588 | 60 HP (50 HP) |
| 589 | 35 HP (30 HP) |
| 590 | 30 HP |
| 591 | 25 HP |
| 592 | 20 HP |
| 593 | 15 HP |
| 594 | 12.5 HP |
| 595 | 12 HP (10 HP) |
| 596 | 10 HP |
| 597 | 7.5 HP |
| 598 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 599 | 60 HP (50 HP) |
| 600 | 35 HP (30 HP) |
| 601 | 30 HP |
| 602 | 25 HP |
| 603 | 20 HP |
| 604 | 15 HP |
| 605 | 12.5 HP |
| 606 | 12 HP (10 HP) |
| 607 | 10 HP |
| 608 | 7.5 HP |
| 609 | Supply and Delivery of PLA Safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 610 | 60 HP (50 HP) |
| 611 | 35 HP (30 HP) |
| 612 | 30 HP |
| 613 | 25 HP |
| 614 | 20 HP |
| 615 | 15 HP |
| 616 | 12.5 HP |
| 617 | 12 HP (10 HP) |
| 618 | 10 HP |
| 619 | 7.5 HP |
| 620 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 621 | 60 HP (50 HP) |
| 622 | 35 HP (30 HP) |
| 623 | 30 HP |
| 624 | 25 HP |
| 625 | 20 HP |
| 626 | 15 HP |
| 627 | 12.5 HP |
| 628 | 12 HP (10 HP) |
| 629 | 10 HP |
| 630 | 7.5 HP |
| 631 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 632 | 60 HP (50 HP) |
| 633 | 35 HP (30 HP) |
| 634 | 30 HP |
| 635 | 25 HP |
| 636 | 20 HP |
| 637 | 15 HP |
| 638 | 12.5 HP |
| 639 | 12 HP (10 HP) |
| 640 | 10 HP |
| 641 | 7.5 HP |
| 642 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 643 | 60 HP (50 HP) |
| 644 | 35 HP (30 HP) |
| 645 | 30 HP |
| 646 | 25 HP |
| 647 | 20 HP |
| 648 | 15 HP |
| 649 | 12.5 HP |
| 650 | 12 HP (10 HP) |
| 651 | 10 HP |
| 652 | 7.5 HP |
| 653 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 654 | 25 HP |
| 655 | 20 HP |
| 656 | 15 HP |
| 657 | 12.5 HP |
| 658 | 12 HP (10 HP) |
| 659 | 10 HP |
| 660 | 7.5 HP |
| 661 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 662 | 60 HP (50 HP) |
| 663 | 35 HP (30 HP) |
| 664 | 30 HP |
| 665 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 666 | 60 HP (50 HP) |
| 667 | 35 HP (30 HP) |
| 668 | 30 HP |
| 669 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 670 | 60 HP (50 HP) |
| 671 | 35 HP (30 HP) |
| 672 | 30 HP |
| 673 | 25 HP |
| 674 | 20 HP |
| 675 | 15 HP |
| 676 | 12.5 HP |
| 677 | 12 HP (10 HP) |
| 678 | 10 HP |
| 679 | 7.5 HP |
| 680 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 681 | 60 HP (50 HP) |
| 682 | 35 HP (30 HP) |
| 683 | 30 HP |
| 684 | 25 HP |
| 685 | 20 HP |
| 686 | 15 HP |
| 687 | 12.5 HP |
| 688 | 12 HP (10 HP) |
| 689 | 10 HP |
| 690 | 7.5 HP |
| 691 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 692 | 60 HP (50 HP) |
| 693 | 35 HP (30 HP) |
| 694 | 30 HP |
| 695 | 25 HP |
| 696 | 20 HP |
| 697 | 15 HP |
| 698 | 12.5 HP |
| 699 | 12 HP (10 HP) |
| 700 | 10 HP |
| 701 | 7.5 HP |
| 702 | Towards the charges for attending the repair works in DOL Starter |
| 703 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter etc., complete and as directed by TWAD Board officers |
| 704 | 7 HP (5 HP) |
| 705 | 6 HP (5 HP) |
| 706 | 4 HP(3HP) |
| 707 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 708 | 7 HP (5HP) |
| 709 | 6 HP (5HP) |
| 710 | 4 HP (3 HP) |
| 711 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 712 | 7 HP (5HP) |
| 713 | 6 HP (5HP) |
| 714 | 4 HP (3 HP) |
| 715 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 716 | 7 HP(5HP) |
| 717 | 6 HP (5HP) |
| 718 | 4 HP (3HP) |
| 719 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 720 | 7 HP (5HP) |
| 721 | 6 HP (5HP) |
| 722 | 4 HP(3HP) |
| 723 | Towards the charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the departmental officers |
| 724 | Vanniya Nagar WTP 7.25 LL |
| 725 | Iruppali Wayside 2.00 LL |
| 726 | Iruppali Wayside 1.50 LL |
| 727 | Kallukadai Medu 2.50 LL |
| 728 | Poosarimoopanvalavu 6.00 LL |
| 729 | Adaiyur 2.00 LL |
| 730 | Pakkanadu 1.90 LL |
| 731 | Pakkanadu 1.50 LL |
| 732 | Mettutheru 1.50 LL |
| 733 | Aduvapatty 0.60 LL |
| 734 | Kalluralkadu 0.60 LL |
| 735 | Anaipallam 0.80 LL |
| 736 | Chettikadu 1.10 LL |
| 737 | Maattuperumal Koil 0.30 LL |
| 738 | Iruppali Booster Station 42.72LL |
| 739 | Ottapatty 4.00 LL |
| 740 | Ammankoil 2.50 LL |
| 741 | Vembaneri 2.00 LL |
| 742 | Vembaneri 1.00 LL |
| 743 | Samudram Booster Station 6.60 LL |
| 744 | Chinnappampatti 3.30LL |
| 745 | Chinnappampatti 1.00 LL |
| 746 | Akkkaraipatty 1.60 LL |
| 747 | Sengadu 1.00 LL |
| 748 | Sengadu 1.70 LL |
| 749 | Samudram Wayside 1.20 LL |
| 750 | Chithrapalayam 1.00 LL |
| 751 | Veveri Theru Moolakadai 1.00 LL |
| 752 | Pudupalayam 1.00 LL |
| 753 | Pudupalayam New 2.40 LL |
| 754 | Senthilpalayam BS 11.00 LL |
| 755 | Sadayampalayam 1.00 LL |
| 756 | Sadayampalayam New 2.20 LL |
| 757 | Katchupalli 1.00 LL |
| 758 | Katchupalli 0.60 LL |
| 759 | Tharakadu 2.00 LL |
| 760 | Kanniyampatti 0.30 LL |
| 761 | Kanniyampatti 0.60 LL |
| 762 | Karattur Palikadu (Kollapatti) 0.10 LL |
| 763 | Karattur Palikadu New 0.60 LL |
| 764 | Ettikuttaimedu 2.00 LL |
| 765 | Ettikuttaimedu New 1.10 LL |
| 766 | Kalarpatti Booster Station 6.91 LL |
| 767 | Vadugapatty 0.30 LL |
| 768 | Pandarathankadu 1.50 LL |
| 769 | A.Pudur 1.50 LL |
| 770 | Pachiammankoil 2.50 LL |
| 771 | Vaikundam 3.00 LL |
| 772 | Sellappampatti 0.30 LL |
| 773 | 327 Eagapuram 0.70 LL |
| 774 | 327 Thappakuttai 1.05 LL |
| 775 | 327 Naduvaneri 0.90 LL |
| 776 | 327 A.Pudur 1.00 LL |
| 777 | 327 Vaikundam 1.05 LL |
| 778 | 327 kannantheri 0.55 LL |
| 779 | 327 Ernapuram 0.90 LL |
| 780 | 327 Gudalur 0.85 LL |
| 781 | 327 KG Palayam 0.60 LL |
| 782 | 327 Thalaiyur 0.75 LL |
| 783 | Vanichampatty BS 7.06 LL |
| 784 | Irusagoundanvalavu 6.29 LL |
| 785 | Amarakundhi BS 4.00 LL |
| 786 | Edanganasalai BS 19.79 LL |
| 787 | Karunganur sump 0.60 LL |
| 788 | Kalarpatty sump 1.50 LL |
| 789 | Kurukkupattiyanvalavu sump 1.00 LL |
| 790 | Panickanur sump 0.60 LL |
| 791 | Selavadai sump 1.50 LL |
| 792 | Nathiyampatty sump 4.00 LL |
| 793 | Duttampatty sump 1.00 LL |
| 794 | Thoppampatty sump 1.50 LL |
| 795 | Kurukkupatty sump 1.00 LL |
| 796 | Lakshmayur sump 1.50 LL |
| 797 | Pothanur sump 1.00 LL |
| 798 | K.R.Thoppur sump 4.00 LL |
| 799 | Karukkalvadi sump 4.00 LL |
| 800 | Mallikuttai sump 0.50 LL |
| 801 | Nadarmoopan theru 1.00 LL |
| 802 | Manathal sump 1.00 LL |
| 803 | K.S.Pettai sump 0.50 LL |
| 804 | Ariyampatti sump 0.30 LL |
| 805 | Karattur sump 0.60 LL |
| 806 | Sedapatty sump 1.00 LL |
| 807 | Duttampatty New Sump 2.10 LL |
| 808 | Alagusamudram 1.10LL |
| 809 | Gudalur 0.95 LL |
| 810 | Naduvaneri 1.80 LL |
| 811 | Egapuram 1.20 LL |
| 812 | Kottamedu 1.00 LL |
| 813 | Aayamarathumedu 1.00 LL |
| 814 | Mottur 1.00 LL |
| 815 | Arurpatty Eri Sump 1.00 LL |
| 816 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 817 | For a period from 01.04.2027 to 31.03.2028 |
| 818 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 819 | Attending DI pipe lines |
| 820 | Burst Pipe replacement |
| 821 | 500 mm DI Pipe |
| 822 | 450 mm DI Pipe |
| 823 | 400 mm DI Pipe |
| 824 | 350 mm DI Pipe |
| 825 | 300 mm DI Pipe |
| 826 | 250 mm DI Pipe |
| 827 | 200 mm DI Pipe |
| 828 | 150 mm DI Pipe |
| 829 | 100 mm DI Pipe |
| 830 | Leak-single MJ Collar |
| 831 | 500 mm DI Pipe |
| 832 | 450 mm DI Pipe |
| 833 | 400 mm DI Pipe |
| 834 | 350 mm DI Pipe |
| 835 | 300 mm DI Pipe |
| 836 | 250 mm DI Pipe |
| 837 | 200 mm DI Pipe |
| 838 | 150 mm DI Pipe |
| 839 | 100 mm DI Pipe |
| 840 | Leak- cut Barrel & MJ Collar |
| 841 | 500 mm DI Pipe |
| 842 | 450 mm DI Pipe |
| 843 | 400 mm DI Pipe |
| 844 | 350 mm DI Pipe |
| 845 | 300 mm DI Pipe |
| 846 | 250 mm DI Pipe |
| 847 | 200 mm DI Pipe |
| 848 | 150 mm DI Pipe |
| 849 | 100 mm DI Pipe |
| 850 | Leak- specials Cement Joint |
| 851 | 500 mm DI Pipe |
| 852 | 450 mm DI Pipe |
| 853 | 400 mm DI Pipe |
| 854 | 350 mm DI Pipe |
| 855 | 300 mm DI Pipe |
| 856 | 250 mm DI Pipe |
| 857 | 200 mm DI Pipe |
| 858 | 150 mm DI Pipe |
| 859 | 100 mm DI Pipe |
| 860 | Leak-Gasket Joint |
| 861 | 500 mm DI Pipe |
| 862 | 450 mm DI Pipe |
| 863 | 400 mm DI Pipe |
| 864 | 350 mm DI Pipe |
| 865 | 300 mm DI Pipe |
| 866 | 250 mm DI Pipe |
| 867 | 200 mm DI Pipe |
| 868 | 150 mm DI Pipe |
| 869 | 100 mm DI Pipe |
| 870 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 871 | ATTENDING BURST IN AC PIPE LINES |
| 872 | Using MS Step Collar Leak |
| 873 | 200 mm AC pipe |
| 874 | 250 mm AC pipe |
| 875 | Using MS barrel pipe |
| 876 | 200 mm AC pipe |
| 877 | 250 mm AC pipe |
| 878 | AC pipe coupler burst using MS plain coller |
| 879 | 200 mm AC pipe |
| 880 | 250 mm AC pipe |
| 881 | AC pipe coupler leak |
| 882 | 200 mm AC pipe |
| 883 | 250 mm AC pipe |
| 884 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 885 | ATTENDING BURST IN PSC PIPE LINES |
| 886 | USING MS STEP COLLAR |
| 887 | 700mm PSC pipe |
| 888 | 800mm PSC pipe |
| 889 | 900mm PSC pipe |
| 890 | 1000mm PSC pipe |
| 891 | USING MS BARREL PIPE |
| 892 | 700mm PSC pipe |
| 893 | 800mm PSC pipe |
| 894 | 900mm PSC pipe |
| 895 | 1000mm PSC pipe |
| 896 | PSC pipe leak using MS plain coller |
| 897 | 700mm PSC pipe |
| 898 | 800mm PSC pipe |
| 899 | 900mm PSC pipe |
| 900 | 1000mm PSC pipe |
| 901 | PSC Cement joint leak |
| 902 | 700mm PSC pipe |
| 903 | 800mm PSC pipe |
| 904 | 900mm PSC pipe |
| 905 | 1000mm PSC pipe |
| 906 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 907 | ATTENDING HDPE PIPE LINES |
| 908 | LEAK HDPE FUSION JOINT |
| 909 | 63 mm HDPE - PN 6 Pipe |
| 910 | 75 mm HDPE - PN 6 Pipe |
| 911 | 90 mm HDPE - PN 6 Pipe |
| 912 | 110 mm HDPE - PN 6 Pipe |
| 913 | 125 mm HDPE - PN 6 Pipe |
| 914 | 140 mm HDPE - PN 6 Pipe |
| 915 | 160 mm HDPE - PN 6 Pipe |
| 916 | 180 mm HDPE - PN 6 Pipe |
| 917 | 200 mm HDPE - PN 6 Pipe |
| 918 | LEAK HDPE COUPLER JOINT |
| 919 | 63 mm HDPE - PN 6 Pipe |
| 920 | 75 mm HDPE - PN 6 Pipe |
| 921 | 90 mm HDPE - PN 6 Pipe |
| 922 | 110 mm HDPE - PN 6 Pipe |
| 923 | 125 mm HDPE - PN 6 Pipe |
| 924 | 140 mm HDPE - PN 6 Pipe |
| 925 | 160 mm HDPE - PN 6 Pipe |
| 926 | 180 mm HDPE - PN 6 Pipe |
| 927 | 200 mm HDPE - PN 6 Pipe |
| 928 | BURST HDPE |
| 929 | 63 mm HDPE - PN 6 Pipe |
| 930 | 75 mm HDPE - PN 6 Pipe |
| 931 | 90 mm HDPE - PN 6 Pipe |
| 932 | 110 mm HDPE - PN 6 Pipe |
| 933 | 125 mm HDPE - PN 6 Pipe |
| 934 | 140 mm HDPE - PN 6 Pipe |
| 935 | 160 mm HDPE - PN 6 Pipe |
| 936 | 180 mm HDPE - PN 6 Pipe |
| 937 | 200 mm HDPE - PN 6 Pipe |
| 938 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 939 | ATTENDING PVC PIPE LINES - LEAK PVC |
| 940 | Leak PVC |
| 941 | 63 mm OD PVC - 6 Ksc Pipe |
| 942 | 75 mm OD PVC - 6 Ksc Pipe |
| 943 | 90 mm OD PVC - 6 Ksc Pipe |
| 944 | 110 mm OD PVC - 6 Ksc Pipe |
| 945 | 140 mm OD PVC - 6 Ksc Pipe |
| 946 | 160 mm OD PVC - 6 Ksc Pipe |
| 947 | Burst in PVC Pipes |
| 948 | 63 mm OD PVC - 6 Ksc Pipe |
| 949 | 75 mm OD PVC - 6 Ksc Pipe |
| 950 | 90 mm OD PVC - 6 Ksc Pipe |
| 951 | 110 mm OD PVC - 6 Ksc Pipe |
| 952 | 140 mm OD PVC - 6 Ksc Pipe |
| 953 | 160 mm OD PVC - 6 Ksc Pipe |
| 954 | Towards the charges for attending Repair and Reconditioning of various size of Sluice Valves |
| 955 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials. |
| 956 | Sluice Valve - 80 mm |
| 957 | Sluice Valve - 100 mm |
| 958 | Sluice Valve - 150 mm |
| 959 | Sluice Valve - 200 mm |
| 960 | Sluice Valve - 250 mm |
| 961 | Sluice Valve - 300 mm |
| 962 | Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc., |
| 963 | Sluice Valve - 80 mm |
| 964 | Sluice Valve - 100 mm |
| 965 | Sluice Valve - 150 mm |
| 966 | Sluice Valve - 200 mm |
| 967 | Sluice Valve - 250 mm |
| 968 | Sluice Valve - 300 mm |
| 969 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials and as directed by the TWAD Board officers |
| 970 | Sluice Valve - 80 mm |
| 971 | Sluice Valve - 100 mm |
| 972 | Sluice Valve - 150 mm |
| 973 | Sluice Valve - 200 mm |
| 974 | Sluice Valve - 250 mm |
| 975 | Sluice Valve - 300 mm |
| 976 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials and as directed by TWAD borad officers |
| 977 | Sluice Valve - 80 mm |
| 978 | Sluice Valve - 100 mm |
| 979 | Sluice Valve - 150 mm |
| 980 | Sluice Valve - 200 mm |
| 981 | Sluice Valve - 250 mm |
| 982 | Sluice Valve - 300 mm |
| 983 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by TWAD borad officers |
| 984 | Sluice Valve - 80 mm |
| 985 | Sluice Valve - 100 mm |
| 986 | Sluice Valve - 150 mm |
| 987 | Sluice Valve - 200 mm |
| 988 | Sluice Valve - 250 mm |
| 989 | Sluice Valve - 300 mm |
| 990 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc.,and as directed by TWAD borad officers |
| 991 | Sluice Valve - 80 mm |
| 992 | Sluice Valve - 100 mm |
| 993 | Sluice Valve - 150 mm |
| 994 | Sluice Valve - 200 mm |
| 995 | Sluice Valve - 250 mm |
| 996 | Sluice Valve - 300 mm |
| 997 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the departmental Officers |
| 998 | 200 mm |
| 999 | 150 mm |
| 1000 | 100 mm |
| 1001 | 80 mm |
| 1002 | 50 mm |
| 1003 | 25 mm |
| 1004 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete and as directed by the departmental Officers |
| 1005 | 100 mm |
| 1006 | 80 mm |
| 1007 | 65 mm |
| 1008 | 50 mm |
| 1009 | Supply and delivery of the following G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications at the site of work to carryout the general maintenance works etc., complete and as directed by TWAD Board officers |
| 1010 | 50 mm G.M. Non Return valves |
| 1011 | 65 mm G.M. Non Return valves |
| 1012 | 80 mm G.M. Non Return valves |
| 1013 | Supply and delivery of CI SINGLE AIR VALVE AS PER ISI 14845/2000 AND WITH 5 YEARS WARRANTY etc., complete and as directed by TWAD Board officers25mm CI Air valve |
| 1014 | VT Pumpset |
| 1015 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1016 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump etc., complete and as directed by TWAD Board officers |
| 1017 | 380 HP VT (375 HP) |
| 1018 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works etc., complete and as directed by TWAD Board officers |
| 1019 | 380 HP VT (310HP) |
| 1020 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers |
| 1021 | 380 HP VT (375 HP) |
| 1022 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete and as directed by TWAD Board officers. |
| 1023 | 380 HP VT (375 HP) |
| 1024 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc., complete and as directed by TWAD Board officers |
| 1025 | 380 HP VT (375 HP) |
| 1026 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers |
| 1027 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly 380 HP VT (375 HP) |
| 1028 | 380 HP VT (375 HP) |
| 1029 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc., complete and as directed by TWAD Board officers |
| 1030 | 380 HP VT (375 HP) |
| 1031 | VT Pumpset |
| 1032 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1033 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 1034 | 380 HP VT |
| 1035 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 1036 | 380 HP VT |
| 1037 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly etc., complete and as directed by TWAD Board officers |
| 1038 | 380 HP VT |
| 1039 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 1040 | 380 HP VT |
| 1041 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) etc., complete and as directed by TWAD Board officers |
| 1042 | 380 HP VT |
| 1043 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1044 | 380 HP VT |
| 1045 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1046 | 380 HP VT |
| 1047 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1048 | 380 HP VT |
| 1049 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1050 | 380 HP VT |
| 1051 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 1052 | 380 HP VT |
| 1053 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 1054 | 380 HP VT |
| 1055 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 1056 | 380 HP VT |
| 1057 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 1058 | 380 HP VT |
| 1059 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components etc., complete and as directed by TWAD Board officers |
| 1060 | 380 HP VT |
| 1061 | VT Motor |
| 1062 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 1063 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1064 | 380 HP VT (375 HP) |
| 1065 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1066 | 380 HP VT (375 HP) |
| 1067 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by TWAD Board officers |
| 1068 | 380 HP VT (375 HP) |
| 1069 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 1070 | 380 HP VT (375 HP) |
| 1071 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., complete and as directed by TWAD Board officers |
| 1072 | 380 HP VT (375 HP) |
| 1073 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by TWAD Board officers |
| 1074 | 380 HP VT (375 HP) |
| 1075 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 1076 | 380 HP VT (375 HP) |
| 1077 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by TWAD Board officers |
| 1078 | 380 HP VT (375 HP) |
| 1079 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 1080 | 380 HP VT (375 HP) |
| 1081 | HSC Pumpsets |
| 1082 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 1083 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1084 | 220 HP |
| 1085 | 170 HP |
| 1086 | 110 HP |
| 1087 | 100 HP |
| 1088 | 75 HP |
| 1089 | 35 HP |
| 1090 | 30 HP |
| 1091 | 22.5 HP |
| 1092 | 17.5 HP |
| 1093 | 12.5 HP |
| 1094 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1095 | 220 HP |
| 1096 | 170 HP |
| 1097 | 110 HP |
| 1098 | 100 HP |
| 1099 | 75 HP |
| 1100 | 35 HP |
| 1101 | 30 HP |
| 1102 | 22.5 HP |
| 1103 | 17.5 HP |
| 1104 | 12.5 HP |
| 1105 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings etc., complete and as directed by TWAD Board officers |
| 1106 | 220 HP |
| 1107 | 170 HP |
| 1108 | 110 HP |
| 1109 | 100 HP |
| 1110 | 75 HP |
| 1111 | 35 HP |
| 1112 | 30 HP |
| 1113 | 22.5 HP |
| 1114 | 17.5 HP |
| 1115 | 12.5 HP |
| 1116 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking etc., complete and as directed by TWAD Board officers, |
| 1117 | 220 HP |
| 1118 | 170 HP |
| 1119 | 110 HP |
| 1120 | 100 HP |
| 1121 | 75 HP |
| 1122 | 35 HP |
| 1123 | 30 HP |
| 1124 | 22.5 HP |
| 1125 | 17.5 HP |
| 1126 | 12.5 HP |
| 1127 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 1128 | 220 HP |
| 1129 | 170 HP |
| 1130 | 110 HP |
| 1131 | 100 HP |
| 1132 | 75 HP |
| 1133 | 35 HP |
| 1134 | 30 HP |
| 1135 | 22.5 HP |
| 1136 | 17.5 HP |
| 1137 | 12.5 HP |
| 1138 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine etc., complete and as directed by TWAD Board officers |
| 1139 | 220 HP |
| 1140 | 170 HP |
| 1141 | 110 HP |
| 1142 | 100 HP |
| 1143 | 75 HP |
| 1144 | 35 HP |
| 1145 | 30 HP |
| 1146 | 22.5 HP |
| 1147 | 17.5 HP |
| 1148 | 12.5 HP |
| 1149 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 1150 | 220 HP |
| 1151 | 170 HP |
| 1152 | 110 HP |
| 1153 | 100 HP |
| 1154 | 75 HP |
| 1155 | 35 HP |
| 1156 | 30 HP |
| 1157 | 22.5 HP |
| 1158 | 17.5 HP |
| 1159 | 12.5 HP |
| 1160 | Supply and delivery of Driven End and Non Driven End bearings etc., complete and as directed by TWAD Board officers |
| 1161 | 220 HP |
| 1162 | 170 HP |
| 1163 | 110 HP |
| 1164 | 100 HP |
| 1165 | 75 HP |
| 1166 | 35 HP |
| 1167 | 30 HP |
| 1168 | 22.5 HP |
| 1169 | 17.5 HP |
| 1170 | 12.5 HP |
| 1171 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 1172 | 220 HP |
| 1173 | 170 HP |
| 1174 | 110 HP |
| 1175 | 100 HP |
| 1176 | 75 HP |
| 1177 | 35 HP |
| 1178 | 30 HP |
| 1179 | 22.5 HP |
| 1180 | 17.5 HP |
| 1181 | 12.5 HP |
| 1182 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 1183 | 220 HP |
| 1184 | 170 HP |
| 1185 | 110 HP |
| 1186 | 100 HP |
| 1187 | 75 HP |
| 1188 | 35 HP |
| 1189 | 30 HP |
| 1190 | 22.5 HP |
| 1191 | 17.5 HP |
| 1192 | 12.5 HP |
| 1193 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 1194 | 220 HP |
| 1195 | 170 HP |
| 1196 | 110 HP |
| 1197 | 100 HP |
| 1198 | 75 HP |
| 1199 | 35 HP |
| 1200 | 30 HP |
| 1201 | 22.5 HP |
| 1202 | 17.5 HP |
| 1203 | 12.5 HP |
| 1204 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 1205 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1206 | 220 HP |
| 1207 | 170 HP |
| 1208 | 110 HP |
| 1209 | 100 HP |
| 1210 | 75 HP |
| 1211 | 35 HP |
| 1212 | 30 HP |
| 1213 | 22.5 HP |
| 1214 | 17.5 HP |
| 1215 | 12.5 HP |
| 1216 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1217 | 220 HP |
| 1218 | 170 HP |
| 1219 | 110 HP |
| 1220 | 100 HP |
| 1221 | 75 HP |
| 1222 | 35 HP |
| 1223 | 30 HP |
| 1224 | 22.5 HP |
| 1225 | 17.5 HP |
| 1226 | 12.5 HP |
| 1227 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings etc., complete and as directed by TWAD Board officers |
| 1228 | 220 HP |
| 1229 | 170 HP |
| 1230 | 110 HP |
| 1231 | 100 HP |
| 1232 | 75 HP |
| 1233 | 35 HP |
| 1234 | 30 HP |
| 1235 | 22.5 HP |
| 1236 | 17.5 HP |
| 1237 | 12.5 HP |
| 1238 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 1239 | 220 HP |
| 1240 | 170 HP |
| 1241 | 110 HP |
| 1242 | 100 HP |
| 1243 | 75 HP |
| 1244 | 35 HP |
| 1245 | 30 HP |
| 1246 | 22.5 HP |
| 1247 | 17.5 HP |
| 1248 | 12.5 HP |
| 1249 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking,etc., complete and as directed by TWAD Board officers |
| 1250 | 220 HP |
| 1251 | 170 HP |
| 1252 | 110 HP |
| 1253 | 100 HP |
| 1254 | 75 HP |
| 1255 | 35 HP |
| 1256 | 30 HP |
| 1257 | 22.5 HP |
| 1258 | 17.5 HP |
| 1259 | 12.5 HP |
| 1260 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor etc., complete and as directed by TWAD Board officers |
| 1261 | 220 HP |
| 1262 | 170 HP |
| 1263 | 110 HP |
| 1264 | 100 HP |
| 1265 | 75 HP |
| 1266 | 35 HP |
| 1267 | 30 HP |
| 1268 | 22.5 HP |
| 1269 | 17.5 HP |
| 1270 | 12.5 HP |
| 1271 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 1272 | 220 HP |
| 1273 | 170 HP |
| 1274 | 110 HP |
| 1275 | 100 HP |
| 1276 | 75 HP |
| 1277 | 35 HP |
| 1278 | 30 HP |
| 1279 | 22.5 HP |
| 1280 | 17.5 HP |
| 1281 | 12.5 HP |
| 1282 | Transportation charges for conveying the motor from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 1283 | 220 HP |
| 1284 | 170 HP |
| 1285 | 110 HP |
| 1286 | 100 HP |
| 1287 | 75 HP |
| 1288 | 35 HP |
| 1289 | 30 HP |
| 1290 | 22.5 HP |
| 1291 | 17.5 HP |
| 1292 | 12.5 HP |
| 1293 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 1294 | 220 HP |
| 1295 | 170 HP |
| 1296 | 110 HP |
| 1297 | 100 HP |
| 1298 | 75 HP |
| 1299 | 35 HP |
| 1300 | 30 HP |
| 1301 | 22.5 HP |
| 1302 | 17.5 HP |
| 1303 | 12.5 HP |
| 1304 | OWS Pumpsets & Motors |
| 1305 | Attending the Repair and Renewal works in Submersible Pumpset |
| 1306 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 1307 | 60 HP |
| 1308 | 25 HP |
| 1309 | 20 HP |
| 1310 | 15 HP |
| 1311 | 12.5 HP |
| 1312 | 12 HP |
| 1313 | 10 HP |
| 1314 | 7.5 HP |
| 1315 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 1316 | 60 HP |
| 1317 | 25 HP |
| 1318 | 20 HP |
| 1319 | 15 HP |
| 1320 | 12.5 HP |
| 1321 | 12 HP |
| 1322 | 10 HP |
| 1323 | 7.5 HP |
| 1324 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 1325 | 60 HP |
| 1326 | 25 HP |
| 1327 | 20 HP |
| 1328 | 15 HP |
| 1329 | 12.5 HP |
| 1330 | 12 HP |
| 1331 | 10 HP |
| 1332 | 7.5 HP |
| 1333 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 1334 | 60 HP |
| 1335 | 25 HP |
| 1336 | 20 HP |
| 1337 | 15 HP |
| 1338 | 12.5 HP |
| 1339 | 12 HP |
| 1340 | 10 HP |
| 1341 | 7.5 HP |
| 1342 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 1343 | 60 HP |
| 1344 | 25 HP |
| 1345 | 20 HP |
| 1346 | 15 HP |
| 1347 | 12.5 HP |
| 1348 | 12 HP |
| 1349 | 10 HP |
| 1350 | 7.5 HP |
| 1351 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 1352 | 60 HP |
| 1353 | 25 HP |
| 1354 | 20 HP |
| 1355 | 15 HP |
| 1356 | 12.5 HP |
| 1357 | 12 HP |
| 1358 | 10 HP |
| 1359 | 7.5 HP |
| 1360 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 1361 | 60 HP |
| 1362 | 25 HP |
| 1363 | 20 HP |
| 1364 | 15 HP |
| 1365 | 12.5 HP |
| 1366 | 12 HP |
| 1367 | 10 HP |
| 1368 | 7.5 HP |
| 1369 | Towards the charges for attending the repair works in Star Delta Starter |
| 1370 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 1371 | 60 HP |
| 1372 | 35 HP |
| 1373 | 30 HP |
| 1374 | 25 HP |
| 1375 | 20 HP |
| 1376 | 15 HP |
| 1377 | 12.5 HP |
| 1378 | 12 HP |
| 1379 | 10 HP |
| 1380 | 7.5 HP |
| 1381 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 1382 | 60 HP |
| 1383 | 35 HP |
| 1384 | 30 HP |
| 1385 | 25 HP |
| 1386 | 20 HP |
| 1387 | 15 HP |
| 1388 | 12.5 HP |
| 1389 | 12 HP |
| 1390 | 10 HP |
| 1391 | 7.5 HP |
| 1392 | Supply and Delivery of PLA Safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 1393 | 60 HP |
| 1394 | 35 HP |
| 1395 | 30 HP |
| 1396 | 25 HP |
| 1397 | 20 HP |
| 1398 | 15 HP |
| 1399 | 12.5 HP |
| 1400 | 12 HP |
| 1401 | 10 HP |
| 1402 | 7.5 HP |
| 1403 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 1404 | 60 HP |
| 1405 | 35 HP |
| 1406 | 30 HP |
| 1407 | 25 HP |
| 1408 | 20 HP |
| 1409 | 15 HP |
| 1410 | 12.5 HP |
| 1411 | 12 HP |
| 1412 | 10 HP |
| 1413 | 7.5 HP |
| 1414 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 1415 | 60 HP |
| 1416 | 35 HP |
| 1417 | 30 HP |
| 1418 | 25 HP |
| 1419 | 20 HP |
| 1420 | 15 HP |
| 1421 | 12.5 HP |
| 1422 | 12 HP |
| 1423 | 10 HP |
| 1424 | 7.5 HP |
| 1425 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 1426 | 60 HP |
| 1427 | 35 HP |
| 1428 | 30 HP |
| 1429 | 25 HP |
| 1430 | 20 HP |
| 1431 | 15 HP |
| 1432 | 12.5 HP |
| 1433 | 12 HP |
| 1434 | 10 HP |
| 1435 | 7.5 HP |
| 1436 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 1437 | 25 HP |
| 1438 | 20 HP |
| 1439 | 15 HP |
| 1440 | 12.5 HP |
| 1441 | 12 HP |
| 1442 | 10 HP |
| 1443 | 7.5 HP |
| 1444 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 1445 | 60 HP |
| 1446 | 35 HP |
| 1447 | 30 HP |
| 1448 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 1449 | 60 HP |
| 1450 | 35 HP |
| 1451 | 30 HP |
| 1452 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 1453 | 60 HP |
| 1454 | 35 HP |
| 1455 | 30 HP |
| 1456 | 25 HP |
| 1457 | 20 HP |
| 1458 | 15 HP |
| 1459 | 12.5 HP |
| 1460 | 12 HP |
| 1461 | 10 HP |
| 1462 | 7.5 HP |
| 1463 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 1464 | 60 HP |
| 1465 | 35 HP |
| 1466 | 30 HP |
| 1467 | 25 HP |
| 1468 | 20 HP |
| 1469 | 15 HP |
| 1470 | 12.5 HP |
| 1471 | 12 HP |
| 1472 | 10 HP |
| 1473 | 7.5 HP |
| 1474 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 1475 | 60 HP |
| 1476 | 35 HP |
| 1477 | 30 HP |
| 1478 | 25 HP |
| 1479 | 20 HP |
| 1480 | 15 HP |
| 1481 | 12.5 HP |
| 1482 | 12 HP |
| 1483 | 10 HP |
| 1484 | 7.5 HP |
| 1485 | Towards the charges for attending the repair works in DOL Starter |
| 1486 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter etc., complete and as directed by TWAD Board officers |
| 1487 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 1488 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 1489 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 1490 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 1491 | Towards the charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the departmental officers |
| 1492 | Vanniya Nagar WTP 7.25 LL |
| 1493 | Iruppali Wayside 2.00 LL |
| 1494 | Iruppali Wayside 1.50 LL |
| 1495 | Kallukadai Medu 2.50 LL |
| 1496 | Poosarimoopanvalavu 6.00 LL |
| 1497 | Adaiyur 2.00 LL |
| 1498 | Pakkanadu 1.90 LL |
| 1499 | Pakkanadu 1.50 LL |
| 1500 | Mettutheru 1.50 LL |
| 1501 | Aduvapatty 0.60 LL |
| 1502 | Kalluralkadu 0.60 LL |
| 1503 | Anaipallam 0.80 LL |
| 1504 | Chettikadu 1.10 LL |
| 1505 | Maattuperumal Koil 0.30 LL |
| 1506 | Iruppali Booster Station 42.72LL |
| 1507 | Ottapatty 4.00 LL |
| 1508 | Ammankoil 2.50 LL |
| 1509 | Vembaneri 2.00 LL |
| 1510 | Vembaneri 1.00 LL |
| 1511 | Samudram Booster Station 6.60 LL |
| 1512 | Chinnappampatti 3.30LL |
| 1513 | Chinnappampatti 1.00 LL |
| 1514 | Akkkaraipatty 1.60 LL |
| 1515 | Sengadu 1.00 LL |
| 1516 | Sengadu 1.70 LL |
| 1517 | Samudram Wayside 1.20 LL |
| 1518 | Chithrapalayam 1.00 LL |
| 1519 | Veveri Theru Moolakadai 1.00 LL |
| 1520 | Pudupalayam 1.00 LL |
| 1521 | Pudupalayam New 2.40 LL |
| 1522 | Senthilpalayam BS 11.00 LL |
| 1523 | Sadayampalayam 1.00 LL |
| 1524 | Sadayampalayam New 2.20 LL |
| 1525 | Katchupalli 1.00 LL |
| 1526 | Katchupalli 0.60 LL |
| 1527 | Tharakadu 2.00 LL |
| 1528 | Kanniyampatti 0.30 LL |
| 1529 | Kanniyampatti 0.60 LL |
| 1530 | Karattur Palikadu (Kollapatti) 0.10 LL |
| 1531 | Karattur Palikadu New 0.60 LL |
| 1532 | Ettikuttaimedu 2.00 LL |
| 1533 | Ettikuttaimedu New 1.10 LL |
| 1534 | Kalarpatti Booster Station 6.91 LL |
| 1535 | Vadugapatty 0.30 LL |
| 1536 | Pandarathankadu 1.50 LL |
| 1537 | A.Pudur 1.50 LL |
| 1538 | Pachiammankoil 2.50 LL |
| 1539 | Vaikundam 3.00 LL |
| 1540 | Sellappampatti 0.30 LL |
| 1541 | 327 Eagapuram 0.70 LL |
| 1542 | 327 Thappakuttai 1.05 LL |
| 1543 | 327 Naduvaneri 0.90 LL |
| 1544 | 327 A.Pudur 1.00 LL |
| 1545 | 327 Vaikundam 1.05 LL |
| 1546 | 327 kannantheri 0.55 LL |
| 1547 | 327 Ernapuram 0.90 LL |
| 1548 | 327 Gudalur 0.85 LL |
| 1549 | 327 KG Palayam 0.60 LL |
| 1550 | 327 Thalaiyur 0.75 LL |
| 1551 | Vanichampatty BS 7.06 LL |
| 1552 | Irusagoundanvalavu 6.29 LL |
| 1553 | Amarakundhi BS 4.00 LL |
| 1554 | Edanganasalai BS 19.79 LL |
| 1555 | Karunganur sump 0.60 LL |
| 1556 | Kalarpatty sump 1.50 LL |
| 1557 | Kurukkupattiyanvalavu sump 1.00 LL |
| 1558 | Panickanur sump 0.60 LL |
| 1559 | Selavadai sump 1.50 LL |
| 1560 | Nathiyampatty sump 4.00 LL |
| 1561 | Duttampatty sump 1.00 LL |
| 1562 | Thoppampatty sump 1.50 LL |
| 1563 | Kurukkupatty sump 1.00 LL |
| 1564 | Lakshmayur sump 1.50 LL |
| 1565 | Pothanur sump 1.00 LL |
| 1566 | K.R.Thoppur sump 4.00 LL |
| 1567 | Karukkalvadi sump 4.00 LL |
| 1568 | Mallikuttai sump 0.50 LL |
| 1569 | Nadarmoopan theru 1.00 LL |
| 1570 | Manathal sump 1.00 LL |
| 1571 | K.S.Pettai sump 0.50 LL |
| 1572 | Ariyampatti sump 0.30 LL |
| 1573 | Karattur sump 0.60 LL |
| 1574 | Sedapatty sump 1.00 LL |
| 1575 | Duttampatty New Sump 2.10 LL |
| 1576 | Alagusamudram 1.10LL |
| 1577 | Gudalur 0.95 LL |
| 1578 | Naduvaneri 1.80 LL |
| 1579 | Egapuram 1.20 LL |
| 1580 | Kottamedu 1.00 LL |
| 1581 | Aayamarathumedu 1.00 LL |
| 1582 | Mottur 1.00 LL |
| 1583 | Arurpatty Eri Sump 1.00 LL |
| 1584 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 1585 | For a period from 01.04.2028 to 31.03.2029 |
| 1586 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1587 | Attending DI pipe lines |
| 1588 | Burst Pipe replacement |
| 1589 | 500 mm DI Pipe |
| 1590 | 450 mm DI Pipe |
| 1591 | 400 mm DI Pipe |
| 1592 | 350 mm DI Pipe |
| 1593 | 300 mm DI Pipe |
| 1594 | 250 mm DI Pipe |
| 1595 | 200 mm DI Pipe |
| 1596 | 150 mm DI Pipe |
| 1597 | 100 mm DI Pipe |
| 1598 | Leak-single MJ Collar |
| 1599 | 500 mm DI Pipe |
| 1600 | 450 mm DI Pipe |
| 1601 | 400 mm DI Pipe |
| 1602 | 350 mm DI Pipe |
| 1603 | 300 mm DI Pipe |
| 1604 | 250 mm DI Pipe |
| 1605 | 200 mm DI Pipe |
| 1606 | 150 mm DI Pipe |
| 1607 | 100 mm DI Pipe |
| 1608 | Leak- cut Barrel & MJ Collar |
| 1609 | 500 mm DI Pipe |
| 1610 | 450 mm DI Pipe |
| 1611 | 400 mm DI Pipe |
| 1612 | 350 mm DI Pipe |
| 1613 | 300 mm DI Pipe |
| 1614 | 250 mm DI Pipe |
| 1615 | 200 mm DI Pipe |
| 1616 | 150 mm DI Pipe |
| 1617 | 100 mm DI Pipe |
| 1618 | Leak- specials Cement Joint |
| 1619 | 500 mm DI Pipe |
| 1620 | 450 mm DI Pipe |
| 1621 | 400 mm DI Pipe |
| 1622 | 350 mm DI Pipe |
| 1623 | 300 mm DI Pipe |
| 1624 | 250 mm DI Pipe |
| 1625 | 200 mm DI Pipe |
| 1626 | 150 mm DI Pipe |
| 1627 | 100 mm DI Pipe |
| 1628 | Leak-Gasket Joint |
| 1629 | 500 mm DI Pipe |
| 1630 | 450 mm DI Pipe |
| 1631 | 400 mm DI Pipe |
| 1632 | 350 mm DI Pipe |
| 1633 | 300 mm DI Pipe |
| 1634 | 250 mm DI Pipe |
| 1635 | 200 mm DI Pipe |
| 1636 | 150 mm DI Pipe |
| 1637 | 100 mm DI Pipe |
| 1638 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1639 | ATTENDING BURST IN AC PIPE LINES |
| 1640 | Using MS Step Collar Leak |
| 1641 | 200 mm AC pipe |
| 1642 | 250 mm AC pipe |
| 1643 | Using MS barrel pipe |
| 1644 | 200 mm AC pipe |
| 1645 | 250 mm AC pipe |
| 1646 | AC pipe coupler burst using MS plain coller |
| 1647 | 200 mm AC pipe |
| 1648 | 250 mm AC pipe |
| 1649 | AC pipe coupler leak |
| 1650 | 200 mm AC pipe |
| 1651 | 250 mm AC pipe |
| 1652 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1653 | ATTENDING BURST IN PSC PIPE LINES |
| 1654 | USING MS STEP COLLAR |
| 1655 | 700mm PSC pipe |
| 1656 | 800mm PSC pipe |
| 1657 | 900mm PSC pipe |
| 1658 | 1000mm PSC pipe |
| 1659 | USING MS BARREL PIPE |
| 1660 | 700mm PSC pipe |
| 1661 | 800mm PSC pipe |
| 1662 | 900mm PSC pipe |
| 1663 | 1000mm PSC pipe |
| 1664 | PSC pipe leak using MS plain coller |
| 1665 | 700mm PSC pipe |
| 1666 | 800mm PSC pipe |
| 1667 | 900mm PSC pipe |
| 1668 | 1000mm PSC pipe |
| 1669 | PSC Cement joint leak |
| 1670 | 700mm PSC pipe |
| 1671 | 800mm PSC pipe |
| 1672 | 900mm PSC pipe |
| 1673 | 1000mm PSC pipe |
| 1674 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1675 | ATTENDING HDPE PIPE LINES |
| 1676 | LEAK HDPE FUSION JOINT |
| 1677 | 63 mm HDPE - PN 6 Pipe |
| 1678 | 75 mm HDPE - PN 6 Pipe |
| 1679 | 90 mm HDPE - PN 6 Pipe |
| 1680 | 110 mm HDPE - PN 6 Pipe |
| 1681 | 125 mm HDPE - PN 6 Pipe |
| 1682 | 140 mm HDPE - PN 6 Pipe |
| 1683 | 160 mm HDPE - PN 6 Pipe |
| 1684 | 180 mm HDPE - PN 6 Pipe |
| 1685 | 200 mm HDPE - PN 6 Pipe |
| 1686 | LEAK HDPE COUPLER JOINT |
| 1687 | 63 mm HDPE - PN 6 Pipe |
| 1688 | 75 mm HDPE - PN 6 Pipe |
| 1689 | 90 mm HDPE - PN 6 Pipe |
| 1690 | 110 mm HDPE - PN 6 Pipe |
| 1691 | 125 mm HDPE - PN 6 Pipe |
| 1692 | 140 mm HDPE - PN 6 Pipe |
| 1693 | 160 mm HDPE - PN 6 Pipe |
| 1694 | 180 mm HDPE - PN 6 Pipe |
| 1695 | 200 mm HDPE - PN 6 Pipe |
| 1696 | BURST HDPE |
| 1697 | 63 mm HDPE - PN 6 Pipe |
| 1698 | 75 mm HDPE - PN 6 Pipe |
| 1699 | 90 mm HDPE - PN 6 Pipe |
| 1700 | 110 mm HDPE - PN 6 Pipe |
| 1701 | 125 mm HDPE - PN 6 Pipe |
| 1702 | 140 mm HDPE - PN 6 Pipe |
| 1703 | 160 mm HDPE - PN 6 Pipe |
| 1704 | 180 mm HDPE - PN 6 Pipe |
| 1705 | 200 mm HDPE - PN 6 Pipe |
| 1706 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1707 | ATTENDING PVC PIPE LINES - LEAK PVC |
| 1708 | Leak PVC |
| 1709 | 63 mm OD PVC - 6 Ksc Pipe |
| 1710 | 75 mm OD PVC - 6 Ksc Pipe |
| 1711 | 90 mm OD PVC - 6 Ksc Pipe |
| 1712 | 110 mm OD PVC - 6 Ksc Pipe |
| 1713 | 140 mm OD PVC - 6 Ksc Pipe |
| 1714 | 160 mm OD PVC - 6 Ksc Pipe |
| 1715 | Burst in PVC Pipes |
| 1716 | 63 mm OD PVC - 6 Ksc Pipe |
| 1717 | 75 mm OD PVC - 6 Ksc Pipe |
| 1718 | 90 mm OD PVC - 6 Ksc Pipe |
| 1719 | 110 mm OD PVC - 6 Ksc Pipe |
| 1720 | 140 mm OD PVC - 6 Ksc Pipe |
| 1721 | 160 mm OD PVC - 6 Ksc Pipe |
| 1722 | Towards the charges for attending Repair and Reconditioning of various size of Sluice Valves |
| 1723 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials. |
| 1724 | Sluice Valve - 80 mm |
| 1725 | Sluice Valve - 100 mm |
| 1726 | Sluice Valve - 150 mm |
| 1727 | Sluice Valve - 200 mm |
| 1728 | Sluice Valve - 250 mm |
| 1729 | Sluice Valve - 300 mm |
| 1730 | Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc., |
| 1731 | Sluice Valve - 80 mm |
| 1732 | Sluice Valve - 100 mm |
| 1733 | Sluice Valve - 150 mm |
| 1734 | Sluice Valve - 200 mm |
| 1735 | Sluice Valve - 250 mm |
| 1736 | Sluice Valve - 300 mm |
| 1737 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials and as directed by the TWAD Board officers |
| 1738 | Sluice Valve - 80 mm |
| 1739 | Sluice Valve - 100 mm |
| 1740 | Sluice Valve - 150 mm |
| 1741 | Sluice Valve - 200 mm |
| 1742 | Sluice Valve - 250 mm |
| 1743 | Sluice Valve - 300 mm |
| 1744 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials and as directed by TWAD borad officers |
| 1745 | Sluice Valve - 80 mm |
| 1746 | Sluice Valve - 100 mm |
| 1747 | Sluice Valve - 150 mm |
| 1748 | Sluice Valve - 200 mm |
| 1749 | Sluice Valve - 250 mm |
| 1750 | Sluice Valve - 300 mm |
| 1751 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by TWAD borad officers |
| 1752 | Sluice Valve - 80 mm |
| 1753 | Sluice Valve - 100 mm |
| 1754 | Sluice Valve - 150 mm |
| 1755 | Sluice Valve - 200 mm |
| 1756 | Sluice Valve - 250 mm |
| 1757 | Sluice Valve - 300 mm |
| 1758 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc.,and as directed by TWAD borad officers |
| 1759 | Sluice Valve - 80 mm |
| 1760 | Sluice Valve - 100 mm |
| 1761 | Sluice Valve - 150 mm |
| 1762 | Sluice Valve - 200 mm |
| 1763 | Sluice Valve - 250 mm |
| 1764 | Sluice Valve - 300 mm |
| 1765 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the departmental Officers |
| 1766 | 200 mm |
| 1767 | 150 mm |
| 1768 | 100 mm |
| 1769 | 80 mm |
| 1770 | 50 mm |
| 1771 | 25 mm |
| 1772 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete and as directed by the departmental Officers |
| 1773 | 100 mm |
| 1774 | 80 mm |
| 1775 | 65 mm |
| 1776 | 50 mm |
| 1777 | Supply and delivery of the following G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications at the site of work to carryout the general maintenance works etc., complete and as directed by TWAD Board officers |
| 1778 | 50 mm G.M. Non Return valves |
| 1779 | 65 mm G.M. Non Return valves |
| 1780 | 80 mm G.M. Non Return valves |
| 1781 | Supply and delivery of CI SINGLE AIR VALVE AS PER ISI 14845/2000 AND WITH 5 YEARS WARRANTY etc., complete and as directed by TWAD Board officers25mm CI Air valve |
| 1782 | VT Pumpset |
| 1783 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1784 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump etc., complete and as directed by TWAD Board officers |
| 1785 | 380 HP VT (375 HP) |
| 1786 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works etc., complete and as directed by TWAD Board officers |
| 1787 | 380 HP VT (375 HP) |
| 1788 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers |
| 1789 | 380 HP VT (375 HP) |
| 1790 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete and as directed by TWAD Board officers. |
| 1791 | 380 HP VT (375 HP) |
| 1792 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc., complete and as directed by TWAD Board officers |
| 1793 | 380 HP VT (375 HP) |
| 1794 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van etc., complete and as directed by TWAD Board officers |
| 1795 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly |
| 1796 | 380 HP VT (375 HP) |
| 1797 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc., complete and as directed by TWAD Board officers |
| 1798 | 380 HP VT (375 HP) |
| 1799 | VT Pumpset |
| 1800 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1801 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 1802 | 380 HP VT |
| 1803 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) etc., complete and as directed by TWAD Board officers |
| 1804 | 380 HP VT |
| 1805 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly etc., complete and as directed by TWAD Board officers |
| 1806 | 380 HP VT |
| 1807 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 1808 | 380 HP VT |
| 1809 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) etc., complete and as directed by TWAD Board officers |
| 1810 | 380 HP VT |
| 1811 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1812 | 380 HP VT |
| 1813 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1814 | 380 HP VT |
| 1815 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1816 | 380 HP VT |
| 1817 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1818 | 380 HP VT |
| 1819 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 1820 | 380 HP VT |
| 1821 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 1822 | 380 HP VT |
| 1823 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 1824 | 380 HP VT |
| 1825 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 1826 | 380 HP VT |
| 1827 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components etc., complete and as directed by TWAD Board officers |
| 1828 | 380 HP VT |
| 1829 | VT Motor |
| 1830 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 1831 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1832 | 380 HP VT (375 HP) |
| 1833 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1834 | 380 HP VT (375 HP) |
| 1835 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by TWAD Board officers |
| 1836 | 380 HP VT (375 HP) |
| 1837 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 1838 | 380 HP VT (375 HP) |
| 1839 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., complete and as directed by TWAD Board officers |
| 1840 | 380 HP VT (375 HP) |
| 1841 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by TWAD Board officers |
| 1842 | 380 HP VT (375 HP) |
| 1843 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 1844 | 380 HP VT (375 HP) |
| 1845 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by TWAD Board officers |
| 1846 | 380 HP VT |
| 1847 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 1848 | 380 HP VT (375 HP) |
| 1849 | HSC Pumpsets |
| 1850 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 1851 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1852 | 220 HP |
| 1853 | 170 HP |
| 1854 | 110 HP |
| 1855 | 100 HP |
| 1856 | 75 HP |
| 1857 | 35 HP |
| 1858 | 30 HP |
| 1859 | 22.5 HP |
| 1860 | 17.5 HP |
| 1861 | 12.5 HP |
| 1862 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1863 | 220 HP |
| 1864 | 170 HP |
| 1865 | 110 HP |
| 1866 | 100 HP |
| 1867 | 75 HP |
| 1868 | 35 HP |
| 1869 | 30 HP |
| 1870 | 22.5 HP |
| 1871 | 17.5 HP |
| 1872 | 12.5 HP |
| 1873 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings etc., complete and as directed by TWAD Board officers |
| 1874 | 220 HP |
| 1875 | 170 HP |
| 1876 | 110 HP |
| 1877 | 100 HP |
| 1878 | 75 HP |
| 1879 | 35 HP |
| 1880 | 30 HP |
| 1881 | 22.5 HP |
| 1882 | 17.5 HP |
| 1883 | 12.5 HP |
| 1884 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking etc., complete and as directed by TWAD Board officers, |
| 1885 | 220 HP |
| 1886 | 170 HP |
| 1887 | 110 HP |
| 1888 | 100 HP |
| 1889 | 75 HP |
| 1890 | 35 HP |
| 1891 | 30 HP |
| 1892 | 22.5 HP |
| 1893 | 17.5 HP |
| 1894 | 12.5 HP |
| 1895 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 1896 | 220 HP |
| 1897 | 170 HP |
| 1898 | 110 HP |
| 1899 | 100 HP |
| 1900 | 75 HP |
| 1901 | 35 HP |
| 1902 | 30 HP |
| 1903 | 22.5 HP |
| 1904 | 17.5 HP |
| 1905 | 12.5 HP |
| 1906 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine etc., complete and as directed by TWAD Board officers |
| 1907 | 220 HP |
| 1908 | 170 HP |
| 1909 | 110 HP |
| 1910 | 100 HP |
| 1911 | 75 HP |
| 1912 | 35 HP |
| 1913 | 30 HP |
| 1914 | 22.5 HP |
| 1915 | 17.5 HP |
| 1916 | 12.5 HP |
| 1917 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials etc., complete and as directed by TWAD Board officers |
| 1918 | 220 HP |
| 1919 | 170 HP |
| 1920 | 110 HP |
| 1921 | 100 HP |
| 1922 | 75 HP |
| 1923 | 35 HP |
| 1924 | 30 HP |
| 1925 | 22.5 HP |
| 1926 | 17.5 HP |
| 1927 | 12.5 HP |
| 1928 | Supply and delivery of Driven End and Non Driven End bearings etc., complete and as directed by TWAD Board officers |
| 1929 | 220 HP |
| 1930 | 170 HP |
| 1931 | 110 HP |
| 1932 | 100 HP |
| 1933 | 75 HP |
| 1934 | 35 HP |
| 1935 | 30 HP |
| 1936 | 22.5 HP |
| 1937 | 17.5 HP |
| 1938 | 12.5 HP |
| 1939 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 1940 | 220 HP |
| 1941 | 170 HP |
| 1942 | 110 HP |
| 1943 | 100 HP |
| 1944 | 75 HP |
| 1945 | 35 HP |
| 1946 | 30 HP |
| 1947 | 22.5 HP |
| 1948 | 17.5 HP |
| 1949 | 12.5 HP |
| 1950 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 1951 | 220 HP |
| 1952 | 170 HP |
| 1953 | 110 HP |
| 1954 | 100 HP |
| 1955 | 75 HP |
| 1956 | 35 HP |
| 1957 | 30 HP |
| 1958 | 22.5 HP |
| 1959 | 17.5 HP |
| 1960 | 12.5 HP |
| 1961 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 1962 | 220 HP |
| 1963 | 170 HP |
| 1964 | 110 HP |
| 1965 | 100 HP |
| 1966 | 75 HP |
| 1967 | 35 HP |
| 1968 | 30 HP |
| 1969 | 22.5 HP |
| 1970 | 17.5 HP |
| 1971 | 12.5 HP |
| 1972 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 1973 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by TWAD Board officers |
| 1974 | 220 HP |
| 1975 | 170 HP |
| 1976 | 110 HP |
| 1977 | 100 HP |
| 1978 | 75 HP |
| 1979 | 35 HP |
| 1980 | 30 HP |
| 1981 | 22.5 HP |
| 1982 | 17.5 HP |
| 1983 | 12.5 HP |
| 1984 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges etc., complete and as directed by TWAD Board officers |
| 1985 | 220 HP |
| 1986 | 170 HP |
| 1987 | 110 HP |
| 1988 | 100 HP |
| 1989 | 75 HP |
| 1990 | 35 HP |
| 1991 | 30 HP |
| 1992 | 22.5 HP |
| 1993 | 17.5 HP |
| 1994 | 12.5 HP |
| 1995 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings etc., complete and as directed by TWAD Board officers |
| 1996 | 220 HP |
| 1997 | 170 HP |
| 1998 | 110 HP |
| 1999 | 100 HP |
| 2000 | 75 HP |
| 2001 | 35 HP |
| 2002 | 30 HP |
| 2003 | 22.5 HP |
| 2004 | 17.5 HP |
| 2005 | 12.5 HP |
| 2006 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by TWAD Board officers |
| 2007 | 220 HP |
| 2008 | 170 HP |
| 2009 | 110 HP |
| 2010 | 100 HP |
| 2011 | 75 HP |
| 2012 | 35 HP |
| 2013 | 30 HP |
| 2014 | 22.5 HP |
| 2015 | 17.5 HP |
| 2016 | 12.5 HP |
| 2017 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking,etc., complete and as directed by TWAD Board officers |
| 2018 | 220 HP |
| 2019 | 170 HP |
| 2020 | 110 HP |
| 2021 | 100 HP |
| 2022 | 75 HP |
| 2023 | 35 HP |
| 2024 | 30 HP |
| 2025 | 22.5 HP |
| 2026 | 17.5 HP |
| 2027 | 12.5 HP |
| 2028 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor etc., complete and as directed by TWAD Board officers |
| 2029 | 220 HP |
| 2030 | 170 HP |
| 2031 | 110 HP |
| 2032 | 100 HP |
| 2033 | 75 HP |
| 2034 | 35 HP |
| 2035 | 30 HP |
| 2036 | 22.5 HP |
| 2037 | 17.5 HP |
| 2038 | 12.5 HP |
| 2039 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by TWAD Board officers |
| 2040 | 220 HP |
| 2041 | 170 HP |
| 2042 | 110 HP |
| 2043 | 100 HP |
| 2044 | 75 HP |
| 2045 | 35 HP |
| 2046 | 30 HP |
| 2047 | 22.5 HP |
| 2048 | 17.5 HP |
| 2049 | 12.5 HP |
| 2050 | Transportation charges for conveying the motor from work shop to Pumping Station etc., complete and as directed by TWAD Board officers |
| 2051 | 220 HP |
| 2052 | 170 HP |
| 2053 | 110 HP |
| 2054 | 100 HP |
| 2055 | 75 HP |
| 2056 | 35 HP |
| 2057 | 30 HP |
| 2058 | 22.5 HP |
| 2059 | 17.5 HP |
| 2060 | 12.5 HP |
| 2061 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by TWAD Board officers |
| 2062 | 220 HP |
| 2063 | 170 HP |
| 2064 | 110 HP |
| 2065 | 100 HP |
| 2066 | 75 HP |
| 2067 | 35 HP |
| 2068 | 30 HP |
| 2069 | 22.5 HP |
| 2070 | 17.5 HP |
| 2071 | 12.5 HP |
| 2072 | OWS Pumpsets & Motors |
| 2073 | Attending the Repair and Renewal works in Submersible Pumpset |
| 2074 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 2075 | 60 HP |
| 2076 | 25 HP |
| 2077 | 20 HP |
| 2078 | 15 HP |
| 2079 | 12.5 HP |
| 2080 | 12 HP |
| 2081 | 10 HP |
| 2082 | 7.5 HP |
| 2083 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 2084 | 60 HP |
| 2085 | 25 HP |
| 2086 | 20 HP |
| 2087 | 15 HP |
| 2088 | 12.5 HP |
| 2089 | 12 HP |
| 2090 | 10 HP |
| 2091 | 7.5 HP |
| 2092 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 2093 | 60 HP |
| 2094 | 25 HP |
| 2095 | 20 HP |
| 2096 | 15 HP |
| 2097 | 12.5 HP |
| 2098 | 12 HP |
| 2099 | 10 HP |
| 2100 | 7.5 HP |
| 2101 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 2102 | 60 HP |
| 2103 | 25 HP |
| 2104 | 20 HP |
| 2105 | 15 HP |
| 2106 | 12.5 HP |
| 2107 | 12 HP |
| 2108 | 10 HP |
| 2109 | 7.5 HP |
| 2110 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 2111 | 60 HP |
| 2112 | 25 HP |
| 2113 | 20 HP |
| 2114 | 15 HP |
| 2115 | 12.5 HP |
| 2116 | 12 HP |
| 2117 | 10 HP |
| 2118 | 7.5 HP |
| 2119 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 2120 | 60 HP |
| 2121 | 25 HP |
| 2122 | 20 HP |
| 2123 | 15 HP |
| 2124 | 12.5 HP |
| 2125 | 12 HP |
| 2126 | 10 HP |
| 2127 | 7.5 HP |
| 2128 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 2129 | 60 HP |
| 2130 | 25 HP |
| 2131 | 20 HP |
| 2132 | 15 HP |
| 2133 | 12.5 HP |
| 2134 | 12 HP |
| 2135 | 10 HP |
| 2136 | 7.5 HP |
| 2137 | Towards the charges for attending the repair works in Star Delta Starter |
| 2138 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 2139 | 60 HP |
| 2140 | 35 HP |
| 2141 | 30 HP |
| 2142 | 25 HP |
| 2143 | 20 HP |
| 2144 | 15 HP |
| 2145 | 12.5 HP |
| 2146 | 12 HP |
| 2147 | 10 HP |
| 2148 | 7.5 HP |
| 2149 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 2150 | 60 HP |
| 2151 | 35 HP |
| 2152 | 30 HP |
| 2153 | 25 HP |
| 2154 | 20 HP |
| 2155 | 15 HP |
| 2156 | 12.5 HP |
| 2157 | 12 HP |
| 2158 | 10 HP |
| 2159 | 7.5 HP |
| 2160 | Supply and Delivery of PLA Safety Relay suitable for the starter etc., complete and as directed by TWAD Board officers |
| 2161 | 60 HP |
| 2162 | 35 HP |
| 2163 | 30 HP |
| 2164 | 25 HP |
| 2165 | 20 HP |
| 2166 | 15 HP |
| 2167 | 12.5 HP |
| 2168 | 12 HP |
| 2169 | 10 HP |
| 2170 | 7.5 HP |
| 2171 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 2172 | 60 HP |
| 2173 | 35 HP |
| 2174 | 30 HP |
| 2175 | 25 HP |
| 2176 | 20 HP |
| 2177 | 15 HP |
| 2178 | 12.5 HP |
| 2179 | 12 HP |
| 2180 | 10 HP |
| 2181 | 7.5 HP |
| 2182 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 2183 | 60 HP |
| 2184 | 35 HP |
| 2185 | 30 HP |
| 2186 | 25 HP |
| 2187 | 20 HP |
| 2188 | 15 HP |
| 2189 | 12.5 HP |
| 2190 | 12 HP |
| 2191 | 10 HP |
| 2192 | 7.5 HP |
| 2193 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete etc., complete and as directed by TWAD Board officers |
| 2194 | 60 HP |
| 2195 | 35 HP |
| 2196 | 30 HP |
| 2197 | 25 HP |
| 2198 | 20 HP |
| 2199 | 15 HP |
| 2200 | 12.5 HP |
| 2201 | 12 HP |
| 2202 | 10 HP |
| 2203 | 7.5 HP |
| 2204 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 2205 | 25 HP |
| 2206 | 20 HP |
| 2207 | 15 HP |
| 2208 | 12.5 HP |
| 2209 | 12 HP |
| 2210 | 10 HP |
| 2211 | 7.5 HP |
| 2212 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 2213 | 60 HP |
| 2214 | 35 HP |
| 2215 | 30 HP |
| 2216 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 2217 | 60 HP |
| 2218 | 35 HP |
| 2219 | 30 HP |
| 2220 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 2221 | 60 HP |
| 2222 | 35 HP |
| 2223 | 30 HP |
| 2224 | 25 HP |
| 2225 | 20 HP |
| 2226 | 15 HP |
| 2227 | 12.5 HP |
| 2228 | 12 HP |
| 2229 | 10 HP |
| 2230 | 7.5 HP |
| 2231 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 2232 | 60 HP |
| 2233 | 35 HP |
| 2234 | 30 HP |
| 2235 | 25 HP |
| 2236 | 20 HP |
| 2237 | 15 HP |
| 2238 | 12.5 HP |
| 2239 | 12 HP |
| 2240 | 10 HP |
| 2241 | 7.5 HP |
| 2242 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 2243 | 60 HP |
| 2244 | 35 HP |
| 2245 | 30 HP |
| 2246 | 25 HP |
| 2247 | 20 HP |
| 2248 | 15 HP |
| 2249 | 12.5 HP |
| 2250 | 12 HP |
| 2251 | 10 HP |
| 2252 | 7.5 HP |
| 2253 | Towards the charges for attending the repair works in DOL Starter |
| 2254 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter etc., complete and as directed by TWAD Board officers |
| 2255 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 2256 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by TWAD Board officers |
| 2257 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 2258 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter etc., complete and as directed by TWAD Board officers |
| 2259 | Towards the charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the departmental officers |
| 2260 | Vanniya Nagar WTP 7.25 LL |
| 2261 | Iruppali Wayside 2.00 LL |
| 2262 | Iruppali Wayside 1.50 LL |
| 2263 | Kallukadai Medu 2.50 LL |
| 2264 | Poosarimoopanvalavu 6.00 LL |
| 2265 | Adaiyur 2.00 LL |
| 2266 | Pakkanadu 1.90 LL |
| 2267 | Pakkanadu 1.50 LL |
| 2268 | Mettutheru 1.50 LL |
| 2269 | Aduvapatty 0.60 LL |
| 2270 | Kalluralkadu 0.60 LL |
| 2271 | Anaipallam 0.80 LL |
| 2272 | Chettikadu 1.10 LL |
| 2273 | Maattuperumal Koil 0.30 LL |
| 2274 | Iruppali Booster Station 42.72LL |
| 2275 | Ottapatty 4.00 LL |
| 2276 | Ammankoil 2.50 LL |
| 2277 | Vembaneri 2.00 LL |
| 2278 | Vembaneri 1.00 LL |
| 2279 | Samudram Booster Station 6.60 LL |
| 2280 | Chinnappampatti 3.30LL |
| 2281 | Chinnappampatti 1.00 LL |
| 2282 | Akkkaraipatty 1.60 LL |
| 2283 | Sengadu 1.00 LL |
| 2284 | Sengadu 1.70 LL |
| 2285 | Samudram Wayside 1.20 LL |
| 2286 | Chithrapalayam 1.00 LL |
| 2287 | Veveri Theru Moolakadai 1.00 LL |
| 2288 | Pudupalayam 1.00 LL |
| 2289 | Pudupalayam New 2.40 LL |
| 2290 | Senthilpalayam BS 11.00 LL |
| 2291 | Sadayampalayam 1.00 LL |
| 2292 | Sadayampalayam New 2.20 LL |
| 2293 | Katchupalli 1.00 LL |
| 2294 | Katchupalli 0.60 LL |
| 2295 | Tharakadu 2.00 LL |
| 2296 | Kanniyampatti 0.30 LL |
| 2297 | Kanniyampatti 0.60 LL |
| 2298 | Karattur Palikadu (Kollapatti) 0.10 LL |
| 2299 | Karattur Palikadu New 0.60 LL |
| 2300 | Ettikuttaimedu 2.00 LL |
| 2301 | Ettikuttaimedu New 1.10 LL |
| 2302 | Kalarpatti Booster Station 6.91 LL |
| 2303 | Vadugapatty 0.30 LL |
| 2304 | Pandarathankadu 1.50 LL |
| 2305 | A.Pudur 1.50 LL |
| 2306 | Pachiammankoil 2.50 LL |
| 2307 | Vaikundam 3.00 LL |
| 2308 | Sellappampatti 0.30 LL |
| 2309 | 327 Eagapuram 0.70 LL |
| 2310 | 327 Thappakuttai 1.05 LL |
| 2311 | 327 Naduvaneri 0.90 LL |
| 2312 | 327 A.Pudur 1.00 LL |
| 2313 | 327 Vaikundam 1.05 LL |
| 2314 | 327 kannantheri 0.55 LL |
| 2315 | 327 Ernapuram 0.90 LL |
| 2316 | 327 Gudalur 0.85 LL |
| 2317 | 327 KG Palayam 0.60 LL |
| 2318 | 327 Thalaiyur 0.75 LL |
| 2319 | Vanichampatty BS 7.06 LL |
| 2320 | Irusagoundanvalavu 6.29 LL |
| 2321 | Amarakundhi BS 4.00 LL |
| 2322 | Edanganasalai BS 19.79 LL |
| 2323 | Karunganur sump 0.60 LL |
| 2324 | Kalarpatty sump 1.50 LL |
| 2325 | Kurukkupattiyanvalavu sump 1.00 LL |
| 2326 | Panickanur sump 0.60 LL |
| 2327 | Selavadai sump 1.50 LL |
| 2328 | Nathiyampatty sump 4.00 LL |
| 2329 | Duttampatty sump 1.00 LL |
| 2330 | Thoppampatty sump 1.50 LL |
| 2331 | Kurukkupatty sump 1.00 LL |
| 2332 | Lakshmayur sump 1.50 LL |
| 2333 | Pothanur sump 1.00 LL |
| 2334 | K.R.Thoppur sump 4.00 LL |
| 2335 | Karukkalvadi sump 4.00 LL |
| 2336 | Mallikuttai sump 0.50 LL |
| 2337 | Nadarmoopan theru 1.00 LL |
| 2338 | Manathal sump 1.00 LL |
| 2339 | K.S.Pettai sump 0.50 LL |
| 2340 | Ariyampatti sump 0.30 LL |
| 2341 | Karattur sump 0.60 LL |
| 2342 | Sedapatty sump 1.00 LL |
| 2343 | Duttampatty New Sump 2.10 LL |
| 2344 | Alagusamudram 1.10LL |
| 2345 | Gudalur 0.95 LL |
| 2346 | Naduvaneri 1.80 LL |
| 2347 | Egapuram 1.20 LL |
| 2348 | Kottamedu 1.00 LL |
| 2349 | Aayamarathumedu 1.00 LL |
| 2350 | Mottur 1.00 LL |
| 2351 | Arurpatty Eri Sump 1.00 LL |
| 2352 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 2353 | Cost of Chemicals |
| 2354 | Supply and delivery of Liquid Chlorine as per IS Specification (with Chlorine 99.8%, Moisture, Na2O3, Hydrogen and Carbondioxide are to be nil) required for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 2355 | For a period from 01.01.2027 to 31.03.2027 |
| 2356 | For a period from 01.04.2027 to 31.03.2028 |
| 2357 | For a period from 01.04.2028 to 31.03.2029 |
| 2358 | Supply and delivery of Stable Bleaching Powder as per IS Specification 1065/ 1989 and as amended from time to time for Grade I for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 2359 | For a period from 01.01.2027 to 31.03.2027 |
| 2360 | For a period from 01.04.2027 to 31.03.2028 |
| 2361 | For a period from 01.04.2028 to 31.03.2029 |
| 2362 | Operation and Maintenance of CWSS to 378 Rural Habitations in Edapadi, Konganapuram and Magudanchavadi Unions of Salem District including repairs, rectification works and supply of Chemicals for 27 months period from 01.01.2027 to 31.03.2029 (2026-2029) |
| 2363 | Operation and Maintenance of CWSS |
| 2364 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protecton of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure -I, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity . |
| 2365 | For a period from 01.01.2027 to 31.03.2027 |
| 2366 | For a period from 01.04.2027 to 31.03.2028 |
| 2367 | For a period from 01.04.2028 to 31.03.2029 |
| 2368 | Repairs and Renewals for the period 01.01.2027 to 31.03.2027 |
| 2369 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2370 | Type of Leak-Cement Joint |
| 2371 | 250 mm DI Pipe |
| 2372 | 200 mm DI Pipe |
| 2373 | Type of Leak-Gasket Joint |
| 2374 | 250 mm DI Pipe |
| 2375 | 200 mm DI Pipe |
| 2376 | Type of Leak-Burst Pipe replacement |
| 2377 | 250 mm DI Pipe |
| 2378 | 200 mm DI Pipe |
| 2379 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2380 | Leak in PVC Pipes |
| 2381 | 63 mm OD PVC - 4 Ksc Pipe |
| 2382 | 63 mm OD PVC - 6 Ksc Pipe |
| 2383 | 75 mm OD PVC - 4 Ksc Pipe |
| 2384 | 75 mm OD PVC - 6 Ksc Pipe |
| 2385 | 90 mm OD PVC - 4 Ksc Pipe |
| 2386 | 90 mm OD PVC - 6 Ksc Pipe |
| 2387 | 110 mm OD PVC - 4 Ksc Pipe |
| 2388 | 110 mm OD PVC - 6 Ksc Pipe |
| 2389 | 140 mm OD PVC - 4 Ksc Pipe |
| 2390 | 140 mm OD PVC - 6 Ksc Pipe |
| 2391 | 160 mm OD PVC - 4 Ksc Pipe |
| 2392 | 160 mm OD PVC - 6 Ksc Pipe |
| 2393 | 200 mm OD PVC - 4 Ksc Pipe |
| 2394 | 200 mm OD PVC - 6 Ksc Pipe |
| 2395 | Burst in PVC Pipes |
| 2396 | 63 mm OD PVC - 4 Ksc Pipe |
| 2397 | 63 mm OD PVC - 6 Ksc Pipe |
| 2398 | 75 mm OD PVC - 4 Ksc Pipe |
| 2399 | 75 mm OD PVC - 6 Ksc Pipe |
| 2400 | 90 mm OD PVC - 4 Ksc Pipe |
| 2401 | 90 mm OD PVC - 6 Ksc Pipe |
| 2402 | 110 mm OD PVC - 4 Ksc Pipe |
| 2403 | 110 mm OD PVC - 6 Ksc Pipe |
| 2404 | 140 mm OD PVC - 4 Ksc Pipe |
| 2405 | 140 mm OD PVC - 6 Ksc Pipe |
| 2406 | 160 mm OD PVC - 4 Ksc Pipe |
| 2407 | 160 mm OD PVC - 6 Ksc Pipe |
| 2408 | 200 mm OD PVC - 4 Ksc Pipe |
| 2409 | 200 mm OD PVC - 6 Ksc Pipe |
| 2410 | Repair / Reconditioning of Gun Metal Valves |
| 2411 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the departmental officer. |
| 2412 | 50 mm Gun Metal Valve |
| 2413 | 65 mm Gun Metal Valve |
| 2414 | 80 mm Gun Metal Valve |
| 2415 | 100 mm Gun Metal Valve |
| 2416 | Repair / Reconditioning of Air valves |
| 2417 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete |
| 2418 | 25 mm Air Valve |
| 2419 | 50 mm Air Valve |
| 2420 | 80 mm Air Valve |
| 2421 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2422 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump |
| 2423 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works |
| 2424 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van |
| 2425 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete. |
| 2426 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete |
| 2427 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van |
| 2428 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly |
| 2429 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete |
| 2430 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2431 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2432 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2433 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly |
| 2434 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 2435 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) |
| 2436 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2437 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2438 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2439 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2440 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 2441 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 2442 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 2443 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 2444 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components |
| 2445 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 2446 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2447 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges. |
| 2448 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials. |
| 2449 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2450 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., |
| 2451 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor. |
| 2452 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2453 | Transportation charges for conveying the motor from work shop to pumping Station |
| 2454 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2455 | Attending the Repair and Replacement of bearings in various HSC Pump - 40 HP |
| 2456 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials. |
| 2457 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges. |
| 2458 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings |
| 2459 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and Jobn driven end bearing seating, knurling, bend checking and etc., |
| 2460 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials |
| 2461 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine |
| 2462 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials |
| 2463 | Supply and delivery of Driven End and Jobn Driven End bearings |
| 2464 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2465 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station. |
| 2466 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., |
| 2467 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) - 40 HP |
| 2468 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2469 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges. |
| 2470 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and Jobn driven end bearings. |
| 2471 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2472 | Labour Charges for reconditioning the worn out shaft for driven end and Jobn driven end bearing seating, knurling, bend checking, and etc., |
| 2473 | Supply and delivery of Driven End and Jobn Driven End bearings suitable for the required Induction Motor |
| 2474 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2475 | Transportation charges for conveying the motor from work shop to Pumping Station |
| 2476 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2477 | Attending the Repair and Renewal works in Submersible Pumpset |
| 2478 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings |
| 2479 | 30 HP |
| 2480 | 20 HP |
| 2481 | 15 HP |
| 2482 | 10 HP |
| 2483 | 7.5 HP |
| 2484 | Transporting the pumpset from Pump House to work shop. |
| 2485 | 30 HP |
| 2486 | 20 HP |
| 2487 | 15 HP |
| 2488 | 10 HP |
| 2489 | 7.5 HP |
| 2490 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials. |
| 2491 | 30 HP |
| 2492 | 20 HP |
| 2493 | 15 HP |
| 2494 | 10 HP |
| 2495 | 7.5 HP |
| 2496 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., |
| 2497 | 30 HP |
| 2498 | 20 HP |
| 2499 | 15 HP |
| 2500 | 10 HP |
| 2501 | 7.5 HP |
| 2502 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material |
| 2503 | 30 HP |
| 2504 | 20 HP |
| 2505 | 15 HP |
| 2506 | 10 HP |
| 2507 | 7.5 HP |
| 2508 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works. |
| 2509 | 30 HP |
| 2510 | 20 HP |
| 2511 | 15 HP |
| 2512 | 10 HP |
| 2513 | 7.5 HP |
| 2514 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping. |
| 2515 | 30 HP |
| 2516 | 20 HP |
| 2517 | 15 HP |
| 2518 | 10 HP |
| 2519 | 7.5 HP |
| 2520 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 2521 | Clear Water sump at Karattupudur - 1.00 LL |
| 2522 | Vellerivelli Booster Sump - 2.20 LL |
| 2523 | AP East Booster Sump - 1.15 LL |
| 2524 | Chitrapalayam Booster Sump - 0.50 LL |
| 2525 | Senthilpalayam Booster Sump - 0.30 LL |
| 2526 | Erumaipatty Booster Sump - 1.00 LL |
| 2527 | Oruvapatty Booster Sump - 0.95 LL |
| 2528 | Vellerivelli Sump - 1.25 LL |
| 2529 | Nedungulam Sump - 0.45 LL |
| 2530 | Reddipatty Muniappan Kovil Sump - 0.95 LL |
| 2531 | Myleripatty Sump - 0.50 LL |
| 2532 | Ammankoil kadu sump - 0.45 LL |
| 2533 | Vannankuttai sump - 0.35 LL |
| 2534 | Vellakaradu Sump - 0.60 LL |
| 2535 | Anaipallam Sump - 0.50 LL |
| 2536 | Kalluralkadu sump - 0.60 LL |
| 2537 | Madeswaran kovil sump - 0.55 LL |
| 2538 | Vethilaikaranvalavu sump - 0.95 LL |
| 2539 | Kalarkadu Sump - 0.40 LL |
| 2540 | Velayeekaradu Sump - 0.40 LL |
| 2541 | Uppanchevi Karadu sump - 0.70 LL |
| 2542 | Ayyanarappankovil sump - 0.80 LL |
| 2543 | Muniampatty Sump - 0.45 LL |
| 2544 | Tharakadu Sump - 1.15 LL |
| 2545 | Kuppusamy kovil sump - 0.30 LL |
| 2546 | Chettimankurichi Sump - 0.55 LL |
| 2547 | Perumal kovil karadu Sump - 0.45 LL |
| 2548 | Thangayur Sump - 0.50 LL |
| 2549 | Erumaipatty Pt sump - 0.40 LL |
| 2550 | Dhadapuram Sump - 0.50 LL |
| 2551 | AP East Sump - 1.30 LL |
| 2552 | Kurumbapatty Sump - 0.20 LL |
| 2553 | Sandaipettai Sump - 0.20 LL |
| 2554 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 2555 | DOL Starter for O.W Submersible Pumpset |
| 2556 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter |
| 2557 | Replacement of required capacity moving kit of Contactor, and Job Volt Coil suitable for the starter including the cost of materials etc., complete |
| 2558 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2559 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 2560 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2561 | Attending the repair works in Auto Transformer StarterFrom 7.50 HP to 15.00 HP |
| 2562 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete., and as directed by TWAD Board officers. |
| 2563 | 7.5 HP |
| 2564 | 10 HP |
| 2565 | 12.5 HP |
| 2566 | 15 HP |
| 2567 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 2568 | 7.5 HP |
| 2569 | 10 HP |
| 2570 | 12.5 HP |
| 2571 | 15 HP |
| 2572 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 2573 | 7.5 HP |
| 2574 | 10 HP |
| 2575 | 12.5 HP |
| 2576 | 15 HP |
| 2577 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 2578 | 7.5 HP |
| 2579 | 10 HP |
| 2580 | 12.5 HP |
| 2581 | 15 HP |
| 2582 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2583 | 7.5 HP |
| 2584 | 10 HP |
| 2585 | 12.5 HP |
| 2586 | 15 HP |
| 2587 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2588 | 7.5 HP |
| 2589 | 10 HP |
| 2590 | 12.5 HP |
| 2591 | 15 HP |
| 2592 | Attending the repair works in Auto Transformer StarterFrom 20.00 HP to 30.00 HP |
| 2593 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete,as directed by TWAD Board officers. |
| 2594 | 20 HP |
| 2595 | 25 HP |
| 2596 | 30 HP |
| 2597 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 2598 | 20 HP |
| 2599 | 25 HP |
| 2600 | 30 HP |
| 2601 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 2602 | 20 HP |
| 2603 | 25 HP |
| 2604 | 30 HP |
| 2605 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 2606 | 20 HP |
| 2607 | 25 HP |
| 2608 | 30 HP |
| 2609 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2610 | 20 HP |
| 2611 | 25 HP |
| 2612 | 30 HP |
| 2613 | Supply and Delivery of PLA Safety Relay suitable for the starter |
| 2614 | 20 HP |
| 2615 | 25 HP |
| 2616 | 30 HP |
| 2617 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 2618 | 20 HP |
| 2619 | 25 HP |
| 2620 | 30 HP |
| 2621 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2622 | 20 HP |
| 2623 | 25 HP |
| 2624 | 30 HP |
| 2625 | Repairs and Renewals for the period 01.04.2027 to 31.03.2028 |
| 2626 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2627 | Type of Leak-Cement Joint |
| 2628 | 250 mm DI Pipe |
| 2629 | 251 mm DI Pipe |
| 2630 | Type of Leak-Gasket Joint |
| 2631 | 250 mm DI Pipe |
| 2632 | 200 mm DI Pipe |
| 2633 | Type of Leak-Burst Pipe replacement |
| 2634 | 250 mm DI Pipe |
| 2635 | 200 mm DI Pipe |
| 2636 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2637 | Leak in PVC Pipes |
| 2638 | 63 mm OD PVC - 4 Ksc Pipe |
| 2639 | 63 mm OD PVC - 6 Ksc Pipe |
| 2640 | 75 mm OD PVC - 4 Ksc Pipe |
| 2641 | 75 mm OD PVC - 6 Ksc Pipe |
| 2642 | 90 mm OD PVC - 4 Ksc Pipe |
| 2643 | 90 mm OD PVC - 6 Ksc Pipe |
| 2644 | 110 mm OD PVC - 4 Ksc Pipe |
| 2645 | 110 mm OD PVC - 6 Ksc Pipe |
| 2646 | 140 mm OD PVC - 4 Ksc Pipe |
| 2647 | 140 mm OD PVC - 6 Ksc Pipe |
| 2648 | 160 mm OD PVC - 4 Ksc Pipe |
| 2649 | 160 mm OD PVC - 6 Ksc Pipe |
| 2650 | 200 mm OD PVC - 4 Ksc Pipe |
| 2651 | 200 mm OD PVC - 6 Ksc Pipe |
| 2652 | Burst in PVC Pipes |
| 2653 | 63 mm OD PVC - 4 Ksc Pipe |
| 2654 | 63 mm OD PVC - 6 Ksc Pipe |
| 2655 | 75 mm OD PVC - 4 Ksc Pipe |
| 2656 | 75 mm OD PVC - 6 Ksc Pipe |
| 2657 | 90 mm OD PVC - 4 Ksc Pipe |
| 2658 | 90 mm OD PVC - 6 Ksc Pipe |
| 2659 | 110 mm OD PVC - 4 Ksc Pipe |
| 2660 | 110 mm OD PVC - 6 Ksc Pipe |
| 2661 | 140 mm OD PVC - 4 Ksc Pipe |
| 2662 | 140 mm OD PVC - 6 Ksc Pipe |
| 2663 | 160 mm OD PVC - 4 Ksc Pipe |
| 2664 | 160 mm OD PVC - 6 Ksc Pipe |
| 2665 | 200 mm OD PVC - 4 Ksc Pipe |
| 2666 | 200 mm OD PVC - 6 Ksc Pipe |
| 2667 | Repair / Reconditioning of Gun Metal Valves |
| 2668 | Replacement of Jobn functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete |
| 2669 | 50 mm Gun Metal Valve |
| 2670 | 65 mm Gun Metal Valve |
| 2671 | 80 mm Gun Metal Valve |
| 2672 | 100 mm Gun Metal Valve |
| 2673 | Repair / Reconditioning of Air valves |
| 2674 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete |
| 2675 | 25 mm Air Valve |
| 2676 | 50 mm Air Valve |
| 2677 | 80 mm Air Valve |
| 2678 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2679 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump |
| 2680 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works |
| 2681 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van |
| 2682 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete. |
| 2683 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete |
| 2684 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van |
| 2685 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly |
| 2686 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete |
| 2687 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2688 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2689 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2690 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly |
| 2691 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 2692 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) |
| 2693 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2694 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2695 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2696 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2697 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 2698 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 2699 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 2700 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 2701 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components |
| 2702 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 2703 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2704 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges. |
| 2705 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials. |
| 2706 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2707 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., |
| 2708 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor. |
| 2709 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2710 | Transportation charges for conveying the motor from work shop to pumping Station |
| 2711 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2712 | Attending the Repair and Replacement of bearings in various HSC Pump - 40 HP |
| 2713 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials. |
| 2714 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges. |
| 2715 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings |
| 2716 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and Jobn driven end bearing seating, knurling, bend checking and etc., |
| 2717 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials |
| 2718 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine |
| 2719 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials |
| 2720 | Supply and delivery of Driven End and Jobn Driven End bearings |
| 2721 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2722 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station. |
| 2723 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., |
| 2724 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) - 40 HP |
| 2725 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2726 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges. |
| 2727 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and Jobn driven end bearings. |
| 2728 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2729 | Labour Charges for reconditioning the worn out shaft for driven end and Jobn driven end bearing seating, knurling, bend checking, and etc., |
| 2730 | Supply and delivery of Driven End and Jobn Driven End bearings suitable for the required Induction Motor |
| 2731 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2732 | Transportation charges for conveying the motor from work shop to Pumping Station |
| 2733 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2734 | Attending the Repair and Renewal works in Submersible Pumpset |
| 2735 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings |
| 2736 | 30 HP |
| 2737 | 20 HP |
| 2738 | 15 HP |
| 2739 | 10 HP |
| 2740 | 7.5 HP |
| 2741 | Transporting the pumpset from Pump House to work shop. |
| 2742 | 30 HP |
| 2743 | 20 HP |
| 2744 | 15 HP |
| 2745 | 10 HP |
| 2746 | 7.5 HP |
| 2747 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials. |
| 2748 | 30 HP |
| 2749 | 20 HP |
| 2750 | 15 HP |
| 2751 | 10 HP |
| 2752 | 7.5 HP |
| 2753 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., |
| 2754 | 30 HP |
| 2755 | 20 HP |
| 2756 | 15 HP |
| 2757 | 10 HP |
| 2758 | 7.5 HP |
| 2759 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material |
| 2760 | 30 HP |
| 2761 | 20 HP |
| 2762 | 15 HP |
| 2763 | 10 HP |
| 2764 | 7.5 HP |
| 2765 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works. |
| 2766 | 30 HP |
| 2767 | 20 HP |
| 2768 | 15 HP |
| 2769 | 10 HP |
| 2770 | 7.5 HP |
| 2771 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping. |
| 2772 | 30 HP |
| 2773 | 20 HP |
| 2774 | 15 HP |
| 2775 | 10 HP |
| 2776 | 7.5 HP |
| 2777 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 2778 | Clear Water sump at Karattupudur - 1.00 LL |
| 2779 | Vellerivelli Booster Sump - 2.20 LL |
| 2780 | AP East Booster Sump - 1.15 LL |
| 2781 | Chitrapalayam Booster Sump - 0.50 LL |
| 2782 | Senthilpalayam Booster Sump - 0.30 LL |
| 2783 | Erumaipatty Booster Sump - 1.00 LL |
| 2784 | Oruvapatty Booster Sump - 0.95 LL |
| 2785 | Vellerivelli Sump - 1.25 LL |
| 2786 | Nedungulam Sump - 0.45 LL |
| 2787 | Reddipatty Muniappan Kovil Sump - 0.95 LL |
| 2788 | Myleripatty Sump - 0.50 LL |
| 2789 | Ammankoil kadu sump - 0.45 LL |
| 2790 | Vannankuttai sump - 0.35 LL |
| 2791 | Vellakaradu Sump - 0.60 LL |
| 2792 | Anaipallam Sump - 0.50 LL |
| 2793 | Kalluralkadu sump - 0.60 LL |
| 2794 | Madeswaran kovil sump - 0.55 LL |
| 2795 | Vethilaikaranvalavu sump - 0.95 LL |
| 2796 | Kalarkadu Sump - 0.40 LL |
| 2797 | Velayeekaradu Sump - 0.40 LL |
| 2798 | Uppanchevi Karadu sump - 0.70 LL |
| 2799 | Ayyanarappankovil sump - 0.80 LL |
| 2800 | Muniampatty Sump - 0.45 LL |
| 2801 | Tharakadu Sump - 1.15 LL |
| 2802 | Kuppusamy kovil sump - 0.30 LL |
| 2803 | Chettimankurichi Sump - 0.55 LL |
| 2804 | Perumal kovil karadu Sump - 0.45 LL |
| 2805 | Thangayur Sump - 0.50 LL |
| 2806 | Erumaipatty Pt sump - 0.40 LL |
| 2807 | Dhadapuram Sump - 0.50 LL |
| 2808 | AP East Sump - 1.30 LL |
| 2809 | Kurumbapatty Sump - 0.20 LL |
| 2810 | Sandaipettai Sump - 0.20 LL |
| 2811 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 2812 | DOL Starter for O.W Submersible Pumpset |
| 2813 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter |
| 2814 | Replacement of required capacity moving kit of Contactor, and Job Volt Coil suitable for the starter including the cost of materials etc., complete |
| 2815 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2816 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 2817 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2818 | Attending the repair works in Auto Transformer StarterFrom 7.50 HP to 15.00 HP |
| 2819 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete., and as directed by TWAD Board officers. |
| 2820 | 7.5 HP |
| 2821 | 10 HP |
| 2822 | 12.5 HP |
| 2823 | 15 HP |
| 2824 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 2825 | 7.5 HP |
| 2826 | 10 HP |
| 2827 | 12.5 HP |
| 2828 | 15 HP |
| 2829 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 2830 | 7.5 HP |
| 2831 | 10 HP |
| 2832 | 12.5 HP |
| 2833 | 15 HP |
| 2834 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 2835 | 7.5 HP |
| 2836 | 10 HP |
| 2837 | 12.5 HP |
| 2838 | 15 HP |
| 2839 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2840 | 7.5 HP |
| 2841 | 10 HP |
| 2842 | 12.5 HP |
| 2843 | 15 HP |
| 2844 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2845 | 7.5 HP |
| 2846 | 10 HP |
| 2847 | 12.5 HP |
| 2848 | 15 HP |
| 2849 | Attending the repair works in Auto Transformer StarterFrom 20.00 HP to 30.00 HP |
| 2850 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete,as directed by TWAD Board officers. |
| 2851 | 20 HP |
| 2852 | 25 HP |
| 2853 | 30 HP |
| 2854 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 2855 | 20 HP |
| 2856 | 25 HP |
| 2857 | 30 HP |
| 2858 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 2859 | 20 HP |
| 2860 | 25 HP |
| 2861 | 30 HP |
| 2862 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 2863 | 20 HP |
| 2864 | 25 HP |
| 2865 | 30 HP |
| 2866 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 2867 | 20 HP |
| 2868 | 25 HP |
| 2869 | 30 HP |
| 2870 | Supply and Delivery of PLA Safety Relay suitable for the starter |
| 2871 | 20 HP |
| 2872 | 25 HP |
| 2873 | 30 HP |
| 2874 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 2875 | 20 HP |
| 2876 | 25 HP |
| 2877 | 30 HP |
| 2878 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 2879 | 20 HP |
| 2880 | 25 HP |
| 2881 | 30 HP |
| 2882 | For a period from 01.04.2028 to 31.03.2029 |
| 2883 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2884 | Type of Leak-Cement Joint |
| 2885 | 250 mm DI Pipe |
| 2886 | 251 mm DI Pipe |
| 2887 | Type of Leak-Gasket Joint |
| 2888 | 250 mm DI Pipe |
| 2889 | 200 mm DI Pipe |
| 2890 | Type of Leak-Burst Pipe replacement |
| 2891 | 250 mm DI Pipe |
| 2892 | 200 mm DI Pipe |
| 2893 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2894 | Leak in PVC Pipes |
| 2895 | 63 mm OD PVC - 4 Ksc Pipe |
| 2896 | 63 mm OD PVC - 6 Ksc Pipe |
| 2897 | 75 mm OD PVC - 4 Ksc Pipe |
| 2898 | 75 mm OD PVC - 6 Ksc Pipe |
| 2899 | 90 mm OD PVC - 4 Ksc Pipe |
| 2900 | 90 mm OD PVC - 6 Ksc Pipe |
| 2901 | 110 mm OD PVC - 4 Ksc Pipe |
| 2902 | 110 mm OD PVC - 6 Ksc Pipe |
| 2903 | 140 mm OD PVC - 4 Ksc Pipe |
| 2904 | 140 mm OD PVC - 6 Ksc Pipe |
| 2905 | 160 mm OD PVC - 4 Ksc Pipe |
| 2906 | 160 mm OD PVC - 6 Ksc Pipe |
| 2907 | 200 mm OD PVC - 4 Ksc Pipe |
| 2908 | 200 mm OD PVC - 6 Ksc Pipe |
| 2909 | Burst in PVC Pipes |
| 2910 | 63 mm OD PVC - 4 Ksc Pipe |
| 2911 | 63 mm OD PVC - 6 Ksc Pipe |
| 2912 | 75 mm OD PVC - 4 Ksc Pipe |
| 2913 | 75 mm OD PVC - 6 Ksc Pipe |
| 2914 | 90 mm OD PVC - 4 Ksc Pipe |
| 2915 | 90 mm OD PVC - 6 Ksc Pipe |
| 2916 | 110 mm OD PVC - 4 Ksc Pipe |
| 2917 | 110 mm OD PVC - 6 Ksc Pipe |
| 2918 | 140 mm OD PVC - 4 Ksc Pipe |
| 2919 | 140 mm OD PVC - 6 Ksc Pipe |
| 2920 | 160 mm OD PVC - 4 Ksc Pipe |
| 2921 | 160 mm OD PVC - 6 Ksc Pipe |
| 2922 | 200 mm OD PVC - 4 Ksc Pipe |
| 2923 | 200 mm OD PVC - 6 Ksc Pipe |
| 2924 | Repair / Reconditioning of Gun Metal Valves |
| 2925 | Replacement of Jobn functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete |
| 2926 | 50 mm Gun Metal Valve |
| 2927 | 65 mm Gun Metal Valve |
| 2928 | 80 mm Gun Metal Valve |
| 2929 | 100 mm Gun Metal Valve |
| 2930 | Repair / Reconditioning of Air valves |
| 2931 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete |
| 2932 | 25 mm Air Valve |
| 2933 | 50 mm Air Valve |
| 2934 | 80 mm Air Valve |
| 2935 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2936 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump |
| 2937 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works |
| 2938 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van |
| 2939 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete. |
| 2940 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete |
| 2941 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van |
| 2942 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly |
| 2943 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete |
| 2944 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump - 75 HP |
| 2945 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2946 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) |
| 2947 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly |
| 2948 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 2949 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete) |
| 2950 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2951 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2952 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2953 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2954 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset |
| 2955 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 2956 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 2957 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 2958 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components |
| 2959 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 2960 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2961 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges. |
| 2962 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials. |
| 2963 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2964 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc., |
| 2965 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor. |
| 2966 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2967 | Transportation charges for conveying the motor from work shop to pumping Station |
| 2968 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2969 | Attending the Repair and Replacement of bearings in various HSC Pump - 40 HP |
| 2970 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials. |
| 2971 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges. |
| 2972 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings |
| 2973 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and Jobn driven end bearing seating, knurling, bend checking and etc., |
| 2974 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials |
| 2975 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine |
| 2976 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials |
| 2977 | Supply and delivery of Driven End and Jobn Driven End bearings |
| 2978 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2979 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station. |
| 2980 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc., |
| 2981 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) - 40 HP |
| 2982 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. |
| 2983 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges. |
| 2984 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and Jobn driven end bearings. |
| 2985 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor |
| 2986 | Labour Charges for reconditioning the worn out shaft for driven end and Jobn driven end bearing seating, knurling, bend checking, and etc., |
| 2987 | Supply and delivery of Driven End and Jobn Driven End bearings suitable for the required Induction Motor |
| 2988 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials |
| 2989 | Transportation charges for conveying the motor from work shop to Pumping Station |
| 2990 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., |
| 2991 | Attending the Repair and Renewal works in Submersible Pumpset |
| 2992 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings |
| 2993 | 30 HP |
| 2994 | 20 HP |
| 2995 | 15 HP |
| 2996 | 10 HP |
| 2997 | 7.5 HP |
| 2998 | Transporting the pumpset from Pump House to work shop. |
| 2999 | 30 HP |
| 3000 | 20 HP |
| 3001 | 15 HP |
| 3002 | 10 HP |
| 3003 | 7.5 HP |
| 3004 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials. |
| 3005 | 30 HP |
| 3006 | 20 HP |
| 3007 | 15 HP |
| 3008 | 10 HP |
| 3009 | 7.5 HP |
| 3010 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., |
| 3011 | 30 HP |
| 3012 | 20 HP |
| 3013 | 15 HP |
| 3014 | 10 HP |
| 3015 | 7.5 HP |
| 3016 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material |
| 3017 | 30 HP |
| 3018 | 20 HP |
| 3019 | 15 HP |
| 3020 | 10 HP |
| 3021 | 7.5 HP |
| 3022 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works. |
| 3023 | 30 HP |
| 3024 | 20 HP |
| 3025 | 15 HP |
| 3026 | 10 HP |
| 3027 | 7.5 HP |
| 3028 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping. |
| 3029 | 30 HP |
| 3030 | 20 HP |
| 3031 | 15 HP |
| 3032 | 10 HP |
| 3033 | 7.5 HP |
| 3034 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 3035 | Clear Water sump at Karattupudur - 1.00 LL |
| 3036 | Vellerivelli Booster Sump - 2.20 LL |
| 3037 | AP East Booster Sump - 1.15 LL |
| 3038 | Chitrapalayam Booster Sump - 0.50 LL |
| 3039 | Senthilpalayam Booster Sump - 0.30 LL |
| 3040 | Erumaipatty Booster Sump - 1.00 LL |
| 3041 | Oruvapatty Booster Sump - 0.95 LL |
| 3042 | Vellerivelli Sump - 1.25 LL |
| 3043 | Nedungulam Sump - 0.45 LL |
| 3044 | Reddipatty Muniappan Kovil Sump - 0.95 LL |
| 3045 | Myleripatty Sump - 0.50 LL |
| 3046 | Ammankoil kadu sump - 0.45 LL |
| 3047 | Vannankuttai sump - 0.35 LL |
| 3048 | Vellakaradu Sump - 0.60 LL |
| 3049 | Anaipallam Sump - 0.50 LL |
| 3050 | Kalluralkadu sump - 0.60 LL |
| 3051 | Madeswaran kovil sump - 0.55 LL |
| 3052 | Vethilaikaranvalavu sump - 0.95 LL |
| 3053 | Kalarkadu Sump - 0.40 LL |
| 3054 | Velayeekaradu Sump - 0.40 LL |
| 3055 | Uppanchevi Karadu sump - 0.70 LL |
| 3056 | Ayyanarappankovil sump - 0.80 LL |
| 3057 | Muniampatty Sump - 0.45 LL |
| 3058 | Tharakadu Sump - 1.15 LL |
| 3059 | Kuppusamy kovil sump - 0.30 LL |
| 3060 | Chettimankurichi Sump - 0.55 LL |
| 3061 | Perumal kovil karadu Sump - 0.45 LL |
| 3062 | Thangayur Sump - 0.50 LL |
| 3063 | Erumaipatty Pt sump - 0.40 LL |
| 3064 | Dhadapuram Sump - 0.50 LL |
| 3065 | AP East Sump - 1.30 LL |
| 3066 | Kurumbapatty Sump - 0.20 LL |
| 3067 | Sandaipettai Sump - 0.20 LL |
| 3068 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 3069 | DOL Starter for O.W Submersible Pumpset |
| 3070 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter |
| 3071 | Replacement of required capacity moving kit of Contactor, and Job Volt Coil suitable for the starter including the cost of materials etc., complete |
| 3072 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 3073 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 3074 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 3075 | Attending the repair works in Auto Transformer StarterFrom 7.50 HP to 15.00 HP |
| 3076 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete., and as directed by TWAD Board officers. |
| 3077 | 7.5 HP |
| 3078 | 10 HP |
| 3079 | 12.5 HP |
| 3080 | 15 HP |
| 3081 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 3082 | 7.5 HP |
| 3083 | 10 HP |
| 3084 | 12.5 HP |
| 3085 | 15 HP |
| 3086 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 3087 | 7.5 HP |
| 3088 | 10 HP |
| 3089 | 12.5 HP |
| 3090 | 15 HP |
| 3091 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 3092 | 7.5 HP |
| 3093 | 10 HP |
| 3094 | 12.5 HP |
| 3095 | 15 HP |
| 3096 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 3097 | 7.5 HP |
| 3098 | 10 HP |
| 3099 | 12.5 HP |
| 3100 | 15 HP |
| 3101 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 3102 | 7.5 HP |
| 3103 | 10 HP |
| 3104 | 12.5 HP |
| 3105 | 15 HP |
| 3106 | Attending the repair works in Auto Transformer StarterFrom 20.00 HP to 30.00 HP |
| 3107 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaing the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete,as directed by TWAD Board officers. |
| 3108 | 20 HP |
| 3109 | 25 HP |
| 3110 | 30 HP |
| 3111 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station |
| 3112 | 20 HP |
| 3113 | 25 HP |
| 3114 | 30 HP |
| 3115 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete |
| 3116 | 20 HP |
| 3117 | 25 HP |
| 3118 | 30 HP |
| 3119 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter |
| 3120 | 20 HP |
| 3121 | 25 HP |
| 3122 | 30 HP |
| 3123 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete |
| 3124 | 20 HP |
| 3125 | 25 HP |
| 3126 | 30 HP |
| 3127 | Supply and Delivery of PLA Safety Relay suitable for the starter |
| 3128 | 20 HP |
| 3129 | 25 HP |
| 3130 | 30 HP |
| 3131 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 3132 | 20 HP |
| 3133 | 25 HP |
| 3134 | 30 HP |
| 3135 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter. |
| 3136 | 20 HP |
| 3137 | 25 HP |
| 3138 | 30 HP |
| 3139 | Cost of Chemicals |
| 3140 | Supply and delivery of Liquid Chlorine as per IS Specification (with Chlorine 99.8%, Moisture, Na2O3, Hydrogen and Carbondioxide are to be nil) required for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 3141 | For a period from 01.01.2027 to 31.03.2027 |
| 3142 | For a period from 01.04.2027 to 31.03.2028 |
| 3143 | For a period from 01.04.2028 to 31.03.2029 |
| 3144 | Supply and delivery of Alum (Sulphate of Alumino Ferric) required for Water Treatment Plants confirming to IS specification 299/1980 and as amended from time to time for delivery at anywhere in Coimbatore District including loading, freight, unloading, transit, insurance and all other incidental charges. |
| 3145 | For a period from 01.01.2027 to 31.03.2027 |
| 3146 | For a period from 01.04.2027 to 31.03.2028 |
| 3147 | For a period from 01.04.2028 to 31.03.2029 |
| 3148 | Supply and delivery of Stable Bleaching Powder as per IS Specification 1065/ 1989 and as amended from time to time for Grade I for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 3149 | For a period from 01.01.2027 to 31.03.2027 |
| 3150 | For a period from 01.04.2027 to 31.03.2028 |
| 3151 | For a period from 01.04.2028 to 31.03.2029 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 25 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender