Tender For Operation And Maintenance Of 2 Nos Of Cwss Under Maintenance Division, Tiruppur In Tiruppur District Including Repairs, Rectification Works And Supply Of Chemicals For A Period Of 27 Months (I.E) From 01.01.2027 To 31.03.2029 (2026-2029) -
Tender Overview
Project Description
Tender for Operation And Maintenance Of 2 Nos Of Cwss Under Maintenance Division, Tiruppur In Tiruppur District Including Repairs, Rectification Works And Supply Of Chemicals For A Period Of 27 Months (I.E) From 01.01.2027 To 31.03.2029 (2026-2029) - Package - 6B
BOQ
| Sl. No. | Item Description |
| 1 | TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD CHIEF ENGINEER, COIMBATORE. Name of work:- Operation and Maintenance of 2 Nos of CWSS under Maintenance Division, Tiruppur in Tiruppur District including Repairs, Rectification works and supply of Chemicals for a period of 27 months (i.e) from 01.01.2027 to 31.03.2029 (2026-2029) - Package - 6B PRICE BID (COVER -II) BILL OF QUANTITY BILL OF QUANTITIES 1) The Bill of Quantities shall contain items for the construction, installation, testing, commissioning and maintenance of the Works to be carried out by the Contractor 2) The Bill of Quantities will be used to calculate the Contract Price. The contractor shall be paid for the quantum of work done at the rate quoted for each item in the Bill of Quantities. 3) The bidder shall fill in rates and prices and line item total (both in figures and words) for all items of works described in the Bill of quantities along with total bid price (both in figures and words). Items for which no rate or price is entered by the bidder will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities 4) The rates quoted in the BOQ shall be for carrying out the work in conformity to the BIS, TNBP and Technical Specifications and other Terms and Conditions set out in the Bid Document. 5) All pages in the BOQ should be signed without omission. All corrections/over writing should be properly attested by the Bidder. Changes in the Probable of Probable of Quantity 6) If the final Quantity of the work done differs from the Probable of Quantity in the Bill of Quantities for the particular item/items, the rates as in the agreement for the relevant items shall be paid. Goods & Service Tax 7) The bid value is inclusive of GST @ 18% (or) at the rates as may be notified by the Government from time to time. The bidder should quote basic price of each item in the Bill of Quantity. The GST amount should be arrived for the Total basic cost of all the items. TDS - GST 8) From every individual periodic payment made to the firm/Contractor, TDS - GST will be deducted at the rates as may be notified from time to time by the Government 9) The Executive Engineer has to show restraint in execution of works under the following category by duly observance of procedure. i. Items quoted with violent excess percentage i.e.,(+) 25% and above over the departmental rate should not ordinarily exceed the departmental quantity during execution. Departement rates shall only be allowed for the excess quantity if any involved during execution on these items. ii. The items quoted with violent less percentage i.e., (-) 10 % and below than the departmental value shall not be ordinarily omitted or reduced during execution. Name of Work: Operation and Maintenance of 2 Nos of CWSS under Maintenance Division, Tiruppur in Tiruppur District including Repairs, Rectification works and supply of Chemicals for a period of 27 months (i.e) from 01.01.2027 to 31.03.2029 (2026-2029) - Package - 6B Sl. No. Description of work Probable quantity Figures TNBP No. Other specification Units in Rates in Amount in figures Figures Words 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Vide separate sheets attached. |
| 2 | 2 Nos of CWSS under Maintenance Division, Tiruppur in Tiruppur District |
| 3 | Operation and Maintenance of CWSS to 158 Habitations in Gudimangalam and Udumalpet Unions in Tiruppur District including repairs, rectification works and supply of Chemicals for the period from 01.01.2027 to 31.03.2029 |
| 4 | Operation and Maintenance of CWSS to Madathukulam, Sankaramanallur, Komaralingam, Kaniyur & Dhali Town Panchayats & 318 Rural Habitations in Udumalpet & Madathukulam Unions in Tiruppur District including repairs, rectification works and supply of Chemicals for the period from 01.01.2027 to 31.03.2029 |
| 5 | Sub - Total |
| 6 | Add 18% GST on Sub Total |
| 7 | Part : 1 - Operation and Maintenance of CWSS to 158 Habitations in Gudimangalam and Udumalpet Unions in Tiruppur District |
| 8 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protecton of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure -I, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity. |
| 9 | For a period from 01.01.2027 to 31.03.2027(8.980 MLD x 90 Days = 808.200 ML) |
| 10 | For a period from 01.04.2027 to 31.03.2028(9.037 MLD x 366 Days = 3307.542 ML) |
| 11 | For a period from 01.04.2028 to 31.03.2029(9.093 MLD x 365 Days = 3318.945 ML) |
| 12 | Repairs and Renewals For a period from 01.01.2027 to 31.03.2027 |
| 13 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 14 | Gasket leak |
| 15 | 500 DI K7 |
| 16 | 450 DI K7 |
| 17 | 400 DI K7 |
| 18 | 350 DI K7 |
| 19 | 300 DI K7 |
| 20 | 250 DI K7 |
| 21 | 200 DI K7 |
| 22 | 150 DI K7 |
| 23 | Cement joint |
| 24 | 500 DI K7 |
| 25 | 450 DI K7 |
| 26 | 400 DI K7 |
| 27 | 350 DI K7 |
| 28 | 300 DI K7 |
| 29 | 250 DI K7 |
| 30 | 200 DI K7 |
| 31 | 150 DI K7 |
| 32 | cut barrel & MJ collar |
| 33 | 500 DI K7 |
| 34 | 450 DI K7 |
| 35 | 400 DI K7 |
| 36 | 350 DI K7 |
| 37 | 300 DI K7 |
| 38 | 250 DI K7 |
| 39 | 200 DI K7 |
| 40 | 150 DI K7 |
| 41 | Single MJ collar |
| 42 | 500 DI K7 |
| 43 | 450 DI K7 |
| 44 | 400 DI K7 |
| 45 | 350 DI K7 |
| 46 | 300 DI K7 |
| 47 | 250 DI K7 |
| 48 | 200 DI K7 |
| 49 | 150 DI K7 |
| 50 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 51 | Fusion joint |
| 52 | 125 HDPE PN 8 |
| 53 | 125 HDPE PN 6 |
| 54 | HDPE Couple joint |
| 55 | 125 HDPE PN 8 |
| 56 | 125 HDPE PN 6 |
| 57 | 125 mm GI |
| 58 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 59 | 200 PVC 10 KSc |
| 60 | 200 PVC 6 Ksc |
| 61 | 200 PVC 4 KSc |
| 62 | 160 PVC 10 KSc |
| 63 | 160 PVC 6 KSc |
| 64 | 160 PVC 4 KSc |
| 65 | 140 PVC 10 KSc |
| 66 | 140 PVC 6 KSc |
| 67 | 110 PVC 4 Ksc |
| 68 | 110 PVC 6 Ksc |
| 69 | 110 PVC 10 KSc |
| 70 | 90 PVC 10 KSc |
| 71 | 90 PVC 6 KSc |
| 72 | 90 PVC 4 KSc |
| 73 | 75 PVC 10 KSc |
| 74 | 75 PVC 4 KSc |
| 75 | 75 PVC 6 KSc |
| 76 | 63 PVC 10 KSc |
| 77 | 63 PVC 6 KSc |
| 78 | 63 PVC 4 KSc |
| 79 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 80 | Burst |
| 81 | 500 DI K7 |
| 82 | 450 DI K7 |
| 83 | 400DI K7 |
| 84 | 350 DI K7 |
| 85 | 300DI K7 |
| 86 | 250DI K7 |
| 87 | 200 DI K 7 |
| 88 | 150 DI K7 |
| 89 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 90 | 125 HDPE PN 8 |
| 91 | 125 HDPE PN 6 |
| 92 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 93 | 200 PVC 10 KSc |
| 94 | 200 PVC 6 Ksc |
| 95 | 200 PVC 4 KSc |
| 96 | 160 PVC 10 KSc |
| 97 | 160 PVC 6 KSc |
| 98 | 160 PVC 4 KSc |
| 99 | 140 PVC 10 KSc |
| 100 | 140 PVC 6 KSc |
| 101 | 110 PVC 4 Ksc |
| 102 | 110 PVC 6 Ksc |
| 103 | 110 PVC 10 KSc |
| 104 | 90 PVC 10 KSc |
| 105 | 90 PVC 6 KSc |
| 106 | 90 PVC 4 KSc |
| 107 | 75 PVC 10 KSc |
| 108 | 75 PVC 4 KSc |
| 109 | 75 PVC 6 KSc |
| 110 | 63 PVC 10 KSc |
| 111 | 63 PVC 6 KSc |
| 112 | 63 PVC 4 KSc |
| 113 | Attending the Repair and Renewal works of various capacities of VT Pumpset |
| 114 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 115 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 116 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 117 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 118 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 119 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 120 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 121 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 122 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 123 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 124 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 125 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 126 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 127 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 128 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 129 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 130 | Repair of VT Pumpset (Motor) |
| 131 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 132 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 133 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 134 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 135 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 136 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 137 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 138 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 139 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 140 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 141 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 142 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 143 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 144 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 145 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 146 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 147 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 148 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 149 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset (Various HSC Motor) etc, Complete and as directed by the departmental officers. |
| 150 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc, Complete and as directed by the departmental officers. |
| 151 | 40 HP @ Thirumoorthi Nagar |
| 152 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges etc, Complete and as directed by the departmental officers. |
| 153 | 40 HP @ Thirumoorthi Nagar |
| 154 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings etc, Complete and as directed by the departmental officers. |
| 155 | 40 HP @ Thirumoorthi Nagar |
| 156 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motoretc, Complete and as directed by the departmental officers. |
| 157 | 40 HP @ Thirumoorthi Nagar |
| 158 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking etc, Complete and as directed by the departmental officers. |
| 159 | 40 HP @ Thirumoorthi Nagar |
| 160 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motoretc, Complete and as directed by the departmental officers. |
| 161 | 40 HP @ Thirumoorthi Nagar |
| 162 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools &Materialsetc, Complete and as directed by the departmental officers. |
| 163 | 40 HP @ Thirumoorthi Nagar |
| 164 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 165 | 40 HP @ Thirumoorthi Nagar |
| 166 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 167 | 40 HP @ Thirumoorthi Nagar |
| 168 | HSC Centrifugal Pumpset |
| 169 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 170 | 40 HP @ Thirumoorthi Nagar |
| 171 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 172 | 40 HP @ Thirumoorthi Nagar |
| 173 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 174 | 40 HP @ Thirumoorthi Nagar |
| 175 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 176 | 40 HP @ Thirumoorthi Nagar |
| 177 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 178 | 40 HP @ Thirumoorthi Nagar |
| 179 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 180 | 40 HP @ Thirumoorthi Nagar |
| 181 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 182 | 40 HP @ Thirumoorthi Nagar |
| 183 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 184 | 40 HP @ Thirumoorthi Nagar |
| 185 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 186 | 40 HP @ Thirumoorthi Nagar |
| 187 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 188 | 40 HP @ Thirumoorthi Nagar |
| 189 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 190 | 40 HP @ Thirumoorthi Nagar |
| 191 | Attending the Repair and Renewal works in Submersible Pumpset etc, complete and as directed by the departmental officers. |
| 192 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 193 | 2.5 HP |
| 194 | 3.00 HP |
| 195 | 5.00 HP |
| 196 | 8.00 HP |
| 197 | 10.00 HP |
| 198 | 30.00 HP |
| 199 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 200 | 2.5 HP |
| 201 | 3.00 HP |
| 202 | 5.00 HP |
| 203 | 8.00 HP |
| 204 | 10.00 HP |
| 205 | 30.00 HP |
| 206 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 207 | 2.5 HP |
| 208 | 3.00 HP |
| 209 | 5.00 HP |
| 210 | 8.00 HP |
| 211 | 10.00 HP |
| 212 | 30.00 HP |
| 213 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 214 | 2.5 HP |
| 215 | 3.00 HP |
| 216 | 5.00 HP |
| 217 | 8.00 HP |
| 218 | 10.00 HP |
| 219 | 30.00 HP |
| 220 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 221 | 2.5 HP |
| 222 | 3.00 HP |
| 223 | 5.00 HP |
| 224 | 8.00 HP |
| 225 | 10.00 HP |
| 226 | 30.00 HP |
| 227 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 228 | 2.5 HP |
| 229 | 3.00 HP |
| 230 | 5.00 HP |
| 231 | 8.00 HP |
| 232 | 10.00 HP |
| 233 | 30.00 HP |
| 234 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 235 | 2.5 HP |
| 236 | 3.00 HP |
| 237 | 5.00 HP |
| 238 | 8.00 HP |
| 239 | 10.00 HP |
| 240 | 30.00 HP |
| 241 | Attending repair works in 3 phase Delta Starters |
| 242 | Labour Charges for Removal of unserviceable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starterand asdirected by TWAD board officers. |
| 243 | 7.50 HP |
| 244 | 10.00 HP |
| 245 | 30.00 HP |
| 246 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials and as directed by TWAD board officers. |
| 247 | 7.50 HP |
| 248 | 10.00 HP |
| 249 | 30.00 HP |
| 250 | Supply and Delivery of PLA Safety Relay suitable for the starterand as directed by TWAD board officers. |
| 251 | 7.50 HP |
| 252 | 10.00 HP |
| 253 | 30.00 HP |
| 254 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 255 | 7.50 HP |
| 256 | 10.00 HP |
| 257 | 30.00 HP |
| 258 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter andas directed by TWAD Board officers. |
| 259 | 7.50 HP |
| 260 | 10.00 HP |
| 261 | 30.00 HP |
| 262 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc complete and as directed by TWAD Board officers. |
| 263 | 7.50 HP |
| 264 | 10.00 HP |
| 265 | 30.00 HP |
| 266 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter and as directed by TWAD Board Officers. |
| 267 | 7.50 HP |
| 268 | 10.00 HP |
| 269 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter and as directed by TWAD Board Officers. |
| 270 | 30.00 HP |
| 271 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap valueand as directed by TWAD board officers. |
| 272 | 30.00 HP |
| 273 | Replacement of CT Coil with suitable Clamp Suitable for the starter and as directed by TWAD Board Officers. |
| 274 | 7.50 HP |
| 275 | 10.00 HP |
| 276 | 30.00 HP |
| 277 | Replacement of required amps Terminal block Suitable for the starterand as directed by TWAD Board Officers. |
| 278 | 7.50 HP |
| 279 | 10.00 HP |
| 280 | 30.00 HP |
| 281 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter and as directed by TWAD Board Officers. |
| 282 | 7.50 HP |
| 283 | 10.00 HP |
| 284 | 30.00 HP |
| 285 | Attending the repair works in Auto Transformer Starter for 40 HP |
| 286 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaning the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete, and as directed by TWAD Board officers. |
| 287 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the departmental officers. |
| 288 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete and as directed by the departmental officers. |
| 289 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter and as directed by the departmental officers. |
| 290 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 291 | Replacement of Power supply Phase indicator, ON /OFF indicator suitable for starter and as directed by the departmental officers. |
| 292 | Replacement of PLA safety relay/ Voltage protection relay suitable for the starter and as directed by the departmental officers. |
| 293 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 294 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 295 | Gun Metal Gate Valve |
| 296 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the Departmental officer |
| 297 | 50 mm |
| 298 | 65 mm |
| 299 | 80 mm |
| 300 | 100 mm |
| 301 | Sluice Valves |
| 302 | Removing the top housing of the Sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges, tools and materials and as Directed by TWAD Board officers. |
| 303 | 150 mm |
| 304 | 200 mm |
| 305 | 250 mm |
| 306 | 300 mm |
| 307 | Reconditining of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as Directed by TWAD Board officers. |
| 308 | 150 mm |
| 309 | 200 mm |
| 310 | 250 mm |
| 311 | 300 mm |
| 312 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lathe work after deducting the cost of old materialsand as Directed by TWAD Board officers. |
| 313 | 150 mm |
| 314 | 200 mm |
| 315 | 250 mm |
| 316 | 300 mm |
| 317 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet, bolt and nuts after deducting the cost of old materials and as Directed by TWAD Board officers. |
| 318 | 150 mm |
| 319 | 200 mm |
| 320 | 250 mm |
| 321 | 300 mm |
| 322 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 323 | 150 mm |
| 324 | 200 mm |
| 325 | 250 mm |
| 326 | 300 mm |
| 327 | Replacement of spindle rod (Brass) suitable for sulice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 328 | 150 mm |
| 329 | 200 mm |
| 330 | 250 mm |
| 331 | 300 mm |
| 332 | Air Valve |
| 333 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete as directed by the Departmental officer |
| 334 | 50 mm |
| 335 | 80 mm |
| 336 | 100 mm |
| 337 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 338 | 100 A Triple Pole MCB |
| 339 | Supply and delivery of electro magnetic contactors of suitable capacity in AC Three Phase rating, conforming to IS/IEC 60947-4-1 complete and as directed by TWAD Board Officers |
| 340 | 225 A |
| 341 | Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. |
| 342 | Astronomical Weekly Programmable Timer Switch |
| 343 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. |
| 344 | 20 -30 A |
| 345 | 10 A to 20 A |
| 346 | 5 A to 10 A |
| 347 | 30 A to 50 A |
| 348 | 150-200A |
| 349 | Supply and delivery of for arial board and pumproom |
| 350 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 351 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 352 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 353 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 354 | Supply and delivery PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 355 | 16 sqmm |
| 356 | 25 sqmm |
| 357 | 10 sqmm |
| 358 | 4 sqmm |
| 359 | 6 sqmm |
| 360 | Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking |
| 361 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 362 | Supply and installation of 4 KVA capacity automatic voltage stabilizer with time Delay relay |
| 363 | Digital Voltmeter 3 phase |
| 364 | Digital Ammeter 3 phase |
| 365 | 48W LED Street Light Fitting with LED |
| 366 | 80W LED Focus Light Fitting with LED |
| 367 | Supply and delivery of the following consumble items for Pump set repairs at the site of work to carryout the general maintenace works |
| 368 | 3 Ply R I Sheet |
| 369 | Supply and delivery of the following sizes of GI pipes and Specials requied The Galvanised mild steel tubes continuously welded Electrilc Resistance Welded (ERW), High Frequency Induction Welded (HFIW), Hot Furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/Part-I 1990 and as amended from time to time and bearing ISI Mark. The cost of pipes should include loading, freight, transit, insurance, incidental charges, packing and transportation charges to stock yard in good condition etc., complete (the cost excluding unloading from lorries at stock yard and stacking which will be paid separately) and as directed by the TWAD Board Officers. |
| 370 | 20mm GI Pipe |
| 371 | 25mm GI Pipe |
| 372 | 32mm GI Pipe |
| 373 | 50mm GI Pipe |
| 374 | 65mm GI Pipe |
| 375 | 80mm GI Pipe |
| 376 | 100mm GI pipe |
| 377 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 378 | Fuse Wire |
| 379 | 10 Amps Fuse Wire |
| 380 | 20 Amps Fuse Wire |
| 381 | Supply and Delivery of Gear Oil (high viscosity) for vertical Turbine Pumpset |
| 382 | 316 KVA Transformer - RBS transformar at Treatment Plant |
| 383 | Charges for removing the Transformer from the plinth after disconnecting the incoming & outgoing supply terminations, earthing, neutral connection in the Transformer loading to vehicle with mobile grane and conveying to workshop unloading the transformer with mobile crane as per site condition and as directed by TWAD Board Officers. |
| 384 | 100 KVA |
| 385 | 315 KVA |
| 386 | Charges for disconnecting the incomming& outgoing (LT & HT Side) supply terminations, earthing, neutral connection in the Transformer and drain out the oil from the conservator Tank and Transformer tank up to the required level and stacking the containers to attend the repair works/ Oil leakages and as directed by TWAD Board Officers. |
| 387 | 100 KVA |
| 388 | 315 KVA |
| 389 | Charges Opening the Transformer Top cover after disconnecting the inside terminal connections, weakening / damaged bushes, brash stud bolt & Nuts and lifting Transformer core & winding without damages and as directed by TWAD Board Officers. |
| 390 | 100 KVA |
| 391 | 315 KVA |
| 392 | Charges for cleaning the winding coils of the Transformer free from moisture and cleaning the inside walls of the Transformer by using required new Transformer oil without any damage to the Transformer Coil and as directed by TWAD Board Officers. |
| 393 | 100 KVA |
| 394 | 315 KVA |
| 395 | Charges for fixing the required capacity brass LT terminal bush 3nos, copper connecting plate,3 nos using necessary bushes, screws bolt nuts and as directed by TWAD Board Officers. |
| 396 | 100 KVA |
| 397 | 315 KVA |
| 398 | Charges for re-fixing the Transformer Top cover with conservator tank on the Transformer and connecting with all inside terminal connections including HT terminals by using required bolt & nuts and filling the tapped oil upto the mark of level indicator and charging the transformers, testing with load and as directed by TWAD Board Officers. |
| 399 | 100 KVA |
| 400 | 315 KVA |
| 401 | Charges for rewinding of Three phase of 11KV/22KV/ 433V Transformer in the suitable core assembly including charges for removing the burnt coil and allining of core assembly and including required insulating materials etc complete after deducting the cost burned scrap and as directed by TWAD Board Officers. |
| 402 | 100 KVA |
| 403 | 315 KVA |
| 404 | Charges for improving of IR Value of Transformer using electric oven - Heat Champer (LT winding, HT winding and Transformer core) and as directed by TWAD Board Officers. |
| 405 | 100 KVA |
| 406 | 315 KVA |
| 407 | Charges for two coats of painting the Transformer and as directed by TWAD Board officers. |
| 408 | 100 KVA |
| 409 | 315 KVA |
| 410 | Charges for two coats of painting the 6 Pole Structure and yard fencing and as directed by TWAD Board officers. |
| 411 | 100 KVA |
| 412 | 315 KVA |
| 413 | Charges for Eart Pit Value Checking with Certificate and as directed by TWAD Board Officers. |
| 414 | 100 KVA |
| 415 | 315 KVA |
| 416 | Charges for 11KV/433V Transformer loading to vehicle with mobile grane and conveying to Pumphouse Unloading the above transformer with mobile crane Re-erection of transformer with cable termination earthing and neutral connection testing of No Load and Load testing at pumphouse as per site condition and existing arrangements and as directed by TWAD Board Officers. |
| 417 | 100 KVA |
| 418 | 315 KVA |
| 419 | Charges for transformer oil filtration using hot air vacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity and as directed by TWAD board officers. |
| 420 | 100 KVA |
| 421 | 315 KVA |
| 422 | Supply and delivery of required size of LT Brass rod with terminal bushing with 4 no of nuts, washers and insulating sleeves and as directed by TWAD board officers. |
| 423 | 100 KVA |
| 424 | 315 KVA |
| 425 | Supply and delivery of required capacity copper, connecting plate for cable termination etc, Complete and as directed by the departmental officers. |
| 426 | 100 KVA |
| 427 | 315 KVA |
| 428 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers etc, Complete and as directed by the departmental officers. |
| 429 | 100 KVA |
| 430 | 315 KVA |
| 431 | Supply and Delivery of Cork Packing Sheet, Cork Bush for LT and HT side, oil level Indicator as directed by TWAD Board officers after deducting the cost of old scraps and as directed by the departmental officers. |
| 432 | 100 KVA |
| 433 | 315 KVA |
| 434 | Supply and delivery of new LT/HT Coil made EC Grade DP coveriong copper wire for winding of 11KV/22KV/433V Transformer and required insulating materials etc, Complete and as directed by the departmental officers. |
| 435 | 100 KVA |
| 436 | 315 KVA |
| 437 | Supply of transformer oil grade “A” for using cooling purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc, Complete and as directed by the departmental officers. |
| 438 | 100 KVA |
| 439 | 315 KVA |
| 440 | Supply and delivery of Drop Out fuse fixing unit setetc, Complete and as directed by the departmental officers. |
| 441 | 100 KVA |
| 442 | 315 KVA |
| 443 | Supply, delivery and fixing of Drop Out fuse Top Contact and bottom Contactetc, Complete and as directed by the departmental officers. |
| 444 | 100 KVA |
| 445 | 315 KVA |
| 446 | Supply and delivery of Breather with Silica gel of required size for the Transfomeretc, Complete and as directed by the departmental officers. |
| 447 | 100 KVA |
| 448 | 315 KVA |
| 449 | Supply and delivery of Silica gel etc, Complete and as directed by the departmental officers. |
| 450 | 100 KVA |
| 451 | 315 KVA |
| 452 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor etc, Complete and as directed by the departmental officers. |
| 453 | 100 KVA |
| 454 | 315 KVA |
| 455 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 456 | 4.15 LL capacity of sump at Clear water Reservoir |
| 457 | 5.80 LL capacity of sump at Wash water tank |
| 458 | 8.95 LL capacity of sump at Pottayampalayam |
| 459 | 6.20 LL capacity of sump at Iluppanagaram |
| 460 | 2.20 LL capacity of sump at Ramachandrapuram |
| 461 | 2.00 LL capacity of sump at Kongalnagar |
| 462 | 0.85 LL capacity of sump at Sikkanuthu privu |
| 463 | 0.10 LL capacity of sump at Puthupalayam |
| 464 | 0.30 LL capacity of sump at Ravanapuram |
| 465 | Repairs and Renewals For a period from 01.04.2027 to 31.03.2028 |
| 466 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 467 | Gasket leak |
| 468 | 500 DI K7 |
| 469 | 450 DI K7 |
| 470 | 400 DI K7 |
| 471 | 350 DI K7 |
| 472 | 300 DI K7 |
| 473 | 250 DI K7 |
| 474 | 200 DI K7 |
| 475 | 150 DI K7 |
| 476 | Cement joint |
| 477 | 500 DI K7 |
| 478 | 450 DI K7 |
| 479 | 400 DI K7 |
| 480 | 350 DI K7 |
| 481 | 300 DI K7 |
| 482 | 250 DI K7 |
| 483 | 200 DI K7 |
| 484 | 150 DI K7 |
| 485 | cut barrel & MJ collar |
| 486 | 500 DI K7 |
| 487 | 450 DI K7 |
| 488 | 400 DI K7 |
| 489 | 350 DI K7 |
| 490 | 300 DI K7 |
| 491 | 250 DI K7 |
| 492 | 200 DI K7 |
| 493 | 150 DI K7 |
| 494 | Single MJ collar |
| 495 | 500 DI K7 |
| 496 | 450 DI K7 |
| 497 | 400 DI K7 |
| 498 | 350 DI K7 |
| 499 | 300 DI K7 |
| 500 | 250 DI K7 |
| 501 | 200 DI K7 |
| 502 | 150 DI K7 |
| 503 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 504 | Fusion joint |
| 505 | 125 HDPE PN 8 |
| 506 | 125 HDPE PN 6 |
| 507 | HDPE Couple joint |
| 508 | 125 HDPE PN 8 |
| 509 | 125 HDPE PN 6 |
| 510 | 125 mm GI |
| 511 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 512 | 200 PVC 10 KSc |
| 513 | 200 PVC 6 Ksc |
| 514 | 200 PVC 4 KSc |
| 515 | 160 PVC 10 KSc |
| 516 | 160 PVC 6 KSc |
| 517 | 160 PVC 4 KSc |
| 518 | 140 PVC 10 KSc |
| 519 | 140 PVC 6 KSc |
| 520 | 110 PVC 4 Ksc |
| 521 | 110 PVC 6 Ksc |
| 522 | 110 PVC 10 KSc |
| 523 | 90 PVC 10 KSc |
| 524 | 90 PVC 6 KSc |
| 525 | 90 PVC 4 KSc |
| 526 | 75 PVC 10 KSc |
| 527 | 75 PVC 4 KSc |
| 528 | 75 PVC 6 KSc |
| 529 | 63 PVC 10 KSc |
| 530 | 63 PVC 6 KSc |
| 531 | 63 PVC 4 KSc |
| 532 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 533 | 500 DI K7 |
| 534 | 450 DI K7 |
| 535 | 400DI K7 |
| 536 | 350 DI K7 |
| 537 | 300DI K7 |
| 538 | 250DI K7 |
| 539 | 200 DI K 7 |
| 540 | 150 DI K7 |
| 541 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 542 | 125 HDPE PN 8 |
| 543 | 125 HDPE PN 6 |
| 544 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 545 | 200 PVC 10 KSc |
| 546 | 200 PVC 6 Ksc |
| 547 | 200 PVC 4 KSc |
| 548 | 160 PVC 10 KSc |
| 549 | 160 PVC 6 KSc |
| 550 | 160 PVC 4 KSc |
| 551 | 140 PVC 10 KSc |
| 552 | 140 PVC 6 KSc |
| 553 | 110 PVC 4 Ksc |
| 554 | 110 PVC 6 Ksc |
| 555 | 110 PVC 10 KSc |
| 556 | 90 PVC 10 KSc |
| 557 | 90 PVC 6 KSc |
| 558 | 90 PVC 4 KSc |
| 559 | 75 PVC 10 KSc |
| 560 | 75 PVC 4 KSc |
| 561 | 75 PVC 6 KSc |
| 562 | 63 PVC 10 KSc |
| 563 | 63 PVC 6 KSc |
| 564 | 63 PVC 4 KSc |
| 565 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 566 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 567 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 568 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 569 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 570 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 571 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 572 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 573 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 574 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 575 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 576 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 577 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 578 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 579 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 580 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 581 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 582 | Repair of VT Pumpset (Motor) |
| 583 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 584 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 585 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 586 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 587 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 588 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 589 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 590 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 591 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 592 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 593 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 594 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 595 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 596 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 597 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 598 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 599 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 600 | 40 HP Vertical Turbine pumpset at Raw water HW @ Thirumoorthi nagar |
| 601 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset (Various HSC Motor)etc, Complete and as directed by the departmental officers. |
| 602 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc, Complete and as directed by the departmental officers. |
| 603 | 40 HP @ Thirumoorthi Nagar |
| 604 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges etc, Complete and as directed by the departmental officers. |
| 605 | 40 HP @ Thirumoorthi Nagar |
| 606 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings etc, Complete and as directed by the departmental officers. |
| 607 | 40 HP @ Thirumoorthi Nagar |
| 608 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motoretc, Complete and as directed by the departmental officers. |
| 609 | 40 HP @ Thirumoorthi Nagar |
| 610 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking etc, Complete and as directed by the departmental officers. |
| 611 | 40 HP @ Thirumoorthi Nagar |
| 612 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motoretc, Complete and as directed by the departmental officers. |
| 613 | 40 HP @ Thirumoorthi Nagar |
| 614 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools &Materialsetc, Complete and as directed by the departmental officers. |
| 615 | 40 HP @ Thirumoorthi Nagar |
| 616 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 617 | 40 HP @ Thirumoorthi Nagar |
| 618 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 619 | 40 HP @ Thirumoorthi Nagar |
| 620 | HSC Centrifugal Pumpset |
| 621 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 622 | 40 HP @ Thirumoorthi Nagar |
| 623 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 624 | 40 HP @ Thirumoorthi Nagar |
| 625 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 626 | 40 HP @ Thirumoorthi Nagar |
| 627 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 628 | 40 HP @ Thirumoorthi Nagar |
| 629 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 630 | 40 HP @ Thirumoorthi Nagar |
| 631 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 632 | 40 HP @ Thirumoorthi Nagar |
| 633 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 634 | 40 HP @ Thirumoorthi Nagar |
| 635 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 636 | 40 HP @ Thirumoorthi Nagar |
| 637 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 638 | 40 HP @ Thirumoorthi Nagar |
| 639 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 640 | 40 HP @ Thirumoorthi Nagar |
| 641 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 642 | 40 HP @ Thirumoorthi Nagar |
| 643 | Attending the Repair and Renewal works in Submersible Pumpset etc, complete and as directed by the departmental officers. |
| 644 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 645 | 2.5 HP |
| 646 | 3.00 HP |
| 647 | 5.00 HP |
| 648 | 8.00 HP |
| 649 | 10.00 HP |
| 650 | 30.00 HP |
| 651 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 652 | 2.5 HP |
| 653 | 3.00 HP |
| 654 | 5.00 HP |
| 655 | 8.00 HP |
| 656 | 10.00 HP |
| 657 | 30.00 HP |
| 658 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 659 | 2.5 HP |
| 660 | 3.00 HP |
| 661 | 5.00 HP |
| 662 | 8.00 HP |
| 663 | 10.00 HP |
| 664 | 30.00 HP |
| 665 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 666 | 2.5 HP |
| 667 | 3.00 HP |
| 668 | 5.00 HP |
| 669 | 8.00 HP |
| 670 | 10.00 HP |
| 671 | 30.00 HP |
| 672 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 673 | 2.5 HP |
| 674 | 3.00 HP |
| 675 | 5.00 HP |
| 676 | 8.00 HP |
| 677 | 10.00 HP |
| 678 | 30.00 HP |
| 679 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 680 | 2.5 HP |
| 681 | 3.00 HP |
| 682 | 5.00 HP |
| 683 | 8.00 HP |
| 684 | 10.00 HP |
| 685 | 30.00 HP |
| 686 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 687 | 2.5 HP |
| 688 | 3.00 HP |
| 689 | 5.00 HP |
| 690 | 8.00 HP |
| 691 | 10.00 HP |
| 692 | 30.00 HP |
| 693 | Attending repair works in 3 phase Delta Starters |
| 694 | Labour Charges for Removal of unserviceable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starterand asdirected by TWAD board officers. |
| 695 | 7.50 HP |
| 696 | 10.00 HP |
| 697 | 30.00 HP |
| 698 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials and as directed by TWAD board officers. |
| 699 | 7.50 HP |
| 700 | 10.00 HP |
| 701 | 30.00 HP |
| 702 | Supply and Delivery of PLA Safety Relay suitable for the starterand as directed by TWAD board officers. |
| 703 | 7.50 HP |
| 704 | 10.00 HP |
| 705 | 30.00 HP |
| 706 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 707 | 7.50 HP |
| 708 | 10.00 HP |
| 709 | 30.00 HP |
| 710 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter andas directed by TWAD Board officers. |
| 711 | 7.50 HP |
| 712 | 10.00 HP |
| 713 | 30.00 HP |
| 714 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc complete and as directed by TWAD Board officers. |
| 715 | 7.50 HP |
| 716 | 10.00 HP |
| 717 | 30.00 HP |
| 718 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter and as directed by TWAD Board Officers. |
| 719 | 7.50 HP |
| 720 | 10.00 HP |
| 721 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter and as directed by TWAD Board Officers. |
| 722 | 30.00 HP |
| 723 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap valueand as directed by TWAD board officers. |
| 724 | 30.00 HP |
| 725 | Replacement of CT Coil with suitable Clamp Suitable for the starter and as directed by TWAD Board Officers. |
| 726 | 7.50 HP |
| 727 | 10.00 HP |
| 728 | 30.00 HP |
| 729 | Replacement of required amps Terminal block Suitable for the starterand as directed by TWAD Board Officers. |
| 730 | 7.50 HP |
| 731 | 10.00 HP |
| 732 | 30.00 HP |
| 733 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter and as directed by TWAD Board Officers. |
| 734 | 7.50 HP |
| 735 | 10.00 HP |
| 736 | 30.00 HP |
| 737 | Attending the repair works in Auto Transformer Starter |
| 738 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaning the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete, and as directed by TWAD Board officers. |
| 739 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the departmental officers. |
| 740 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete and as directed by the departmental officers. |
| 741 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter and as directed by the departmental officers. |
| 742 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 743 | Replacement of Power supply Phase indicator, ON /OFF indicator suitable for starter and as directed by the departmental officers. |
| 744 | Replacement of PLA safety relay/ Voltage protection relay suitable for the starter and as directed by the departmental officers. |
| 745 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 746 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 747 | Gun Metal Gate Valve |
| 748 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the Departmental officer |
| 749 | 50 mm |
| 750 | 65 mm |
| 751 | 80 mm |
| 752 | 100 mm |
| 753 | Sluice Valves |
| 754 | Removing the top housing of the Sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges, tools and materials and as Directed by TWAD Board officers. |
| 755 | 150 mm |
| 756 | 200 mm |
| 757 | 250 mm |
| 758 | 300 mm |
| 759 | Reconditining of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as Directed by TWAD Board officers. |
| 760 | 150 mm |
| 761 | 200 mm |
| 762 | 250 mm |
| 763 | 300 mm |
| 764 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lathe work after deducting the cost of old materialsand as Directed by TWAD Board officers. |
| 765 | 150 mm |
| 766 | 200 mm |
| 767 | 250 mm |
| 768 | 300 mm |
| 769 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet, bolt and nuts after deducting the cost of old materials and as Directed by TWAD Board officers. |
| 770 | 150 mm |
| 771 | 200 mm |
| 772 | 250 mm |
| 773 | 300 mm |
| 774 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 775 | 150 mm |
| 776 | 200 mm |
| 777 | 250 mm |
| 778 | 300 mm |
| 779 | Replacement of spindle rod (Brass) suitable for sulice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 780 | 150 mm |
| 781 | 200 mm |
| 782 | 250 mm |
| 783 | 300 mm |
| 784 | Air Valve |
| 785 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete as directed by the Departmental officer |
| 786 | 50 mm |
| 787 | 80 mm |
| 788 | 100 mm |
| 789 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 790 | 100 A Triple Pole MCB |
| 791 | Supply and delivery of electro magnetic contactors of suitable capacity in AC Three Phase rating, conforming to IS/IEC 60947-4-1 complete and as directed by TWAD Board Officers |
| 792 | 225 A |
| 793 | Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. |
| 794 | Astronomical Weekly Programmable Timer Switch |
| 795 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. |
| 796 | 20 -30 A |
| 797 | 10 A to 20 A |
| 798 | 5 A to 10 A |
| 799 | 30 A to 50 A |
| 800 | 150-200A |
| 801 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 802 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 803 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 804 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 805 | Supply and delivery PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 806 | 16 sqmm |
| 807 | 25 sqmm |
| 808 | 10 sqmm |
| 809 | 4 sqmm |
| 810 | 6 sqmm |
| 811 | Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking |
| 812 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 813 | Triple Pole & Neutral 6A to 32A,10KA - Higher End |
| 814 | Supply and installation of 4 KVA capacity automatic voltage stabilizer with time Delay relay |
| 815 | Digital Voltmeter 3 phase |
| 816 | Digital Ammeter 3 phase |
| 817 | 48W LED Street Light Fitting with LED |
| 818 | 80W LED Focus Light Fitting with LED |
| 819 | Supply and delivery of the following consumble items for Pump set repairs at the site of work to carryout the general maintenace works |
| 820 | 3 Ply R I Sheet |
| 821 | Supply and delivery of the following sizes of GI pipes and Specials requied The Galvanised mild steel tubes continuously welded Electrilc Resistance Welded (ERW), High Frequency Induction Welded (HFIW), Hot Furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/Part-I 1990 and as amended from time to time and bearing ISI Mark. The cost of pipes should include loading, freight, transit, insurance, incidental charges, packing and transportation charges to stock yard in good condition etc., complete (the cost excluding unloading from lorries at stock yard and stacking which will be paid separately) and as directed by the TWAD Board Officers. |
| 822 | 20mm GI Pipe |
| 823 | 25mm GI Pipe |
| 824 | 32mm GI Pipe |
| 825 | 50mm GI Pipe |
| 826 | 65mm GI Pipe |
| 827 | 80mm GI Pipe |
| 828 | 100mm GI pipe |
| 829 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 830 | Fuse Wire |
| 831 | 10 Amps Fuse Wire |
| 832 | 20 Amps Fuse Wire |
| 833 | Supply and Delivery of Gear oil (high viscosity)for vertical Turbine pumpset |
| 834 | Repair works to 315 KVA Transformer at Treatment Plant |
| 835 | Charges for removing the Transformer from the plinth after disconnecting the incoming & outgoing supply terminations, earthing, neutral connection in the Transformer loading to vehicle with mobile grane and conveying to workshop unloading the transformer with mobile crane as per site condition and as directed by TWAD Board Officers. |
| 836 | 100 KVA |
| 837 | 315 KVA |
| 838 | Charges for disconnecting the incomming& outgoing (LT & HT Side) supply terminations, earthing, neutral connection in the Transformer and drain out the oil from the conservator Tank and Transformer tank up to the required level and stacking the containers to attend the repair works/ Oil leakages and as directed by TWAD Board Officers. |
| 839 | 100 KVA |
| 840 | 315 KVA |
| 841 | Charges Opening the Transformer Top cover after disconnecting the inside terminal connections, weakening / damaged bushes, brash stud bolt & Nuts and lifting Transformer core & winding without damages and as directed by TWAD Board Officers. |
| 842 | 100 KVA |
| 843 | 315 KVA |
| 844 | Charges for cleaning the winding coils of the Transformer free from moisture and cleaning the inside walls of the Transformer by using required new Transformer oil without any damage to the Transformer Coil and as directed by TWAD Board Officers. |
| 845 | 100 KVA |
| 846 | 315 KVA |
| 847 | Charges for fixing the required capacity brass LT terminal bush 3nos, copper connecting plate,3 nos using necessary bushes, screws bolt nuts and as directed by TWAD Board Officers. |
| 848 | 100 KVA |
| 849 | 315 KVA |
| 850 | Charges for re-fixing the Transformer Top cover with conservator tank on the Transformer and connecting with all inside terminal connections including HT terminals by using required bolt & nuts and filling the tapped oil upto the mark of level indicator and charging the transformers, testing with load and as directed by TWAD Board Officers. |
| 851 | 100 KVA |
| 852 | 315 KVA |
| 853 | Charges for rewinding of Three phase of 11KV/22KV/ 433V Transformer in the suitable core assembly including charges for removing the burnt coil and allining of core assembly and including required insulating materials etc complete after deducting the cost burned scrap and as directed by TWAD Board Officers. |
| 854 | 100 KVA |
| 855 | 315 KVA |
| 856 | Charges for improving of IR Value of Transformer using electric oven - Heat Champer (LT winding, HT winding and Transformer core) and as directed by TWAD Board Officers. |
| 857 | 100 KVA |
| 858 | 315 KVA |
| 859 | Charges for two coats of painting the Transformer and as directed by TWAD Board officers. |
| 860 | 100 KVA |
| 861 | 315 KVA |
| 862 | Charges for two coats of painting the 6 Pole Structure and yard fencing and as directed by TWAD Board officers. |
| 863 | 100 KVA |
| 864 | 315 KVA |
| 865 | Charges for Eart Pit Value Checking with Certificate and as directed by TWAD Board Officers. |
| 866 | 100 KVA |
| 867 | 315 KVA |
| 868 | Charges for 11KV/433V Transformer loading to vehicle with mobile grane and conveying to Pumphouse Unloading the above transformer with mobile crane Re-erection of transformer with cable termination earthing and neutral connection testing of No Load and Load testing at pumphouse as per site condition and existing arrangements and as directed by TWAD Board Officers. |
| 869 | 100 KVA |
| 870 | 315 KVA |
| 871 | Charges for transformer oil filtration using hot air vacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity and as directed by TWAD board officers. |
| 872 | 100 KVA |
| 873 | 315 KVA |
| 874 | Supply and delivery of required size of LT Brass rod with terminal bushing with 4 no of nuts, washers and insulating sleeves and as directed by TWAD board officers. |
| 875 | 100 KVA |
| 876 | 315 KVA |
| 877 | Supply and delivery of required capacity copper, connecting plate for cable termination etc, Complete and as directed by the departmental officers. |
| 878 | 100 KVA |
| 879 | 315 KVA |
| 880 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers etc, Complete and as directed by the departmental officers. |
| 881 | 100 KVA |
| 882 | 315 KVA |
| 883 | Supply and Delivery of Cork Packing Sheet, Cork Bush for LT and HT side, oil level Indicator as directed by TWAD Board officers after deducting the cost of old scraps and as directed by the departmental officers. |
| 884 | 100 KVA |
| 885 | 315 KVA |
| 886 | Supply and delivery of new LT/HT Coil made EC Grade DP coveriong copper wire for winding of 11KV/22KV/433V Transformer and required insulating materials etc, Complete and as directed by the departmental officers. |
| 887 | 100 KVA |
| 888 | 315 KVA |
| 889 | Supply of transformer oil grade “A” for using cooling purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc, Complete and as directed by the departmental officers. |
| 890 | 100 KVA |
| 891 | 315 KVA |
| 892 | Supply and delivery of Drop Out fuse fixing unit setetc, Complete and as directed by the departmental officers. |
| 893 | 100 KVA |
| 894 | 315 KVA |
| 895 | Supply, delivery and fixing of Drop Out fuse Top Contact and bottom Contactetc, Complete and as directed by the departmental officers. |
| 896 | 100 KVA |
| 897 | 315 KVA |
| 898 | Supply and delivery of Breather with Silica gel of required size for the Transfomeretc, Complete and as directed by the departmental officers. |
| 899 | 100 KVA |
| 900 | 315 KVA |
| 901 | Supply and delivery of Silica gel etc, Complete and as directed by the departmental officers. |
| 902 | 100 KVA |
| 903 | 315 KVA |
| 904 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor etc, Complete and as directed by the departmental officers. |
| 905 | 100 KVA |
| 906 | 315 KVA |
| 907 | Charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the departmental officers |
| 908 | 4.15 LL capacity of sump at Clear water Reservoir |
| 909 | 5.80 LL capacity of sump at Wash water tank |
| 910 | 8.95 LL capacity of sump at Pottayampalayam |
| 911 | 6.20 LL capacity of sump at Iluppanagaram |
| 912 | 2.20 LL capacity of sump at Ramachandrapuram |
| 913 | 2.00 LL capacity of sump at Kongalnagar |
| 914 | 0.85 LL capacity of sump at Sikkanuthu privu |
| 915 | 0.10 LL capacity of sump at Puthupalayam |
| 916 | 0.30 LL capacity of sump at Ravanapuram |
| 917 | Repairs and Renewals For a period from 01.04.2028 to 31.03.2029 |
| 918 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 919 | Gasket leak |
| 920 | 500 DI K7 |
| 921 | 450 DI K7 |
| 922 | 400 DI K7 |
| 923 | 350 DI K7 |
| 924 | 300 DI K7 |
| 925 | 250 DI K7 |
| 926 | 200 DI K7 |
| 927 | 150 DI K7 |
| 928 | Cement joint |
| 929 | 500 DI K7 |
| 930 | 450 DI K7 |
| 931 | 400 DI K7 |
| 932 | 350 DI K7 |
| 933 | 300 DI K7 |
| 934 | 250 DI K7 |
| 935 | 200 DI K7 |
| 936 | 150 DI K7 |
| 937 | cut barrel & MJ collar |
| 938 | 500 DI K7 |
| 939 | 450 DI K7 |
| 940 | 400 DI K7 |
| 941 | 350 DI K7 |
| 942 | 300 DI K7 |
| 943 | 250 DI K7 |
| 944 | 200 DI K7 |
| 945 | 150 DI K7 |
| 946 | Single MJ collar |
| 947 | 500 DI K7 |
| 948 | 450 DI K7 |
| 949 | 400 DI K7 |
| 950 | 350 DI K7 |
| 951 | 300 DI K7 |
| 952 | 250 DI K7 |
| 953 | 200 DI K7 |
| 954 | 150 DI K7 |
| 955 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 956 | Fusion joint |
| 957 | 125 HDPE PN 8 |
| 958 | 125 HDPE PN 6 |
| 959 | HDPE Couple joint |
| 960 | 125 HDPE PN 8 |
| 961 | 125 HDPE PN 6 |
| 962 | 125 mm GI |
| 963 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 964 | 200 PVC 10 KSc |
| 965 | 200 PVC 6 Ksc |
| 966 | 200 PVC 4 KSc |
| 967 | 160 PVC 10 KSc |
| 968 | 160 PVC 6 KSc |
| 969 | 160 PVC 4 KSc |
| 970 | 140 PVC 10 KSc |
| 971 | 140 PVC 6 KSc |
| 972 | 110 PVC 4 Ksc |
| 973 | 110 PVC 6 Ksc |
| 974 | 110 PVC 10 KSc |
| 975 | 90 PVC 10 KSc |
| 976 | 90 PVC 6 KSc |
| 977 | 90 PVC 4 KSc |
| 978 | 75 PVC 10 KSc |
| 979 | 75 PVC 4 KSc |
| 980 | 75 PVC 6 KSc |
| 981 | 63 PVC 10 KSc |
| 982 | 63 PVC 6 KSc |
| 983 | 63 PVC 4 KSc |
| 984 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe 3 including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 985 | Burst |
| 986 | 500 DI K7 |
| 987 | 450 DI K7 |
| 988 | 400DI K7 |
| 989 | 350 DI K7 |
| 990 | 300DI K7 |
| 991 | 250DI K7 |
| 992 | 200 DI K 7 |
| 993 | 150 DI K7 |
| 994 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 995 | 125 HDPE PN 8 |
| 996 | 125 HDPE PN 6 |
| 997 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 998 | 200 PVC 10 KSc |
| 999 | 200 PVC 6 Ksc |
| 1000 | 200 PVC 4 KSc |
| 1001 | 160 PVC 10 KSc |
| 1002 | 160 PVC 6 KSc |
| 1003 | 160 PVC 4 KSc |
| 1004 | 140 PVC 10 KSc |
| 1005 | 140 PVC 6 KSc |
| 1006 | 110 PVC 4 Ksc |
| 1007 | 110 PVC 6 Ksc |
| 1008 | 110 PVC 10 KSc |
| 1009 | 90 PVC 10 KSc |
| 1010 | 90 PVC 6 KSc |
| 1011 | 90 PVC 4 KSc |
| 1012 | 75 PVC 10 KSc |
| 1013 | 75 PVC 4 KSc |
| 1014 | 75 PVC 6 KSc |
| 1015 | 63 PVC 10 KSc |
| 1016 | 63 PVC 6 KSc |
| 1017 | 63 PVC 4 KSc |
| 1018 | Attending VT Pump set (Pump) - Head works at Thirumoorthi nagar |
| 1019 | Rewinding of Motors in pumping stations in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II. |
| 1020 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 1021 | 40 HP Vrertical Trubine pumpset at Raw water HW @ Thirumoorthi nagar |
| 1022 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 1023 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1024 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1025 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1026 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 1027 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1028 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 1029 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1030 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1031 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1032 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 1033 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1034 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 1035 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1036 | Repair of Pumpsets |
| 1037 | Attending VT Pump set (Motor) |
| 1038 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1039 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1040 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1041 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1042 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1043 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1044 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1045 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1046 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1047 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1048 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1049 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1050 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1051 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1052 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 1053 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1054 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 1055 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar |
| 1056 | HSC Centrifugal pumpset ( Motor) |
| 1057 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1058 | 40 HP @ Thirumoorthi nagar |
| 1059 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1060 | 40 HP @ Thirumoorthi nagar |
| 1061 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1062 | 40 HP @ Thirumoorthi nagar |
| 1063 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1064 | 40 HP @ Thirumoorthi nagar |
| 1065 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1066 | 40 HP @ Thirumoorthi nagar |
| 1067 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1068 | 40 HP @ Thirumoorthi nagar |
| 1069 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1070 | 40 HP @ Thirumoorthi nagar |
| 1071 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 1072 | 40 HP @ Thirumoorthi nagar |
| 1073 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 1074 | 40 HP @ Thirumoorthi nagar |
| 1075 | HSC Centrifugal pumpset ( Pump) Clear water |
| 1076 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 1077 | 40 HP @ Thirumoorthi nagar |
| 1078 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 1079 | 40 HP @ Thirumoorthi nagar |
| 1080 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 1081 | 40 HP @ Thirumoorthi nagar |
| 1082 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 1083 | 40 HP @ Thirumoorthi nagar |
| 1084 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 1085 | 40 HP @ Thirumoorthi nagar |
| 1086 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 1087 | 40 HP @ Thirumoorthi nagar |
| 1088 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 1089 | 40 HP @ Thirumoorthi nagar |
| 1090 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 1091 | 40 HP @ Thirumoorthi nagar |
| 1092 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 1093 | 40 HP @ Thirumoorthi nagar |
| 1094 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 1095 | 40 HP @ Thirumoorthi nagar |
| 1096 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 1097 | 40 HP @ Thirumoorthi nagar |
| 1098 | Attending Open well submercible pumpset |
| 1099 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 1100 | 2.5 HP |
| 1101 | 10 HP |
| 1102 | 30 HP |
| 1103 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 1104 | 2.5 HP |
| 1105 | 10 HP |
| 1106 | 30 HP |
| 1107 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 1108 | 2 .5HP |
| 1109 | 10 HP |
| 1110 | 30 HP |
| 1111 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 1112 | 2.5 HP |
| 1113 | 10 HP |
| 1114 | 30 HP |
| 1115 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 1116 | 2.5 HP |
| 1117 | 10 HP |
| 1118 | 30 HP |
| 1119 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 1120 | 2.5 HP |
| 1121 | 7.5 HP |
| 1122 | 10 HP |
| 1123 | 30 HP |
| 1124 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 1125 | 2.5 HP |
| 1126 | 7.5 HP |
| 1127 | 10 HP |
| 1128 | 30 HP |
| 1129 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 1130 | Attending the Repair works in Three Phase star Delta Starters |
| 1131 | Labour Charges for Removal of unserviceable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starterand asdirected by TWAD board officers. |
| 1132 | 7.5HP |
| 1133 | 10 HP |
| 1134 | 30 HP |
| 1135 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials and as directed by TWAD board officers. |
| 1136 | 7.5HP |
| 1137 | 10 HP |
| 1138 | 30 HP |
| 1139 | Supply and Delivery of PLA Safety Relay suitable for the starterand as directed by TWAD board officers. |
| 1140 | 7.5HP |
| 1141 | 10 HP |
| 1142 | 30 HP |
| 1143 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 1144 | 7.5HP |
| 1145 | 10 HP |
| 1146 | 30 HP |
| 1147 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter andas directed by TWAD Board officers. |
| 1148 | 7.5HP |
| 1149 | 10 HP |
| 1150 | 30 HP |
| 1151 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc completeand as directed by TWAD Board officers. |
| 1152 | 7.5HP |
| 1153 | 10 HP |
| 1154 | 30 HP |
| 1155 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter and as directed by TWAD Board Officers. |
| 1156 | 7.5HP |
| 1157 | 10 HP |
| 1158 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter and as directed by TWAD Board Officers. |
| 1159 | 30 HP |
| 1160 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap valueand as directed by TWAD board officers. |
| 1161 | 30 HP |
| 1162 | Replacement of CT Coil with suitable Clamp Suitable for the starter and as directed by TWAD |
| 1163 | 7.5HP |
| 1164 | 10 HP |
| 1165 | 30 HP |
| 1166 | Replacement of required amps Terminal block Suitable for the starterand as directed by TWAD |
| 1167 | 7.5HP |
| 1168 | 10 HP |
| 1169 | 30 HP |
| 1170 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter and as directed by TWAD Board Officers. |
| 1171 | 7.5HP |
| 1172 | 10 HP |
| 1173 | 30 HP |
| 1174 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 1175 | Labour Charges for removing the Burnt ATS Coil after draining the contaminated oil and cleaning the oil tank and fixing the ATS Coil after attending the rewinding work and filling the required oil in the oil tank etc., Complete, and as directed by TWAD Board officers. (40 HP ) Raw water |
| 1176 | Charges for Conveying the ATS Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the departmental officers. |
| 1177 | Charges for Removing the old wire from the ATS Coil , Cleaning, Rewinding of ATS Coil by using double Coated Enamel Copper Wire and all insulation materials including the cost of materials after deducting old scrap materials etc., complete and as directed by the departmental officers. |
| 1178 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, OLR, CT Coil and PLA safety Relay suitable for the starter and as directed by the departmental officers. |
| 1179 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 1180 | Replacement of Power supply Phase indicator, ON /OFF indicator suitable for starter and as directed by the departmental officers. |
| 1181 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 1182 | Replacement of PLA safety relay/ Voltage protection relay suitable for the starter and as directed by the departmental officers. |
| 1183 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the departmental officers. |
| 1184 | Gun Metal Gate valve |
| 1185 | Replacement of non functioning unserviceable Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the Departmental officer |
| 1186 | 50 mm |
| 1187 | 65 mm |
| 1188 | 80 mm |
| 1189 | 100 mm |
| 1190 | Attending repair works in 300mm Sluice Valve |
| 1191 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges, tools and materials and as Directed by TWAD Board officers. |
| 1192 | 150 mm |
| 1193 | 200 mm |
| 1194 | 250 mm |
| 1195 | 300 mm |
| 1196 | Reconditioning of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as Directed by TWAD Board officers. |
| 1197 | 150 mm |
| 1198 | 200 mm |
| 1199 | 250 mm |
| 1200 | 300 mm |
| 1201 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lathe work after deducting the cost of old materialsand as Directed by TWAD Board officers. |
| 1202 | 150 mm |
| 1203 | 200 mm |
| 1204 | 250 mm |
| 1205 | 300 mm |
| 1206 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet, bolt and nuts after deducting the cost of old materials and as Directed by TWAD Board officers. |
| 1207 | 150 mm |
| 1208 | 200 mm |
| 1209 | 250 mm |
| 1210 | 300 mm |
| 1211 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 1212 | 150 mm |
| 1213 | 200 mm |
| 1214 | 250 mm |
| 1215 | 300 mm |
| 1216 | Replacement of spindle rod (Brass) suitable for sulice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 1217 | 150 mm |
| 1218 | 200 mm |
| 1219 | 250 mm |
| 1220 | 300 mm |
| 1221 | Air Valve |
| 1222 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete as directed by the Departmental officer |
| 1223 | 50 mm |
| 1224 | 80 mm |
| 1225 | 100 mm |
| 1226 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 1227 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 1228 | 100 A Triple Pole MCB |
| 1229 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 225Amps rating conforming to IS / IEC 60947 |
| 1230 | 225 A |
| 1231 | Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. |
| 1232 | Astronomical Weekly Programmable Timer Switch |
| 1233 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. |
| 1234 | 20 -30 A |
| 1235 | 10 A to 20 A |
| 1236 | 5 A to 10 A |
| 1237 | 30 A to 50 A |
| 1238 | 150-200A |
| 1239 | Charges for removing the burnt power capacitor and labour charges for fixing the new capacitor suitable length copper cable wiring this panel board testing etc. complete after adjusted the old scrap materials. |
| 1240 | Supply and delivery of for arial board and pumproom |
| 1241 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 1242 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 1243 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 1244 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 1245 | Supply and delivery PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 1246 | 16 sqmm |
| 1247 | 25 sqmm |
| 1248 | 10 sqmm |
| 1249 | 4 sqmm |
| 1250 | 6 sqmm |
| 1251 | Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking |
| 1252 | MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. |
| 1253 | Supply and delivery of Triple Pole & Neutral 6A to 32A,10KA |
| 1254 | Supply and installation of 4 KVA capacity automatic voltage stabilizer with time Delay relay |
| 1255 | Volt Meter 3 PHASE |
| 1256 | Ammeter 3 PHASE |
| 1257 | 48W LED Street Light Fitting with LED |
| 1258 | 80W LED Focus Light Fitting with LED |
| 1259 | Supply and delivery of the following consumable items for Pump Set repairs at the site of work to carryout the general maintenance works |
| 1260 | 3 Ply R I Sheet |
| 1261 | 20mm GI Pipe |
| 1262 | 25mm GI Pipe |
| 1263 | 32mm GI Pipe |
| 1264 | 50mm GI Pipe |
| 1265 | 65mm GI Pipe |
| 1266 | 80mm GI Pipe |
| 1267 | 100mm GI pipe |
| 1268 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 1269 | Fuse Wire (COPPER) |
| 1270 | 10 Amps Fuse Wire |
| 1271 | 20 Amps Fuse Wire |
| 1272 | supply and Delivery of Gear oil (high viscosity)for vertical Turbine pumpset |
| 1273 | Repair works to 315 KVA transformar at Treatment Plant |
| 1274 | Charges for removing the Transformer from the plinth after disconnecting the incoming & outgoing supply terminations, earthing, neutral connection in the Transformer loading to vehicle with mobile grane and conveying to workshop unloading the transformer with mobile crane as per site condition and as directed by TWAD Board Officers. |
| 1275 | 100 KVA |
| 1276 | 315 KVA |
| 1277 | Charges for disconnecting the incomming& outgoing (LT & HT Side) supply terminations, earthing, neutral connection in the Transformer and drain out the oil from the conservator Tank and Transformer tank up to the required level and stacking the containers to attend the repair works/ Oil leakages and as directed by TWAD Board Officers. |
| 1278 | 100 KVA |
| 1279 | 315 KVA |
| 1280 | Charges Opening the Transformer Top cover afterdisconnecting the inside terminal connections, weakening / damaged bushes, brash stud bolt & Nuts and lifting Transformer core & winding without damages and as directed by TWAD Board Officers. |
| 1281 | 100 KVA |
| 1282 | 315 KVA |
| 1283 | Charges for cleaning the winding coils of the Transformer free from moisture and cleaning the inside walls of the Transformer by using required new Transformer oil without any damage to the Transformer Coil and as directed by TWAD Board Officers. |
| 1284 | 100 KVA |
| 1285 | 315 KVA |
| 1286 | Charges for fixing the required capacity brass LTterminal bush 3nos, copper connecting pIate,3 nos using necessary bushes, screws bolt nuts and as directed by TWAD Board Officers. |
| 1287 | 100 KVA |
| 1288 | 315 KVA |
| 1289 | Charges for re-fixing the Transformer Top coverwith conservator tank on the Transformer and connecting with all inside terminal connections including HT terminals by using required bolt & nuts and filling the tapped oil upto the mark of level indicator and charging the transformers, testing with load and as directed by TWAD Board Officers. |
| 1290 | 100 KVA |
| 1291 | 315 KVA |
| 1292 | Charges for rewinding of Three phase of11KV/22KV/ 433V Transformer in the suitable core assembly including charges for removing the burnt coil and allining of core assembly and including required insulating materials etc complete after deducting the cost burned scrap and as directed by TWAD Board Officers. |
| 1293 | 100 KVA |
| 1294 | 315 KVA |
| 1295 | Charges for improving of IR Value of Transformerusing electric oven - Heat Champer (LT winding, HT winding and Transformer core) and as directed by TWAD Board Officers. |
| 1296 | 100 KVA |
| 1297 | 315 KVA |
| 1298 | Charges for two coats of painting theTransformer and as directed by TWAD Board officers. |
| 1299 | 100 KVA |
| 1300 | 315 KVA |
| 1301 | Charges for two coats of painting the 6 PoleStructure and yard fencing and as directed by TWAD Board officers. |
| 1302 | 100 KVA |
| 1303 | 315 KVA |
| 1304 | Charges for Eart Pit Value Checking withCertificate and as directed by TWAD BoardOfficers. |
| 1305 | 100 KVA |
| 1306 | 315 KVA |
| 1307 | Charges for 11KV/433V Transformer loading tovehicle with mobile crane and conveying to Pumphouse Unloading the above transformer with mobile crane Re-erection of transformer with cable termination earthing and neutral connection testing of No Load and Load testing at pumphouse as per site condition and existing arrangements and as directed by TWAD Board Officers. |
| 1308 | 100 KVA |
| 1309 | 315 KVA |
| 1310 | Charges for transformer oil filtration using hot airvacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity and as directed by TWAD board officers. |
| 1311 | 100 KVA |
| 1312 | 315 KVA |
| 1313 | Supply and delivery of required size of LT Brassrod with terminal bushing with 4 no of nuts, washers and insulating sleeves and as directed by TWAD board officers. |
| 1314 | 100 KVA |
| 1315 | 315 KVA |
| 1316 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers etc, Complete and as directed by the departmental officers. |
| 1317 | 100 KVA |
| 1318 | 315 KVA |
| 1319 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers etc, Complete and as directed by the departmental officers. |
| 1320 | 100 KVA |
| 1321 | 315 KVA |
| 1322 | Supply and Delivery of Cork Packing Sheet, Cork Bush for LT and HT side, oil level Indicator as directed by TWAD Board officers after deducting the cost of old scraps and as directed by the departmental officers. |
| 1323 | 100 KVA |
| 1324 | 315 KVA |
| 1325 | Supply and delivery of new LT/HT Coil made EC Grade DP coveriong copper wire for winding of 11KV/22KV/433V Transformer and required insulating materials etc, Complete and as directed by the departmental officers. |
| 1326 | 100 KVA |
| 1327 | 315 KVA |
| 1328 | Supply of transformer oil grade “A\\" for using purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc, Complete and as directed by the departmental officers. |
| 1329 | 100 KVA |
| 1330 | 315 KVA |
| 1331 | Supply and delivery of Drop Out fuse fixing unit set etc, Complete and as directed by the departmental officers. |
| 1332 | 100 KVA |
| 1333 | 315 KVA |
| 1334 | Supply, delivery and fixing of Drop Out fuse TopContact and bottom Contactetc, Complete and as directed by the departmental officers. |
| 1335 | 100 KVA |
| 1336 | 315 KVA |
| 1337 | Supply and delivery of Breather with Silica gel of required size for the Transfomeretc, Complete and as directed by the departmental officers. |
| 1338 | 100 KVA |
| 1339 | 315 KVA |
| 1340 | Supply and delivery of Silica gel etc, Completeand as directed by the departmental officers. |
| 1341 | 100 KVA |
| 1342 | 315 KVA |
| 1343 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor etc, Complete and as directed by the departmental officers. |
| 1344 | 100 KVA |
| 1345 | 315 KVA |
| 1346 | Charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the departmental officers |
| 1347 | 4.15 LL capacity of sump at Clear water Reservoir |
| 1348 | 5.80 LL capacity of sump at Wash water tank |
| 1349 | 8.95 LL capacity of sump at Pottayampalayam |
| 1350 | 6.20 LL capacity of sump at Iluppanagaram |
| 1351 | 2.20 LL capacity of sump at Ramachandrapuram |
| 1352 | 2.00 LL capacity of sump at Kongalnagar |
| 1353 | 0.85 LL capacity of sump at Sikkanuthu privu |
| 1354 | 0.10 LL capacity of sump at Puthupalayam |
| 1355 | 0.30 LL capacity of sump at Ravanapuram |
| 1356 | Cost of Chemicals |
| 1357 | Supply and delivery of Liquid Chlorine as per IS Specification ( with Chlorine 99.8%, Moisture, Na2O3, Hydrogen and Carbondioxide are to be nil) required for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Tiruppur District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 1358 | For a period from 01.01.2027 to 31.03.2027 (35.92 kg/ 1000) x 90 days) = 3.233 MT |
| 1359 | For a period from 01.04.2027 to 31.03.2028(36.148 kg/ 1000) x 366 days) = 13.230 MT |
| 1360 | For a period from 01.04.2028 to 31.03.2029(36.372 kg/ 1000) x 365 days) = 13.276 MT |
| 1361 | Supply and delivery of Alum (Sulphate of Alumino Ferric) required for Water Treatment Plants confirming to IS specification 299/1980 and as amended from time to time for delivery at anywhere in Tiruppur District including loading, freight, unloading, transit, insurance and all other incidental charges. |
| 1362 | For a period from 01.01.2027 to 31.03.2027 179.60 kg/ 1000) x 90 days) = 16.164 MT |
| 1363 | For a period from 01.04.2027 to 31.03.2028(180.74 kg/ 1000) x 366 days) = 66.151 MT |
| 1364 | For a period from 01.04.2028 to 31.03.2029(181.86 kg/ 1000) x 365 days) = 66.379 MT |
| 1365 | Supply and delivery of Stable Bleaching Powder as per IS Specification 1065/ 1989 and as amended from time to time for Grade I for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Tiruppur District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 1366 | For a period from 01.01.2027 to 31.03.2027(54.42 kg/ 1000) x 90 days) = 4.898 MT |
| 1367 | For a period from 01.04.2027 to 31.03.2028(54.76 kg/ 1000) x 366 days) = 20.042 MT |
| 1368 | For a period from 01.04.2028 to 31.03.2029(55.12 kg/ 1000) x 365 days) = 20.119 MT |
| 1369 | Operation and Maintenance of CWSS to Madathukulam, Sankaramanallur, Komaralingam, Kaniyur & Dhali Town Panchayats & 318 Rural Habitations in Udumalpet & Madathukulam Unions in Tiruppur District |
| 1370 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protecton of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure -I, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity . |
| 1371 | For a period from 01.01.2027 to 31.03.2027(20.652 MLD x 90 Days = 1858.680 ML) |
| 1372 | For a period from 01.04.2027 to 31.03.2028(21.013 MLD x 366 Days = 7690.758 ML) |
| 1373 | For a period from 01.04.2028 to 31.03.2029(21.373 MLD x 365 Days = 7801.145 ML) |
| 1374 | Repairs and Renewals For a period from 01.01.2027 to 31.03.2027 |
| 1375 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1376 | 50mm OD PVC 6 KSC pipes |
| 1377 | 63mm OD PVC 4 KSC pipes |
| 1378 | 63mm OD PVC 6 KSC pipes |
| 1379 | 63mm OD PVC 10 KSC pipes |
| 1380 | 75mm OD PVC 4 KSC pipes |
| 1381 | 75mm OD PVC 6 KSC pipes |
| 1382 | 90mm OD PVC 4 KSC pipes |
| 1383 | 90mm OD PVC 6 KSC pipes |
| 1384 | 90mm OD PVC 10 KSC pipes |
| 1385 | 110mm OD PVC 4 KSC pipes |
| 1386 | 110mm OD PVC 6 KSC pipes |
| 1387 | 110mm OD PVC 10 KSC pipes |
| 1388 | 140mm OD PVC 4 KSC pipes |
| 1389 | 140mm OD PVC 6 KSC pipes |
| 1390 | 140mm OD PVC 10 KSC pipes |
| 1391 | 160mm OD PVC 6KSC pipes |
| 1392 | 160mm OD PVC 10KSC pipes |
| 1393 | 200mm OD PVC 6 KSC pipes |
| 1394 | 200mm OD PVC 10 KSC pipes |
| 1395 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1396 | Using MS Barrel pipe |
| 1397 | 250 mm |
| 1398 | Using MS Step Collar |
| 1399 | 250 mm AC pipe |
| 1400 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound Socket and spigot machine end MS fittings including supply and delivery rolling, cutting welding, Turning, facing, griding, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1401 | Using MS step collar |
| 1402 | 350 mm PSC 8 KSC Pipe |
| 1403 | 400 mm PSC 8 KSC Pipe |
| 1404 | 450 mm PSC 8 KSC Pipe |
| 1405 | 500 mm PSC 8 KSC Pipe |
| 1406 | 600 mm PSC 8 KSC Pipe |
| 1407 | 700 mm PSC 6 KSC Pipe |
| 1408 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1409 | Attending leaks in HDPE pipe |
| 1410 | Burst |
| 1411 | 250 mm HDPE, PN - 8 Pipe |
| 1412 | 250 mm HDPE, PN - 6 Pipe |
| 1413 | 200 mm HDPE, PN - 8 Pipe |
| 1414 | 200 mm HDPE, PN - 6 Pipe |
| 1415 | 160 mm HDPE, PN - 10 Pipe |
| 1416 | 160 mm HDPE, PN - 6 Pipe |
| 1417 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes couplers, union jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1418 | 80mm GI pipes |
| 1419 | 50mm GI pipes |
| 1420 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound DI pipe, including supply and delivery of C.I/D.I/S/S Pipes D/S couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1421 | Burst Pipe Replacement |
| 1422 | 450 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1423 | 400 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1424 | 350 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1425 | 300 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1426 | 250 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1427 | 200 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1428 | 150 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1429 | REPAIRS AND RENEWALS |
| 1430 | Verical Turbine Pumpset (Pump) |
| 1431 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 1432 | 40 HP Vrertical Trubine pumpset at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1433 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1434 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1435 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 1436 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1437 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1438 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1439 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1440 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1441 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1442 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1443 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 1444 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1445 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1446 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1447 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 1448 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1449 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1450 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1451 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1452 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1453 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1454 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1455 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 1456 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1457 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1458 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1459 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 1460 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1461 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1462 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1463 | Attending VT Pump set (Motor) |
| 1464 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1465 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1466 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1467 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1468 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1469 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1470 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1471 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1472 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1473 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1474 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1475 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1476 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1477 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1478 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1479 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1480 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1481 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1482 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1483 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1484 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1485 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1486 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1487 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1488 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1489 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1490 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1491 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1492 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 1493 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1494 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1495 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1496 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 1497 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1498 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1499 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1500 | HSC Centrifugal pumpset ( Motor) |
| 1501 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1502 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1503 | 40 HP @ Kanakkampalayam |
| 1504 | 40 HP @ New Madathukulam |
| 1505 | 20 HP @ new Madathukulam |
| 1506 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1507 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1508 | 40 HP @ Kanakkampalayam |
| 1509 | 40 HP @ New Madathukulam |
| 1510 | 20 HP @ new Madathukulam |
| 1511 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1512 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1513 | 40 HP @ Kanakkampalayam |
| 1514 | 40 HP @ New Madathukulam |
| 1515 | 20 HP @ new Madathukulam |
| 1516 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1517 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1518 | 40 HP @ Kanakkampalayam |
| 1519 | 40 HP @ New Madathukulam |
| 1520 | 20 HP @ new Madathukulam |
| 1521 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1522 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1523 | 40 HP @ Kanakkampalayam |
| 1524 | 40 HP @ New Madathukulam |
| 1525 | 20 HP @ new Madathukulam |
| 1526 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1527 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1528 | 40 HP @ Kanakkampalayam |
| 1529 | 40 HP @ New Madathukulam |
| 1530 | 20 HP @ new Madathukulam |
| 1531 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1532 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1533 | 40 HP @ Kanakkampalayam |
| 1534 | 40 HP @ New Madathukulam |
| 1535 | 20 HP @ new Madathukulam |
| 1536 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 1537 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1538 | 40 HP @ Kanakkampalayam |
| 1539 | 40 HP @ New Madathukulam |
| 1540 | 20 HP @ new Madathukulam |
| 1541 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 1542 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1543 | 40 HP @ Kanakkampalayam |
| 1544 | 40 HP @ New Madathukulam |
| 1545 | 20 HP @ new Madathukulam |
| 1546 | HSC Centrifugal pumpset ( Pump) |
| 1547 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 1548 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1549 | 40 HP @ Kanakkampalayam |
| 1550 | 40 HP @ New Madathukulam |
| 1551 | 20 HP @ new Madathukulam |
| 1552 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 1553 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1554 | 40 HP @ Kanakkampalayam |
| 1555 | 40 HP @ New Madathukulam |
| 1556 | 20 HP @ new Madathukulam |
| 1557 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 1558 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1559 | 40 HP @ Kanakkampalayam |
| 1560 | 40 HP @ New Madathukulam |
| 1561 | 20 HP @ new Madathukulam |
| 1562 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 1563 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1564 | 40 HP @ Kanakkampalayam |
| 1565 | 40 HP @ New Madathukulam |
| 1566 | 20 HP @ new Madathukulam |
| 1567 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 1568 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1569 | 40 HP @ Kanakkampalayam |
| 1570 | 40 HP @ New Madathukulam |
| 1571 | 20 HP @ new Madathukulam |
| 1572 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 1573 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1574 | 40 HP @ Kanakkampalayam |
| 1575 | 40 HP @ New Madathukulam |
| 1576 | 20 HP @ new Madathukulam |
| 1577 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 1578 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1579 | 40 HP @ Kanakkampalayam |
| 1580 | 40 HP @ New Madathukulam |
| 1581 | 20 HP @ new Madathukulam |
| 1582 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 1583 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1584 | 40 HP @ Kanakkampalayam |
| 1585 | 40 HP @ New Madathukulam |
| 1586 | 20 HP @ new Madathukulam |
| 1587 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 1588 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1589 | 40 HP @ Kanakkampalayam |
| 1590 | 40 HP @ New Madathukulam |
| 1591 | 20 HP @ new Madathukulam |
| 1592 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 1593 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1594 | 40 HP @ Kanakkampalayam |
| 1595 | 40 HP @ New Madathukulam |
| 1596 | 20 HP @ new Madathukulam |
| 1597 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 1598 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1599 | 40 HP @ Kanakkampalayam |
| 1600 | 40 HP @ New Madathukulam |
| 1601 | 20 HP @ new Madathukulam |
| 1602 | Attending the Repair and Renewal works in Submersible Pumpset etc, complete and as directed by the departmental officers. |
| 1603 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 1604 | 1.50 HP |
| 1605 | 2.00 HP |
| 1606 | 3.00 HP |
| 1607 | 5.00 HP |
| 1608 | 7.50 HP |
| 1609 | 10.00 HP |
| 1610 | 20.00 HP |
| 1611 | 30.00 HP |
| 1612 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 1613 | 1.50 HP |
| 1614 | 2.00 HP |
| 1615 | 3.00 HP |
| 1616 | 5.00 HP |
| 1617 | 7.50 HP |
| 1618 | 10.00 HP |
| 1619 | 20.00 HP |
| 1620 | 30.00 HP |
| 1621 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 1622 | 1.50 HP |
| 1623 | 2.00 HP |
| 1624 | 3.00 HP |
| 1625 | 5.00 HP |
| 1626 | 7.50 HP |
| 1627 | 10.00 HP |
| 1628 | 20.00 HP |
| 1629 | 30.00 HP |
| 1630 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 1631 | 1.50 HP |
| 1632 | 2.00 HP |
| 1633 | 3.00 HP |
| 1634 | 5.00 HP |
| 1635 | 7.50 HP |
| 1636 | 10.00 HP |
| 1637 | 20.00 HP |
| 1638 | 30.00 HP |
| 1639 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 1640 | 1.50 HP |
| 1641 | 2.00 HP |
| 1642 | 3.00 HP |
| 1643 | 5.00 HP |
| 1644 | 7.50 HP |
| 1645 | 10.00 HP |
| 1646 | 20.00 HP |
| 1647 | 30.00 HP |
| 1648 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 1649 | 1.50 HP |
| 1650 | 2.00 HP |
| 1651 | 3.00 HP |
| 1652 | 5.00 HP |
| 1653 | 7.50 HP |
| 1654 | 10.00 HP |
| 1655 | 20.00 HP |
| 1656 | 30.00 HP |
| 1657 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 1658 | 1.50 HP |
| 1659 | 2.00 HP |
| 1660 | 3.00 HP |
| 1661 | 5.00 HP |
| 1662 | 7.50 HP |
| 1663 | 10.00 HP |
| 1664 | 20.00 HP |
| 1665 | 30.00 HP |
| 1666 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 1667 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 1668 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 1669 | Supply and delivery of 160Amps, 4 pole, Moulded case circuit breaker (MCCB). |
| 1670 | 160 A 3 Pole MCCB |
| 1671 | 250 A 3 Pole MCCB |
| 1672 | 63 A 3 Phase 4 Pole MCCBContactor |
| 1673 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 225Amps rating conforming to IS / IEC 60947 |
| 1674 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 32Amps rating conforming to IS / IEC 60947 |
| 1675 | Supply , delivery and fixing of single phase preventer should protect the motor against single phasing, reverse phasing and unbalance supply |
| 1676 | Astronomical Weekly Programmable Timer Switch |
| 1677 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. 20-30A |
| 1678 | Charges for removing the burnt power capacitor and labour charges for fixing the new capacitor suitable length copper cable wiring this panel board testing etc. complete after adjusted the old scrap materials. |
| 1679 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 1680 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 1681 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 1682 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 1683 | Supply and delivery 16Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 1684 | Supply and delivery 25Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 1685 | Supply and delivery of Triple Pole & Neutral 6A to 32A,10KA |
| 1686 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 1687 | 3.00 LL |
| 1688 | 2.00 LL |
| 1689 | 1.00 LL |
| 1690 | 0.95 LL |
| 1691 | 0.60 LL |
| 1692 | 0.40 LL |
| 1693 | 0.30 LL |
| 1694 | 0.20 LL |
| 1695 | 0.12LL |
| 1696 | 0.10 LL |
| 1697 | Supply and delivery of the following Electrical Works :Consumable items at the site of work to carryout the general maintenance works |
| 1698 | Digital Voltmeter 3 phase |
| 1699 | Digital Ammeter 3 phase |
| 1700 | 48W LED Street Light Fitting with LED |
| 1701 | 80W LED Focus Light Fitting with LED |
| 1702 | Gun Metal Gate valve |
| 1703 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the Departmental officer |
| 1704 | 50 mm |
| 1705 | 65 mm |
| 1706 | 80 mm |
| 1707 | 100 mm |
| 1708 | Sluice Valves |
| 1709 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges, tools and materials and as Directed by TWAD Board officers. |
| 1710 | 150 mm |
| 1711 | 200 mm |
| 1712 | 250 mm |
| 1713 | 300 mm |
| 1714 | Reconditining of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as Directed by TWAD Board officers. |
| 1715 | 150 mm |
| 1716 | 200 mm |
| 1717 | 250 mm |
| 1718 | 300 mm |
| 1719 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lathe work after deducting the cost of old materialsand as Directed by TWAD Board officers. |
| 1720 | 150 mm |
| 1721 | 200 mm |
| 1722 | 250 mm |
| 1723 | 300 mm |
| 1724 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet, bolt and nuts after deducting the cost of old materials and as Directed by TWAD Board officers. |
| 1725 | 150 mm |
| 1726 | 200 mm |
| 1727 | 250 mm |
| 1728 | 300 mm |
| 1729 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 1730 | 150 mm |
| 1731 | 200 mm |
| 1732 | 250 mm |
| 1733 | 300 mm |
| 1734 | Replacement of spindle rod (Brass) suitable for sulice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 1735 | 150 mm |
| 1736 | 200 mm |
| 1737 | 250 mm |
| 1738 | 300 mm |
| 1739 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete as directed by the Departmental officer |
| 1740 | 50 mm |
| 1741 | 80 mm |
| 1742 | 100 mm |
| 1743 | Supply and delivery of the following consumble items for Pump set repairs at the site of work to carryout the general maintenace works |
| 1744 | 3 Ply R I Sheet |
| 1745 | Supply and delivery of the following sizes of GI pipes and Specials requied The Galvanised mild steel tubes continuously welded Electrilc Resistance Welded (ERW), High Frequency Induction Welded (HFIW), Hot Furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/Part-I 1990 and as amended from time to time and bearing ISI Mark. The cost of pipes should include loading, freight, transit, insurance, incidental charges, packing and transportation charges to stock yard in good condition etc., complete (the cost excluding unloading from lorries at stock yard and stacking which will be paid separately) and as directed by the TWAD Board Officers. |
| 1746 | 20mm GI Pipe |
| 1747 | 25mm GI Pipe |
| 1748 | 32mm GI Pipe |
| 1749 | 50mm GI Pipe |
| 1750 | 65mm GI Pipe |
| 1751 | 80mm GI Pipe |
| 1752 | 100mm GI pipe |
| 1753 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 1754 | Supply and Delivery of Gear oil (high viscosity)for vertical Turbine pumpset |
| 1755 | Fuse Wire (COPPER) |
| 1756 | 10 Amps Fuse Wire |
| 1757 | 20 Amps Fuse Wire |
| 1758 | For a period from 01.04.2027 to 31.03.2028 |
| 1759 | Leak & Burst |
| 1760 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1761 | 50mm OD PVC 6 KSC pipes |
| 1762 | 63mm OD PVC 4 KSC pipes |
| 1763 | 63mm OD PVC 6 KSC pipes |
| 1764 | 63mm OD PVC 10 KSC pipes |
| 1765 | 75mm OD PVC 4 KSC pipes |
| 1766 | 75mm OD PVC 6 KSC pipes |
| 1767 | 90mm OD PVC 4 KSC pipes |
| 1768 | 90mm OD PVC 6 KSC pipes |
| 1769 | 90mm OD PVC 10 KSC pipes |
| 1770 | 110mm OD PVC 6 KSC pipes |
| 1771 | 110mm OD PVC 4 KSC pipes |
| 1772 | 110mm OD PVC 10 KSC pipes |
| 1773 | 140mm OD PVC 4 KSC pipes |
| 1774 | 140mm OD PVC 6 KSC pipes |
| 1775 | 140mm OD PVC 10 KSC pipes |
| 1776 | 160mm OD PVC 6KSC pipes |
| 1777 | 160mm OD PVC 10KSC pipes |
| 1778 | 200mm OD PVC 6 KSC pipes |
| 1779 | 200mm OD PVC 10 KSC pipes |
| 1780 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1781 | Using MS Barrel pipe |
| 1782 | 250 mm |
| 1783 | Using MS Step Collar |
| 1784 | 250 mm AC pipe |
| 1785 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound Socket and spigot machine end MS fittings including supply and delivery rolling, cutting welding, Turning, facing, griding, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1786 | Using MS step collar |
| 1787 | 350 mm PSC 8 KSC Pipe |
| 1788 | 400 mm PSC 8 KSC Pipe |
| 1789 | 450 mm PSC 8 KSC Pipe |
| 1790 | 500 mm PSC 8 KSC Pipe |
| 1791 | 600 mm PSC 8 KSC Pipe |
| 1792 | 700 mm PSC 6 KSC Pipe |
| 1793 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1794 | Attending leaks in HDPE pipe |
| 1795 | Burst |
| 1796 | 250 mm HDPE, PN - 8 Pipe |
| 1797 | 250 mm HDPE, PN - 6 Pipe |
| 1798 | 200 mm HDPE, PN - 8 Pipe |
| 1799 | 200 mm HDPE, PN - 6 Pipe |
| 1800 | 160 mm HDPE, PN - 10 Pipe |
| 1801 | 160 mm HDPE, PN - 6 Pipe |
| 1802 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes couplers, union jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1803 | 80mm GI pipes |
| 1804 | 50mm GI pipes |
| 1805 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound DI pipe, including supply and delivery of C.I/D.I/S/S Pipes D/S couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1806 | Burst Pipe Replacement |
| 1807 | 450 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1808 | 400 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1809 | 350 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1810 | 300 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1811 | 250 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1812 | 200 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1813 | 150 mm DI, K-9 Pipe Burst Pipe Replacement |
| 1814 | REPAIRS AND RENEWALS |
| 1815 | Verical Turbine Pumpset (Pump) |
| 1816 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 1817 | 40 HP Vrertical Trubine pumpset at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1818 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1819 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1820 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 1821 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1822 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1823 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1824 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1825 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1826 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1827 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1828 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 1829 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1830 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1831 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1832 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 1833 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1834 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1835 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1836 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 1837 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1838 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1839 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1840 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 1841 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1842 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1843 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1844 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 1845 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1846 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1847 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1848 | Attending VT Pump set (Motor) |
| 1849 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1850 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1851 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1852 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1853 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1854 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1855 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1856 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1857 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1858 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1859 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1860 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1861 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1862 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1863 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1864 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1865 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1866 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1867 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1868 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1869 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1870 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1871 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1872 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1873 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1874 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1875 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1876 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1877 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 1878 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1879 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1880 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1881 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 1882 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 1883 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 1884 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 1885 | HSC Centrifugal pumpset ( Motor) |
| 1886 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 1887 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1888 | 40 HP @ Kanakkampalayam |
| 1889 | 40 HP @ New Madathukulam |
| 1890 | 20 HP @ new Madathukulam |
| 1891 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 1892 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1893 | 40 HP @ Kanakkampalayam |
| 1894 | 40 HP @ New Madathukulam |
| 1895 | 20 HP @ new Madathukulam |
| 1896 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 1897 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1898 | 40 HP @ Kanakkampalayam |
| 1899 | 40 HP @ New Madathukulam |
| 1900 | 20 HP @ new Madathukulam |
| 1901 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 1902 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1903 | 40 HP @ Kanakkampalayam |
| 1904 | 40 HP @ New Madathukulam |
| 1905 | 20 HP @ new Madathukulam |
| 1906 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 1907 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1908 | 40 HP @ Kanakkampalayam |
| 1909 | 40 HP @ New Madathukulam |
| 1910 | 20 HP @ new Madathukulam |
| 1911 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 1912 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1913 | 40 HP @ Kanakkampalayam |
| 1914 | 40 HP @ New Madathukulam |
| 1915 | 20 HP @ new Madathukulam |
| 1916 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 1917 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1918 | 40 HP @ Kanakkampalayam |
| 1919 | 40 HP @ New Madathukulam |
| 1920 | 20 HP @ new Madathukulam |
| 1921 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 1922 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1923 | 40 HP @ Kanakkampalayam |
| 1924 | 40 HP @ New Madathukulam |
| 1925 | 20 HP @ new Madathukulam |
| 1926 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 1927 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1928 | 40 HP @ Kanakkampalayam |
| 1929 | 40 HP @ New Madathukulam |
| 1930 | 20 HP @ new Madathukulam |
| 1931 | HSC Centrifugal pumpset ( Pump) |
| 1932 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 1933 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1934 | 40 HP @ Kanakkampalayam |
| 1935 | 40 HP @ New Madathukulam |
| 1936 | 20 HP @ new Madathukulam |
| 1937 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 1938 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1939 | 40 HP @ Kanakkampalayam |
| 1940 | 40 HP @ New Madathukulam |
| 1941 | 20 HP @ new Madathukulam |
| 1942 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 1943 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1944 | 40 HP @ Kanakkampalayam |
| 1945 | 40 HP @ New Madathukulam |
| 1946 | 20 HP @ new Madathukulam |
| 1947 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 1948 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1949 | 40 HP @ Kanakkampalayam |
| 1950 | 40 HP @ New Madathukulam |
| 1951 | 20 HP @ new Madathukulam |
| 1952 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 1953 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1954 | 40 HP @ Kanakkampalayam |
| 1955 | 40 HP @ New Madathukulam |
| 1956 | 20 HP @ new Madathukulam |
| 1957 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 1958 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1959 | 40 HP @ Kanakkampalayam |
| 1960 | 40 HP @ New Madathukulam |
| 1961 | 20 HP @ new Madathukulam |
| 1962 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 1963 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1964 | 40 HP @ Kanakkampalayam |
| 1965 | 40 HP @ New Madathukulam |
| 1966 | 20 HP @ new Madathukulam |
| 1967 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 1968 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1969 | 40 HP @ Kanakkampalayam |
| 1970 | 40 HP @ New Madathukulam |
| 1971 | 20 HP @ new Madathukulam |
| 1972 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 1973 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1974 | 40 HP @ Kanakkampalayam |
| 1975 | 40 HP @ New Madathukulam |
| 1976 | 20 HP @ new Madathukulam |
| 1977 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 1978 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1979 | 40 HP @ Kanakkampalayam |
| 1980 | 40 HP @ New Madathukulam |
| 1981 | 20 HP @ new Madathukulam |
| 1982 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 1983 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 1984 | 40 HP @ Kanakkampalayam |
| 1985 | 40 HP @ New Madathukulam |
| 1986 | 20 HP @ new Madathukulam |
| 1987 | Attending the Repair and Renewal works in Submersible Pumpset etc, complete and as directed by the departmental officers. |
| 1988 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 1989 | 1.50 HP |
| 1990 | 2.00 HP |
| 1991 | 3.00 HP |
| 1992 | 5.00 HP |
| 1993 | 7.50 HP |
| 1994 | 10.00 HP |
| 1995 | 20.00 HP |
| 1996 | 30.00 HP |
| 1997 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 1998 | 1.50 HP |
| 1999 | 2.00 HP |
| 2000 | 3.00 HP |
| 2001 | 5.00 HP |
| 2002 | 7.50 HP |
| 2003 | 10.00 HP |
| 2004 | 20.00 HP |
| 2005 | 30.00 HP |
| 2006 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 2007 | 1.50 HP |
| 2008 | 2.00 HP |
| 2009 | 3.00 HP |
| 2010 | 5.00 HP |
| 2011 | 7.50 HP |
| 2012 | 10.00 HP |
| 2013 | 20.00 HP |
| 2014 | 30.00 HP |
| 2015 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 2016 | 1.50 HP |
| 2017 | 2.00 HP |
| 2018 | 3.00 HP |
| 2019 | 5.00 HP |
| 2020 | 7.50 HP |
| 2021 | 10.00 HP |
| 2022 | 20.00 HP |
| 2023 | 30.00 HP |
| 2024 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 2025 | 1.50 HP |
| 2026 | 2.00 HP |
| 2027 | 3.00 HP |
| 2028 | 5.00 HP |
| 2029 | 7.50 HP |
| 2030 | 10.00 HP |
| 2031 | 20.00 HP |
| 2032 | 30.00 HP |
| 2033 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 2034 | 1.50 HP |
| 2035 | 2.00 HP |
| 2036 | 3.00 HP |
| 2037 | 5.00 HP |
| 2038 | 7.50 HP |
| 2039 | 10.00 HP |
| 2040 | 20.00 HP |
| 2041 | 30.00 HP |
| 2042 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 2043 | 1.50 HP |
| 2044 | 2.00 HP |
| 2045 | 3.00 HP |
| 2046 | 5.00 HP |
| 2047 | 7.50 HP |
| 2048 | 10.00 HP |
| 2049 | 20.00 HP |
| 2050 | 30.00 HP |
| 2051 | Attending repair works in 3 phase Delta Starters |
| 2052 | Labour Charges for Removal of unserviceable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starterand asdirected by TWAD board officers. |
| 2053 | 7.50 HP |
| 2054 | 20.00 HP |
| 2055 | 30.00 HP |
| 2056 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials and as directed by TWAD board officers. |
| 2057 | 7.50 HP |
| 2058 | 20.00 HP |
| 2059 | 30.00 HP |
| 2060 | Supply and Delivery of PLA Safety Relay suitable for the starterand as directed by TWAD board officers. |
| 2061 | 7.50 HP |
| 2062 | 20.00 HP |
| 2063 | 30.00 HP |
| 2064 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 2065 | 7.50 HP |
| 2066 | 20.00 HP |
| 2067 | 30.00 HP |
| 2068 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter andas directed by TWAD Board officers. |
| 2069 | 7.50 HP |
| 2070 | 20.00 HP |
| 2071 | 30.00 HP |
| 2072 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc complete and as directed by TWAD Board officers. |
| 2073 | 7.50 HP |
| 2074 | 20.00 HP |
| 2075 | 30.00 HP |
| 2076 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter and as directed by TWAD Board Officers. |
| 2077 | 7.50 HP |
| 2078 | 20.00 HP |
| 2079 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter and as directed by TWAD Board Officers. |
| 2080 | 30.00 HP |
| 2081 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap valueand as directed by TWAD board officers. |
| 2082 | 30.00 HP |
| 2083 | Replacement of CT Coil with suitable Clamp Suitable for the starter and as directed by TWAD Board Officers. |
| 2084 | 7.50 HP |
| 2085 | 20.00 HP |
| 2086 | 30.00 HP |
| 2087 | Replacement of required amps Terminal block Suitable for the starterand as directed by TWAD Board Officers. |
| 2088 | 7.50 HP |
| 2089 | 20.00 HP |
| 2090 | 30.00 HP |
| 2091 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter and as directed by TWAD Board Officers. |
| 2092 | 7.50 HP |
| 2093 | 20.00 HP |
| 2094 | 30.00 HP |
| 2095 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 2096 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 2097 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 2098 | Supply and delivery of 160Amps, 4 pole, Moulded case circuit breaker (MCCB). |
| 2099 | 160 A 3 Pole MCCB |
| 2100 | 250 A 3 Pole MCCB |
| 2101 | 63 A 3 Phase 4 Pole Contactor |
| 2102 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 225Amps rating conforming to IS / IEC 60947 |
| 2103 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 32Amps rating conforming to IS / IEC 60947 |
| 2104 | Supply , delivery and fixing of single phase preventer should protect the motor against single phasing, reverse phasing and unbalance supply |
| 2105 | Astronomical Weekly Programmable Timer Switch |
| 2106 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. 20-30A |
| 2107 | Charges for removing the burnt power capacitor and labour charges for fixing the new capacitor suitable length copper cable wiring this panel board testing etc. complete after adjusted the old scrap materials. |
| 2108 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 2109 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 2110 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 2111 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 2112 | Supply and delivery 16Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 2113 | Supply and delivery 25Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 2114 | Supply and delivery of Triple Pole & Neutral 6A to 32A,10KA |
| 2115 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 2116 | 3.00 LL |
| 2117 | 2.00 LL |
| 2118 | 1.00 LL |
| 2119 | 0.95 LL |
| 2120 | 0.60 LL |
| 2121 | 0.40 LL |
| 2122 | 0.30 LL |
| 2123 | 0.20 LL |
| 2124 | 0.12LL |
| 2125 | 0.10 LL |
| 2126 | Supply and delivery of the following Electrical Works :Consumable items at the site of work to carryout the general maintenance works |
| 2127 | Volt Meter 3 phase |
| 2128 | Ammeter 3 phase |
| 2129 | 48W LED Street Light Fitting with LED |
| 2130 | 80W LED Focus Light Fitting with LED |
| 2131 | Supply and delivery of the following consumble items for Pump set repairs at the site of work to carryout the general maintenace works |
| 2132 | 3 Ply R I Sheet |
| 2133 | Supply and delivery of the following sizes of GI pipes and Specials requied The Galvanised mild steel tubes continuously welded Electrilc Resistance Welded (ERW), High Frequency Induction Welded (HFIW), Hot Furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/Part-I 1990 and as amended from time to time and bearing ISI Mark. The cost of pipes should include loading, freight, transit, insurance, incidental charges, packing and transportation charges to stock yard in good condition etc., complete (the cost excluding unloading from lorries at stock yard and stacking which will be paid separately) and as directed by the TWAD Board Officers. |
| 2134 | 20mm GI Pipe |
| 2135 | 25mm GI Pipe |
| 2136 | 32mm GI Pipe |
| 2137 | 50mm GI Pipe |
| 2138 | 65mm GI Pipe |
| 2139 | 80mm GI Pipe |
| 2140 | 100mm GI pipe |
| 2141 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 2142 | Supply and Delivery of Gear oil (high viscosity)for vertical Turbine pumpset |
| 2143 | Fuse Wire (COPPER) |
| 2144 | 10 Amps Fuse Wire |
| 2145 | 20 Amps Fuse Wire |
| 2146 | For a period from 01.04.2028 to 31.03.2029 |
| 2147 | Leak & Burst |
| 2148 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2149 | 50mm OD PVC 6 KSC pipes |
| 2150 | 63mm OD PVC 4 KSC pipes |
| 2151 | 63mm OD PVC 6 KSC pipes |
| 2152 | 63mm OD PVC 10 KSC pipes |
| 2153 | 75mm OD PVC 4 KSC pipes |
| 2154 | 75mm OD PVC 6 KSC pipes |
| 2155 | 90mm OD PVC 6 KSC pipes |
| 2156 | 90mm OD PVC 4 KSC pipes |
| 2157 | 90mm OD PVC 10 KSC pipes |
| 2158 | 110mm OD PVC 6 KSC pipes |
| 2159 | 110mm OD PVC 4 KSC pipes |
| 2160 | 110mm OD PVC 10 KSC pipes |
| 2161 | 140mm OD PVC 4 KSC pipes |
| 2162 | 140mm OD PVC 6 KSC pipes |
| 2163 | 140mm OD PVC 10 KSC pipes |
| 2164 | 160mm OD PVC 6KSC pipes |
| 2165 | 160mm OD PVC 10KSC pipes |
| 2166 | 200mm OD PVC 6 KSC pipes |
| 2167 | 200mm OD PVC 10 KSC pipes |
| 2168 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2169 | Using MS Barrel pipe |
| 2170 | 250 mm |
| 2171 | Using MS Step Collar |
| 2172 | 250 mm AC pipe |
| 2173 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound Socket and spigot machine end MS fittings including supply and delivery rolling, cutting welding, Turning, facing, griding, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2174 | Using MS step collar |
| 2175 | 700 mm PSC 6 KSC Pipe |
| 2176 | 600 mm PSC 8 KSC Pipe |
| 2177 | 500 mm PSC 8 KSC Pipe |
| 2178 | 450 mm PSC 8 KSC Pipe |
| 2179 | 400 mm PSC 8 KSC Pipe |
| 2180 | 350 mm PSC 8 KSC Pipe |
| 2181 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2182 | Attending leaks in HDPE pipe |
| 2183 | Burst |
| 2184 | 250 mm HDPE, PN - 8 Pipe |
| 2185 | 250 mm HDPE, PN - 6 Pipe |
| 2186 | 200 mm HDPE, PN - 8 Pipe |
| 2187 | 200 mm HDPE, PN - 6 Pipe |
| 2188 | 160 mm HDPE, PN - 10 Pipe |
| 2189 | 160 mm HDPE, PN - 6 Pipe |
| 2190 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes couplers, union jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2191 | 80mm GI pipes |
| 2192 | 50mm GI pipes |
| 2193 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound DI pipe, including supply and delivery of C.I/D.I/S/S Pipes D/S couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2194 | Burst Pipe Replacement |
| 2195 | 450 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2196 | 400 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2197 | 350 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2198 | 300 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2199 | 250 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2200 | 200 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2201 | 150 mm DI, K-9 Pipe Burst Pipe Replacement |
| 2202 | REPAIRS AND RENEWALS |
| 2203 | Verical Turbine Pumpset (Pump) |
| 2204 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by the departmental officers. |
| 2205 | 40 HP Vrertical Trubine pumpset at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2206 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2207 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2208 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assembly for attending Pump repair works and as directed by the departmental officers. |
| 2209 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2210 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2211 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2212 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 2213 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2214 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2215 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2216 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works and as directed by the departmental officers. |
| 2217 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2218 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2219 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2220 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore and outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignmentand as directed by the departmental officers. |
| 2221 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2222 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2223 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2224 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by the departmental officers. |
| 2225 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2226 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2227 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2228 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by the departmental officers. |
| 2229 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2230 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2231 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2232 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load and as directed by the departmental officers. |
| 2233 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2234 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2235 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2236 | Attending VT Pump set (Motor) |
| 2237 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 2238 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2239 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2240 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2241 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 2242 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2243 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2244 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2245 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 2246 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2247 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2248 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2249 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 2250 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2251 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2252 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2253 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 2254 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2255 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2256 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2257 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 2258 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2259 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2260 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2261 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 2262 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2263 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2264 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2265 | Transportation charges for conveying the motor from work shop to pumping Station etc., complete and as directed by the departmental officers. |
| 2266 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2267 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2268 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2269 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc., complete and as directed by the departmental officers. |
| 2270 | 40 HP Vrertical Trubine pumpseet at Raw water HW @ Thirumoorthi nagar Existing Madathukulam |
| 2271 | 40 HP Vrertical Trubine pumpset Existing Kanakkampalayam |
| 2272 | 40 HP Vrertical Trubine pumpset New Madathukulam |
| 2273 | HSC Centrifugal pumpset ( Motor) |
| 2274 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials etc., complete and as directed by the departmental officesr.. |
| 2275 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2276 | 40 HP @ Kanakkampalayam |
| 2277 | 40 HP @ New Madathukulam |
| 2278 | 20 HP @ new Madathukulam |
| 2279 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges etc., complete and as directed by the departmental officers. |
| 2280 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2281 | 40 HP @ Kanakkampalayam |
| 2282 | 40 HP @ New Madathukulam |
| 2283 | 20 HP @ new Madathukulam |
| 2284 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials etc., complete and as directed by the departmental officers. |
| 2285 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2286 | 40 HP @ Kanakkampalayam |
| 2287 | 40 HP @ New Madathukulam |
| 2288 | 20 HP @ new Madathukulam |
| 2289 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including supply and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor etc., complete and as directed by the departmental officers. |
| 2290 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2291 | 40 HP @ Kanakkampalayam |
| 2292 | 40 HP @ New Madathukulam |
| 2293 | 20 HP @ new Madathukulam |
| 2294 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checkingetc., complete and as directed by the departmental officers. |
| 2295 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2296 | 40 HP @ Kanakkampalayam |
| 2297 | 40 HP @ New Madathukulam |
| 2298 | 20 HP @ new Madathukulam |
| 2299 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor etc., complete and as directed by the departmental officers. |
| 2300 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2301 | 40 HP @ Kanakkampalayam |
| 2302 | 40 HP @ New Madathukulam |
| 2303 | 20 HP @ new Madathukulam |
| 2304 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials etc., complete and as directed by the departmental officers. |
| 2305 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2306 | 40 HP @ Kanakkampalayam |
| 2307 | 40 HP @ New Madathukulam |
| 2308 | 20 HP @ new Madathukulam |
| 2309 | Transportation charges for conveying the motor from work shop to Pumping Stationetc, Complete and as directed by the departmental officers. |
| 2310 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2311 | 40 HP @ Kanakkampalayam |
| 2312 | 40 HP @ New Madathukulam |
| 2313 | 20 HP @ new Madathukulam |
| 2314 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc, Complete and as directed by the departmental officers. |
| 2315 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2316 | 40 HP @ Kanakkampalayam |
| 2317 | 40 HP @ New Madathukulam |
| 2318 | 20 HP @ new Madathukulam |
| 2319 | HSC Centrifugal pumpset ( Pump) |
| 2320 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials and as directed by the departmental officers. |
| 2321 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2322 | 40 HP @ Kanakkampalayam |
| 2323 | 40 HP @ New Madathukulam |
| 2324 | 20 HP @ new Madathukulam |
| 2325 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges and as directed by the departmental officers. |
| 2326 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2327 | 40 HP @ Kanakkampalayam |
| 2328 | 40 HP @ New Madathukulam |
| 2329 | 20 HP @ new Madathukulam |
| 2330 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by the departmental officers. |
| 2331 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2332 | 40 HP @ Kanakkampalayam |
| 2333 | 40 HP @ New Madathukulam |
| 2334 | 20 HP @ new Madathukulam |
| 2335 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and as directed by the departmental officers. |
| 2336 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2337 | 40 HP @ Kanakkampalayam |
| 2338 | 40 HP @ New Madathukulam |
| 2339 | 20 HP @ new Madathukulam |
| 2340 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by the departmental officers. |
| 2341 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2342 | 40 HP @ Kanakkampalayam |
| 2343 | 40 HP @ New Madathukulam |
| 2344 | 20 HP @ new Madathukulam |
| 2345 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by the departmental officers. |
| 2346 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2347 | 40 HP @ Kanakkampalayam |
| 2348 | 40 HP @ New Madathukulam |
| 2349 | 20 HP @ new Madathukulam |
| 2350 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by the departmental officers. |
| 2351 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2352 | 40 HP @ Kanakkampalayam |
| 2353 | 40 HP @ New Madathukulam |
| 2354 | 20 HP @ new Madathukulam |
| 2355 | Supply and delivery of Driven End and Non Driven End bearings and as directed by the departmental officers. |
| 2356 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2357 | 40 HP @ Kanakkampalayam |
| 2358 | 40 HP @ New Madathukulam |
| 2359 | 20 HP @ new Madathukulam |
| 2360 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by the departmental officers. |
| 2361 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2362 | 40 HP @ Kanakkampalayam |
| 2363 | 40 HP @ New Madathukulam |
| 2364 | 20 HP @ new Madathukulam |
| 2365 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station and as directed by the departmental officers. |
| 2366 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2367 | 40 HP @ Kanakkampalayam |
| 2368 | 40 HP @ New Madathukulam |
| 2369 | 20 HP @ new Madathukulam |
| 2370 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running and as directed by the departmental officers. |
| 2371 | 40 HP @ Thirumoorthi nagar Existing Madathukulam |
| 2372 | 40 HP @ Kanakkampalayam |
| 2373 | 40 HP @ New Madathukulam |
| 2374 | 20 HP @ new Madathukulam |
| 2375 | Attending the Repair and Renewal works in Submersible Pumpset etc, complete and as directed by the departmental officers. |
| 2376 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc, complete and as directed by the departmental officers. |
| 2377 | 1.50 HP |
| 2378 | 2.00 HP |
| 2379 | 3.00 HP |
| 2380 | 5.00 HP |
| 2381 | 7.50 HP |
| 2382 | 10.00 HP |
| 2383 | 20.00 HP |
| 2384 | 30.00 HP |
| 2385 | Transporting the pumpset from Pump House to work shopetc, complete and as directed by the departmental officers. |
| 2386 | 1.50 HP |
| 2387 | 2.00 HP |
| 2388 | 3.00 HP |
| 2389 | 5.00 HP |
| 2390 | 7.50 HP |
| 2391 | 10.00 HP |
| 2392 | 20.00 HP |
| 2393 | 30.00 HP |
| 2394 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materialsetc, complete and as directed by the departmental officers. |
| 2395 | 1.50 HP |
| 2396 | 2.00 HP |
| 2397 | 3.00 HP |
| 2398 | 5.00 HP |
| 2399 | 7.50 HP |
| 2400 | 10.00 HP |
| 2401 | 20.00 HP |
| 2402 | 30.00 HP |
| 2403 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc, complete and as directed by the departmental officers. |
| 2404 | 1.50 HP |
| 2405 | 2.00 HP |
| 2406 | 3.00 HP |
| 2407 | 5.00 HP |
| 2408 | 7.50 HP |
| 2409 | 10.00 HP |
| 2410 | 20.00 HP |
| 2411 | 30.00 HP |
| 2412 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old materialetc, complete and as directed by the departmental officers. |
| 2413 | 1.50 HP |
| 2414 | 2.00 HP |
| 2415 | 3.00 HP |
| 2416 | 5.00 HP |
| 2417 | 7.50 HP |
| 2418 | 10.00 HP |
| 2419 | 20.00 HP |
| 2420 | 30.00 HP |
| 2421 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair worksetc, complete and as directed by the departmental officers. |
| 2422 | 1.50 HP |
| 2423 | 2.00 HP |
| 2424 | 3.00 HP |
| 2425 | 5.00 HP |
| 2426 | 7.50 HP |
| 2427 | 10.00 HP |
| 2428 | 20.00 HP |
| 2429 | 30.00 HP |
| 2430 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc, complete and as directed by the departmental officers. |
| 2431 | 1.50 HP |
| 2432 | 2.00 HP |
| 2433 | 3.00 HP |
| 2434 | 5.00 HP |
| 2435 | 7.50 HP |
| 2436 | 10.00 HP |
| 2437 | 20.00 HP |
| 2438 | 30.00 HP |
| 2439 | Attending repair works in 3 phase Delta Starters |
| 2440 | Labour Charges for Removal of unserviceable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starterand asdirected by TWAD board officers. |
| 2441 | 7.50 HP |
| 2442 | 20.00 HP |
| 2443 | 30.00 HP |
| 2444 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials and as directed by TWAD board officers. |
| 2445 | 7.50 HP |
| 2446 | 20.00 HP |
| 2447 | 30.00 HP |
| 2448 | Supply and Delivery of PLA Safety Relay suitable for the starterand as directed by TWAD board officers. |
| 2449 | 7.50 HP |
| 2450 | 20.00 HP |
| 2451 | 30.00 HP |
| 2452 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter and as directed by TWAD Board officers. |
| 2453 | 7.50 HP |
| 2454 | 20.00 HP |
| 2455 | 30.00 HP |
| 2456 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter andas directed by TWAD Board officers. |
| 2457 | 7.50 HP |
| 2458 | 20.00 HP |
| 2459 | 30.00 HP |
| 2460 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc complete and as directed by TWAD Board officers. |
| 2461 | 7.50 HP |
| 2462 | 20.00 HP |
| 2463 | 30.00 HP |
| 2464 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter and as directed by TWAD Board Officers. |
| 2465 | 7.50 HP |
| 2466 | 20.00 HP |
| 2467 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter and as directed by TWAD Board Officers. |
| 2468 | 30.00 HP |
| 2469 | Supply and Delivery of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap valueand as directed by TWAD board officers. |
| 2470 | 30.00 HP |
| 2471 | Replacement of CT Coil with suitable Clamp Suitable for the starter and as directed by TWAD Board Officers. |
| 2472 | 7.50 HP |
| 2473 | 20.00 HP |
| 2474 | 30.00 HP |
| 2475 | Replacement of required amps Terminal block Suitable for the starterand as directed by TWAD Board Officers. |
| 2476 | 7.50 HP |
| 2477 | 20.00 HP |
| 2478 | 30.00 HP |
| 2479 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter and as directed by TWAD Board Officers. |
| 2480 | 7.50 HP |
| 2481 | 20.00 HP |
| 2482 | 30.00 HP |
| 2483 | Gun Metal Gate valve |
| 2484 | Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI Pipe, nipple, coupling etc., complete as directed by the Departmental officer |
| 2485 | 50 mm |
| 2486 | 65 mm |
| 2487 | 80 mm |
| 2488 | 100 mm |
| 2489 | Sluice Valves |
| 2490 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges, tools and materials and as Directed by TWAD Board officers. |
| 2491 | 150 mm |
| 2492 | 200 mm |
| 2493 | 250 mm |
| 2494 | 300 mm |
| 2495 | Reconditining of spindle rod (Brass) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as Directed by TWAD Board officers. |
| 2496 | 150 mm |
| 2497 | 200 mm |
| 2498 | 250 mm |
| 2499 | 300 mm |
| 2500 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lathe work after deducting the cost of old materialsand as Directed by TWAD Board officers. |
| 2501 | 150 mm |
| 2502 | 200 mm |
| 2503 | 250 mm |
| 2504 | 300 mm |
| 2505 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet, bolt and nuts after deducting the cost of old materials and as Directed by TWAD Board officers. |
| 2506 | 150 mm |
| 2507 | 200 mm |
| 2508 | 250 mm |
| 2509 | 300 mm |
| 2510 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 2511 | 150 mm |
| 2512 | 200 mm |
| 2513 | 250 mm |
| 2514 | 300 mm |
| 2515 | Replacement of spindle rod (Brass) suitable for sulice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lathe work etc., and as Directed by TWAD Board officers. |
| 2516 | 150 mm |
| 2517 | 200 mm |
| 2518 | 250 mm |
| 2519 | 300 mm |
| 2520 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete as directed by the Departmental officer |
| 2521 | 50 mm |
| 2522 | 80 mm |
| 2523 | 100 mm |
| 2524 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 2525 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ (± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately).separately). |
| 2526 | Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Elctro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all charges for dismantling, repair, reinstallation, conveyance, cost of materials and all other incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II.B74 |
| 2527 | Supply and delivery of 160Amps, 4 pole, Moulded case circuit breaker (MCCB). |
| 2528 | 160 A 3 Pole MCCB |
| 2529 | 250 A 3 Pole MCCB |
| 2530 | 63 A 3 Phase 4 Pole Contactor |
| 2531 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 225Amps rating conforming to IS / IEC 60947 |
| 2532 | Supply and delivery of electro magnetic contactors of suitable capacity in AC three phase 32Amps rating conforming to IS / IEC 60947 |
| 2533 | Supply , delivery and fixing of single phase preventer should protect the motor against single phasing, reverse phasing and unbalance supply |
| 2534 | Astronomical Weekly Programmable Timer Switch |
| 2535 | Overload Relays: Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. 20-30A |
| 2536 | Charges for removing the burnt power capacitor and labour charges for fixing the new capacitor suitable length copper cable wiring this panel board testing etc. complete after adjusted the old scrap materials. |
| 2537 | Supply and delivery of 16 Amps Porcelain Fuse Unit (500V) for arial board and pumproom |
| 2538 | Supply and delivery of 200 Amps Porcelain Fuse Unit (500V) |
| 2539 | Supply and delivery of 63Amps porcelain fuse (500V) |
| 2540 | Supply and fixing of 63 Amps three phase 500 V 4 pole Change over switch |
| 2541 | Supply and delivery 16Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 2542 | Supply and delivery 25Sqmm PVC Insulated and Sheathed 3 Core flat type copper cable Conforming to IS 694/1990 and as amended thereafter |
| 2543 | Supply and delivery of Triple Pole & Neutral 6A to 32A,10KA |
| 2544 | Cleaning of all storage points like sumps, elevated reservoirs of various capacities available in this scheme including scrapping the inner side of compartment completely, scouring / dewatering / desilting using required machineries, materials, labour and all other incidental charges, application of bleaching powder/ solution etc complete. |
| 2545 | 3.00 LL |
| 2546 | 2.00 LL |
| 2547 | 1.00 LL |
| 2548 | 0.95 LL |
| 2549 | 0.60 LL |
| 2550 | 0.40 LL |
| 2551 | 0.30 LL |
| 2552 | 0.20 LL |
| 2553 | 0.12LL |
| 2554 | 0.10 LL |
| 2555 | Supply and delivery of the following Electrical Works :Consumable items at the site of work to carryout the general maintenance works |
| 2556 | Digital Voltmeter 3 phase |
| 2557 | Digital Ammeter 3 phase |
| 2558 | 48W LED Street Light Fitting with LED |
| 2559 | 80W LED Focus Light Fitting with LED |
| 2560 | Supply and delivery of the following consumble items for Pump set repairs at the site of work to carryout the general maintenace works |
| 2561 | 3 Ply R I Sheet |
| 2562 | Supply and delivery of the following sizes of GI pipes and Specials requied The Galvanised mild steel tubes continuously welded Electrilc Resistance Welded (ERW), High Frequency Induction Welded (HFIW), Hot Furnaced welded (HFN) types screwed in both ends, conforming to IS 554/85 for pipes threading, socketted on one end and the other end protected with plastic thread protector, in random length of 4 to 7m GI pipes conforming to IS 1239/Part-I 1990 and as amended from time to time and bearing ISI Mark. The cost of pipes should include loading, freight, transit, insurance, incidental charges, packing and transportation charges to stock yard in good condition etc., complete (the cost excluding unloading from lorries at stock yard and stacking which will be paid separately) and as directed by the TWAD Board Officers. |
| 2563 | 20mm GI Pipe |
| 2564 | 25mm GI Pipe |
| 2565 | 32mm GI Pipe |
| 2566 | 50mm GI Pipe |
| 2567 | 65mm GI Pipe |
| 2568 | 80mm GI Pipe |
| 2569 | 100mm GI pipe |
| 2570 | MS Bolt and Nuts-16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. |
| 2571 | Supply and Delivery of Gear oil (high viscosity)for vertical Turbine pumpset |
| 2572 | Fuse Wire (COPPER) |
| 2573 | 10 Amps Fuse Wire |
| 2574 | 20 Amps Fuse Wire |
| 2575 | Cost of Chemicals |
| 2576 | Supply and delivery of Liquid Chlorine as per IS Specification ( with Chlorine 99.8%, Moisture, Na2O3, Hydrogen and Carbondioxide are to be nil) required for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Tiruppur District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 2577 | For a period from 01.01.2027 to 31.03.2027(82.608 kg/ 1000) x 90 days) = 7.435 MT |
| 2578 | For a period from 01.04.2027 to 31.03.2028(84.052 kg/ 1000) x 366 days) = 30.763 MT |
| 2579 | For a period from 01.04.2028 to 31.03.2029(85.492 kg/ 1000) x 365 days) = 31.205 MT |
| 2580 | Supply and delivery of Alum (Sulphate of Alumino Ferric) required for Water Treatment Plants confirming to IS specification 299/1980 and as amended from time to time for delivery at anywhere in Tiruppur District including loading, freight, unloading, transit, insurance and all other incidental charges. |
| 2581 | For a period from 01.01.2027 to 31.03.2027(413.04 kg/ 1000) x 90 days) = 37.174 MT |
| 2582 | For a period from 01.04.2027 to 31.03.2028(420.26 kg/ 1000) x 366 days) = 153.815 MT |
| 2583 | For a period from 01.04.2028 to 31.03.2029(427.46 kg/ 1000) x 365 days) = 156.023 MT |
| 2584 | Supply and delivery of Stable Bleaching Powder as per IS Specification 1065/ 1989 and as amended from time to time for Grade I for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Tiruppur District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 2585 | For a period from 01.01.2027 to 31.03.2027(125.15 kg/ 1000) x 151 days) = 11.264 MT |
| 2586 | For a period from 01.04.2027 to 31.03.2028(127.36 kg/ 1000) x 366 days) = 46.614 MT |
| 2587 | For a period from 01.04.2028 to 31.03.2029(129.55 kg/ 1000) x 365 days) = 47.286 MT Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender