Water Resources and Irrigation Government Departments Closing in 16 days TDR #58449094

Tender For Operation And Maintenance Of The Cwss To 1766 Habitations In Pudukkottai District (Pkg-33 A), Including Repair, Rectification Works And Supply Of Chemicals For The Period From 01.01.2027 To 31.03.2029

Issued by Government Departments · Pudukkottai, Tamil Nadu
Tender Value
35.19 Crore
Estimated cost
Bid Submission
07 Dec 2026
16 days left
EMD
26.39 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Pudukkottai → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Operation And Maintenance Of The Cwss To 1766 Habitations In Pudukkottai District (Pkg-33 A), Including Repair, Rectification Works And Supply Of Chemicals For The Period From 01.01.2027 To 31.03.2029

BOQ

Name of Work:- Operation and Maintenance of the CWSS to 1766 Habitations in Pudukkottai District (Pkg-33 A), including repair, rectification works and supply of chemicals for the period from 01.01.2027 to 31.03.2029
Sl. No. Item Description
1Operation and Maintenance of the CWSS to 1766 Habitations in Pudukkottai District (Pkg-33 A), including repair, rectification works and supply of chemicals for the period from 01.01.2027 to 31.03.2029
2Sub Total
3GST @18 %
4For the Year 2026 - 2027. (From 01.01.2027 to 31.03.2027)
5Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity.
6Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
70.05 LL to 0.15 LL capacity of sump
80.16 LL to 0.30 LL capacity of sump
90.31 LL to 0.45 LL capacity of sump
100.46 LL to 0.60 LL capacity of sump
110.61 LL to 0.75 LL capacity of sump
120.76 LL to 1.00 LL capacity of sump
131.01 LL to 1.25 LL capacity of sump
141.26 LL to 1.50 LL capacity of sump
151.51 LL to 1.75 LL capacity of sump
165.90 LL capacity of sump at Madhayanaipatti BS
174.55 LL capacity of sump at Rapoosal BS
182.55 LL capacity of sump at Edayapatti BS
192.45 LL capacity of sump at Madhayanaipatti BS
20For Major leaks
21Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes. (Major leaks)
2250mm 6 ksc PVC Pipes
2363mm 4 ksc PVC Pipes
2463mm 6 ksc PVC Pipes
2575mm 4 ksc PVC Pipes
2675mm 6 ksc PVC Pipes
2790mm 4 ksc PVC Pipes
2890mm 6 ksc PVC Pipes
2990mm 10 ksc PVC Pipes
30110mm 4 ksc PVC Pipes
31110mm 6 ksc PVC Pipes
32140mm 4 ksc PVC Pipes
33140mm 6 ksc PVC Pipes
34140mm 10 ksc PVC Pipes
35160mm 4 ksc PVC Pipes
36160mm 6 ksc PVC Pipes
37160mm 10 ksc PVC Pipes
38200mm 4 ksc PVC Pipes
39200mm 6 ksc PVC Pipes
40200mm 10 ksc PVC Pipes
41For Minor leaks
42Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
4350mm 6 ksc PVC Pipes
4463mm 4 ksc PVC Pipes
4563mm 6 ksc PVC Pipes
4675mm 4 ksc PVC Pipes
4775mm 6 ksc PVC Pipes
4890mm 4 ksc PVC Pipes
4990mm 6 ksc PVC Pipes
5090mm 10 ksc PVC Pipes
51110mm 4 ksc PVC Pipes
52110mm 6 ksc PVC Pipes
53140mm 4 ksc PVC Pipes
54140mm 6 ksc PVC Pipes
55140mm 10 ksc PVC Pipes
56160mm 4 ksc PVC Pipes
57160mm 6 ksc PVC Pipes
58160mm 10 ksc PVC Pipes
59200mm 4 ksc PVC Pipes
60200mm 6 ksc PVC Pipes
61200mm 10 ksc PVC Pipes
62Charges for attending MS and DI Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete .
63150mm DI K7 Pipes
64200mm DI K7 Pipes
65250mm DI K7 Pipes
66300mm DI K7 Pipes
67350mm DI K7 Pipes
68400mm DI K7 Pipes
69450mm DI K7 Pipes
70500mm DI K7 Pipes
71600mm DI K7 Pipes
72711mm MS Pipes (Above GL)
73711mm MS Pipes (Below GL)
74Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
75150mm DI K7 Pipes
76200mm DI K7 Pipes
77250mm DI K7 Pipes
78300mm DI K7 Pipes
79350mm DI K7 Pipes
80400mm DI K7 Pipes
81450mm DI K7 Pipes
82500mm DI K7 Pipes
83600mm DI K7 Pipes
84Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
85400mm Sluice Valve
86Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
87Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
88Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
89Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
90Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
91Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
92350mm Sluice Valve
93Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
94Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
95Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
96Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
97Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
98Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
99300mm Sluice Valve
100Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
101Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
102Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
103Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
104Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
105Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
106250mm Sluice Valve
107Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
108Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
109Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
110Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
111Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
112Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
113200mm Sluice Valve
114Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
115Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
116Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
117Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
118Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
119Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
120150mm Sluice Valve
121Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
122Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
123Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
124Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
125Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
126Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
127100mm Sluice Valve
128Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
129Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
130Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
131Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
132Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
133Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
134Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
135100mm GM Valve
13680mm GM Valve
13765mm GM Valve
13850mm GM Valve
139Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete.
140150mm Air Valve
141100mm Air Valve
14280mm Air Valve
14350mm Air Valve
14440mm Air Valve
14520mm Air Valve
146Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete .
147FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS
1480.5 HP
149Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
150Transporting the pumpset from Pump House to work shop.
151Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
152Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
153Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
154Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
155Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
156Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
157Transporting the pumpset from Pump House to work shop.
158Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
159Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
160Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
161Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
162Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1631.5 Hp
164Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
165Transporting the pumpset from Pump House to work shop.
166Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
167Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
168Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
169Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
170Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
171Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
172Transporting the pumpset from Pump House to work shop.
173Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
174Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
175Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
176Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
177Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
178Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
179Transporting the pumpset from Pump House to work shop.
180Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
181Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
182Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
183Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
184Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
185Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
186Transporting the pumpset from Pump House to work shop.
187Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
188Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
189Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
190Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
191Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1927.5 HP
193Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
194Transporting the pumpset from Pump House to work shop.
195Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
196Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
197Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
198Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
199Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
20010 HP
201Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
202Transporting the pumpset from Pump House to work shop.
203Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
204Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
205Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
206Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
207Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
20812.5 HP
209Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
210Transporting the pumpset from Pump House to work shop.
211Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
212Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
213Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
214Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
215Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
21615 HP
217Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
218Transporting the pumpset from Pump House to work shop.
219Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
220Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
221Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
222Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
223Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
22420 HP
225Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
226Transporting the pumpset from Pump House to work shop.
227Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
228Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
229Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
230Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
231Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
23225 HP
233Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
234Transporting the pumpset from Pump House to work shop.
235Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
236Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
237Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
238Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
239Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
24030 HP
241Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
242Transporting the pumpset from Pump House to work shop.
243Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
244Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
245Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
246Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
247Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
24875 HP
249Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
250Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.
251Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.
252Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
253Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
254Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor
255Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
256Transportation charges for conveying the motor from work shop to Pumping Station
257Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
258Rewinding and replacement of bearings of Induction Motor for VT Pumpset
259100 HP
260Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
261Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
262Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
263Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
264Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
265Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
266Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
267Transportation charges for conveying the motor from work shop to site of work
268Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
269150 HP
270Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
271Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
272Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
273Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
274Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
275Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
276Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
277Transportation charges for conveying the motor from work shop to site of work
278Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
279200 HP
280Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
281Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
282Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
283Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
284Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
285Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
286Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
287Transportation charges for conveying the motor from work shop to site of work
288Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
289Supply of Materials for attending the Repair and Renewal works of VT Pump
290100 HP VT Pump
291Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
292Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
293Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
294Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
295Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
296Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
297Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
298Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
299Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
300Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
301Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
302Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
303Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
304Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
305150 HP VT Pump
306Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
307Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
308Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
309Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
310Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
311Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
312Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
313Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
314Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
315Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
316Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
317Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
318Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
319Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
320200 HP VT Pump
321Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
322Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
323Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
324Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
325Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
326Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
327Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
328Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
329Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
330Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
331Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
332Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
333Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
334Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
335Attending the Repair and Replacement of bearings in HSC Pump
33675 HP HSC PUMP
337Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.
338Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.
339Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings
340Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,
341Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials
342Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine
343Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials
344Supply and delivery of Driven End and Non Driven End bearings
345Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
346Transportation charges for conveying the Pump assembly from work shop to Pumping Station.
347Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,
348Supply of Materials for attending the Repair and Renewal works of VT Pump
349100 HP VT Pump
350Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
351Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
352Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
353Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
354Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
355Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
356Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
357Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
358150 HP VT Pump
359Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
360Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
361Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
362Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
363Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
364Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
365Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
366Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
367200 HP VT Pump
368Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
369Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
370Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
371Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
372Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
373Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
374Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
375Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
376Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor..
3770.5 HP
3781.5 Hp
3792.5 HP
3807.5 HP
381Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor..
38210 HP
38312.5 HP
38415 HP
38520 HP
38625 HP
38730 HP
388200 HP
389150 HP
390100 HP
39175 HP
392Supply and Delivery of LT Aluminium Armoured Cable confirming to IS 7098 (Part I) / 1988
3933C 4 sq.mm
3943C 6 sq.mm
3953C 10sq.mm
3963C 25sq.mm
3973C 50sq.mm
398Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable confirming to IS 694 / 1990
3991.5 sq.mm
4004.0 sq.mm
4016.0 sq.mm
40210.0 sq.mm
403Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ confirming to ISS with ISI marking
404Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
405Upto 5 A
4065 A to 10 A
40710 A to 20 A
40820 A to 30 A
40930 A to 50 A
41050 A to 75 A
41175 A to 110 A
412110 A to 150 A
413150 A to 200 A
414200 A to 300 A
415Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. ( Single Phasing Preventer)
416Supply and Delivery of Porcelien Fuse Units
41732 Amps
41863 Amps
419100 Amps
420Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
421400 AMPS
422250 AMPS
423160 AMPS
424125AMPS
425100 AMPS
42663 AMPS
427Supply and Delivery of MCB Isolator
42840 A FP
42963 A FP
430100 A FP
431Ammeter
432Digitial Ammeter 3 phase
433Voltmeter
434Digital Voltmeter 3 phase
435Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
436Change Over Switch
43732 Amps
43863 Amps
439100 amps
440Switch Disconnector Fuse units in Sheet Steel Enclosure
44163 Amps
442100 Amps
443Light Emitting Diode
44415W Led Bulb
445Electro magnetic contactors of suitable capacity in AC Three Phase rating, confirming to IS/IEC 60947-4-1.
44612Amps
44718Amps
44822Amps
44925Amps
45032Amps
45140Amps
45280Amps
453110Amps
454185Amps
455225Amps
456Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
457100mm
458125mm
459150mm
460Supply and Delivery of GI Specials as per IS 1239/PART II/2004
461GI Bend
462100mm
463125mm
464150mm
465Supply and Delivery of PVC Specials as per IS 7834 / 1987
466PVC Threaded Coupler
46763mm x 50mm
46875mm x 50mm
46990mm x 80mm
470110mm x 100mm
471140mm x 125mm
472PVC Male Threaded Adapter
473110mm
474140mm
475160mm
476200mm
477Supply and Delivery of End Termination Kits
478185 sq.mm
479240 sq.mm
480300 sq.mm
481Supply and Delivery of GM Gate Valve as per IS BS 5154
482100mm
483Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
484100mm
485125mm
486150mm
487200mm
488Supply, Delivery and Errection of Woltman model water meter confirming to ISO 4064 part I, II, III Class B and IS-2373
489100mm
490Supply and Delivery of Silica Gel
491Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
492For the Year 2027 - 2028. (From 01.04.2027 to 31.03.2028)
493Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity.
494Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
4950.05 LL to 0.15 LL capacity of sump
4960.16 LL to 0.30 LL capacity of sump
4970.31 LL to 0.45 LL capacity of sump
4980.46 LL to 0.60 LL capacity of sump
4990.61 LL to 0.75 LL capacity of sump
5000.76 LL to 1.00 LL capacity of sump
5011.01 LL to 1.25 LL capacity of sump
5021.26 LL to 1.50 LL capacity of sump
5031.51 LL to 1.75 LL capacity of sump
5045.90 LL capacity of sump at Madhayanaipatti BS
5054.55 LL capacity of sump at Rapoosal BS
5062.55 LL capacity of sump at Edayapatti BS
5072.45 LL capacity of sump at Madhayanaipatti BS
508For Major leaks
509Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes. .(Major leaks)
51050mm 6 ksc PVC Pipes
51163mm 4 ksc PVC Pipes
51263mm 6 ksc PVC Pipes
51375mm 4 ksc PVC Pipes
51475mm 6 ksc PVC Pipes
51590mm 4 ksc PVC Pipes
51690mm 6 ksc PVC Pipes
51790mm 10 ksc PVC Pipes
518110mm 4 ksc PVC Pipes
519110mm 6 ksc PVC Pipes
520140mm 4 ksc PVC Pipes
521140mm 6 ksc PVC Pipes
522140mm 10 ksc PVC Pipes
523160mm 4 ksc PVC Pipes
524160mm 6 ksc PVC Pipes
525160mm 10 ksc PVC Pipes
526200mm 4 ksc PVC Pipes
527200mm 6 ksc PVC Pipes
528200mm 10 ksc PVC Pipes
529For Minor leaks
530Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes. .
53150mm 6 ksc PVC Pipes
53263mm 4 ksc PVC Pipes
53363mm 6 ksc PVC Pipes
53475mm 4 ksc PVC Pipes
53575mm 6 ksc PVC Pipes
53690mm 4 ksc PVC Pipes
53790mm 6 ksc PVC Pipes
53890mm 10 ksc PVC Pipes
539110mm 4 ksc PVC Pipes
540110mm 6 ksc PVC Pipes
541140mm 4 ksc PVC Pipes
542140mm 6 ksc PVC Pipes
543140mm 10 ksc PVC Pipes
544160mm 4 ksc PVC Pipes
545160mm 6 ksc PVC Pipes
546160mm 10 ksc PVC Pipes
547200mm 4 ksc PVC Pipes
548200mm 6 ksc PVC Pipes
549200mm 10 ksc PVC Pipes
550Charges for attending MS and DI Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete .
551150mm DI K7 Pipes
552200mm DI K7 Pipes
553250mm DI K7 Pipes
554300mm DI K7 Pipes
555350mm DI K7 Pipes
556400mm DI K7 Pipes
557450mm DI K7 Pipes
558500mm DI K7 Pipes
559600mm DI K7 Pipes
560711mm MS Pipes (Above GL)
561711mm MS Pipes (Below GL)
562Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers.
563150mm DI K7 Pipes
564200mm DI K7 Pipes
565250mm DI K7 Pipes
566300mm DI K7 Pipes
567350mm DI K7 Pipes
568400mm DI K7 Pipes
569450mm DI K7 Pipes
570500mm DI K7 Pipes
571600mm DI K7 Pipes
572Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete.
573400mm Sluice Valve
574Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
575Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
576Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
577Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
578Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
579Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
580350mm Sluice Valve
581Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
582Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
583Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
584Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
585Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
586Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
587300mm Sluice Valve
588Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
589Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
590Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
591Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
592Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
593Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
594250mm Sluice Valve
595Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
596Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
597Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
598Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
599Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
600Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
601200mm Sluice Valve
602Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
603Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
604Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
605Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
606Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
607Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
608150mm Sluice Valve
609Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
610Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
611Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
612Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
613Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
614Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
615100mm Sluice Valve
616Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
617Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
618Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
619Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
620Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
621Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
622Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete.
623100mm GM Valve
62480mm GM Valve
62565mm GM Valve
62650mm GM Valve
627Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete.
628150mm Air Valve
629100mm Air Valve
63080mm Air Valve
63150mm Air Valve
63240mm Air Valve
63320mm Air Valve
634Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete .
635FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS
6360.5 HP
637Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
638Transporting the pumpset from Pump House to work shop.
639Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
640Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
641Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
642Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
643Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
644Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
645Transporting the pumpset from Pump House to work shop.
646Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
647Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
648Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
649Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
650Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
6511.5 Hp
652Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
653Transporting the pumpset from Pump House to work shop.
654Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
655Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
656Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
657Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
658Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
659Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
660Transporting the pumpset from Pump House to work shop.
661Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
662Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
663Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
664Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
665Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
666Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
667Transporting the pumpset from Pump House to work shop.
668Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
669Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
670Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
671Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
672Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
673Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
674Transporting the pumpset from Pump House to work shop.
675Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
676Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
677Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
678Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
679Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
6807.5 HP
681Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
682Transporting the pumpset from Pump House to work shop.
683Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
684Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
685Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
686Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
687Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
68810 HP
689Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
690Transporting the pumpset from Pump House to work shop.
691Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
692Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
693Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
694Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
695Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
69612.5 HP
697Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
698Transporting the pumpset from Pump House to work shop.
699Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
700Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
701Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
702Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
703Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
70415 HP
705Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
706Transporting the pumpset from Pump House to work shop.
707Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
708Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
709Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
710Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
711Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
71220 HP
713Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
714Transporting the pumpset from Pump House to work shop.
715Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
716Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
717Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
718Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
719Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
72025 HP
721Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
722Transporting the pumpset from Pump House to work shop.
723Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
724Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
725Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
726Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
727Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
72830 HP
729Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
730Transporting the pumpset from Pump House to work shop.
731Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
732Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
733Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
734Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
735Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
73675 HP
737Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
738Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.
739Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.
740Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
741Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
742Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor
743Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
744Transportation charges for conveying the motor from work shop to Pumping Station
745Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
746Rewinding and replacement of bearings of Induction Motor for VT Pumpset
747100 HP
748Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
749Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
750Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
751Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
752Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
753Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
754Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
755Transportation charges for conveying the motor from work shop to site of work
756Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
757150 HP
758Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
759Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
760Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
761Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
762Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
763Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
764Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
765Transportation charges for conveying the motor from work shop to site of work
766Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
767200 HP
768Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
769Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
770Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
771Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
772Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
773Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
774Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
775Transportation charges for conveying the motor from work shop to site of work
776Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
777Supply of Materials for attending the Repair and Renewal works of VT Pump
778100 HP VT Pump
779Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
780Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
781Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
782Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
783Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
784Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
785Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
786Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
787Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
788Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
789Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
790Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
791Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
792Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
793150 HP VT Pump
794Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
795Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
796Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
797Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
798Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
799Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
800Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
801Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
802Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
803Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
804Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
805Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
806Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
807Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
808200 HP VT Pump
809Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
810Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
811Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
812Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
813Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
814Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
815Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
816Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
817Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
818Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
819Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
820Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
821Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
822Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
823Attending the Repair and Replacement of bearings in HSC Pump
82475 HP HSC PUMP
825Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.
826Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.
827Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings
828Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,
829Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials
830Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine
831Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials
832Supply and delivery of Driven End and Non Driven End bearings
833Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
834Transportation charges for conveying the Pump assembly from work shop to Pumping Station.
835Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,
836Supply of Materials for attending the Repair and Renewal works of VT Pump
837100 HP VT Pump
838Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
839Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
840Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
841Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
842Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
843Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
844Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
845Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
846150 HP VT Pump
847Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
848Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
849Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
850Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
851Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
852Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
853Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
854Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
855200 HP VT Pump
856Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
857Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
858Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
859Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
860Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
861Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
862Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
863Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
864Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor..
8650.5 HP
8661.5 Hp
8672.5 HP
8687.5 HP
869Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor..
87010 HP
87112.5 HP
87215 HP
87320 HP
87425 HP
87530 HP
876200 HP
877150 HP
878100 HP
87975 HP
880Supply and Delivery of LT Aluminium Armoured Cable confirming to IS 7098 (Part I) / 1988 .
8813C 4 sq.mm
8823C 6 sq.mm
8833C 10sq.mm
8843C 16sq.mm
8853C 25sq.mm
8863C 50sq.mm
887Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable confirming to IS 694 / 1990
8881.5 sq.mm
8892.5 sq.mm
8904.0 sq.mm
8916.0 sq.mm
89210.0 sq.mm
893Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ confirming to ISS with ISI marking
894Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
895Upto 5 A
8965 A to 10 A
89710 A to 20 A
89820 A to 30 A
89930 A to 50 A
90050 A to 75 A
90175 A to 110 A
902110 A to 150 A
903150 A to 200 A
904200 A to 300 A
905Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. ( Single Phasing Preventer)
906Supply and Delivery of Porcelien Fuse Units
90732 Amps
90863 Amps
909100 Amps
910Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
911400 AMPS
912250 AMPS
913160 AMPS
914125AMPS
915100 AMPS
91663 AMPS
917Supply and Delivery of MCB Isolator
91840 A FP
91963 A FP
920100 A FP
921Ammeter
922Digitial Ammeter 3 phase
923Voltmeter
924Digital Voltmeter 3 phase
925Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
926Change Over Switch
92732 Amps
92863 Amps
929100 amps
930Switch Disconnector Fuse units in Sheet Steel Enclosure
93163 Amps
932100 Amps
933Light Emitting Diode
93415W Led Bulb
935Electro magnetic contactors of suitable capacity in AC Three Phase rating, confirming to IS/IEC 60947-4-1.
93612Amps
93718Amps
93822Amps
93925Amps
94032Amps
94140Amps
94280Amps
943110Amps
944185Amps
945225Amps
946Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
947100mm
948125mm
949150mm
950Supply and Delivery of GI Specials as per IS 1239/PART II/2004
951GI Bend
952100mm
953125mm
954150mm
955Supply and Delivery of PVC Specials as per IS 7834 / 1987
956PVC Threaded Coupler
95763mm x 50mm
95875mm x 50mm
95990mm x 80mm
960110mm x 100mm
961140mm x 125mm
962PVC Male Threaded Adapter
963110mm
964140mm
965160mm
966200mm
967Supply and Delivery of End Termination Kits
968185 sq.mm
969240 sq.mm
970300 sq.mm
971Supply and Delivery of GM Gate Valve as per IS BS 5154
972100mm
973Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
974100mm
975125mm
976150mm
977200mm
978Supply, Delivery and Errection of Woltman model water meter confirming to ISO 4064 part I, II, III Class B and IS-2373.24-25,
979100mm
980Supply and Delivery of Silica Gel
981Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
982For the Year 2028 - 2029. (From 01.04.2028 to 31.03.2029)
983Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity.
984Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
9850.05 LL to 0.15 LL capacity of sump
9860.16 LL to 0.30 LL capacity of sump
9870.31 LL to 0.45 LL capacity of sump
9880.46 LL to 0.60 LL capacity of sump
9890.61 LL to 0.75 LL capacity of sump
9900.76 LL to 1.00 LL capacity of sump
9911.01 LL to 1.25 LL capacity of sump
9921.26 LL to 1.50 LL capacity of sump
9931.51 LL to 1.75 LL capacity of sump
9945.90 LL capacity of sump at Madhayanaipatti BS
9954.55 LL capacity of sump at Rapoosal BS
9962.55 LL capacity of sump at Edayapatti BS
9972.45 LL capacity of sump at Madhayanaipatti BS
998For Major leaks
999Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes. .(Major leaks)
100050mm 6 ksc PVC Pipes
100163mm 4 ksc PVC Pipes
100263mm 6 ksc PVC Pipes
100375mm 4 ksc PVC Pipes
100475mm 6 ksc PVC Pipes
100590mm 4 ksc PVC Pipes
100690mm 6 ksc PVC Pipes
100790mm 10 ksc PVC Pipes
1008110mm 4 ksc PVC Pipes
1009110mm 6 ksc PVC Pipes
1010140mm 4 ksc PVC Pipes
1011140mm 6 ksc PVC Pipes
1012140mm 10 ksc PVC Pipes
1013160mm 4 ksc PVC Pipes
1014160mm 6 ksc PVC Pipes
1015160mm 10 ksc PVC Pipes
1016200mm 4 ksc PVC Pipes
1017200mm 6 ksc PVC Pipes
1018200mm 10 ksc PVC Pipes
1019For Minor leaks
1020Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes. .
102150mm 6 ksc PVC Pipes
102263mm 4 ksc PVC Pipes
102363mm 6 ksc PVC Pipes
102475mm 4 ksc PVC Pipes
102575mm 6 ksc PVC Pipes
102690mm 4 ksc PVC Pipes
102790mm 6 ksc PVC Pipes
102890mm 10 ksc PVC Pipes
1029110mm 4 ksc PVC Pipes
1030110mm 6 ksc PVC Pipes
1031140mm 4 ksc PVC Pipes
1032140mm 6 ksc PVC Pipes
1033140mm 10 ksc PVC Pipes
1034160mm 4 ksc PVC Pipes
1035160mm 6 ksc PVC Pipes
1036160mm 10 ksc PVC Pipes
1037200mm 4 ksc PVC Pipes
1038200mm 6 ksc PVC Pipes
1039200mm 10 ksc PVC Pipes
1040Charges for attending MS and DI Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete .
1041150mm DI K7 Pipes
1042200mm DI K7 Pipes
1043250mm DI K7 Pipes
1044300mm DI K7 Pipes
1045350mm DI K7 Pipes
1046400mm DI K7 Pipes
1047450mm DI K7 Pipes
1048500mm DI K7 Pipes
1049600mm DI K7 Pipes
1050711mm MS Pipes (Above GL)
1051711mm MS Pipes (Below GL)
1052Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers.
1053150mm DI K7 Pipes
1054200mm DI K7 Pipes
1055250mm DI K7 Pipes
1056300mm DI K7 Pipes
1057350mm DI K7 Pipes
1058400mm DI K7 Pipes
1059450mm DI K7 Pipes
1060500mm DI K7 Pipes
1061600mm DI K7 Pipes
1062Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete.
1063400mm Sluice Valve
1064Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1065Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1066Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1067Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1068Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1069Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1070350mm Sluice Valve
1071Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1072Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1073Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1074Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1075Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1076Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1077300mm Sluice Valve
1078Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1079Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1080Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1081Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1082Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1083Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1084250mm Sluice Valve
1085Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1086Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1087Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1088Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1089Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1090Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1091200mm Sluice Valve
1092Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1093Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1094Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1095Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1096Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1097Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1098150mm Sluice Valve
1099Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1100Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1101Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1102Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1103Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1104Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1105100mm Sluice Valve
1106Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
1107Reconditioning of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1108Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
1109Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
1110Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1111Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
1112Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete.
1113100mm GM Valve
111480mm GM Valve
111565mm GM Valve
111650mm GM Valve
1117Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete.
1118150mm Air Valve
1119100mm Air Valve
112080mm Air Valve
112150mm Air Valve
112240mm Air Valve
112320mm Air Valve
1124Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete .
1125FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS
11260.5 HP
1127Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1128Transporting the pumpset from Pump House to work shop.
1129Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1130Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1131Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1132Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1133Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1134Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1135Transporting the pumpset from Pump House to work shop.
1136Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1137Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1138Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1139Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1140Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
11411.5 Hp
1142Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1143Transporting the pumpset from Pump House to work shop.
1144Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1145Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1146Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1147Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1148Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1149Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1150Transporting the pumpset from Pump House to work shop.
1151Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1152Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1153Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1154Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1155Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1156Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1157Transporting the pumpset from Pump House to work shop.
1158Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1159Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1160Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1161Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1162Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
1163Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1164Transporting the pumpset from Pump House to work shop.
1165Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1166Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1167Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1168Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1169Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
11707.5 HP
1171Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1172Transporting the pumpset from Pump House to work shop.
1173Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1174Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1175Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1176Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1177Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
117810 HP
1179Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1180Transporting the pumpset from Pump House to work shop.
1181Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1182Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1183Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1184Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1185Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
118612.5 HP
1187Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1188Transporting the pumpset from Pump House to work shop.
1189Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1190Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1191Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1192Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1193Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
119415 HP
1195Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1196Transporting the pumpset from Pump House to work shop.
1197Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1198Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1199Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1200Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1201Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
120220 HP
1203Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1204Transporting the pumpset from Pump House to work shop.
1205Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1206Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1207Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1208Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1209Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
121025 HP
1211Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1212Transporting the pumpset from Pump House to work shop.
1213Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1214Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1215Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1216Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1217Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
121830 HP
1219Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
1220Transporting the pumpset from Pump House to work shop.
1221Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
1222Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
1223Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
1224Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
1225Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
122675 HP
1227Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
1228Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.
1229Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.
1230Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
1231Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
1232Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor
1233Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
1234Transportation charges for conveying the motor from work shop to Pumping Station
1235Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
1236Rewinding and replacement of bearings of Induction Motor for VT Pumpset
1237100 HP
1238Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
1239Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
1240Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
1241Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
1242Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
1243Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
1244Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
1245Transportation charges for conveying the motor from work shop to site of work
1246Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
1247150 HP
1248Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
1249Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
1250Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
1251Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
1252Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
1253Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
1254Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
1255Transportation charges for conveying the motor from work shop to site of work
1256Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
1257200 HP
1258Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
1259Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
1260Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
1261Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
1262Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
1263Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
1264Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
1265Transportation charges for conveying the motor from work shop to site of work
1266Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
1267Supply of Materials for attending the Repair and Renewal works of VT Pump
1268100 HP VT Pump
1269Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1270Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1271Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
1272Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
1273Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
1274Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1275Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
1276Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
1277Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1278Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
1279Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
1280Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
1281Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
1282Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
1283150 HP VT Pump
1284Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1285Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1286Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
1287Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
1288Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
1289Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1290Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
1291Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
1292Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1293Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
1294Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
1295Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
1296Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
1297Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
1298200 HP VT Pump
1299Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1300Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
1301Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
1302Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
1303Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
1304Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1305Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
1306Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
1307Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
1308Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
1309Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
1310Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
1311Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
1312Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
1313Attending the Repair and Replacement of bearings in HSC Pump
131475 HP HSC PUMP
1315Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.
1316Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.
1317Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings
1318Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,
1319Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials
1320Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine
1321Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials
1322Supply and delivery of Driven End and Non Driven End bearings
1323Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
1324Transportation charges for conveying the Pump assembly from work shop to Pumping Station.
1325Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,
1326Supply of Materials for attending the Repair and Renewal works of VT Pump
1327100 HP VT Pump
1328Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
1329Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
1330Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
1331Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
1332Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
1333Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
1334Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
1335Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
1336150 HP VT Pump
1337Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
1338Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
1339Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
1340Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
1341Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
1342Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
1343Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
1344Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
1345200 HP VT Pump
1346Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
1347Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
1348Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
1349Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
1350Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
1351Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
1352Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
1353Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
1354Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor..
13550.5 HP
13561.5 Hp
13572.5 HP
13587.5 HP
1359Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor..
136010 HP
136112.5 HP
136215 HP
136320 HP
136425 HP
136530 HP
1366200 HP
1367150 HP
1368100 HP
136975 HP
1370Supply and Delivery of LT Aluminium Armoured Cable confirming to IS 7098 (Part I) / 1988 .
13713C 4 sq.mm
13723C 6 sq.mm
13733C 10sq.mm
13743C 16sq.mm
13753C 25sq.mm
13763C 50sq.mm
1377Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable confirming to IS 694 / 1990
13781.5 sq.mm
13792.5 sq.mm
13804.0 sq.mm
13816.0 sq.mm
138210.0 sq.mm
1383Power capacitor for power factor improvement with oilfilled with discharge resistance 3 phase 415/440V 50 HZ confirming to ISS with ISI marking
1384Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
1385Upto 5 A
13865 A to 10 A
138710 A to 20 A
138820 A to 30 A
138930 A to 50 A
139050 A to 75 A
139175 A to 110 A
1392110 A to 150 A
1393150 A to 200 A
1394200 A to 300 A
1395Electric Motor protection device against single phasing. The device should protect the motor against single phasing, reverse phasing and unbalance supply. The device should be suitable for any auxillary device and have provisions for mounting in panel boards. Operate without need of any auxiliary supply. ( Single Phasing Preventer)
1396Supply and Delivery of Porcelien Fuse Units
139732 Amps
139863 Amps
1399100 Amps
1400Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
1401400 AMPS
1402250 AMPS
1403160 AMPS
1404125AMPS
1405100 AMPS
140663 AMPS
1407Supply and Delivery of MCB Isolator
140840 A FP
140963 A FP
1410100 A FP
1411Ammeter
1412Digitial Ammeter 3 phase
1413Voltmeter
1414Digital Voltmeter 3 phase
1415Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
1416Change Over Switch
141732 Amps
141863 Amps
1419100 amps
1420Switch Disconnector Fuse units in Sheet Steel Enclosure
142163 Amps
1422100 Amps
1423Light Emitting Diode
142415W Led Bulb
1425Electro magnetic contactors of suitable capacity in AC Three Phase rating, confirming to IS/IEC 60947-4-1.
142612Amps
142718Amps
142822Amps
142925Amps
143032Amps
143140Amps
143280Amps
1433110Amps
1434185Amps
1435225Amps
1436Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
1437100mm
1438125mm
1439150mm
1440Supply and Delivery of GI Specials as per IS 1239/PART II/2004
1441GI Bend
1442100mm
1443125mm
1444150mm
1445Supply and Delivery of PVC Specials as per IS 7834 / 1987
1446PVC Threaded Coupler
144763mm x 50mm
144875mm x 50mm
144990mm x 80mm
1450110mm x 100mm
1451140mm x 125mm
1452PVC Male Threaded Adapter
1453110mm
1454140mm
1455160mm
1456200mm
1457Supply and Delivery of End Termination Kits
1458185 sq.mm
1459240 sq.mm
1460300 sq.mm
1461Supply and Delivery of GM Gate Valve as per IS BS 5154
1462100mm
1463Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
1464100mm
1465125mm
1466150mm
1467200mm
1468Supply, Delivery and Errection of Woltman model water meter confirming to ISO 4064 part I, II, III Class B and IS-2373.24-25,
1469100mm
1470Supply and Delivery of Silica Gel
1471Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58449094
AUTHORITY Government Departments
TENDER VALUE 35.19 Crore
LAST DATE 07-12-2026
Authority
Authority Name Tamilnadu Water Supply And Drainage Board
Work Description Tender for Operation And Maintenance Of The Cwss To 1766 Habitations In Pudukkottai District (Pkg-33 A), Including Repair, Rectification Works And Supply Of Chemicals For The Period From 01.01.2027 To 31.03.2029
Basic Detail
Tender No 9 F O and M of CWSS SDO TNJ 2026
Bidding Type Tender
Location
City Pudukkottai
State Tamil Nadu
Key Dates
Publish Date 09 Nov 2026
Submission Date 07 Dec 2026
Open Date 08 Dec 2026
Finance
Tender Value 35.19 Crore
Tender Fee Ref. Documents
EMD 26.39 Lakhs
Exemption Not Available
Document List
9349f380-fe4b-474f-a0d5-e54108cb7d22.html
BID1766.pdf
BOQ_869434.xls
Salientdetails1766.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Dec 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
html

9349f380-fe4b-474f-a0d5-e54108cb7d22.html

pdf

BID1766.pdf

xls

BOQ_869434.xls

pdf

Salientdetails1766.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender