Tender For Repairing Of Swing Gear Box (Rhs) , Swing Motor (Rhs) Along With Repairing Of Swing Device Mounting And Housing And Repairing Of 01 Nos. Self Starter (Make -Mitsubishi, 24V, 40 Mt) & 01 Nos. Alternator Assembly Of Tata Hitachi Zx 650H Mode
Tender Overview
Project Description
Tender for Repairing Of Swing Gear Box (Rhs) , Swing Motor (Rhs) Along With Repairing Of Swing Device Mounting And Housing And Repairing Of 01 Nos. Self Starter (Make -Mitsubishi, 24V, 40 Mt) & 01 Nos. Alternator Assembly Of Tata Hitachi Zx 650H Model Excavator Machine Sl.No. 194
BOQ
| Sl. No. | Item Description |
| 1 | Gauging electrode for Removal of Broken stuck bolts in swing gear box mounting housing ( Lotherm- L802) |
| 2 | Suitable steel electrode for material filling and welding in worn out holes of swing gear box mounting housing (Electrode- Lomelt -205) |
| 3 | Gear teeth rebuilding of 02 nos. sun gear, 06 nos. planetary gears and Ring gear using steel electrodes (Electrode – Lomelt – 210) |
| 4 | Machining of rebuild gear teeth of 02 nos. sun gear, 06 nos. planetary gears and Ring gear as per required shape and size |
| 5 | Cost of washing and cleaning all internal parts of Swing gear box |
| 6 | Replacement of swing gear box damaged oil seal.(part no.-4424982) |
| 7 | Assembling of accessories of Swing Gear Box and Testing of Assembly. |
| 8 | Replacement of swing motor Piston assembly |
| 9 | Replacement of Shaft |
| 10 | Replacement of Spring plate of swash plate in swing motor |
| 11 | Replacement of swing motor seal |
| 12 | Washing charges for swing motor assembly |
| 13 | Assembling of all accessories of Swing motor and Testing of Assembly. |
| 14 | Grinding stone for grinding build up holes in swing gear box mounting housing |
| 15 | Cost of thread tapping in housing holes (13 nos.) as per required size and shape. |
| 16 | Replacement of swing device mounting bolts 13 nos. |
| 17 | Armature rewinding with commutator repairing. |
| 18 | Repairing of solenoid switch assembly. |
| 19 | Repairing of field coil assembly. |
| 20 | Replacement of drive assembly. |
| 21 | Replacement of terminal assembly. |
| 22 | Carbon brush holder gear assy. Repairing. |
| 23 | Replacement of starter coil. |
| 24 | Replacement of rotor coil. |
| 25 | Replacement of regulator. |
| 26 | Replacement of rectifier. |
| 27 | Replacement of terminal assembly. |
| 28 | Replacement of bearing (6307). |
| 29 | Replacement of bearing (6305) |
| 30 | Hiring cost of grinding machine, hydraulic jack, jigs and fixture with special tools for job completion |
| 31 | Supervisor : 01 person per shift x 05 days |
| 32 | Electrician : 01 person per shift x 02 days |
| 33 | Machinist : 02 person per shift x 05 days |
| 34 | Fitter : 02 person per shift x 05 days |
| 35 | Welder : 02 person per shift x 05 days |
| 36 | Helper : 02 person per shift x 05 days |
| 37 | Contractor profit |
| 38 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender