Tender For Design, Reverse Engineering, Manufacturing, Transportation, Dismantling And Supply Installation Testing and Commissioning of Pelton Turbine Shaft And Other Miscellaneous Works At Urgam Shp (2 × 1500 Kw), Chamoli
Tender Overview
Project Description
Tender for Design, Reverse Engineering, Manufacturing, Transportation, Dismantling And Supply Installation Testing and Commissioning of Pelton Turbine Shaft And Other Miscellaneous Works At Urgam Shp (2 × 1500 Kw), Chamoli
BOQ
| Sl. No. | Item Description |
| 1 | Design and Reverse Engineering: Inspection, measurement and reverse engineering of the existing Pelton turbine shaft, including preparation of detailed manufacturing drawings, dimensional specifications, material grade, coupling details, keyway dimensions and machining tolerances as per the existing assembly . |
| 2 | Manufacturing and Supply of Pelton Turbine Shaft: Manufacture and supply of a new turbine shaft suitable for a 1500 kW, 600 RPM Pelton turbine. The shaft shall be manufactured from forged alloy steel or carbon steel of an approved grade. Material grade shall conform to the original manufacturer's specifications or an approved equivalent. The work shall include rough and finish machining, keyways, coupling ends, threads, fits, surface finishing, dimensional inspection, material test certificates and non-destructive testing (NDT) as specified. |
| 3 | Supply of Hardwares:-Supply of associated coupling bolts, nuts, locking arrangements, spacers and other essential accessories required for installation of the new shaft. |
| 4 | Transportation and Handling: Packing, loading, transportation and transit insurance of the Pelton turbine shaft from the manufacturer's works to the power house site, including unloading at the designated location outside the power house and manual shifting of the shaft to the required installation location inside the power house |
| 5 | Dismantling of Existing Shaft: Dismantling and removal of the existing turbine shaft, including disconnection of coupling arrangements and removal of Runner , DE & NDE Bearing & associated components as required. |
| 6 | Erection and Installation: Installation of the new shaft, including fitting, coupling, installation of keys and associated accessories, alignment with the turbine runner and generator, DE & NDE Bearing and checking of shaft runout, concentricity, bearing clearances and coupling alignment as per approved drawings and manufacturer's tolerances complete in all respects including all manpower, materials, consumables, and tools & plants (T&P) required for the proper completion of the work. |
| 7 | Testing and Commissioning: Inspection and testing of the installed shaft, including dimensional verification, coupling alignment, vibration monitoring, bearing temperature checks and operational trial under applicable no-load and load conditions, followed by commissioning of the turbine-generator unit complete in all respects including all manpower, materials, consumables, and tools & plants (T&P) required for the proper completion of the work. |
| 8 | Supply & replacement of LED light, 200W, 240V LED, IP66 in switchyard, Make Bajaj/Havells/ Philips or equivalent.-6 Nos |
| 9 | Supply & Replacement of LED Light 150W, 240V LED for Machine Hall (Make Bajaj, Havells, Philips or equivalent) -6 Nos. |
| 10 | Supply and installation of Turbine DE Bearing Tubular type water Cooler with all necessary fittings, as per existing size. Note-GST Extra as aaplicable. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 27 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender