Drinking Water Supply and Sanitation Government Departments Closing in 9 days TDR #58446558

Tender For Construction Of Cwr, Source Work, Supply, Laying And Jointing Of Gi Pipe Line And Other Appurtenant Works At Saliyana Urban W/S Scheme Under State Plan 2026-27 In Gairsain Block Of District Chamoli.

Issued by Government Departments · Chamoli, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Nov 2026
9 days left
EMD
58500
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chamoli → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Cwr, Source Work, Supply, Laying And Jointing Of Gi Pipe Line And Other Appurtenant Works At Saliyana Urban W/S Scheme Under State Plan 2026-27 In Gairsain Block Of District Chamoli.

BOQ

Name of Work:- Construction of CWR, Source work, Supply, Laying and Jointing of GI pipe line and other Appurtenant works at Saliyana Urban W/s scheme Under State Plan 2026-27 in Gairsain block of District Chamoli.
Sl. No. Item Description
1Construction of CWR, Source work, Supply, Laying and Jointing of GI pipe line and other Appurtenant works at Saliyana Urban W/s scheme Under State Plan 2026-27 in Gairsain block of District Chamoli.
2Source & Treatment works (including all the necessary sample tests.)Construction of RCC Spring Collecting Chamber Cum Roughening Filter of Size (1.0mx1.0mx1.5m) size at tapping point for collection of water including supply of all materials,labour, T&P etc. complete , including all the necessary sample tests.
3Earthwork in excavation for protection work
4PCC 1:4:8 for 600 mm wide apron around protection
5Random Rubble Stone Masonry in CM 1:6 of two long side
6Random Rubble Stone Masonry in CM 1:6 of front/end side
7RR Dry 75 mm thick boulder pitching on two side slopes
8RR Dry 75 mm thick boulder pitching on front side
9Clear Water Reservoir Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose including soil testing & Design & drawing etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2.including all the necessary sample tests.50.00 KL
10Supply of FRP coated MS bucket type chlorinator of 25 ltr capacity with chlorination arrangements
11Earthwork Excavation for Foundation
12PCC 1:4:8 Foundation (150 mm thick)
13Breast Wall (RR Masonry CM 1:6)
14Retaining Wall (RR Masonry CM 1:6)
15Toe Wall (RR Masonry CM 1:6)
16Stone Pitching (230 mm thick)
17Catch Water Drain (CC 1:2:4)
18Supply Main laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.(GI medium quality (As per marked G.I. Pipe conforming to IS 1239))Supply Main40 mm dia
1950 mm dia
20Cartage of following size of GM valves/air valve upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber. Make As Per QA PlanSupply Main40 mm dia
2150 mm dia
22(b) High head cast iron air valves 20 mm dia (TP-10kg/sqcm)
23Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 60% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock(a) Soil mixed with boulder and bajri
24(b) Medium Rock/Soft Rock
25Provide all materials, labour, T&P and construct following chambers as per type designs(a) Sluice valve chamber (0.60 X 0.60X0.75)
26Excavation in foundation including dressing & disposal
27PCC 1:4:8 in foundation (100 mm thick)
28Random Rubble Stone Masonry in CM 1:6
29RCC Top Slab 1:2:4 (75 mm thick)
30PCC 1:3:6 Pipe Cradle
31RCC Cover Slab 1:2:4 (100 mm thick)
3212 mm Cement Plaster (Top & Outside)
33Distribution System laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.(GI medium quality (As per marked G.I. Pipe conforming to is 1239))Distribution Main25 mm dia
3450 mm dia
35Cartage of following size of GM valves/air valve upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber.Make As per QA PlanDistribution Main25 mm dia
3650 mm dia
37(b) High head cast iron air valves 15 mm dia (TP-10kg/sqcm)
38Provide all materials, labour, T&P and construct following chambers as per type designs(a) Wheel valve chamber (0.60 X 0.60X0.75)
39Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 60% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock(a) Soil mixed with boulder and bajri
40(b) Medium Rock/Soft Rock
41Excavation in foundation including dressing & disposal
42PCC 1:4:8 in foundation (100 mm thick)
43Random Rubble Stone Masonry in CM 1:6
44RCC Top Slab 1:2:4 (75 mm thick)
45Cartage of Material From Divisional Store to Site of work (including head load) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58446558
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 19-11-2026
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Tender for Construction Of Cwr, Source Work, Supply, Laying And Jointing Of Gi Pipe Line And Other Appurtenant Works At Saliyana Urban W/S Scheme Under State Plan 2026-27 In Gairsain Block Of District Chamoli.
Basic Detail
Tender No 2716/e-tender notice/2026-27 Date 05-11-2026
Bidding Type Tender
Location
City Chamoli
State Uttarakhand
Key Dates
Publish Date 07 Nov 2026
Submission Date 19 Nov 2026
Open Date 21 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee 2360
EMD 58500
Exemption Not Available
Document List
BOQ_120445.xls
ed81172e-2666-49e8-b00c-800cf55d79c6.html
TD_Saliyana_Urban.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Nov 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_120445.xls

html

ed81172e-2666-49e8-b00c-800cf55d79c6.html

pdf

TD_Saliyana_Urban.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender