Tender For Tender Estimate For providing 11/0.4Kv 100 Kva Dtr At Chhatri On Existing Double Pole Structure Of 11 Kv Kotla Feeder In Electrical Section Dramman Under Esd Hpsebl Shahpur. T/S No. 90/2026-27 & 91/2026-27, And Tender For providing Augment
Tender Overview
Project Description
Tender for Tender Estimate For providing 11/0.4Kv 100 Kva Dtr At Chhatri On Existing Double Pole Structure Of 11 Kv Kotla Feeder In Electrical Section Dramman Under Esd Hpsebl Shahpur. T/S No. 90/2026-27 & 91/2026-27, And Tender For providing Augmentation Of 11/0.4Kv 63Kva To 100 Kva S/Stn. Parsel 1St Uesd Hpsebl, Rait. ( T/S No. 95/2026-27 , Scheme Capex Plan & Sed-64/2026-27).
BOQ
| Sl. No. | Item Description |
| 1 | T/s No. 89/2026-27 100 kVA DTR at Chhatri |
| 2 | Prov. 11/0.4KV, Distribution Transformer, 100KVA O/D (Prov. By HPSEBL) |
| 3 | Prov. X-Arm:{Channel Iron (100x50x5mm), Length : (2800mm x 2Nos) for incommer line.(Prov. By HPSEBL) |
| 4 | Prov. ACSR 6/1/3.35 mm (Prov. By HPSEBL) |
| 5 | Prov. MSAI 2800x50x50x6mm for LA (Prov. By HPSEBL) |
| 6 | Prov. X-Arm:{Channel Iron (75x40x6mm), Length : (2800mm x 4Nos) for supporting DO Fuse and GO switch (Prov. By HPSEBL) |
| 7 | Prov. X-arm CI (100x50x6mm) 2800 mm x 2 Nos for T/F Bed(Prov. By HPSEBL) |
| 8 | Prov. MSCI 460(100x50x6)mm for supporting main channel of T/F CT-PT main(Prov. By HPSEBL) |
| 9 | Prov. MSAI 2800x(50x50x6mm)x2nos.(Prov. By HPSEBL) |
| 10 | Prov. MSAI 460x35x35x5mm (Prov. By HPSEBL) |
| 11 | Prov. MSAI 950x50x50x6mm for bed knee bracing (Prov. By HPSEBL) |
| 12 | Prov. MSAI (50x50x6mm),length 2800mm x 2Nos. (Prov. By HPSEBL) |
| 13 | Prov. MSAI 450x50x50x6mm |
| 14 | Prov. MSCI 460x75x40x4.8mm for supporting GO Switch handle(Prov. By HPSEBL) |
| 15 | Prov. 11KV Lightening/ Surge Arrester (Prov. By HPSEBL) |
| 16 | Prov. Stay Wire 7/3.15mm @7Kg./Stay set (Prov. By HPSEBL) |
| 17 | Prov. G.I Wire 6 SWG for Earthing. (Prov. By HPSEBL) |
| 18 | Prov. LT Distribution Panel Box with MCCB(100A, 35KA 3P for 100 KVA DTR) with Kit Kat (Prov. By HPSEBL) |
| 19 | Prov. Al.Thimbles off size 300 sqm (Prov. By HPSEBL) |
| 20 | Prov. Copper Thimble 95mm2 (Prov. By HPSEBL) |
| 21 | Prov. Danger Plate 11KV (Prov. By HPSEBL) |
| 22 | Prov. 11KV 400 AB G.O. Switch unit complete |
| 23 | Prov. 11KV D.O. Fuse Unit |
| 24 | Prov. HT Stay Set complete |
| 25 | Prov. Pipe Earthing set Complete (HT) |
| 26 | Prov. MS Half Clamps |
| 27 | Prov. MS Full Clamps |
| 28 | Prov. M.S. Nut & Bolts Off Sizes |
| 29 | Prov. Barbed Wire |
| 30 | Prov. LT AB Cable XLPE 3.5 x 120mm² |
| 31 | Prov. Aluminium Paint |
| 32 | Prov. Red Oxide |
| 33 | Prov. Chain fencing complete along with concete flooring |
| 34 | Erection part |
| 35 | Add Erection Charges |
| 36 | Add Erection Charges |
| 37 | T/s No. 91/2026-27 LT line at chhatri |
| 38 | Prov. Steel tubular pole 8 mtr long. (Prov. By HPSEBL) |
| 39 | Prov. Egg Insulator (Prov. By HPSEBL) |
| 40 | Prov. Danger Plate (Prov. By HPSEBL) |
| 41 | Prov. Stay wire7/3.15(@6.0Kg per stay set) (Prov. By HPSEBL) |
| 42 | Prov. RCC muff. |
| 43 | Prov. Anchoring Assembly |
| 44 | Prov. Knee Bracing set length 1100 mm (65x65x6)mm |
| 45 | Prov. X-Arm (horizontal) MS Channel iron 100x50x50x5(600mm) |
| 46 | Prov. Façade hook |
| 47 | Prov. Stay set (LT) complete |
| 48 | Prov. MS Half Clamps |
| 49 | Prov. MS full Clamps |
| 50 | Prov. Aluminium Paint |
| 51 | Prov. Nuts and bolts off sizes. |
| 52 | Erection part |
| 53 | Add Erection Charges of pole as per the cost data. |
| 54 | Add Erection Charges LT Stay set as per the cost data. |
| 55 | Add Transportation Charges |
| 56 | T/s No. 95/2026-27 63kVA to 100 kVA S/Stn. Parsel 1st |
| 57 | Prov. 11/0.4KV 100KVA Transformer (Prov. By HPSEBL) |
| 58 | Prov. LT Distribution Panel Box with MCCB 100 KVA (Prov. By HPSEBL) |
| 59 | Prov. LT AB cable 3.5 core 185 mm2 |
| 60 | Erection part |
| 61 | Add Erection Charges |
| 62 | Add Transportation Charges Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender