Power Boards / Undertakings / PSU Closing in 3 days TDR #58444295

Tender For Mtps-Ii - Mi Circle - Boiler Maintenance - Overhauling Of Air Pre Heater A And Replacement Of Axial Seal Plate Assembly During The Coh Period Of 2026-27.

Issued by Boards / Undertakings / PSU · Salem, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Nov 2026
3 days left
EMD
35600
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Mtps-Ii - Mi Circle - Boiler Maintenance - Overhauling Of Air Pre Heater A And Replacement Of Axial Seal Plate Assembly During The Coh Period Of 2026-27.

BOQ

Name of Work:- MTPS-II - MI Circle - Boiler Maintenance – Overhauling of Air pre heater A and replacement of Axial seal plate assembly during the COH period of 2026-27.
Sl. No. Item Description
1Opening of all manhole doors & closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors.
2Removal of Ash deposit around guide bearing area and inside the APH.
3Marking and gas cutting of Air Pre Heater Flue gas/PA/SA shell body mother plate with chain block support at insulation removed location for required size to facilitate to dismantling of existing Axial Seal Plate and erection of a new Axial Seal Plate plate through this APH Flue gas/PA/SA shell body mother plate and re-erection of the mother plate after renewal of Axial Seal Plate.
4Arresting of existing wornout Axial seal plate by chain block and hydraulic jack after removing of adjuster screws, lowering of existing wornout Axial seal plate gradually and releasing of chain block supports and drawing outside of Air Pre Heater through the opening made in Air Pre Heater PA/SA/flue gas side shell body mother plate, leading and lowering the removed worn-out Axial seal plate from 19.15mtr Air Pre Heater floor level to '0' mtr boiler floor by means of motor operated winch, transporting and devoluting to store.
5Erection of a new Axial seal plate, this work includes transporting of axial plate from store to site, leading and lifting of a new Axial seal plate from '0'mtr boiler floor to 17mtr Air Pre Heater floor level by means of motor operated winch and inserting the new Axial seal plate through the PA/SA/flue gas shell body mother plate opening by means of chain blocks support, placing the Axial seal plate to the existing wornout Axial seal plate removed location and re-assembling the new Axial seal plate in position asper standard procedure and aligning of axial plate as per the standard alignment protocal.
6Cutting and removing of bracing support pipes at APH flue gas hot end side / New re-erection of removed bracing pipes by welding in position after the erection of new hot end sector plate.
7Removal of Cold end heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements after renewal of Cold end support frame and diaphragm plate.
88) Removal of Hot end sacrificing heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements after renewal of Hot end support frame and diaphragm plate.
9Removal of Hot end heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements into its position.
10Removal of Intermediate heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements into its position.
11Replacing the old eroded/damaged cold end gratings into new one, This work inReplacing the old eroded/damaged cold end gratings into new one, This work involves cutting and removing the old eroded/damaged cold end gratings and surface finishing the Rotor shell body and fixing the new cold end gratings , including drawl of new materials from stores and transporting to APH area and devoluting old material to stores, including all required consumables & T&P,s etc., as per engineer in charge hire charge.
12Cutting and removing of bracing support pipes at APH flue gas cold end side / New re-erection of removed bracing pipes by welding in position after the erection of new cold end sector plate.
13Cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers.
14Fixing up straight edge after finding the low point of sector plate adjusting the radial seals to correct clearance, clamping the seals in both hot end and cold end of APH (Double Sealing Arangement).
15Removal of worn - out radial seal in both cold end and hot end and re fixing with new HT bolts & nuts and positioning (including transporting of new materials from stores to site and scraps from site to stores).
16Fixing up straight edge after finding the low point of axial seal plate, adjusting the axial seals to correct clearance, clamping the seals properly in both hot end and cold end of APH. (Double Sealing Arangement).
17Removal of worn-out axial seal in both cold end and hot end re fixing with new HT bolts and positioning. (including transporting of new materials from stores to site and scaps from site to stores).
18Removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals, new HT bolts. (Including transporting of new materials from stores to site and scraps from site to stores).
19Water washing of Air Pre Heater. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58444295
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 16-11-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Mtps-Ii - Mi Circle - Boiler Maintenance - Overhauling Of Air Pre Heater A And Replacement Of Axial Seal Plate Assembly During The Coh Period Of 2026-27.
Basic Detail
Tender No OT 68 Overhauling of APH A
Bidding Type Tender
Location
City Salem
State Tamil Nadu
Key Dates
Publish Date 07 Nov 2026
Submission Date 16 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 35600
Exemption Available
Document List
9125f306-b4f2-45f8-810a-0118720cf30e.html
BOQ_869423.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

9125f306-b4f2-45f8-810a-0118720cf30e.html

xls

BOQ_869423.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender