Tender For Mtps-Ii - Mi Circle - Boiler Maintenance - Coh - 2026-27 - Cleaning Of The Accumulated Ash Inside Hot Primary Air Ducts, Hot Secondary Air Ducts And Flue Gas Ducts - Arresting The Air Leakage - Patch Up Works And Repair Works In ‘A Side.
Tender Overview
Project Description
Tender for Mtps-Ii - Mi Circle - Boiler Maintenance - Coh - 2026-27 - Cleaning Of The Accumulated Ash Inside Hot Primary Air Ducts, Hot Secondary Air Ducts And Flue Gas Ducts - Arresting The Air Leakage - Patch Up Works And Repair Works In ‘A Side.
BOQ
| Sl. No. | Item Description |
| 1 | Opening of manhole doors and closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors. |
| 2 | Removal of Ash deposit inside the inlet Flue gas duct, hot Primary air duct and hot Secondary air duct to '0'mtr. |
| 3 | Transportation of ash & dumping the ash into MTPS Ash dyke from '0'mtr. |
| 4 | Labour charges for welding eroded initial welding joints in the PA, SA & FG duct inlet and outlet below 2 mtr level (including the cost of welding electrodes) |
| 5 | Labour charges for welding eroded initial welding joints in the PA, SA & FG duct inlet and outlet above 2 mtr level (including the cost of welding electrodes) |
| 6 | Cutting and removal of eroded guard plates over the expansion joint and providing new guard plate of size 3.15 mm HR sheet over the expansion joint after completion of inspection and patch welding works on expansion joints. |
| 7 | Transporting the 6mm MS Chequered plates from central stores / MTPS to Boiler area, cutting in to required size, leading, lifting, positioning on the eroded portions of the PA,SA &FG duct below 1.5mtr and welding the same including cost of welding electrodes. |
| 8 | Transporting the 6mm MS Chequered plates from central stores / MTPS to Boiler area, cutting in to required size, leading , lifting , positioning on the eroded portions of the PA, SA & FG duct inlet and outlet above 1.5mtr side wall portion and Top portion of the PA, SA & FG duct and welding the same including of welding electrodes. |
| 9 | Drawal of 6mm M.S plate from central stores transporting the materials to outside workshop cutting in to required size, bending to the required size and profile, transporting back to ESP flue gas inlet area. |
| 10 | Transporting new deflector plate and leading to flue gas duct, leading , lifting to Boiler Flue gas ducts. Fixing and welding in the duct and to the correct contour. Placing the deflector plate in the guide angle and welding the same. |
| 11 | Renewal of Flue gas bracing pipe in ESP inlet flue gas duct.This work involve making the scaffolding arrangement, removing the eroded bracing pipes, fixing the new pipes, lead & lift, position and welding , devolute the scrap from site to stores. |
| 12 | Fixing and removing the scaffolding arrangements for insulation work around the Flue gas duct,Hot PA duct and APH. |
| 13 | Removal of insulation Single layer (60mm thick) wool mattress, G.I Cladding sheet, stiffeners, retainer plates etc. welding the support plates, rectification and refixing the existing insulation Single layer (60mm thick) wool mattress, GI sheets, lead and lift etc in the required area of Flue gas duct and Air Pre Heater with new fastners |
| 14 | Non Metallic : Cutting and dismantling of existing fabric compensator for the renewal of expansion joint of size 8800x3800 of APH Flue gas outlet duct Cutting and removal of eroded expansion joint of size 8800 X 3800. This work involves providing platforms inside and outside the ducts,locking and arresting the upstream and downstream sides of flue gas ducts, cutting, dismanting and removal of the damaged expansion joint and devoluting the same to the Central Stores/MTPS- II. |
| 15 | Drawal of new fabric compensator of size 8800x3800 from Central Store / MTPS-II and transporting to Boiler area lifting, leading and erection in position, alignment with flue gas duct and welding. Finally cutting and removing all the locking and arresting arrangement, This work including the transporting charges of materials from Central Store to Boiler. (Including the cost of welding electrodes. |
| 16 | Removal of Ash deposit inside the outlet Flue gas duct. |
| 17 | Transportation of ash & dumping the ash into MTPS Ash dyke from '0'mtr. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.