Tender For Operation And Maintenance Of 23 Nos.Cwss In Sivagangai Cwss For Period From 01.01.2027 To 31.03.2029 And 32 Nos.Cwss In Ramanathapuram Cwss For Period From 01.01.2027 To 31.03.2027 Including Repair, Rectification Works And Supply Of Chemic
Tender Overview
Project Description
Tender for Operation And Maintenance Of 23 Nos.Cwss In Sivagangai Cwss For Period From 01.01.2027 To 31.03.2029 And 32 Nos.Cwss In Ramanathapuram Cwss For Period From 01.01.2027 To 31.03.2027 Including Repair, Rectification Works And Supply Of Chemicals.(Pkg.22)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Nov-2026 | Salient Details and Earmarked Quantity | Other | 20-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Operation and Maintenance of 23 nos.CWSS in Sivagangai CWSS for period from 01.01.2027 to 31.03.2029 and 32 nos.CWSS in Ramanathapuram CWSS for period from 01.1.2027 to 31.03.2027 (Pkg.22) including repair, rectification works and supply of chemicals. |
| 2 | CWSS to Alavidankan and 17 other habitation in Ilayangudi Union of Sivagangai District and R.S. angalam Union of Ramnad District. |
| 3 | CWSS to Erivayal and 13 other habitations in Kalayarkoil Union of Sivagangai District |
| 4 | CWSS to Kadambankulam and 14 other habitations in Manamadurai Union of Sivagangai District |
| 5 | CWSSto Palayanoor and 12 other habitations inThiruppuvanam Union of Sivagangai District |
| 6 | CWSSto Kannankottai and 9 other habitations in Devakottai Union of Sivagangai District |
| 7 | Unjanai CWSS and 23 other habitations in Kannangudi and Devakottai Unions of Sivagangai District |
| 8 | Vayalseri CWSS and 19 other habitations in Thiruppuvanam Union of Sivagangai District |
| 9 | Keelamelgudi CWSS and 12 other Habitations in Manamadurai Union of Sivagangai District |
| 10 | CWSS to P. Alangulam and 17 other habitation in Manamadurai and Ilayangudi Unions of of Sivagangai District |
| 11 | CWSS to Perumpatcheri and 6 other habitation in Ilayangudi Unions of of Sivagangai District |
| 12 | CWSS to Periyaavarakadu and 15 other habitation in Thiruppuvanam and Manamadurai Unions of of Sivagangai District |
| 13 | CWSS to Chithalur and 7 other habitation in Manamadurai and Sivagangai Unions of of Sivagangai District |
| 14 | CWSS to Pidaranendhal and 15 other habitation in Devakottai Unions of of Sivagangai District |
| 15 | CWSS to Vilankattur and 22 other habitation in Devakottai Unions of of Sivagangai District |
| 16 | CWSS to Selugai and 20 other habitation in Devakottai Unions of of Sivagangai District |
| 17 | Anukkanendhal CWSS and 7 other habitation in Kannangudi Unions of of Sivagangai District |
| 18 | Thayamangalam CWSS and 73 other habitation in Ilayankudi Union of of Sivagangai District |
| 19 | CWSS to Anumanthakudi and 10 other habitation in Kannangudi Union of of Sivagangai District |
| 20 | CWSS Anna Nagar and 7 other habitation in Kallal and Sakkottai Unions of of Sivagangai District |
| 21 | CWSS to Kannayiruppu and 8 other habitation in Sivagangai Union of of Sivagangai District |
| 22 | CWSS to Pudukottai and 14 other habitation in Ilayangudi Union of of Sivagangai District and R.S. Mangalam Union of Ramnad District. |
| 23 | CWSS to Andakudi and 45 other habitation in Ilayangudi, Kalayarkoil & Devakottai Unions of of Sivagangai District. |
| 24 | CWSS to Paluvoor and 12 other habitations in Kalayarkoil Union of Sivagangai District |
| 25 | CWSS to Ilandaikulam and 5 other habitation in Paramakudi Union of of Ramanathapuram District. |
| 26 | CWSS to Somathur and 16 other habitation in Paramakudi Union of of Ramanathapuram District and Manamadurai Union of Sivagangai District. |
| 27 | CWSS to Kolundapuri and 4 other habitation in Paramakudi Union of of Ramanathapuram District. |
| 28 | CWSS to Venthoni and 13 other habitation in Paramakudi Union of of Ramanathapuram District. |
| 29 | CWSS to Enathikottai and 1 other habitation in Paramakudi Union of of Ramanathapuram District and Manamadurai Union of Sivagangai District.. |
| 30 | CWSS to Nelmadur and 22 other habitations in Paramakudi Union of of Ramanathapuram District. |
| 31 | CWSS to K.Karungulam and 5 other habitations in Bogalur & Nainarkovil Union of of Ramanathapuram District. |
| 32 | CWSS to A.Puthur and 9 other habitations in Bogalur Union of of Ramanathapuram District. |
| 33 | CWSS to Thiruvadi and 10 other habitations in Bogalur & Nainarkovil Union of of Ramanathapuram District. |
| 34 | CWSS to Meyyanendhal and 9 other habitations in Bogalur & Nainarkovil Union of of Ramanathapuram District. |
| 35 | CWSS to Sathanoor and 11 other habitations in Ramanathapuram District. |
| 36 | CWSS to Pottagavayal and 02 other habitations in Nainarkovil union of Ramanathapuram District. |
| 37 | CWSS to Radhapuli and 05 other habitations in Nainarkovil union of Ramanathapuram District. |
| 38 | CWSS to Koluvoor and 04 other habitations in Nainarkovil union of Ramanathapuram District. |
| 39 | CWSS to Kolundurai and 05 other habitations in Paramakudi union of Ramanathapuram District. |
| 40 | CWSS to Mandalamanickam and 14 other habitations in Kamuthi union of Ramanathapuram District. |
| 41 | CWSS to Kadaladi- Mudhukulathur and 58 other habitations in Kamuthi & mudukulathur union of Ramanathapuram District. |
| 42 | CWSS to Thondi - Thiruvadanai and 46 other habitations in Thiruvadanai union of Ramanathapuram District and Devakottai Union of Sivagangai District |
| 43 | CWSS to Kunjankulam and 34 other habitations in Thiruvadanai union of Ramanathapuram District |
| 44 | CWSS to Thondi - Nambuthalai and 37 other habitations in Thiruvadanai union of Ramanathapuram District |
| 45 | CWSS to Nagarikathan - Oriyur and 10 other habitations in Thiruvadanai union of Ramanathapuram District |
| 46 | CWSS to Kattivayal and 25 other habitations in Thiruvadanai union of Ramanathapuram District |
| 47 | CWSS to Pandukudi and 34 other habitations in Thiruvadanai union of Ramanathapuram District |
| 48 | CWSS to S.P.Pattinam and 24 other habitations in Thiruvadanai union of Ramanathapuram District |
| 49 | CWSS to Pallamorkulam and 18 other habitations in Thirupullani union of Ramanathapuram District |
| 50 | CWSS to Panaiyadiyendhal and 14 other habitations in Thirupullani union of Ramanathapuram District |
| 51 | CWSS to Oppilan and 13 other habitations in Kadaladi union of Ramanathapuram District |
| 52 | CWSS to Peruvayal and 21 other habitations in Ramanathapuram union of Ramanathapuram District |
| 53 | CWSS to Paravoor and 5 other habitations in Ramanathapuram union of Ramanathapuram District |
| 54 | CWSS to Ayiraveli and 6 other habitations in RS Mangalam union of Ramanathapuram District and Devakottai Union of Sivagangai District |
| 55 | CWSS to A.Manakudi and 79 other habitations in R.S.Mangalam and Thiruvadanai union of Ramanathapuram District and Devakottai Union of Sivagangai District |
| 56 | CWSS to Kavanakottai and 45 other habitations in R.S.Mangalam union of Ramanathapuram District |
| 57 | Total Basic Value |
| 58 | Add GST @18% on Basic Value |
| 59 | 2.0 For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 60 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.195 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 29.445 ML (0.195*90) |
| 61 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 62 | PVC Pipes of various sizes |
| 63 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 64 | 63mm PVC 4KSC |
| 65 | 90 mm PVC 4KSC |
| 66 | 110 mm PVC 4KSC |
| 67 | 140 mm PVC 4KSC PVC COUPLER FABRICATED |
| 68 | 63 mm PVC 4 KSC |
| 69 | 90 mm PVC 4 KSC |
| 70 | 110 mm PVC 4 KSC |
| 71 | 140 mm PVC 4 KSC |
| 72 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 73 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 74 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 75 | 4 H.P. |
| 76 | 3 H.P. |
| 77 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 78 | For 2HP |
| 79 | For 5HP Attending cable fault by replacing the cable |
| 80 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 81 | 3core 4 Sq. mm |
| 82 | 3core 6 Sq. mm |
| 83 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 84 | 3core 4 Sq. mm |
| 85 | 3core 6 Sq. mm |
| 86 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 87 | 3core 4 Sq. mm |
| 88 | 3core 6 Sq. mm |
| 89 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 90 | 63 Amps 3 Pole MCCB Switch Electro magnetic Contactors |
| 91 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 92 | For 2 HP Starter |
| 93 | For 4 HP Starter |
| 94 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 95 | For 5 HP |
| 96 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 97 | 0.30 LL capacity Sump |
| 98 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 99 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 100 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 101 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.195 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 71.175 ML (0.195*365) |
| 102 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 103 | PVC Pipes of various sizes |
| 104 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 105 | 63mm PVC 4KSC |
| 106 | 90 mm PVC 4KSC |
| 107 | 110 mm PVC 4KSC |
| 108 | 140 mm PVC 4KSC PVC COUPLER FABRICATED |
| 109 | 63 mm PVC 4 KSC |
| 110 | 90 mm PVC 4 KSC |
| 111 | 110 mm PVC 4 KSC |
| 112 | 140 mm PVC 4 KSC |
| 113 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 114 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 115 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 116 | 4 H.P. |
| 117 | 3 H.P. |
| 118 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 119 | For 2HP |
| 120 | For 5HP Attending cable fault by replacing the cable |
| 121 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 122 | 3core 4 Sq. mm |
| 123 | 3core 6 Sq. mm |
| 124 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 125 | 3core 4 Sq. mm |
| 126 | 3core 6 Sq. mm |
| 127 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 128 | 3core 4 Sq. mm |
| 129 | 3core 6 Sq. mm |
| 130 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 131 | 63 Amps 3 Pole MCCB Switch Electro magnetic Contactors |
| 132 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 133 | For 2 HP Starter |
| 134 | For 4 HP Starter |
| 135 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 136 | For 5 HP |
| 137 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 138 | 0.30 LL capacity Sump |
| 139 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 140 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 141 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 142 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.195 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 71.175 ML (0.195*365) |
| 143 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 144 | PVC Pipes of various sizes |
| 145 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 146 | 63mm PVC 4KSC |
| 147 | 90 mm PVC 4KSC |
| 148 | 110 mm PVC 4KSC |
| 149 | 140 mm PVC 4KSC PVC COUPLER FABRICATED |
| 150 | 63 mm PVC 4 KSC |
| 151 | 90 mm PVC 4 KSC |
| 152 | 110 mm PVC 4 KSC |
| 153 | 140 mm PVC 4 KSC |
| 154 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 155 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 156 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 157 | 4 H.P. |
| 158 | 3 H.P. |
| 159 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 160 | For 2HP |
| 161 | For 5HP Attending cable fault by replacing the cable |
| 162 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 163 | 3core 4 Sq. mm |
| 164 | 3core 6 Sq. mm |
| 165 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 166 | 3core 4 Sq. mm |
| 167 | 3core 6 Sq. mm |
| 168 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 169 | 3core 4 Sq. mm |
| 170 | 3core 6 Sq. mm |
| 171 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 172 | 63 Amps 3 Pole MCCB Switch |
| 173 | Electro magnetic Contactors |
| 174 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 175 | For 2 HP Starter |
| 176 | For 4 HP Starter |
| 177 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 178 | For 5 HP |
| 179 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 180 | 0.30 LL capacity Sump |
| 181 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 182 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 183 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. |
| 184 | 2.0 For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 185 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.11 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 9.9 ML (0.11*90) Attending Burst in the pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc complete and as directed by TWAD Board officers |
| 186 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 187 | PVC Pipes of various sizes |
| 188 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 189 | 63 mm PVC 4 KSC |
| 190 | 75 mm PVC 4 KSC |
| 191 | 90 mm PVC 4 KSC PVC COUPLER FABRICATED |
| 192 | 63 mm PVC 4 KSC |
| 193 | 75 mm PVC 4 KSC |
| 194 | 90 mm PVC 4 KSC |
| 195 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 196 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 197 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 198 | For 4HP |
| 199 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 200 | For 3 H.P. |
| 201 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 202 | For 3 HP Starter |
| 203 | For 4 HP Starter Attending cable fault by replacing the cable |
| 204 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 205 | 3core 4 Sq. mm |
| 206 | 3core 6 Sq. mm |
| 207 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 208 | 3core 4 Sq. mm |
| 209 | 3core 6 Sq. mm |
| 210 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 211 | 3core 4 Sq. mm |
| 212 | 3core 6 Sq. mm |
| 213 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 214 | 100 Amps 3 Pole MCCB Switch |
| 215 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 216 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 217 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 218 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 219 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.11 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 40.15 ML (0.11*365) Attending Burst in the pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc complete and as directed by TWAD Board officers |
| 220 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 221 | PVC Pipes of various sizes |
| 222 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 223 | 63 mm PVC 4 KSC |
| 224 | 75 mm PVC 4 KSC |
| 225 | 90 mm PVC 4 KSC PVC COUPLER FABRICATED |
| 226 | 63 mm PVC 4 KSC |
| 227 | 75 mm PVC 4 KSC |
| 228 | 90 mm PVC 4 KSC |
| 229 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 230 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 231 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 232 | For 4HP |
| 233 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 234 | For 3 H.P. |
| 235 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 236 | For 3 HP Starter |
| 237 | For 4 HP Starter Attending cable fault by replacing the cable |
| 238 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 239 | 3core 4 Sq. mm |
| 240 | 3core 6 Sq. mm |
| 241 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 242 | 3core 4 Sq. mm |
| 243 | 3core 6 Sq. mm |
| 244 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 245 | 3core 4 Sq. mm |
| 246 | 3core 6 Sq. mm |
| 247 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 248 | 100 Amps 3 Pole MCCB Switch |
| 249 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 250 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 251 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 252 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 253 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.11 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 40.15 ML (0.11*365) Attending Burst in the pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc complete and as directed by TWAD Board officers |
| 254 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 255 | PVC Pipes of various sizes |
| 256 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 257 | 63 mm PVC 4 KSC |
| 258 | 75 mm PVC 4 KSC |
| 259 | 90 mm PVC 4 KSC PVC COUPLER FABRICATED |
| 260 | 63 mm PVC 4 KSC |
| 261 | 75 mm PVC 4 KSC |
| 262 | 90 mm PVC 4 KSC |
| 263 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 264 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 265 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 266 | For 4HP |
| 267 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 268 | For 3 H.P. |
| 269 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 270 | For 3 HP Starter |
| 271 | For 4 HP Starter Attending cable fault by replacing the cable |
| 272 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 273 | 3core 4 Sq. mm |
| 274 | 3core 6 Sq. mm |
| 275 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 276 | 3core 4 Sq. mm |
| 277 | 3core 6 Sq. mm |
| 278 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 279 | 3core 4 Sq. mm |
| 280 | 3core 6 Sq. mm |
| 281 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 282 | 100 Amps 3 Pole MCCB Switch |
| 283 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 284 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 285 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 286 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 287 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 288 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.218 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 19.62 ML (0.218 *90) |
| 289 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 290 | 50 mm PVC 6 KSC |
| 291 | 63 mm PVC 4 KSC |
| 292 | 75 mm PVC 4 KSC |
| 293 | 90 mm PVC 4 KSC |
| 294 | 110 mm PVC 4 KSC |
| 295 | 140 mm PVC 4 KSC |
| 296 | 160 mm PVC 4 KSC |
| 297 | PVC COUPLER FABRICATED |
| 298 | 50 mm PVC 6 KSC |
| 299 | 63 mm PVC 4 KSC |
| 300 | 75 mm PVC 4 KSC |
| 301 | 90 mm PVC 4 KSC |
| 302 | 110 mm PVC 4 KSC |
| 303 | 140 mm PVC 4 KSC |
| 304 | 160 mm PVC 4 KSC |
| 305 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 306 | PVC Pipes of various sizes |
| 307 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 308 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers |
| 309 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 310 | 2 H.P. |
| 311 | 4 H.P. |
| 312 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 313 | 6 H.P. |
| 314 | 2 H.P. Electro magnetic Contactors |
| 315 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 316 | For 2 HP Starter |
| 317 | For 4 HP Starter |
| 318 | For 5 HP Starter |
| 319 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 320 | for 6 HP |
| 321 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 322 | 100 Amps 3 Pole MCCB Switch |
| 323 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 324 | 3.00 core 4 Sq. mm |
| 325 | 3.00 core 6 Sq. mm |
| 326 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 327 | 3.00 core 4 Sq. mm |
| 328 | 3.00 core 6 Sq. mm |
| 329 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 330 | 3.00 core 4 Sq. mm |
| 331 | 3.00 core 6 Sq. mm |
| 332 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 333 | 0.30 LL capacity Sump |
| 334 | 0.15 LL capacity Sump COST OF CHEMICALS |
| 335 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 336 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. |
| 337 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 338 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.218 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 79.57 ML (0.218 *365) |
| 339 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 340 | 50 mm PVC 6 KSC |
| 341 | 63 mm PVC 4 KSC |
| 342 | 75 mm PVC 4 KSC |
| 343 | 90 mm PVC 4 KSC |
| 344 | 110 mm PVC 4 KSC |
| 345 | 140 mm PVC 4 KSC |
| 346 | 160 mm PVC 4 KSC |
| 347 | PVC COUPLER FABRICATED |
| 348 | 50 mm PVC 6 KSC |
| 349 | 63 mm PVC 4 KSC |
| 350 | 75 mm PVC 4 KSC |
| 351 | 90 mm PVC 4 KSC |
| 352 | 110 mm PVC 4 KSC |
| 353 | 140 mm PVC 4 KSC |
| 354 | 160 mm PVC 4 KSC |
| 355 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 356 | PVC Pipes of various sizes |
| 357 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 358 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers |
| 359 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 360 | 2 H.P. |
| 361 | 4 H.P. |
| 362 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 363 | 6 H.P. |
| 364 | 2 H.P. Electro magnetic Contactors |
| 365 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 366 | For 2 HP Starter |
| 367 | For 4 HP Starter |
| 368 | For 5 HP Starter |
| 369 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 370 | for 6 HP |
| 371 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 372 | 100 Amps 3 Pole MCCB Switch |
| 373 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 374 | 3.00 core 4 Sq. mm |
| 375 | 3.00 core 6 Sq. mm |
| 376 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 377 | 3.00 core 4 Sq. mm |
| 378 | 3.00 core 6 Sq. mm |
| 379 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 380 | 3.00 core 4 Sq. mm |
| 381 | 3.00 core 6 Sq. mm |
| 382 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 383 | 0.30 LL capacity Sump |
| 384 | 0.15 LL capacity Sump COST OF CHEMICALS |
| 385 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 386 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. |
| 387 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 388 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.218 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 79.57 ML (0.218 *365) |
| 389 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 390 | 50 mm PVC 6 KSC |
| 391 | 63 mm PVC 4 KSC |
| 392 | 75 mm PVC 4 KSC |
| 393 | 90 mm PVC 4 KSC |
| 394 | 110 mm PVC 4 KSC |
| 395 | 140 mm PVC 4 KSC |
| 396 | 160 mm PVC 4 KSC |
| 397 | PVC COUPLER FABRICATED |
| 398 | 50 mm PVC 6 KSC |
| 399 | 63 mm PVC 4 KSC |
| 400 | 75 mm PVC 4 KSC |
| 401 | 90 mm PVC 4 KSC |
| 402 | 110 mm PVC 4 KSC |
| 403 | 140 mm PVC 4 KSC |
| 404 | 160 mm PVC 4 KSC |
| 405 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 406 | PVC Pipes of various sizes |
| 407 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 408 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers |
| 409 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 410 | 2 H.P. |
| 411 | 4 H.P. |
| 412 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 413 | 6 H.P. |
| 414 | 2 H.P. Electro magnetic Contactors |
| 415 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 416 | For 2 HP Starter |
| 417 | For 4 HP Starter |
| 418 | For 5 HP Starter |
| 419 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 420 | for 6 HP |
| 421 | Supply and delivery of following Range AMPS 3 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 422 | 100 Amps 3 Pole MCCB Switch |
| 423 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 424 | 3.00 core 4 Sq. mm |
| 425 | 3.00 core 6 Sq. mm |
| 426 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 427 | 3.00 core 4 Sq. mm |
| 428 | 3.00 core 6 Sq. mm |
| 429 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 430 | 3.00 core 4 Sq. mm |
| 431 | 3.00 core 6 Sq. mm |
| 432 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 433 | 0.30 LL capacity Sump |
| 434 | 0.15 LL capacity Sump COST OF CHEMICALS |
| 435 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 436 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. |
| 437 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 438 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.144 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 12.96 ML (0.144*90) |
| 439 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 440 | 63 mm PVC 4 KSC |
| 441 | 75 mm PVC 4 KSC |
| 442 | 90 mm PVC 4 KSC |
| 443 | 110 mm PVC 4 KSC |
| 444 | PVC COUPLER FABRICATED |
| 445 | 63 mm PVC 4 KSC |
| 446 | 75 mm PVC 4 KSC |
| 447 | 90 mm PVC 4 KSC |
| 448 | 110 mm PVC 4 KSC |
| 449 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for the following sizes of pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 450 | For PVC Pipes of various sizes |
| 451 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 452 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 453 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 454 | 7.5HP |
| 455 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 456 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 457 | Upto 3 HP |
| 458 | Upto 4 HP |
| 459 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 460 | For 7.5 HP |
| 461 | For 10 HP |
| 462 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 463 | 3core 4 Sq. mm |
| 464 | 3core 6 Sq. mm |
| 465 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 466 | 3core 4 Sq. mm |
| 467 | 3core 6 Sq. mm |
| 468 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 469 | 3core 4 Sq. mm |
| 470 | 3core 6 Sq. mm |
| 471 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 472 | 100 Amps 3 Pole MCCB Switch |
| 473 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 474 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 475 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 476 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 477 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 478 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.144 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 52.56 ML (0.144*365) |
| 479 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 480 | 63 mm PVC 4 KSC |
| 481 | 75 mm PVC 4 KSC |
| 482 | 90 mm PVC 4 KSC |
| 483 | 110 mm PVC 4 KSC |
| 484 | PVC COUPLER FABRICATED |
| 485 | 63 mm PVC 4 KSC |
| 486 | 75 mm PVC 4 KSC |
| 487 | 90 mm PVC 4 KSC |
| 488 | 110 mm PVC 4 KSC |
| 489 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for the following sizes of pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 490 | For PVC Pipes of various sizes |
| 491 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 492 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 493 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 494 | 7.5HP |
| 495 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 496 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 497 | Upto 3 HP |
| 498 | Upto 4 HP |
| 499 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 500 | For 7.5 HP |
| 501 | For 10 HP |
| 502 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 503 | 3core 4 Sq. mm |
| 504 | 3core 6 Sq. mm |
| 505 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 506 | 3core 4 Sq. mm |
| 507 | 3core 6 Sq. mm |
| 508 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 509 | 3core 4 Sq. mm |
| 510 | 3core 6 Sq. mm Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 511 | 3 Pole MCCB |
| 512 | 100 Amps 3 Pole MCCB Switch |
| 513 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 514 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 515 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 516 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 517 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 518 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.144 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 52.56 ML (0.144*365) |
| 519 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 520 | 63 mm PVC 4 KSC |
| 521 | 75 mm PVC 4 KSC |
| 522 | 90 mm PVC 4 KSC |
| 523 | 110 mm PVC 4 KSC |
| 524 | PVC COUPLER FABRICATED |
| 525 | 63 mm PVC 4 KSC |
| 526 | 75 mm PVC 4 KSC |
| 527 | 90 mm PVC 4 KSC |
| 528 | 110 mm PVC 4 KSC |
| 529 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for the following sizes of pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 530 | For PVC Pipes of various sizes |
| 531 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 532 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 533 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 534 | 7.5HP |
| 535 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 536 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 537 | Upto 3 HP |
| 538 | Upto 4 HP |
| 539 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 540 | For 7.5 HP |
| 541 | For 10 HP |
| 542 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 543 | 3core 4 Sq. mm |
| 544 | 3core 6 Sq. mm |
| 545 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 546 | 3core 4 Sq. mm |
| 547 | 3core 6 Sq. mm |
| 548 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 549 | 3core 4 Sq. mm |
| 550 | 3core 6 Sq. mm Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 551 | 3 Pole MCCB |
| 552 | 100 Amps 3 Pole MCCB Switch |
| 553 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 554 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 555 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 556 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 557 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 558 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.100 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 9 ML (0.100*90) |
| 559 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 560 | 63 mm PVC 4 KSC |
| 561 | 90 mm PVC 4 KSC |
| 562 | PVC COUPLER FABRICATED |
| 563 | 63 mm PVC 4 KSC |
| 564 | 90 mm PVC 4 KSC |
| 565 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 566 | PVC Pipes of various sizes |
| 567 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 568 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 569 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 570 | 4.00 HP |
| 571 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 572 | For 4 HP |
| 573 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 574 | 3.00 core 4 Sq. mm |
| 575 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 576 | 3.00 core 4 Sq. mm |
| 577 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 578 | 3.00 core 4 Sq. mm |
| 579 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 580 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 581 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 582 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 583 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 584 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.100 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 36.5 ML (0.100*365) |
| 585 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 586 | 63 mm PVC 4 KSC |
| 587 | 90 mm PVC 4 KSC |
| 588 | PVC COUPLER FABRICATED |
| 589 | 63 mm PVC 4 KSC |
| 590 | 90 mm PVC 4 KSC |
| 591 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 592 | PVC Pipes of various sizes |
| 593 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 594 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 595 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 596 | 4.00 HP |
| 597 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 598 | For 4 HP |
| 599 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 600 | 3.00 core 4 Sq. mm |
| 601 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 602 | 3.00 core 4 Sq. mm |
| 603 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 604 | 3.00 core 4 Sq. mm |
| 605 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 606 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 607 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 608 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 609 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 610 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.100 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 36.5 ML (0.100*365) |
| 611 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 612 | 63 mm PVC 4 KSC |
| 613 | 90 mm PVC 4 KSC |
| 614 | PVC COUPLER FABRICATED |
| 615 | 63 mm PVC 4 KSC |
| 616 | 90 mm PVC 4 KSC |
| 617 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 618 | PVC Pipes of various sizes |
| 619 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 620 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 621 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 622 | 4.00 HP |
| 623 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 624 | For 4 HP |
| 625 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 626 | 3.00 core 4 Sq. mm |
| 627 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 628 | 3.00 core 4 Sq. mm |
| 629 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 630 | 3.00 core 4 Sq. mm |
| 631 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 632 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 633 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 634 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 635 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 636 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.430 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 38.7 ML (0.430*90) Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 637 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 638 | PVC Pipes of various sizes |
| 639 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 640 | 63mm PVC 4 KSC |
| 641 | 90mm PVC 4 KSC |
| 642 | 110mm PVC 4 KSC |
| 643 | 140mm PVC 4 KSC |
| 644 | PVC COUPLER FABRICATED |
| 645 | 63 mm PVC Coupler 4 KSC |
| 646 | 90 mm PVC Coupler 4 KSC |
| 647 | 110 mm PVC Coupler 4 KSC |
| 648 | 140 mm PVC Coupler 4 KSC |
| 649 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 650 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 651 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning of pump and repair works to various capacity Open well Submersible pumpset including cost of all material, conveyance, labour charges for removing and re-erection etc., complete and as directed by TWAD Board officers. |
| 652 | 10.00 HP |
| 653 | 3.00 HP |
| 654 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 655 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 656 | for 5 HP |
| 657 | for 4 HP |
| 658 | for 3 HP |
| 659 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 660 | for 10 HP |
| 661 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 662 | 3.00 core 4 Sq. mm |
| 663 | 3.00 core 6 Sq. mm |
| 664 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 665 | 3.00 core 4 Sq. mm |
| 666 | 3.00 core 6 Sq. mm |
| 667 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 668 | 3.00 core 4 Sq. mm |
| 669 | 3.00 core 6 Sq. mm |
| 670 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 671 | 100 Amps 3 Pole MCCB Switch |
| 672 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 673 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 674 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 675 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 676 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 677 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.430 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 156.95 ML (0.430*365) Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 678 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 679 | PVC Pipes of various sizes |
| 680 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 681 | 63mm PVC 4 KSC |
| 682 | 90mm PVC 4 KSC |
| 683 | 110mm PVC 4 KSC |
| 684 | 140mm PVC 4 KSC |
| 685 | PVC COUPLER FABRICATED |
| 686 | 63 mm PVC Coupler 4 KSC |
| 687 | 90 mm PVC Coupler 4 KSC |
| 688 | 110 mm PVC Coupler 4 KSC |
| 689 | 140 mm PVC Coupler 4 KSC |
| 690 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 691 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 692 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning of pump and repair works to various capacity Open well Submersible pumpset including cost of all material, conveyance, labour charges for removing and re-erection etc., complete and as directed by TWAD Board officers. |
| 693 | 10.00 HP |
| 694 | 3.00 HP |
| 695 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 696 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 697 | for 5 HP |
| 698 | for 4 HP |
| 699 | for 3 HP |
| 700 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 701 | for 10 HP |
| 702 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 703 | 3.00 core 4 Sq. mm |
| 704 | 3.00 core 6 Sq. mm |
| 705 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 706 | 3.00 core 4 Sq. mm |
| 707 | 3.00 core 6 Sq. mm |
| 708 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 709 | 3.00 core 4 Sq. mm |
| 710 | 3.00 core 6 Sq. mm |
| 711 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 712 | 3 Pole MCCB |
| 713 | 100 Amps 3 Pole MCCB Switch |
| 714 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 715 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 716 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 717 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 718 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 719 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.430 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 156.95 ML (0.430*365) Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 720 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 721 | PVC Pipes of various sizes |
| 722 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 723 | 63mm PVC 4 KSC |
| 724 | 90mm PVC 4 KSC |
| 725 | 110mm PVC 4 KSC |
| 726 | 140mm PVC 4 KSC |
| 727 | PVC COUPLER FABRICATED |
| 728 | 63 mm PVC Coupler 4 KSC |
| 729 | 90 mm PVC Coupler 4 KSC |
| 730 | 110 mm PVC Coupler 4 KSC |
| 731 | 140 mm PVC Coupler 4 KSC |
| 732 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 733 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 734 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning of pump and repair works to various capacity Open well Submersible pumpset including cost of all material, conveyance, labour charges for removing and re-erection etc., complete and as directed by TWAD Board officers. |
| 735 | 10.00 HP |
| 736 | 3.00 HP |
| 737 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 738 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 739 | for 5 HP |
| 740 | for 4 HP |
| 741 | for 3 HP |
| 742 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 743 | for 10 HP |
| 744 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 745 | 3.00 core 4 Sq. mm |
| 746 | 3.00 core 6 Sq. mm |
| 747 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 748 | 3.00 core 4 Sq. mm |
| 749 | 3.00 core 6 Sq. mm |
| 750 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 751 | 3.00 core 4 Sq. mm |
| 752 | 3.00 core 6 Sq. mm |
| 753 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 754 | 3 Pole MCCB |
| 755 | 100 Amps 3 Pole MCCB Switch |
| 756 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 757 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 758 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 759 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 760 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 761 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.304 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 27.36 ML (0.304*90) |
| 762 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 763 | 63mm PVC 4KSC |
| 764 | 75mm PVC 4KSC |
| 765 | 90mm PVC 4 KSC |
| 766 | 110mm PVC 4KSC |
| 767 | 140mm PVC 4KSC |
| 768 | PVC COUPLER FABRICATED |
| 769 | 63mm PVC 4KSC |
| 770 | 75mm PVC 4KSC |
| 771 | 90mm PVC 4 KSC |
| 772 | 110mm PVC 4KSC |
| 773 | 140mm PVC 4KSC |
| 774 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 775 | PVC Pipes of various sizes |
| 776 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 777 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 778 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 779 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 780 | 7.5 HP |
| 781 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 782 | For 3 HP |
| 783 | For 4 HP |
| 784 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 785 | for 7.5 HP |
| 786 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 787 | 3.00 core 4 Sq. mm |
| 788 | 3.00 core 6 Sq. mm |
| 789 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 790 | 3.00 core 4 Sq. mm |
| 791 | 3.00 core 6 Sq. mm |
| 792 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 793 | 3.00 core 4 Sq. mm |
| 794 | 3.00 core 6 Sq. mm |
| 795 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 796 | 3 Pole MCCB |
| 797 | 100 Amps 3 Pole MCCB Switch |
| 798 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 799 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 800 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 801 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 802 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 803 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.304 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 110.96 ML (0.304*365) |
| 804 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 805 | 63mm PVC 4KSC |
| 806 | 75mm PVC 4KSC |
| 807 | 90mm PVC 4 KSC |
| 808 | 110mm PVC 4KSC |
| 809 | 140mm PVC 4KSC |
| 810 | PVC COUPLER FABRICATED |
| 811 | 63mm PVC 4KSC |
| 812 | 75mm PVC 4KSC |
| 813 | 90mm PVC 4 KSC |
| 814 | 110mm PVC 4KSC |
| 815 | 140mm PVC 4KSC |
| 816 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 817 | PVC Pipes of various sizes |
| 818 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 819 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 820 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 821 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 822 | 7.5 HP |
| 823 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 824 | For 3 HP |
| 825 | For 4 HP |
| 826 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 827 | for 7.5 HP |
| 828 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 829 | 3.00 core 4 Sq. mm |
| 830 | 3.00 core 6 Sq. mm |
| 831 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 832 | 3.00 core 4 Sq. mm |
| 833 | 3.00 core 6 Sq. mm |
| 834 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 835 | 3.00 core 4 Sq. mm |
| 836 | 3.00 core 6 Sq. mm |
| 837 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 838 | 3 Pole MCCB |
| 839 | 100 Amps 3 Pole MCCB Switch |
| 840 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 841 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 842 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 843 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 844 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 845 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.304 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 110.96 ML (0.304*365) |
| 846 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 847 | 63mm PVC 4KSC |
| 848 | 75mm PVC 4KSC |
| 849 | 90mm PVC 4 KSC |
| 850 | 110mm PVC 4KSC |
| 851 | 140mm PVC 4KSC |
| 852 | PVC COUPLER FABRICATED |
| 853 | 63mm PVC 4KSC |
| 854 | 75mm PVC 4KSC |
| 855 | 90mm PVC 4 KSC |
| 856 | 110mm PVC 4KSC |
| 857 | 140mm PVC 4KSC |
| 858 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 859 | PVC Pipes of various sizes |
| 860 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 861 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 862 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 863 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 864 | 7.5 HP |
| 865 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 866 | For 3 HP |
| 867 | For 4 HP |
| 868 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 869 | for 7.5 HP |
| 870 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 871 | 3.00 core 4 Sq. mm |
| 872 | 3.00 core 6 Sq. mm |
| 873 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 874 | 3.00 core 4 Sq. mm |
| 875 | 3.00 core 6 Sq. mm |
| 876 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 877 | 3.00 core 4 Sq. mm |
| 878 | 3.00 core 6 Sq. mm |
| 879 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 880 | 3 Pole MCCB |
| 881 | 100 Amps 3 Pole MCCB Switch |
| 882 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 883 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 884 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 885 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 886 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 887 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.208 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 18.72 ML (0.208*90) |
| 888 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 889 | 63mm PVC 4KSC |
| 890 | 75mm PVC 4 KSC |
| 891 | 90mm PVC 4 KSC |
| 892 | PVC COUPLER FABRICATED |
| 893 | 63mm PVC 4KSC |
| 894 | 75mm PVC 4 KSC |
| 895 | 90mm PVC 4 KSC |
| 896 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 897 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 898 | PVC Pipes of various sizes |
| 899 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 900 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 901 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 902 | 7.5 H.P. |
| 903 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 904 | 7.5 HP |
| 905 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 906 | For 3 HP |
| 907 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 908 | for 7.5 HP |
| 909 | For 6 HP |
| 910 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 911 | 3.00 core 4 Sq. mm |
| 912 | 3.00 core 6 Sq. mm |
| 913 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 914 | 3.00 core 4 Sq. mm |
| 915 | 3.00 core 6 Sq. mm |
| 916 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 917 | 3.00 core 4 Sq. mm |
| 918 | 3.00 core 6 Sq. mm |
| 919 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 920 | 100 Amps 3 Pole MCCB Switch |
| 921 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 922 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 923 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 924 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 925 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 926 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.208 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 75.92 ML (0.208*365) |
| 927 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 928 | 63mm PVC 4KSC |
| 929 | 75mm PVC 4 KSC |
| 930 | 90mm PVC 4 KSC |
| 931 | PVC COUPLER FABRICATED |
| 932 | 63mm PVC 4KSC |
| 933 | 75mm PVC 4 KSC |
| 934 | 90mm PVC 4 KSC |
| 935 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 936 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 937 | PVC Pipes of various sizes |
| 938 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 939 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 940 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 941 | 7.5 H.P. |
| 942 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 943 | 7.5 HP |
| 944 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 945 | For 3 HP |
| 946 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 947 | for 7.5 HP |
| 948 | For 6 HP |
| 949 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 950 | 3.00 core 4 Sq. mm |
| 951 | 3.00 core 6 Sq. mm |
| 952 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 953 | 3.00 core 4 Sq. mm |
| 954 | 3.00 core 6 Sq. mm |
| 955 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 956 | 3.00 core 4 Sq. mm |
| 957 | 3.00 core 6 Sq. mm |
| 958 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 959 | 100 Amps 3 Pole MCCB Switch |
| 960 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 961 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 962 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 963 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 964 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 965 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.208 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 75.92 ML (0.208*365) |
| 966 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 967 | 63mm PVC 4KSC |
| 968 | 75mm PVC 4 KSC |
| 969 | 90mm PVC 4 KSC |
| 970 | PVC COUPLER FABRICATED |
| 971 | 63mm PVC 4KSC |
| 972 | 75mm PVC 4 KSC |
| 973 | 90mm PVC 4 KSC |
| 974 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 975 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 976 | PVC Pipes of various sizes |
| 977 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 978 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 979 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 980 | 7.5 H.P. |
| 981 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 982 | 7.5 HP |
| 983 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 984 | For 3 HP |
| 985 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 986 | for 7.5 HP |
| 987 | For 6 HP |
| 988 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 989 | 3.00 core 4 Sq. mm |
| 990 | 3.00 core 6 Sq. mm |
| 991 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 992 | 3.00 core 4 Sq. mm |
| 993 | 3.00 core 6 Sq. mm |
| 994 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 995 | 3.00 core 4 Sq. mm |
| 996 | 3.00 core 6 Sq. mm |
| 997 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 998 | 100 Amps 3 Pole MCCB Switch |
| 999 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1000 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1001 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1002 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1003 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1004 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.160 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 14.4 ML (0.160*90) |
| 1005 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1006 | 63mm PVC 4KSC |
| 1007 | 75mm PVC 4 KSC |
| 1008 | 90mm PVC 4 KSC |
| 1009 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 1010 | 63mm PVC 4KSC |
| 1011 | 75mm PVC 4 KSC |
| 1012 | 90mm PVC 4 KSC |
| 1013 | 110mm PVC 4KSC Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1014 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1015 | PVC Pipes of various sizes |
| 1016 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1017 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1018 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1019 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1020 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1021 | For 5 HP |
| 1022 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1023 | for 15 HP |
| 1024 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1025 | 3.00 core 4 Sq. mm |
| 1026 | 3.00 core 6 Sq. mm |
| 1027 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1028 | 3.00 core 4 Sq. mm |
| 1029 | 3.00 core 6 Sq. mm |
| 1030 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1031 | 3.00 core 4 Sq. mm |
| 1032 | 3.00 core 95 Sq. mm Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1033 | 3 Pole MCCB |
| 1034 | 100 Amps 3 Pole MCCB Switch |
| 1035 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1036 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1037 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1038 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1039 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1040 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.160 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 58.40 ML (0.160*365) |
| 1041 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1042 | 63mm PVC 4KSC |
| 1043 | 75mm PVC 4 KSC |
| 1044 | 90mm PVC 4 KSC |
| 1045 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 1046 | 63mm PVC 4KSC |
| 1047 | 75mm PVC 4 KSC |
| 1048 | 90mm PVC 4 KSC |
| 1049 | 110mm PVC 4KSC Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1050 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1051 | PVC Pipes of various sizes |
| 1052 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1053 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1054 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1055 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1056 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1057 | For 5 HP |
| 1058 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1059 | for 15 HP |
| 1060 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1061 | 3.00 core 4 Sq. mm |
| 1062 | 3.00 core 6 Sq. mm |
| 1063 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1064 | 3.00 core 4 Sq. mm |
| 1065 | 3.00 core 6 Sq. mm |
| 1066 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1067 | 3.00 core 4 Sq. mm |
| 1068 | 3.00 core 95 Sq. mm Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1069 | 3 Pole MCCB |
| 1070 | 100 Amps 3 Pole MCCB Switch |
| 1071 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1072 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1073 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1074 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1075 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1076 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.160 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 58.40 ML (0.160*365) |
| 1077 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1078 | 63mm PVC 4KSC |
| 1079 | 75mm PVC 4 KSC |
| 1080 | 90mm PVC 4 KSC |
| 1081 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 1082 | 63mm PVC 4KSC |
| 1083 | 75mm PVC 4 KSC |
| 1084 | 90mm PVC 4 KSC |
| 1085 | 110mm PVC 4KSC Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1086 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1087 | PVC Pipes of various sizes |
| 1088 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1089 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1090 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1091 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1092 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1093 | For 5 HP |
| 1094 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1095 | for 15 HP |
| 1096 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1097 | 3.00 core 4 Sq. mm |
| 1098 | 3.00 core 6 Sq. mm |
| 1099 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1100 | 3.00 core 4 Sq. mm |
| 1101 | 3.00 core 6 Sq. mm |
| 1102 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1103 | 3.00 core 4 Sq. mm |
| 1104 | 3.00 core 95 Sq. mm Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1105 | 3 Pole MCCB |
| 1106 | 100 Amps 3 Pole MCCB Switch |
| 1107 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1108 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1109 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1110 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1111 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1112 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.075 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 6.75 ML (0.075*90) |
| 1113 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1114 | 63mm PVC 4KSC |
| 1115 | 75mm PVC 4 KSC |
| 1116 | 90mm PVC 4 KSC |
| 1117 | PVC COUPLER FABRICATED |
| 1118 | 63mm PVC 4KSC |
| 1119 | 75mm PVC 4 KSC |
| 1120 | 90mm PVC 4 KSC |
| 1121 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1122 | PVC Pipes of various sizes |
| 1123 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1124 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1125 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1126 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1127 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1128 | For 3 HP |
| 1129 | For 4 HP |
| 1130 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1131 | 3.00 core 4 Sq. mm |
| 1132 | 3.00 core 6 Sq. mm |
| 1133 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1134 | 3.00 core 4 Sq. mm |
| 1135 | 3.00 core 6 Sq. mm |
| 1136 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1137 | 3.00 core 4 Sq. mm |
| 1138 | 3.00 core 6 Sq. mm |
| 1139 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1140 | 3 Pole MCCB |
| 1141 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1142 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1143 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1144 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1145 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.075 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 27.375 ML (0.075*365) |
| 1146 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1147 | 63mm PVC 4KSC |
| 1148 | 75mm PVC 4 KSC |
| 1149 | 90mm PVC 4 KSC |
| 1150 | PVC COUPLER FABRICATED |
| 1151 | 63mm PVC 4KSC |
| 1152 | 75mm PVC 4 KSC |
| 1153 | 90mm PVC 4 KSC |
| 1154 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1155 | PVC Pipes of various sizes |
| 1156 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1157 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1158 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1159 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1160 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1161 | For 3 HP |
| 1162 | For 4 HP |
| 1163 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1164 | 3.00 core 4 Sq. mm |
| 1165 | 3.00 core 6 Sq. mm |
| 1166 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1167 | 3.00 core 4 Sq. mm |
| 1168 | 3.00 core 6 Sq. mm |
| 1169 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1170 | 3.00 core 4 Sq. mm |
| 1171 | 3.00 core 6 Sq. mm |
| 1172 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1173 | 3 Pole MCCB |
| 1174 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1175 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1176 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1177 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1178 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.075 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 27.375 ML (0.075*365) |
| 1179 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1180 | 63mm PVC 4KSC |
| 1181 | 75mm PVC 4 KSC |
| 1182 | 90mm PVC 4 KSC |
| 1183 | PVC COUPLER FABRICATED |
| 1184 | 63mm PVC 4KSC |
| 1185 | 75mm PVC 4 KSC |
| 1186 | 90mm PVC 4 KSC |
| 1187 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1188 | PVC Pipes of various sizes |
| 1189 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1190 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1191 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1192 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1193 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1194 | For 3 HP |
| 1195 | For 4 HP |
| 1196 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1197 | 3.00 core 4 Sq. mm |
| 1198 | 3.00 core 6 Sq. mm |
| 1199 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1200 | 3.00 core 4 Sq. mm |
| 1201 | 3.00 core 6 Sq. mm |
| 1202 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1203 | 3.00 core 4 Sq. mm |
| 1204 | 3.00 core 6 Sq. mm |
| 1205 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1206 | 3 Pole MCCB |
| 1207 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1208 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1209 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1210 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1211 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.368 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 33.12ML (0.368*90) |
| 1212 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1213 | 50mm PVC 6KSC |
| 1214 | 63mm PVC 4KSC |
| 1215 | 75mm PVC 4 KSC |
| 1216 | 90mm PVC 4 KSC |
| 1217 | 110mm PVC 4KSC |
| 1218 | 140mm PVC 4KSC |
| 1219 | PVC COUPLER FABRICATED |
| 1220 | 50mm PVC 6KSC |
| 1221 | 63mm PVC 4KSC |
| 1222 | 75mm PVC 4 KSC |
| 1223 | 90mm PVC 4 KSC |
| 1224 | 110mm PVC 4KSC |
| 1225 | 140mm PVC 4KSC |
| 1226 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1227 | 50 mm GI Elbow |
| 1228 | 80 mm GI Elbow |
| 1229 | 50 mm GI Coupling |
| 1230 | 80 mm GI Coubling |
| 1231 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1232 | 50 mm GI Pipe |
| 1233 | 80 mm GI Pipe |
| 1234 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1235 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1236 | PVC Pipes of various sizes |
| 1237 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1238 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1239 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1240 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1241 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1242 | For 2 HP |
| 1243 | For 4 HP |
| 1244 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1245 | 3.00 core 4 Sq. mm |
| 1246 | 3.00 core 6 Sq. mm |
| 1247 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1248 | 3.00 core 4 Sq. mm |
| 1249 | 3.00 core 6 Sq. mm |
| 1250 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1251 | 3.00 core 4 Sq. mm |
| 1252 | 3.00 core 6 Sq. mm |
| 1253 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1254 | 3 Pole MCCB |
| 1255 | 100 Amps 3 Pole MCCB Switch |
| 1256 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1257 | 0.30 LL capacity Sump |
| 1258 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1259 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1260 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1261 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1262 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.368 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 134.32 ML (0.368*365) |
| 1263 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1264 | 50mm PVC 6KSC |
| 1265 | 63mm PVC 4KSC |
| 1266 | 75mm PVC 4 KSC |
| 1267 | 90mm PVC 4 KSC |
| 1268 | 110mm PVC 4KSC |
| 1269 | 140mm PVC 4KSC |
| 1270 | PVC COUPLER FABRICATED |
| 1271 | 50mm PVC 6KSC |
| 1272 | 63mm PVC 4KSC |
| 1273 | 75mm PVC 4 KSC |
| 1274 | 90mm PVC 4 KSC |
| 1275 | 110mm PVC 4KSC |
| 1276 | 140mm PVC 4KSC |
| 1277 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1278 | 50 mm GI Elbow |
| 1279 | 80 mm GI Elbow |
| 1280 | 50 mm GI Coupling |
| 1281 | 80 mm GI Coubling |
| 1282 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1283 | 50 mm GI Pipe |
| 1284 | 80 mm GI Pipe |
| 1285 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1286 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1287 | PVC Pipes of various sizes |
| 1288 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1289 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1290 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1291 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1292 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1293 | For 2 HP |
| 1294 | For 4 HP |
| 1295 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1296 | 3.00 core 4 Sq. mm |
| 1297 | 3.00 core 6 Sq. mm |
| 1298 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1299 | 3.00 core 4 Sq. mm |
| 1300 | 3.00 core 6 Sq. mm |
| 1301 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1302 | 3.00 core 4 Sq. mm |
| 1303 | 3.00 core 6 Sq. mm |
| 1304 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1305 | 3 Pole MCCB |
| 1306 | 100 Amps 3 Pole MCCB Switch |
| 1307 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1308 | 0.30 LL capacity Sump |
| 1309 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1310 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1311 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1312 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1313 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.368 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 134.32 ML (0.368*365) |
| 1314 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1315 | 50mm PVC 6KSC |
| 1316 | 63mm PVC 4KSC |
| 1317 | 75mm PVC 4 KSC |
| 1318 | 90mm PVC 4 KSC |
| 1319 | 110mm PVC 4KSC |
| 1320 | 140mm PVC 4KSC |
| 1321 | PVC COUPLER FABRICATED |
| 1322 | 50mm PVC 6KSC |
| 1323 | 63mm PVC 4KSC |
| 1324 | 75mm PVC 4 KSC |
| 1325 | 90mm PVC 4 KSC |
| 1326 | 110mm PVC 4KSC |
| 1327 | 140mm PVC 4KSC |
| 1328 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1329 | 50 mm GI Elbow |
| 1330 | 80 mm GI Elbow |
| 1331 | 50 mm GI Coupling |
| 1332 | 80 mm GI Coubling |
| 1333 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 1334 | 50 mm GI Pipe |
| 1335 | 80 mm GI Pipe |
| 1336 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1337 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1338 | PVC Pipes of various sizes |
| 1339 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1340 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1341 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1342 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1343 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1344 | For 2 HP |
| 1345 | For 4 HP |
| 1346 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1347 | 3.00 core 4 Sq. mm |
| 1348 | 3.00 core 6 Sq. mm |
| 1349 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1350 | 3.00 core 4 Sq. mm |
| 1351 | 3.00 core 6 Sq. mm |
| 1352 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1353 | 3.00 core 4 Sq. mm |
| 1354 | 3.00 core 6 Sq. mm |
| 1355 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 1356 | 3 Pole MCCB |
| 1357 | 100 Amps 3 Pole MCCB Switch |
| 1358 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1359 | 0.30 LL capacity Sump |
| 1360 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1361 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1362 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1363 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1364 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 14.76 ML (0.164*90) |
| 1365 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1366 | 63mm PVC 4KSC |
| 1367 | 75mm PVC 4 KSC |
| 1368 | 90mm PVC 4 KSC |
| 1369 | 110mm PVC 4KSC |
| 1370 | 140mm PVC 4KSC |
| 1371 | PVC COUPLER FABRICATED |
| 1372 | 63mm PVC 4KSC |
| 1373 | 75mm PVC 4 KSC |
| 1374 | 90mm PVC 4 KSC |
| 1375 | 110mm PVC 4KSC |
| 1376 | 140mm PVC 4KSC |
| 1377 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1378 | PVC Pipes of various sizes |
| 1379 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1380 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1381 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1382 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1383 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1384 | for 15 HP |
| 1385 | For 5 HP |
| 1386 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1387 | 3.00 core 4 Sq. mm |
| 1388 | 3.00 core 6 Sq. mm |
| 1389 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1390 | 3.00 core 4 Sq. mm |
| 1391 | 3.00 core 6 Sq. mm |
| 1392 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1393 | 3.00 core 4 Sq. mm |
| 1394 | 3.00 core 6 Sq. mm |
| 1395 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1396 | 100 Amps 3 Pole MCCB Switch |
| 1397 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1398 | 0.10 LL capacity Sump |
| 1399 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1400 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1401 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1402 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1403 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 59.86 ML (0.164*365) |
| 1404 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1405 | 63mm PVC 4KSC |
| 1406 | 75mm PVC 4 KSC |
| 1407 | 90mm PVC 4 KSC |
| 1408 | 110mm PVC 4KSC |
| 1409 | 140mm PVC 4KSC |
| 1410 | PVC COUPLER FABRICATED |
| 1411 | 63mm PVC 4KSC |
| 1412 | 75mm PVC 4 KSC |
| 1413 | 90mm PVC 4 KSC |
| 1414 | 110mm PVC 4KSC |
| 1415 | 140mm PVC 4KSC |
| 1416 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1417 | PVC Pipes of various sizes |
| 1418 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1419 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1420 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1421 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1422 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1423 | for 15 HP |
| 1424 | For 5 HP |
| 1425 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1426 | 3.00 core 4 Sq. mm |
| 1427 | 3.00 core 6 Sq. mm |
| 1428 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1429 | 3.00 core 4 Sq. mm |
| 1430 | 3.00 core 6 Sq. mm |
| 1431 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1432 | 3.00 core 4 Sq. mm |
| 1433 | 3.00 core 6 Sq. mm |
| 1434 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1435 | 100 Amps 3 Pole MCCB Switch |
| 1436 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1437 | 0.10 LL capacity Sump |
| 1438 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1439 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1440 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1441 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1442 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 59.86 ML (0.164*365) |
| 1443 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1444 | 63mm PVC 4KSC |
| 1445 | 75mm PVC 4 KSC |
| 1446 | 90mm PVC 4 KSC |
| 1447 | 110mm PVC 4KSC |
| 1448 | 140mm PVC 4KSC |
| 1449 | PVC COUPLER FABRICATED |
| 1450 | 63mm PVC 4KSC |
| 1451 | 75mm PVC 4 KSC |
| 1452 | 90mm PVC 4 KSC |
| 1453 | 110mm PVC 4KSC |
| 1454 | 140mm PVC 4KSC |
| 1455 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1456 | PVC Pipes of various sizes |
| 1457 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1458 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1459 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1460 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1461 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1462 | for 15 HP |
| 1463 | For 5 HP |
| 1464 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1465 | 3.00 core 4 Sq. mm |
| 1466 | 3.00 core 6 Sq. mm |
| 1467 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1468 | 3.00 core 4 Sq. mm |
| 1469 | 3.00 core 6 Sq. mm |
| 1470 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1471 | 3.00 core 4 Sq. mm |
| 1472 | 3.00 core 6 Sq. mm |
| 1473 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1474 | 100 Amps 3 Pole MCCB Switch |
| 1475 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1476 | 0.10 LL capacity Sump |
| 1477 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 1478 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1479 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1480 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1481 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.190 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 17.1 ML (0.190*90) |
| 1482 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1483 | 63mm PVC 4KSC |
| 1484 | 90mm PVC 4 KSC |
| 1485 | 110mm PVC 4KSC |
| 1486 | PVC COUPLER FABRICATED |
| 1487 | 63mm PVC 4KSC |
| 1488 | 90mm PVC 4 KSC |
| 1489 | 110mm PVC 4 KSC |
| 1490 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1491 | PVC Pipes of various sizes |
| 1492 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1493 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1494 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1495 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1496 | 7.5HP |
| 1497 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1498 | For 3 HP |
| 1499 | For 5 HP |
| 1500 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1501 | For 7.5 HP |
| 1502 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1503 | 3.00 core 4 Sq. mm |
| 1504 | 3.00 core 6 Sq. mm |
| 1505 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1506 | 3.00 core 4 Sq. mm |
| 1507 | 3.00 core 6 Sq. mm |
| 1508 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1509 | 3.00 core 4 Sq. mm |
| 1510 | 3.00 core 6 Sq. mm |
| 1511 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1512 | 100 Amps 3 Pole MCCB Switch |
| 1513 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1514 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1515 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1516 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1517 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1518 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.190 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 69.350 ML (0.190*365) |
| 1519 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1520 | 63mm PVC 4KSC |
| 1521 | 90mm PVC 4 KSC |
| 1522 | 110mm PVC 4KSC |
| 1523 | PVC COUPLER FABRICATED |
| 1524 | 63mm PVC 4KSC |
| 1525 | 90mm PVC 4 KSC |
| 1526 | 110mm PVC 4 KSC |
| 1527 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1528 | PVC Pipes of various sizes |
| 1529 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1530 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1531 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1532 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1533 | 7.5HP |
| 1534 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1535 | For 3 HP |
| 1536 | For 5 HP |
| 1537 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1538 | For 7.5 HP |
| 1539 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1540 | 3.00 core 4 Sq. mm |
| 1541 | 3.00 core 6 Sq. mm |
| 1542 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1543 | 3.00 core 4 Sq. mm |
| 1544 | 3.00 core 6 Sq. mm |
| 1545 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1546 | 3.00 core 4 Sq. mm |
| 1547 | 3.00 core 6 Sq. mm |
| 1548 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1549 | 100 Amps 3 Pole MCCB Switch |
| 1550 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1551 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1552 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1553 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1554 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1555 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.190 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 69.350 ML (0.190*365) |
| 1556 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1557 | 63mm PVC 4KSC |
| 1558 | 90mm PVC 4 KSC |
| 1559 | 110mm PVC 4KSC |
| 1560 | PVC COUPLER FABRICATED |
| 1561 | 63mm PVC 4KSC |
| 1562 | 90mm PVC 4 KSC |
| 1563 | 110mm PVC 4 KSC |
| 1564 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1565 | PVC Pipes of various sizes |
| 1566 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1567 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1568 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1569 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1570 | 7.5HP |
| 1571 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1572 | For 3 HP |
| 1573 | For 5 HP |
| 1574 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1575 | For 7.5 HP |
| 1576 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1577 | 3.00 core 4 Sq. mm |
| 1578 | 3.00 core 6 Sq. mm |
| 1579 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1580 | 3.00 core 4 Sq. mm |
| 1581 | 3.00 core 6 Sq. mm |
| 1582 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1583 | 3.00 core 4 Sq. mm |
| 1584 | 3.00 core 6 Sq. mm |
| 1585 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1586 | 100 Amps 3 Pole MCCB Switch |
| 1587 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1588 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1589 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1590 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1591 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1592 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.280 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 25.2 ML (0.280*90) |
| 1593 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1594 | 63mm PVC 4KSC |
| 1595 | 90mm PVC 4 KSC |
| 1596 | 110mm PVC 4KSC |
| 1597 | 140mm PVC 4KSC |
| 1598 | PVC COUPLER FABRICATED |
| 1599 | 63mm PVC 4KSC |
| 1600 | 90mm PVC 4 KSC |
| 1601 | 110mm PVC 4KSC |
| 1602 | 140mm PVC 4KSC |
| 1603 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1604 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1605 | PVC Pipes of various sizes |
| 1606 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1607 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1608 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1609 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1610 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1611 | For 2 HP |
| 1612 | For 4 HP |
| 1613 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1614 | For 6 HP |
| 1615 | For 15 HP |
| 1616 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1617 | 3.00 core 4 Sq. mm |
| 1618 | 3.00 core 6 Sq. mm |
| 1619 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1620 | 3.00 core 4 Sq. mm |
| 1621 | 3.00 core 6 Sq. mm |
| 1622 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1623 | 3.00 core 4 Sq. mm |
| 1624 | 3.00 core 6 Sq. mm |
| 1625 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1626 | 100 Amps 3 Pole MCCB Switch |
| 1627 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1628 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1629 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1630 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1631 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1632 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.280 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 102.20 ML (0.280*365) |
| 1633 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1634 | 63mm PVC 4KSC |
| 1635 | 90mm PVC 4 KSC |
| 1636 | 110mm PVC 4KSC |
| 1637 | 140mm PVC 4KSC |
| 1638 | PVC COUPLER FABRICATED |
| 1639 | 63mm PVC 4KSC |
| 1640 | 90mm PVC 4 KSC |
| 1641 | 110mm PVC 4KSC |
| 1642 | 140mm PVC 4KSC |
| 1643 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1644 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1645 | PVC Pipes of various sizes |
| 1646 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1647 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1648 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1649 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1650 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1651 | For 2 HP |
| 1652 | For 4 HP |
| 1653 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1654 | For 6 HP |
| 1655 | For 15 HP |
| 1656 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1657 | 3.00 core 4 Sq. mm |
| 1658 | 3.00 core 6 Sq. mm |
| 1659 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1660 | 3.00 core 4 Sq. mm |
| 1661 | 3.00 core 6 Sq. mm |
| 1662 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1663 | 3.00 core 4 Sq. mm |
| 1664 | 3.00 core 6 Sq. mm |
| 1665 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1666 | 100 Amps 3 Pole MCCB Switch |
| 1667 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1668 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1669 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1670 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1671 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1672 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.280 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 102.20 ML (0.280*365) |
| 1673 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1674 | 63mm PVC 4KSC |
| 1675 | 90mm PVC 4 KSC |
| 1676 | 110mm PVC 4KSC |
| 1677 | 140mm PVC 4KSC |
| 1678 | PVC COUPLER FABRICATED |
| 1679 | 63mm PVC 4KSC |
| 1680 | 90mm PVC 4 KSC |
| 1681 | 110mm PVC 4KSC |
| 1682 | 140mm PVC 4KSC |
| 1683 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1684 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1685 | PVC Pipes of various sizes |
| 1686 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1687 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1688 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1689 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1690 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1691 | For 2 HP |
| 1692 | For 4 HP |
| 1693 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1694 | For 6 HP |
| 1695 | For 15 HP |
| 1696 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1697 | 3.00 core 4 Sq. mm |
| 1698 | 3.00 core 6 Sq. mm |
| 1699 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1700 | 3.00 core 4 Sq. mm |
| 1701 | 3.00 core 6 Sq. mm |
| 1702 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1703 | 3.00 core 4 Sq. mm |
| 1704 | 3.00 core 6 Sq. mm |
| 1705 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1706 | 100 Amps 3 Pole MCCB Switch |
| 1707 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1708 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1709 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1710 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1711 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1712 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.168 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 15.12 ML (0.168*90) |
| 1713 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1714 | 63mm PVC 4KSC |
| 1715 | 90mm PVC 4 KSC |
| 1716 | 110mm PVC 4KSC |
| 1717 | PVC COUPLER FABRICATED |
| 1718 | 63mm PVC 4KSC |
| 1719 | 90mm PVC 4 KSC |
| 1720 | 110mm PVC 4KSC |
| 1721 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1722 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1723 | PVC Pipes of various sizes |
| 1724 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1725 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1726 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1727 | 7.5HP |
| 1728 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1729 | For 4 HP |
| 1730 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1731 | For7.5 HP |
| 1732 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1733 | 3.00 core 4 Sq. mm |
| 1734 | 3.00 core 6 Sq. mm |
| 1735 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1736 | 3.00 core 4 Sq. mm |
| 1737 | 3.00 core 6 Sq. mm |
| 1738 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1739 | 3.00 core 4 Sq. mm |
| 1740 | 3.00 core 6 Sq. mm |
| 1741 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1742 | 100 Amps 3 Pole MCCB Switch |
| 1743 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1744 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1745 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1746 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1747 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1748 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.168 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 61.32 ML (0.168*365) |
| 1749 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1750 | 63mm PVC 4KSC |
| 1751 | 90mm PVC 4 KSC |
| 1752 | 110mm PVC 4KSC |
| 1753 | PVC COUPLER FABRICATED |
| 1754 | 63mm PVC 4KSC |
| 1755 | 90mm PVC 4 KSC |
| 1756 | 110mm PVC 4KSC |
| 1757 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1758 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1759 | PVC Pipes of various sizes |
| 1760 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1761 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1762 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1763 | 7.5HP |
| 1764 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1765 | For 4 HP |
| 1766 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1767 | For7.5 HP |
| 1768 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1769 | 3.00 core 4 Sq. mm |
| 1770 | 3.00 core 6 Sq. mm |
| 1771 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1772 | 3.00 core 4 Sq. mm |
| 1773 | 3.00 core 6 Sq. mm |
| 1774 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1775 | 3.00 core 4 Sq. mm |
| 1776 | 3.00 core 6 Sq. mm |
| 1777 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1778 | 100 Amps 3 Pole MCCB Switch |
| 1779 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1780 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1781 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1782 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1783 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1784 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.168 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 61.32 ML (0.168*365) |
| 1785 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1786 | 63mm PVC 4KSC |
| 1787 | 90mm PVC 4 KSC |
| 1788 | 110mm PVC 4KSC |
| 1789 | PVC COUPLER FABRICATED |
| 1790 | 63mm PVC 4KSC |
| 1791 | 90mm PVC 4 KSC |
| 1792 | 110mm PVC 4KSC |
| 1793 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 1794 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1795 | PVC Pipes of various sizes |
| 1796 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1797 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1798 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1799 | 7.5HP |
| 1800 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1801 | For 4 HP |
| 1802 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1803 | For7.5 HP |
| 1804 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1805 | 3.00 core 4 Sq. mm |
| 1806 | 3.00 core 6 Sq. mm |
| 1807 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1808 | 3.00 core 4 Sq. mm |
| 1809 | 3.00 core 6 Sq. mm |
| 1810 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1811 | 3.00 core 4 Sq. mm |
| 1812 | 3.00 core 6 Sq. mm |
| 1813 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1814 | 100 Amps 3 Pole MCCB Switch |
| 1815 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1816 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1817 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1818 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1819 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1820 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.059 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 5.31 ML (0.059*90) |
| 1821 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1822 | 63mm PVC 4KSC |
| 1823 | 90mm PVC 4 KSC |
| 1824 | 140mm PVC 4KSC |
| 1825 | PVC COUPLER FABRICATED |
| 1826 | 63mm PVC 4KSC |
| 1827 | 90mm PVC 4 KSC |
| 1828 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1829 | PVC Pipes of various sizes |
| 1830 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1831 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1832 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1833 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1834 | For 5 HP |
| 1835 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1836 | 3.00 core 4 Sq. mm |
| 1837 | 3.00 core 6 Sq. mm |
| 1838 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1839 | 3.00 core 4 Sq. mm |
| 1840 | 3.00 core 6 Sq. mm |
| 1841 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1842 | 3.00 core 4 Sq. mm |
| 1843 | 3.00 core 6 Sq. mm |
| 1844 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1845 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1846 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1847 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1848 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1849 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.059 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 21.535 ML (0.059*365) |
| 1850 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1851 | 63mm PVC 4KSC |
| 1852 | 90mm PVC 4 KSC |
| 1853 | 140mm PVC 4KSC |
| 1854 | PVC COUPLER FABRICATED |
| 1855 | 63mm PVC 4KSC |
| 1856 | 90mm PVC 4 KSC |
| 1857 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1858 | PVC Pipes of various sizes |
| 1859 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1860 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1861 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1862 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1863 | For 5 HP |
| 1864 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1865 | 3.00 core 4 Sq. mm |
| 1866 | 3.00 core 6 Sq. mm |
| 1867 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1868 | 3.00 core 4 Sq. mm |
| 1869 | 3.00 core 6 Sq. mm |
| 1870 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1871 | 3.00 core 4 Sq. mm |
| 1872 | 3.00 core 6 Sq. mm |
| 1873 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1874 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1875 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1876 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1877 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1878 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.059 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 21.535 ML (0.059*365) |
| 1879 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1880 | 63mm PVC 4KSC |
| 1881 | 90mm PVC 4 KSC |
| 1882 | 140mm PVC 4KSC |
| 1883 | PVC COUPLER FABRICATED |
| 1884 | 63mm PVC 4KSC |
| 1885 | 90mm PVC 4 KSC |
| 1886 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1887 | PVC Pipes of various sizes |
| 1888 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1889 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1890 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1891 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1892 | For 5 HP |
| 1893 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1894 | 3.00 core 4 Sq. mm |
| 1895 | 3.00 core 6 Sq. mm |
| 1896 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1897 | 3.00 core 4 Sq. mm |
| 1898 | 3.00 core 6 Sq. mm |
| 1899 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1900 | 3.00 core 4 Sq. mm |
| 1901 | 3.00 core 6 Sq. mm |
| 1902 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1903 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 1904 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1905 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1906 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 1907 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1908 | 63mm PVC 4KSC |
| 1909 | 75mm PVC 4 KSC |
| 1910 | 90mm PVC 4 KSC |
| 1911 | 110mm PVC 4KSC |
| 1912 | 140mm PVC 4KSC |
| 1913 | PVC COUPLER FABRICATED |
| 1914 | 63mm PVC 4KSC |
| 1915 | 75mm PVC 4 KSC |
| 1916 | 90mm PVC 4 KSC |
| 1917 | 110mm PVC 4KSC |
| 1918 | 140mm PVC 4KSC |
| 1919 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1920 | PVC Pipes of various sizes |
| 1921 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1922 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1923 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1924 | 7.5HP |
| 1925 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1926 | 7.5HP |
| 1927 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1928 | For 5 HP |
| 1929 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1930 | For7.5 HP |
| 1931 | For 15 HP |
| 1932 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1933 | 3.00 core 4 Sq. mm |
| 1934 | 3.00 core 6 Sq. mm |
| 1935 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1936 | 3.00 core 4 Sq. mm |
| 1937 | 3.00 core 6 Sq. mm |
| 1938 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1939 | 3.00 core 4 Sq. mm |
| 1940 | 3.00 core 6 Sq. mm |
| 1941 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1942 | 100 Amps 3 Pole MCCB Switch |
| 1943 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1944 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1945 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1946 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1947 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 1948 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1949 | 63mm PVC 4KSC |
| 1950 | 75mm PVC 4 KSC |
| 1951 | 90mm PVC 4 KSC |
| 1952 | 110mm PVC 4KSC |
| 1953 | 140mm PVC 4KSC |
| 1954 | PVC COUPLER FABRICATED |
| 1955 | 63mm PVC 4KSC |
| 1956 | 75mm PVC 4 KSC |
| 1957 | 90mm PVC 4 KSC |
| 1958 | 110mm PVC 4KSC |
| 1959 | 140mm PVC 4KSC |
| 1960 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 1961 | PVC Pipes of various sizes |
| 1962 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 1963 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 1964 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1965 | 7.5HP |
| 1966 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 1967 | 7.5HP |
| 1968 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 1969 | For 5 HP |
| 1970 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 1971 | For7.5 HP |
| 1972 | For 15 HP |
| 1973 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 1974 | 3.00 core 4 Sq. mm |
| 1975 | 3.00 core 6 Sq. mm |
| 1976 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 1977 | 3.00 core 4 Sq. mm |
| 1978 | 3.00 core 6 Sq. mm |
| 1979 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 1980 | 3.00 core 4 Sq. mm |
| 1981 | 3.00 core 6 Sq. mm |
| 1982 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 1983 | 100 Amps 3 Pole MCCB Switch |
| 1984 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 1985 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 1986 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 1987 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 1988 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 1989 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 1990 | 63mm PVC 4KSC |
| 1991 | 75mm PVC 4 KSC |
| 1992 | 90mm PVC 4 KSC |
| 1993 | 110mm PVC 4KSC |
| 1994 | 140mm PVC 4KSC |
| 1995 | PVC COUPLER FABRICATED |
| 1996 | 63mm PVC 4KSC |
| 1997 | 75mm PVC 4 KSC |
| 1998 | 90mm PVC 4 KSC |
| 1999 | 110mm PVC 4KSC |
| 2000 | 140mm PVC 4KSC |
| 2001 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2002 | PVC Pipes of various sizes |
| 2003 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2004 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2005 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2006 | 7.5HP |
| 2007 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2008 | 7.5HP |
| 2009 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2010 | For 5 HP |
| 2011 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2012 | For7.5 HP |
| 2013 | For 15 HP |
| 2014 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2015 | 3.00 core 4 Sq. mm |
| 2016 | 3.00 core 6 Sq. mm |
| 2017 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2018 | 3.00 core 4 Sq. mm |
| 2019 | 3.00 core 6 Sq. mm |
| 2020 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2021 | 3.00 core 4 Sq. mm |
| 2022 | 3.00 core 6 Sq. mm |
| 2023 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2024 | 100 Amps 3 Pole MCCB Switch |
| 2025 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2026 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 2027 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2028 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2029 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2030 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.108 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 9.72 ML (0.108*90) |
| 2031 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2032 | 63mm PVC 4KSC |
| 2033 | 90mm PVC 4 KSC |
| 2034 | 110mm PVC 4 KSC |
| 2035 | 140mm PVC 4KSC |
| 2036 | PVC COUPLER FABRICATED |
| 2037 | 63mm PVC 4KSC |
| 2038 | 90mm PVC 4 KSC |
| 2039 | 110mm PVC 4KSC |
| 2040 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2041 | PVC Pipes of various sizes |
| 2042 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2043 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2044 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2045 | 7.5HP |
| 2046 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2047 | 7.5HP |
| 2048 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2049 | For 5 HP |
| 2050 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2051 | For7.5 HP |
| 2052 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2053 | 3.00 core 4 Sq. mm |
| 2054 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2055 | 3.00 core 4 Sq. mm |
| 2056 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2057 | 3.00 core 4 Sq. mm |
| 2058 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2059 | 100 Amps 3 Pole MCCB Switch |
| 2060 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2061 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 2062 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2063 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2064 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2065 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.108 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 39.42 ML (0.108*365) |
| 2066 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2067 | 63mm PVC 4KSC |
| 2068 | 90mm PVC 4 KSC |
| 2069 | 110mm PVC 4 KSC |
| 2070 | 140mm PVC 4KSC |
| 2071 | PVC COUPLER FABRICATED |
| 2072 | 63mm PVC 4KSC |
| 2073 | 90mm PVC 4 KSC |
| 2074 | 110mm PVC 4KSC |
| 2075 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2076 | PVC Pipes of various sizes |
| 2077 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2078 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2079 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2080 | 7.5HP |
| 2081 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2082 | 7.5HP |
| 2083 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2084 | For 5 HP |
| 2085 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2086 | For7.5 HP |
| 2087 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2088 | 3.00 core 4 Sq. mm |
| 2089 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2090 | 3.00 core 4 Sq. mm |
| 2091 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2092 | 3.00 core 4 Sq. mm |
| 2093 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2094 | 100 Amps 3 Pole MCCB Switch |
| 2095 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2096 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 2097 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2098 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2099 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2100 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.108 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 39.42 ML (0.108*365) |
| 2101 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2102 | 63mm PVC 4KSC |
| 2103 | 90mm PVC 4 KSC |
| 2104 | 110mm PVC 4 KSC |
| 2105 | 140mm PVC 4KSC |
| 2106 | PVC COUPLER FABRICATED |
| 2107 | 63mm PVC 4KSC |
| 2108 | 90mm PVC 4 KSC |
| 2109 | 110mm PVC 4KSC |
| 2110 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2111 | PVC Pipes of various sizes |
| 2112 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2113 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2114 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2115 | 7.5HP |
| 2116 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2117 | 7.5HP |
| 2118 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2119 | For 5 HP |
| 2120 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2121 | For7.5 HP |
| 2122 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2123 | 3.00 core 4 Sq. mm |
| 2124 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2125 | 3.00 core 4 Sq. mm |
| 2126 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2127 | 3.00 core 4 Sq. mm |
| 2128 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2129 | 100 Amps 3 Pole MCCB Switch |
| 2130 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2131 | 0.30 LL capacity Sump COST OF CHEMICALS |
| 2132 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2133 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2134 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2135 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.084 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 7.56 ML (0.084*90) |
| 2136 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2137 | 50mm PVC 6KSC |
| 2138 | 63mm PVC 4KSC |
| 2139 | 75mm PVC 4 KSC |
| 2140 | 90mm PVC 4 KSC |
| 2141 | PVC COUPLER FABRICATED |
| 2142 | 50mm PVC 6KSC |
| 2143 | 63mm PVC 4KSC |
| 2144 | 75mm PVC 4 KSC |
| 2145 | 90mm PVC 4 KSC |
| 2146 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2147 | PVC Pipes of various sizes |
| 2148 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2149 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2150 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2151 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2152 | For 10 HP |
| 2153 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2154 | 3.00 core 4 Sq. mm |
| 2155 | 3.00 core 6 Sq. mm |
| 2156 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2157 | 3.00 core 4 Sq. mm |
| 2158 | 3.00 core 6 Sq. mm |
| 2159 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2160 | 3.00 core 4 Sq. mm |
| 2161 | 3.00 core 6 Sq. mm |
| 2162 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2163 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2164 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2165 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2166 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2167 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.084 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 30.66 ML (0.084*365) |
| 2168 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2169 | 50mm PVC 6KSC |
| 2170 | 63mm PVC 4KSC |
| 2171 | 75mm PVC 4 KSC |
| 2172 | 90mm PVC 4 KSC |
| 2173 | PVC COUPLER FABRICATED |
| 2174 | 50mm PVC 6KSC |
| 2175 | 63mm PVC 4KSC |
| 2176 | 75mm PVC 4 KSC |
| 2177 | 90mm PVC 4 KSC |
| 2178 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2179 | PVC Pipes of various sizes |
| 2180 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2181 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2182 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2183 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2184 | For 10 HP |
| 2185 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2186 | 3.00 core 4 Sq. mm |
| 2187 | 3.00 core 6 Sq. mm |
| 2188 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2189 | 3.00 core 4 Sq. mm |
| 2190 | 3.00 core 6 Sq. mm |
| 2191 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2192 | 3.00 core 4 Sq. mm |
| 2193 | 3.00 core 6 Sq. mm |
| 2194 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2195 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2196 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2197 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2198 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2199 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.084 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 30.66 ML (0.084*365) |
| 2200 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2201 | 50mm PVC 6KSC |
| 2202 | 63mm PVC 4KSC |
| 2203 | 75mm PVC 4 KSC |
| 2204 | 90mm PVC 4 KSC |
| 2205 | PVC COUPLER FABRICATED |
| 2206 | 50mm PVC 6KSC |
| 2207 | 63mm PVC 4KSC |
| 2208 | 75mm PVC 4 KSC |
| 2209 | 90mm PVC 4 KSC |
| 2210 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2211 | PVC Pipes of various sizes |
| 2212 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2213 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2214 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2215 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2216 | For 10 HP |
| 2217 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2218 | 3.00 core 4 Sq. mm |
| 2219 | 3.00 core 6 Sq. mm |
| 2220 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2221 | 3.00 core 4 Sq. mm |
| 2222 | 3.00 core 6 Sq. mm |
| 2223 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2224 | 3.00 core 4 Sq. mm |
| 2225 | 3.00 core 6 Sq. mm |
| 2226 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2227 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2228 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2229 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2230 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2231 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 14.76 ML (0.164*90) |
| 2232 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2233 | 50mm PVC 6KSC |
| 2234 | 63mm PVC 4KSC |
| 2235 | 75mm PVC 4 KSC |
| 2236 | 90mm PVC 4 KSC |
| 2237 | 110mm PVC 4 KSC |
| 2238 | PVC COUPLER FABRICATED |
| 2239 | 63mm PVC 4KSC |
| 2240 | 75mm PVC 4 KSC |
| 2241 | 90mm PVC 4 KSC |
| 2242 | 110mm PVC 4 KSC |
| 2243 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2244 | 50 mm GI Pipe |
| 2245 | 80 mm GI Pipe |
| 2246 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2247 | 50 mm GI Elbow |
| 2248 | 80 mm GI Elbow |
| 2249 | 50 mm GI Coupling |
| 2250 | 80 mm GI Bend |
| 2251 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 2252 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2253 | PVC Pipes of various sizes |
| 2254 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2255 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2256 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2257 | For 3HP |
| 2258 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2259 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2260 | For 3 HP |
| 2261 | For 4 HP |
| 2262 | For 5 HP |
| 2263 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2264 | 3.00 core 4 Sq. mm |
| 2265 | 3.00 core 6 Sq. mm |
| 2266 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2267 | 3.00 core 4 Sq. mm |
| 2268 | 3.00 core 6 Sq. mm |
| 2269 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2270 | 3.00 core 4 Sq. mm |
| 2271 | 3.00 core 6 Sq. mm COST OF CHEMICALS |
| 2272 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2273 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2274 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2275 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 59.86 ML (0.164*365) |
| 2276 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2277 | 50mm PVC 6KSC |
| 2278 | 63mm PVC 4KSC |
| 2279 | 75mm PVC 4 KSC |
| 2280 | 90mm PVC 4 KSC |
| 2281 | 110mm PVC 4 KSC |
| 2282 | PVC COUPLER FABRICATED |
| 2283 | 63mm PVC 4KSC |
| 2284 | 75mm PVC 4 KSC |
| 2285 | 90mm PVC 4 KSC |
| 2286 | 110mm PVC 4 KSC |
| 2287 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2288 | 50 mm GI Pipe |
| 2289 | 80 mm GI Pipe |
| 2290 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2291 | 50 mm GI Elbow |
| 2292 | 80 mm GI Elbow |
| 2293 | 50 mm GI Coupling |
| 2294 | 80 mm GI Bend |
| 2295 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 2296 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2297 | PVC Pipes of various sizes |
| 2298 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2299 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2300 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2301 | For 3HP |
| 2302 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2303 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2304 | For 3 HP |
| 2305 | For 4 HP |
| 2306 | For 5 HP |
| 2307 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2308 | 3.00 core 4 Sq. mm |
| 2309 | 3.00 core 6 Sq. mm |
| 2310 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2311 | 3.00 core 4 Sq. mm |
| 2312 | 3.00 core 6 Sq. mm |
| 2313 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2314 | 3.00 core 4 Sq. mm |
| 2315 | 3.00 core 6 Sq. mm COST OF CHEMICALS |
| 2316 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2317 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2318 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2319 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.164 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 59.86 ML (0.164*365) |
| 2320 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2321 | 50mm PVC 6KSC |
| 2322 | 63mm PVC 4KSC |
| 2323 | 75mm PVC 4 KSC |
| 2324 | 90mm PVC 4 KSC |
| 2325 | 110mm PVC 4 KSC |
| 2326 | PVC COUPLER FABRICATED |
| 2327 | 63mm PVC 4KSC |
| 2328 | 75mm PVC 4 KSC |
| 2329 | 90mm PVC 4 KSC |
| 2330 | 110mm PVC 4 KSC |
| 2331 | Supply and delivery of the following sizes of GI pipes ( Medium class) confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2332 | 50 mm GI Pipe |
| 2333 | 80 mm GI Pipe |
| 2334 | Supply and delivery of the following sizes of GI Specials confirming to the IS and other specifications including transportation charges any where in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2335 | 50 mm GI Elbow |
| 2336 | 80 mm GI Elbow |
| 2337 | 50 mm GI Coupling |
| 2338 | 80 mm GI Bend |
| 2339 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 2340 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2341 | PVC Pipes of various sizes |
| 2342 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2343 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2344 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2345 | For 3HP |
| 2346 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2347 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2348 | For 3 HP |
| 2349 | For 4 HP |
| 2350 | For 5 HP |
| 2351 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2352 | 3.00 core 4 Sq. mm |
| 2353 | 3.00 core 6 Sq. mm |
| 2354 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2355 | 3.00 core 4 Sq. mm |
| 2356 | 3.00 core 6 Sq. mm |
| 2357 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2358 | 3.00 core 4 Sq. mm |
| 2359 | 3.00 core 6 Sq. mm COST OF CHEMICALS |
| 2360 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2361 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2362 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2363 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.121 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 10.89 ML (0.121*90) |
| 2364 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2365 | 50mm PVC 6KSC |
| 2366 | 63mm PVC 4KSC |
| 2367 | 75mm PVC 4 KSC |
| 2368 | 90mm PVC 4 KSC |
| 2369 | 110mm PVC 4 KSC |
| 2370 | PVC COUPLER FABRICATED |
| 2371 | 63mm PVC 4KSC |
| 2372 | 75mm PVC 4 KSC |
| 2373 | 90mm PVC 4 KSC |
| 2374 | 110mm PVC 4 KSC |
| 2375 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 2376 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2377 | PVC Pipes of various sizes |
| 2378 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2379 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2380 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2381 | For 6HP |
| 2382 | For 1HP |
| 2383 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2384 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2385 | For 3 HP |
| 2386 | For 4 HP |
| 2387 | For 5 HP |
| 2388 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2389 | For 6 HP |
| 2390 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2391 | 3.00 core 4 Sq. mm |
| 2392 | 3.00 core 6 Sq. mm |
| 2393 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2394 | 3.00 core 4 Sq. mm |
| 2395 | 3.00 core 6 Sq. mm |
| 2396 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2397 | 3.00 core 4 Sq. mm |
| 2398 | 3.00 core 6 Sq. mm |
| 2399 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2400 | 100 Amps 3 Pole MCCB Switch |
| 2401 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2402 | 0.05 LL capacity Sump |
| 2403 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 2404 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2405 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2406 | For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2407 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.121 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 44.17 ML (0.121*365) |
| 2408 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2409 | 50mm PVC 6KSC |
| 2410 | 63mm PVC 4KSC |
| 2411 | 75mm PVC 4 KSC |
| 2412 | 90mm PVC 4 KSC |
| 2413 | 110mm PVC 4 KSC |
| 2414 | PVC COUPLER FABRICATED |
| 2415 | 63mm PVC 4KSC |
| 2416 | 75mm PVC 4 KSC |
| 2417 | 90mm PVC 4 KSC |
| 2418 | 110mm PVC 4 KSC |
| 2419 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2420 | PVC Pipes of various sizes |
| 2421 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2422 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2423 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2424 | For 6HP |
| 2425 | For 1HP |
| 2426 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2427 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2428 | For 3 HP |
| 2429 | For 4 HP |
| 2430 | For 5 HP |
| 2431 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2432 | For 6 HP |
| 2433 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2434 | 3.00 core 4 Sq. mm |
| 2435 | 3.00 core 6 Sq. mm |
| 2436 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2437 | 3.00 core 4 Sq. mm |
| 2438 | 3.00 core 6 Sq. mm |
| 2439 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2440 | 3.00 core 4 Sq. mm |
| 2441 | 3.00 core 6 Sq. mm |
| 2442 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2443 | 100 Amps 3 Pole MCCB Switch |
| 2444 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2445 | 0.05 LL capacity Sump |
| 2446 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 2447 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2448 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2449 | For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2450 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.121 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 44.17 ML (0.121*365) |
| 2451 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2452 | 50mm PVC 6KSC |
| 2453 | 63mm PVC 4KSC |
| 2454 | 75mm PVC 4 KSC |
| 2455 | 90mm PVC 4 KSC |
| 2456 | 110mm PVC 4 KSC |
| 2457 | PVC COUPLER FABRICATED |
| 2458 | 63mm PVC 4KSC |
| 2459 | 75mm PVC 4 KSC |
| 2460 | 90mm PVC 4 KSC |
| 2461 | 110mm PVC 4 KSC |
| 2462 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. |
| 2463 | Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2464 | PVC Pipes of various sizes |
| 2465 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2466 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2467 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2468 | For 6HP |
| 2469 | For 1HP |
| 2470 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2471 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2472 | For 3 HP |
| 2473 | For 4 HP |
| 2474 | For 5 HP |
| 2475 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2476 | For 6 HP |
| 2477 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2478 | 3.00 core 4 Sq. mm |
| 2479 | 3.00 core 6 Sq. mm |
| 2480 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2481 | 3.00 core 4 Sq. mm |
| 2482 | 3.00 core 6 Sq. mm |
| 2483 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2484 | 3.00 core 4 Sq. mm |
| 2485 | 3.00 core 6 Sq. mm |
| 2486 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2487 | 100 Amps 3 Pole MCCB Switch |
| 2488 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2489 | 0.05 LL capacity Sump |
| 2490 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 2491 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2492 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2493 | 2.0 For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2494 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2495 | 63mm PVC 4KSC |
| 2496 | 90mm PVC 4 KSC |
| 2497 | 110mm PVC 4 KSC |
| 2498 | 140mm PVC 4 KSC |
| 2499 | PVC COUPLER FABRICATED |
| 2500 | 63mm PVC 4KSC |
| 2501 | 90mm PVC 4 KSC |
| 2502 | 110mm PVC 4 KSC |
| 2503 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2504 | PVC Pipes of various sizes |
| 2505 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2506 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2507 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2508 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2509 | 22.5HP |
| 2510 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2511 | For 3 HP |
| 2512 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2513 | For 25 HP |
| 2514 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2515 | 3.00 core 4 Sq. mm |
| 2516 | 3.00 core 6 Sq. mm |
| 2517 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2518 | 3.00 core 4 Sq. mm |
| 2519 | 3.00 core 6 Sq. mm |
| 2520 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2521 | 3.00 core 4 Sq. mm |
| 2522 | 3.00 core 6 Sq. mm |
| 2523 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2524 | 100 Amps 3 Pole MCCB Switch |
| 2525 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2526 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 2527 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2528 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2529 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2530 | 63mm PVC 4KSC |
| 2531 | 90mm PVC 4 KSC |
| 2532 | 110mm PVC 4 KSC |
| 2533 | 140mm PVC 4 KSC |
| 2534 | PVC COUPLER FABRICATED |
| 2535 | 63mm PVC 4KSC |
| 2536 | 90mm PVC 4 KSC |
| 2537 | 110mm PVC 4 KSC |
| 2538 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2539 | PVC Pipes of various sizes |
| 2540 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2541 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2542 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2543 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2544 | 22.5HP |
| 2545 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2546 | For 3 HP |
| 2547 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2548 | For 25 HP |
| 2549 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2550 | 3.00 core 4 Sq. mm |
| 2551 | 3.00 core 6 Sq. mm |
| 2552 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2553 | 3.00 core 4 Sq. mm |
| 2554 | 3.00 core 6 Sq. mm |
| 2555 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2556 | 3.00 core 4 Sq. mm |
| 2557 | 3.00 core 6 Sq. mm |
| 2558 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2559 | 100 Amps 3 Pole MCCB Switch |
| 2560 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2561 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 2562 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2563 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2564 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2565 | 63mm PVC 4KSC |
| 2566 | 90mm PVC 4 KSC |
| 2567 | 110mm PVC 4 KSC |
| 2568 | 140mm PVC 4 KSC |
| 2569 | PVC COUPLER FABRICATED |
| 2570 | 63mm PVC 4KSC |
| 2571 | 90mm PVC 4 KSC |
| 2572 | 110mm PVC 4 KSC |
| 2573 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2574 | PVC Pipes of various sizes |
| 2575 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2576 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2577 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2578 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2579 | 22.5HP |
| 2580 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor etc complete and as directed by TWAD Board officers (the cost of capacitor is to be taken separately). |
| 2581 | For 3 HP |
| 2582 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2583 | For 25 HP |
| 2584 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2585 | 3.00 core 4 Sq. mm |
| 2586 | 3.00 core 6 Sq. mm |
| 2587 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2588 | 3.00 core 4 Sq. mm |
| 2589 | 3.00 core 6 Sq. mm |
| 2590 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2591 | 3.00 core 4 Sq. mm |
| 2592 | 3.00 core 6 Sq. mm |
| 2593 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2594 | 100 Amps 3 Pole MCCB Switch |
| 2595 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2596 | 0.60 LL capacity Sump COST OF CHEMICALS |
| 2597 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2598 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2599 | 2.0 For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 2600 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.122 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 10.98 ML (0.122 *90) |
| 2601 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2602 | 63 mm PVC 4 KSC |
| 2603 | 90 mm PVC 4 KSC |
| 2604 | 110 mm PVC 4 KSC |
| 2605 | PVC COUPLER FABRICATED |
| 2606 | 63 mm PVC 4 KSC |
| 2607 | 90 mm PVC 4 KSC |
| 2608 | 110 mm PVC 4 KSC |
| 2609 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2610 | PVC Pipes of various sizes |
| 2611 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2612 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2613 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 2614 | 2 H.P. |
| 2615 | 4 H.P. Electro magnetic Contactors |
| 2616 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 2617 | For 2 HP Starter |
| 2618 | For 4 HP Starter |
| 2619 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2620 | 3.00 core 4 Sq. mm |
| 2621 | 3.00 core 6 Sq. mm |
| 2622 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2623 | 3.00 core 4 Sq. mm |
| 2624 | 3.00 core 6 Sq. mm |
| 2625 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2626 | 3.00 core 4 Sq. mm |
| 2627 | 3.00 core 6 Sq. mm |
| 2628 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2629 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2630 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2631 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. For the Year 2027-2028 (From 01.04.2027 - 31.03.2028) |
| 2632 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.122 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 44.53 ML (0.122 *365) |
| 2633 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2634 | 63 mm PVC 4 KSC |
| 2635 | 90 mm PVC 4 KSC |
| 2636 | 110 mm PVC 4 KSC |
| 2637 | PVC COUPLER FABRICATED |
| 2638 | 63 mm PVC 4 KSC |
| 2639 | 90 mm PVC 4 KSC |
| 2640 | 110 mm PVC 4 KSC |
| 2641 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2642 | PVC Pipes of various sizes |
| 2643 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2644 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2645 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 2646 | 2 H.P. |
| 2647 | 4 H.P. Electro magnetic Contactors |
| 2648 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 2649 | For 2 HP Starter |
| 2650 | For 4 HP Starter |
| 2651 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2652 | 3.00 core 4 Sq. mm |
| 2653 | 3.00 core 6 Sq. mm |
| 2654 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2655 | 3.00 core 4 Sq. mm |
| 2656 | 3.00 core 6 Sq. mm |
| 2657 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2658 | 3.00 core 4 Sq. mm |
| 2659 | 3.00 core 6 Sq. mm |
| 2660 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2661 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2662 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2663 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. For the Year 2028-2029 (From 01.04.2028 - 31.03.2029) |
| 2664 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protector of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure 0.122 MLD, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity etc complete and as directed by TWAD Board officers Totally 44.53 ML (0.122 *365) |
| 2665 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2666 | 63 mm PVC 4 KSC |
| 2667 | 90 mm PVC 4 KSC |
| 2668 | 110 mm PVC 4 KSC |
| 2669 | PVC COUPLER FABRICATED |
| 2670 | 63 mm PVC 4 KSC |
| 2671 | 90 mm PVC 4 KSC |
| 2672 | 110 mm PVC 4 KSC |
| 2673 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of Pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2674 | PVC Pipes of various sizes |
| 2675 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2676 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2677 | Rewinding of Motors in pumping stations iod in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6 of General conditions of Contract Part II. etc complete and as directed by the TWAD Board Officers Rewinding of motor and reconditioning pump and repair works to various capacity Vertical bore well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Vertical bore well Submersible Pump Set etc, complete and as directed by the TWAD Board officers. |
| 2678 | 2 H.P. |
| 2679 | 4 H.P. Electro magnetic Contactors |
| 2680 | Supply and delivery of direct online starter confirming to IS13947 and IEC60947-1 suitable KW rating for operation in AC/ three Phase/50HZ(+/- 5%) and 415V (+/- 10%) including Ammeter, Overload relay, under Voltage release with no Volt coil, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, including the capacitor(the cost of capacitor is to be taken separately). |
| 2681 | For 2 HP Starter |
| 2682 | For 4 HP Starter |
| 2683 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2684 | 3.00 core 4 Sq. mm |
| 2685 | 3.00 core 6 Sq. mm |
| 2686 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2687 | 3.00 core 4 Sq. mm |
| 2688 | 3.00 core 6 Sq. mm |
| 2689 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2690 | 3.00 core 4 Sq. mm |
| 2691 | 3.00 core 6 Sq. mm |
| 2692 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2693 | 100 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2694 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2695 | Supply, Delivery of stable bleaching powder anywhere in the schemes maintained by TWAD Board as per 1065:1989 (grade I) and amended from time to time including freight, loading, unloading, transportation, transit insurances all other incidental charges at site of work etc., complete and as directed by TWAD Board Officers. |
| 2696 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2697 | 63mm PVC 4KSC |
| 2698 | 90mm PVC 4 KSC |
| 2699 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2700 | 63mm PVC 4KSC |
| 2701 | 90mm PVC 4 KSC |
| 2702 | 110mm PVC 4 KSC |
| 2703 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2704 | PVC Pipes of various sizes |
| 2705 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2706 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2707 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2708 | 7.5HP |
| 2709 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2710 | 9 Amps |
| 2711 | 12 Amps |
| 2712 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2713 | Upto 5 Amps |
| 2714 | 5 - 10 Amps |
| 2715 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 2716 | For 7.5 HP |
| 2717 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2718 | 32 Amps 3 Pole MCCB Switch |
| 2719 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2720 | 50mm GM Gate valve |
| 2721 | 80mm GM Gate valve COST OF CHEMICALS |
| 2722 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2723 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2724 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2725 | 63mm PVC 4KSC |
| 2726 | 75mm PVC 4 KSC |
| 2727 | 90mm PVC 4 KSC |
| 2728 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2729 | 63mm PVC 4KSC |
| 2730 | 75mm PVC 4 KSC |
| 2731 | 90mm PVC 4 KSC |
| 2732 | 110mm PVC 4 KSC |
| 2733 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2734 | PVC Pipes of various sizes |
| 2735 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2736 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2737 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2738 | For 5HP |
| 2739 | For7.5HP |
| 2740 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2741 | 9 Amps |
| 2742 | 12 Amps |
| 2743 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2744 | Upto 5 Amps |
| 2745 | 5 - 10 Amps |
| 2746 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2747 | 32 Amps 3 Pole MCCB Switch |
| 2748 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2749 | 100mm GM Gate valve |
| 2750 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2751 | 0.30 LL capacity Sump |
| 2752 | 0.05 LL capacity Sump COST OF CHEMICALS |
| 2753 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2754 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2755 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2756 | 63mm PVC 4KSC |
| 2757 | 75mm PVC 4 KSC |
| 2758 | 90mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2759 | 63mm PVC 4KSC |
| 2760 | 75mm PVC 4 KSC |
| 2761 | 90mm PVC 4 KSC |
| 2762 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2763 | PVC Pipes of various sizes |
| 2764 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2765 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2766 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2767 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2768 | 9 Amps |
| 2769 | 12 Amps |
| 2770 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2771 | 5 - 10 Amps |
| 2772 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2773 | 65mm GM Gate valve COST OF CHEMICALS |
| 2774 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2775 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2776 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2777 | 63mm PVC 4KSC |
| 2778 | 75mm PVC 4 KSC |
| 2779 | 90mm PVC 4 KSC |
| 2780 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2781 | 63mm PVC 4KSC |
| 2782 | 75mm PVC 4 KSC |
| 2783 | 90mm PVC 4 KSC |
| 2784 | 110mm PVC 4 KSC |
| 2785 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2786 | PVC Pipes of various sizes |
| 2787 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2788 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2789 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2790 | For 5HP |
| 2791 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2792 | 9 Amps |
| 2793 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2794 | Upto 5 Amps |
| 2795 | THREE PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO STARTSupply and delivery of direct online starter confirming to IS13947, IEC60947-1 andas amended thereafter with suitable KW rating for operation in AC/ThreePhase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, ThermalOverload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection,Indication lamp, starting capacitor, running capacitor and On/Off Push buttonswitches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulatedcable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers |
| 2796 | For 5 HP |
| 2797 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2798 | 3.00 core 10 Sq. mm |
| 2799 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2800 | 3.00 core 10 Sq. mm |
| 2801 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2802 | 3.00 core 10 Sq. mm |
| 2803 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2804 | 50mm GM Gate valve |
| 2805 | 65mm GM Gate valve |
| 2806 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2807 | 0.10 LL capacity Sump COST OF CHEMICALS |
| 2808 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2809 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2810 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2811 | 63mm PVC 4KSC |
| 2812 | 75mm PVC 4 KSC |
| 2813 | 90mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2814 | 63mm PVC 4KSC |
| 2815 | 75mm PVC 4 KSC |
| 2816 | 90mm PVC 4 KSC |
| 2817 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2818 | PVC Pipes of various sizes |
| 2819 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2820 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2821 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2822 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2823 | 7.5HP |
| 2824 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2825 | 12 Amps |
| 2826 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2827 | 5 - 10 Amps |
| 2828 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2829 | 32 Amps 3 Pole MCCB Switch COST OF CHEMICALS |
| 2830 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2831 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2832 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2833 | 63mm PVC 4 KSC |
| 2834 | 75mm PVC 4 KSC |
| 2835 | 90mm PVC 4KSC |
| 2836 | 110mm PVC 4 KSC |
| 2837 | 140mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2838 | 63mm PVC 4KSC |
| 2839 | 75mm PVC 4 KSC |
| 2840 | 90mm PVC 4KSC |
| 2841 | 110mm PVC 4 KSC |
| 2842 | 140mm PVC 4 KSC |
| 2843 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2844 | PVC Pipes of various sizes |
| 2845 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2846 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2847 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2848 | For 3HP |
| 2849 | For7.5HP |
| 2850 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2851 | 9 Amps |
| 2852 | 25 Amps |
| 2853 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2854 | Upto 5 Amps |
| 2855 | 5 - 10 Amps |
| 2856 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2857 | 3.00 core 10 Sq. mm |
| 2858 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2859 | 3.00 core 10 Sq. mm |
| 2860 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2861 | 3.00 core 10 Sq. mm |
| 2862 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2863 | 32 Amps 3 Pole MCCB Switch |
| 2864 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2865 | 50mm GM Gate valve |
| 2866 | 65mm GM Gate valve |
| 2867 | 80mm GM Gate valve |
| 2868 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2869 | 0.30 LL capacity Sump @ Vanikudi & Nallur COST OF CHEMICALS |
| 2870 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2871 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2872 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2873 | 63mm PVC 4 KSC |
| 2874 | 75mm PVC 4 KSC |
| 2875 | 90mm PVC 4KSC |
| 2876 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2877 | 63mm PVC 4KSC |
| 2878 | 75mm PVC 4 KSC |
| 2879 | 90mm PVC 4KSC |
| 2880 | 110mm PVC 4 KSC |
| 2881 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2882 | PVC Pipes of various sizes |
| 2883 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2884 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2885 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2886 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2887 | 7.5HP |
| 2888 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2889 | 12 Amps |
| 2890 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2891 | 5 - 10 Amps |
| 2892 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2893 | 3.00 core 10 Sq. mm |
| 2894 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2895 | 3.00 core 10 Sq. mm |
| 2896 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2897 | 3.00 core 10 Sq. mm |
| 2898 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 2899 | 32 Amps 3 Pole MCCB Switch |
| 2900 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2901 | 50mm GM Gate valve |
| 2902 | 80mm GM Gate valve |
| 2903 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2904 | 0.60 LL capacity Sump @ Gangaikondan COST OF CHEMICALS |
| 2905 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2906 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2907 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2908 | 63mm PVC 4 KSC |
| 2909 | 75mm PVC 4 KSC |
| 2910 | 90mm PVC 4KSC |
| 2911 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 2912 | 63mm PVC 4KSC |
| 2913 | 75mm PVC 4 KSC |
| 2914 | 90mm PVC 4KSC |
| 2915 | 110mm PVC 4 KSC |
| 2916 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2917 | PVC Pipes of various sizes |
| 2918 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2919 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2920 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2921 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2922 | 7.5HP |
| 2923 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2924 | 12 Amps |
| 2925 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2926 | 5 - 10 Amps |
| 2927 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board |
| 2928 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2929 | 0.60 LL capacity Sump @ Kamankottai COST OF CHEMICALS |
| 2930 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2931 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2932 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2933 | 63mm PVC 4 KSC |
| 2934 | 90mm PVC 4KSC PVC COUPLER FABRICATED |
| 2935 | 63mm PVC 4KSC |
| 2936 | 90mm PVC 4KSC |
| 2937 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2938 | PVC Pipes of various sizes |
| 2939 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2940 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2941 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2942 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2943 | 7.5HP |
| 2944 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 2945 | 9 Amps |
| 2946 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 2947 | 5 - 10 Amps |
| 2948 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2949 | 3.00 core 10 Sq. mm |
| 2950 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2951 | 3.00 core 10 Sq. mm |
| 2952 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2953 | 3.00 core 10 Sq. mm |
| 2954 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 2955 | 65mm GM Gate valve |
| 2956 | 80mm GM Gate valve |
| 2957 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 2958 | 0.30 LL capacity Sump @ Manjur COST OF CHEMICALS |
| 2959 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2960 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2961 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2962 | 63mm PVC 4 KSC |
| 2963 | 75mm PVC 4 KSC |
| 2964 | 90mm PVC 4 KSC |
| 2965 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 2966 | 63mm PVC 4KSC |
| 2967 | 75mm PVC 4 KSC |
| 2968 | 90mm PVC 4 KSC |
| 2969 | 110mm PVC 4KSC |
| 2970 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2971 | PVC Pipes of various sizes |
| 2972 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 2973 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 2974 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 2975 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 2976 | 7.5HP |
| 2977 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 2978 | 3.00 core 10 Sq. mm |
| 2979 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 2980 | 3.00 core 10 Sq. mm |
| 2981 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 2982 | 3.00 core 10 Sq. mm |
| 2983 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 2984 | 3core 4 Sq. mm copper cable |
| 2985 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 2986 | 50mm UPVC Pipe COST OF CHEMICALS |
| 2987 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 2988 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 2989 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 2990 | 63mm PVC 4 KSC |
| 2991 | 75mm PVC 4 KSC |
| 2992 | 90mm PVC 4 KSC |
| 2993 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 2994 | 63mm PVC 4KSC |
| 2995 | 75mm PVC 4 KSC |
| 2996 | 90mm PVC 4 KSC |
| 2997 | 110mm PVC 4KSC |
| 2998 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 2999 | PVC Pipes of various sizes |
| 3000 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3001 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 3002 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3003 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3004 | 9 Amps |
| 3005 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3006 | Upto 5 Amps |
| 3007 | THREE PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO STARTSupply and delivery of direct online starter confirming to IS13947, IEC60947-1 andas amended thereafter with suitable KW rating for operation in AC/ThreePhase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, ThermalOverload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection,Indication lamp, starting capacitor, running capacitor and On/Off Push buttonswitches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulatedcable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers |
| 3008 | For 5 HP |
| 3009 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3010 | 32 Amps 3 Pole MCCB Switch |
| 3011 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 3012 | 80mm GM Gate valve |
| 3013 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3014 | 0.60 LL capacity Sump @ Mukutu Salai |
| 3015 | 0.10 LL capacity Sump @ Samathuvapuram COST OF CHEMICALS |
| 3016 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3017 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3018 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3019 | 63mm PVC 4 KSC |
| 3020 | 110mm PVC 4KSC |
| 3021 | 160mm PVC 4KSC PVC COUPLER FABRICATED |
| 3022 | 63mm PVC 4KSC |
| 3023 | 110mm PVC 4KSC |
| 3024 | 160mm PVC 4KSC |
| 3025 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3026 | PVC Pipes of various sizes |
| 3027 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3028 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3029 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3030 | 7.5HP |
| 3031 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3032 | 9 Amps |
| 3033 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3034 | Upto 5-10 Amps COST OF CHEMICALS |
| 3035 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3036 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3037 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3038 | 63mm PVC 4 KSC |
| 3039 | 75 mm PVC 4KSC |
| 3040 | 90mm PVC 4KSC PVC COUPLER FABRICATED |
| 3041 | 63mm PVC 4KSC |
| 3042 | 75 mm PVC 4KSC |
| 3043 | 90mm PVC 4KSC |
| 3044 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3045 | PVC Pipes of various sizes |
| 3046 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3047 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3048 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3049 | 7.5HP |
| 3050 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3051 | 9 Amps |
| 3052 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3053 | Upto 5-10 Amps |
| 3054 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3055 | 3.00 core 10 Sq. mm |
| 3056 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3057 | 3.00 core 10 Sq. mm |
| 3058 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3059 | 3.00 core 10 Sq. mm |
| 3060 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3061 | 0.10 LL capacity Sump @ Rathapuli COST OF CHEMICALS |
| 3062 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3063 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3064 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3065 | 63mm PVC 4 KSC |
| 3066 | 90mm PVC 4KSC |
| 3067 | 110mm PVC 4KSC PVC COUPLER FABRICATED |
| 3068 | 63mm PVC 4KSC |
| 3069 | 90 mm PVC 4KSC |
| 3070 | 110mm PVC 4KSC |
| 3071 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3072 | PVC Pipes of various sizes |
| 3073 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3074 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3075 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3076 | For 5HP |
| 3077 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3078 | 9 Amps |
| 3079 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3080 | Upto 5 Amps |
| 3081 | THREE PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO STARTSupply and delivery of direct online starter confirming to IS13947, IEC60947-1 andas amended thereafter with suitable KW rating for operation in AC/ThreePhase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, ThermalOverload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection,Indication lamp, starting capacitor, running capacitor and On/Off Push buttonswitches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulatedcable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers |
| 3082 | For 5 HP |
| 3083 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3084 | 3.00 core 10 Sq. mm |
| 3085 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3086 | 3.00 core 10 Sq. mm |
| 3087 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3088 | 3.00 core 10 Sq. mm |
| 3089 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3090 | 32 Amps 3 Pole MCCB Switch |
| 3091 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 3092 | 50mm GM Gate valve COST OF CHEMICALS |
| 3093 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3094 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3095 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3096 | 63mm PVC 4 KSC |
| 3097 | 75mm PVC 4KSC |
| 3098 | 90mm PVC 4KSC |
| 3099 | 110mm PVC 4 KSC |
| 3100 | 140mm PVC 4KSC |
| 3101 | 160mm PVC 4KSC |
| 3102 | 200mm PVC 4KSC PVC COUPLER FABRICATED |
| 3103 | 63mm PVC 4 KSC |
| 3104 | 75mm PVC 4KSC |
| 3105 | 90mm PVC 4KSC |
| 3106 | 110mm PVC 4 KSC |
| 3107 | 140mm PVC 4KSC |
| 3108 | 160mm PVC 4KSC |
| 3109 | 200mm PVC 4KSC |
| 3110 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3111 | PVC Pipes of various sizes |
| 3112 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3113 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3114 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3115 | For 10HP |
| 3116 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3117 | 12 Amps |
| 3118 | 18 Amps |
| 3119 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3120 | 5-10 Amps |
| 3121 | 10-20 Amps |
| 3122 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 3123 | For 7.5 HP |
| 3124 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3125 | 63 Amps 3 Pole MCCB Switch |
| 3126 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3127 | 1.00 LL capacity Sump @ Thandradevipattinam COST OF CHEMICALS |
| 3128 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3129 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3130 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3131 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3132 | 63mm PVC 4 KSC |
| 3133 | 75mm PVC 4KSC |
| 3134 | 90mm PVC 4KSC |
| 3135 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3136 | 63mm PVC 4 KSC |
| 3137 | 75mm PVC 4KSC |
| 3138 | 90mm PVC 4KSC |
| 3139 | 110mm PVC 4 KSC |
| 3140 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3141 | PVC Pipes of various sizes |
| 3142 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3143 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3144 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 3145 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3146 | 7.5HP |
| 3147 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3148 | 12 Amps |
| 3149 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3150 | 5-10 Amps |
| 3151 | THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers. |
| 3152 | For 7.5 HP |
| 3153 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3154 | 3.00 core 10 Sq. mm |
| 3155 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3156 | 3.00 core 10 Sq. mm |
| 3157 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3158 | 3.00 core 10 Sq. mm |
| 3159 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3160 | 3core 6 Sq. mm copper cable |
| 3161 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3162 | 50mm UPVC Pipe |
| 3163 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 3164 | 50mm GM Gate valve |
| 3165 | 80mm GM Gate valve |
| 3166 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3167 | 0.30 LL capacity Sump @Pasumbon COST OF CHEMICALS |
| 3168 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3169 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3170 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3171 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3172 | 63mm PVC 4 KSC |
| 3173 | 75mm PVC 4KSC |
| 3174 | 90mm PVC 4KSC |
| 3175 | 110mm PVC 4 KSC |
| 3176 | 140mm PVC 4 KSC |
| 3177 | 160mm PVC 4KSC |
| 3178 | 200mm PVC 4KSC |
| 3179 | 250mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3180 | 63mm PVC 4 KSC |
| 3181 | 75mm PVC 4KSC |
| 3182 | 90mm PVC 4KSC |
| 3183 | 110mm PVC 4 KSC |
| 3184 | 140mm PVC 4 KSC |
| 3185 | 160mm PVC 4KSC |
| 3186 | 200mm PVC 4KSC |
| 3187 | 250mm PVC 4 KSC |
| 3188 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3189 | PVC Pipes of various sizes |
| 3190 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3191 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3192 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3193 | For 5HP |
| 3194 | For 12.5HP |
| 3195 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3196 | 32 Amps 3 Pole MCCB Switch |
| 3197 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3198 | 9 Amps |
| 3199 | 18Amps |
| 3200 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3201 | Upto 5 Amps |
| 3202 | 5-10 Amps |
| 3203 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3204 | 3.00 core 6 Sq. mm |
| 3205 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3206 | 3core 6 Sq. mm copper cable |
| 3207 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3208 | 50mm UPVC Pipe COST OF CHEMICALS |
| 3209 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3210 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3211 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3212 | 63mm PVC 4 KSC |
| 3213 | 75mm PVC 4KSC |
| 3214 | 90mm PVC 4KSC |
| 3215 | 110mm PVC 4 KSC |
| 3216 | 140mm PVC 4 KSC |
| 3217 | 160mm PVC 4KSC PVC COUPLER FABRICATED |
| 3218 | 63mm PVC 4 KSC |
| 3219 | 75mm PVC 4KSC |
| 3220 | 90mm PVC 4KSC |
| 3221 | 110mm PVC 4 KSC |
| 3222 | 140mm PVC 4 KSC |
| 3223 | 160mm PVC 4KSC |
| 3224 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3225 | PVC Pipes of various sizes |
| 3226 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3227 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3228 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3229 | For 12.5HP |
| 3230 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3231 | 3.00 core 10 Sq. mm |
| 3232 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3233 | 3.00 core 10 Sq. mm |
| 3234 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3235 | 3.00 core 10 Sq. mm |
| 3236 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3237 | 3core 6 Sq. mm copper cable |
| 3238 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3239 | 50mm UPVC Pipe |
| 3240 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3241 | 0.60 LL capacity Sump @ Maviduthikottai and Thondi |
| 3242 | 0.75 LL capacity Sump @ Karumozhi COST OF CHEMICALS |
| 3243 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3244 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3245 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3246 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3247 | 63mm PVC 4 KSC |
| 3248 | 75mm PVC 4KSC |
| 3249 | 90mm PVC 4KSC |
| 3250 | 110mm PVC 4 KSC |
| 3251 | 140mm PVC 4 KSC |
| 3252 | 160mm PVC 4KSC PVC COUPLER FABRICATED |
| 3253 | 63mm PVC 4 KSC |
| 3254 | 75mm PVC 4KSC |
| 3255 | 90mm PVC 4KSC |
| 3256 | 110mm PVC 4 KSC |
| 3257 | 140mm PVC 4 KSC |
| 3258 | 160mm PVC 4KSC |
| 3259 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3260 | PVC Pipes of various sizes |
| 3261 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3262 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3263 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3264 | For 15HP |
| 3265 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3266 | For 10HP |
| 3267 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3268 | 63 Amps 3 Pole MCCB Switch |
| 3269 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3270 | 12 Amps |
| 3271 | 18 Amps |
| 3272 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3273 | 5-10 Amps |
| 3274 | 10-20 Amps |
| 3275 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3276 | 3.00 core 10 Sq. mm |
| 3277 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3278 | 3.00 core 10 Sq. mm |
| 3279 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3280 | 3.00 core 10 Sq. mm |
| 3281 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3282 | 3core 6 Sq. mm copper cable |
| 3283 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3284 | 50mm UPVC Pipe |
| 3285 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3286 | 1.00 LL capacity Sump @ Mangalakudi COST OF CHEMICALS |
| 3287 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3288 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3289 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3290 | 63mm PVC 4 KSC |
| 3291 | 75mm PVC 4KSC |
| 3292 | 90mm PVC 4KSC |
| 3293 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3294 | 63mm PVC 4 KSC |
| 3295 | 75mm PVC 4KSC |
| 3296 | 90mm PVC 4KSC |
| 3297 | 110mm PVC 4 KSC |
| 3298 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3299 | PVC Pipes of various sizes |
| 3300 | AC Pipes of various sizes |
| 3301 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3302 | PVC Pipes of various sizes |
| 3303 | AC Pipes of various sizes |
| 3304 | Supply and delivery of lead wool as per sample including loading, umloading and transportation charges etc. complete and as directed by TWAD Bd. Officers |
| 3305 | 200 mm dia AC Pipe Various Classes |
| 3306 | 250mm dia AC Pipe Various Classes |
| 3307 | Supply and delivery of Hardcrete oil as per sample including loading, umloading and transportation charges etc. complete and as directed by TWAD Bd. Officers |
| 3308 | 200 mm dia AC Pipe Various Classes |
| 3309 | 250mm dia AC Pipe Various Classes |
| 3310 | Supply and delivery of cementincluding loading, umloading and transportation charges etc. complete and as directed by TWAD Bd. Officers REPAIR AND RENEWAL OF PUMPSETS |
| 3311 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3312 | For 12.5HP |
| 3313 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3314 | 10 HP |
| 3315 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3316 | 63 Amps 3 Pole MCCB Switch |
| 3317 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3318 | 9 Amps |
| 3319 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3320 | 5-10 Amps |
| 3321 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3322 | 3.00 core 10 Sq. mm |
| 3323 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3324 | 3.00 core 10 Sq. mm |
| 3325 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3326 | 3.00 core 10 Sq. mm |
| 3327 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3328 | 3core 6 Sq. mm copper cable |
| 3329 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3330 | 50mm UPVC Pipe |
| 3331 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3332 | 0.30 LL capacity Sump @ Mangalam and Mugilthagam |
| 3333 | 1.00 LL capacity Sump @ Thinaikathanvayal COST OF CHEMICALS |
| 3334 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3335 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3336 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3337 | 63mm PVC 4 KSC |
| 3338 | 75mm PVC 4KSC |
| 3339 | 90mm PVC 4KSC |
| 3340 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3341 | 63mm PVC 4 KSC |
| 3342 | 75mm PVC 4KSC |
| 3343 | 90mm PVC 4KSC |
| 3344 | 110mm PVC 4 KSC |
| 3345 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3346 | PVC Pipes of various sizes |
| 3347 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3348 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3349 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3350 | 10 HP |
| 3351 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3352 | 12 Amps |
| 3353 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3354 | 5-10 Amps |
| 3355 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3356 | 0.60 LL capacity Sump @ Kamankottai COST OF CHEMICALS |
| 3357 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3358 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3359 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3360 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3361 | 50mm PVC 6 KSC |
| 3362 | 63mm PVC 4 KSC |
| 3363 | 90mm PVC 4KSC |
| 3364 | 110mm PVC 4 KSC |
| 3365 | 140mm PVC 4 KSC |
| 3366 | 160mm PVC 4KSC PVC COUPLER FABRICATED |
| 3367 | 50mm PVC 6 KSC |
| 3368 | 63mm PVC 4 KSC |
| 3369 | 90mm PVC 4KSC |
| 3370 | 110mm PVC 4 KSC |
| 3371 | 140mm PVC 4 KSC |
| 3372 | 160mm PVC 4KSC |
| 3373 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3374 | PVC Pipes of various sizes |
| 3375 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3376 | PVC Pipes of various sizes |
| 3377 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3378 | 10 HP |
| 3379 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3380 | 12 Amps |
| 3381 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3382 | 10-20 Amps |
| 3383 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3384 | 3.00 core 10 Sq. mm |
| 3385 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3386 | 3.00 core 10 Sq. mm |
| 3387 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3388 | 3.00 core 10 Sq. mm |
| 3389 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3390 | 0.30 LL capacity Sump @ Paganur COST OF CHEMICALS |
| 3391 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3392 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3393 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3394 | 63mm PVC 4 KSC |
| 3395 | 75mm PVC 4KSC |
| 3396 | 90mm PVC 4KSC |
| 3397 | 110mm PVC 4 KSC |
| 3398 | 140mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3399 | 63mm PVC 4 KSC |
| 3400 | 75mm PVC 4KSC |
| 3401 | 90mm PVC 4KSC |
| 3402 | 110mm PVC 4 KSC |
| 3403 | 140mm PVC 4 KSC |
| 3404 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3405 | PVC Pipes of various sizes |
| 3406 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3407 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3408 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3409 | For 7.5HP |
| 3410 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3411 | 63 Amps 3 Pole MCCB Switch |
| 3412 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3413 | 12 Amps |
| 3414 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3415 | 5-10 Amps |
| 3416 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3417 | 3.00 core 10 Sq. mm |
| 3418 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3419 | 3.00 core 10 Sq. mm |
| 3420 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3421 | 3.00 core 10 Sq. mm |
| 3422 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3423 | 3core 6 Sq. mm copper cable |
| 3424 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3425 | 50mm UPVC Pipe |
| 3426 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 3427 | 50mm GM Gate valve |
| 3428 | 80mm GM Gate valve |
| 3429 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3430 | 0.60 LL capacity Sump @ Muruganenthal |
| 3431 | 1.00 LL capacity Sump @ Kallur COST OF CHEMICALS |
| 3432 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3433 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3434 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3435 | 63mm PVC 4 KSC |
| 3436 | 75mm PVC 4KSC |
| 3437 | 90mm PVC 4KSC |
| 3438 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3439 | 63mm PVC 4 KSC |
| 3440 | 75mm PVC 4KSC |
| 3441 | 90mm PVC 4KSC |
| 3442 | 110mm PVC 4 KSC |
| 3443 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3444 | PVC Pipes of various sizes |
| 3445 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3446 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3447 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3448 | 7.5 HP |
| 3449 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3450 | 9 Amps |
| 3451 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3452 | 0.60 LL capacity Sump @ Alambadi and Vattanam COST OF CHEMICALS |
| 3453 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3454 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3455 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3456 | 63mm PVC 4 KSC |
| 3457 | 75mm PVC 4KSC |
| 3458 | 90mm PVC 4KSC |
| 3459 | 110mm PVC 4 KSC |
| 3460 | 140mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3461 | 63mm PVC 4 KSC |
| 3462 | 75mm PVC 4KSC |
| 3463 | 90mm PVC 4KSC |
| 3464 | 110mm PVC 4 KSC |
| 3465 | 140mm PVC 4 KSC |
| 3466 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3467 | PVC Pipes of various sizes |
| 3468 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3469 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3470 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3471 | For 5HP |
| 3472 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3473 | 25 Amps |
| 3474 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3475 | Upto 5 Amps |
| 3476 | 5-10 Amps |
| 3477 | 10-20 Amps |
| 3478 | 20-30 Amps COST OF CHEMICALS |
| 3479 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3480 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3481 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3482 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3483 | 63mm PVC 4 KSC |
| 3484 | 110mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3485 | 63mm PVC 4 KSC |
| 3486 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3487 | PVC Pipes of various sizes |
| 3488 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3489 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3490 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3491 | For 3HP |
| 3492 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3493 | 25 Amps |
| 3494 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3495 | Upto 5 Amps |
| 3496 | Attending Repair, Rectification and reconditioning of CI Double Air Valve and DI single chamber air valve including cost of all materials, conveyance, labour charges for removeing and re-erection etc., complete and as directed by TWAD Board Officers CI Sluice valve |
| 3497 | 100 mm COST OF CHEMICALS |
| 3498 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3499 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3500 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3501 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3502 | 63mm PVC 4 KSC |
| 3503 | 75mm PVC 4KSC |
| 3504 | 90mm PVC 4KSC |
| 3505 | 110mm PVC 4 KSC |
| 3506 | 140mm PVC 4 KSC |
| 3507 | 160mm PVC 4KSC PVC COUPLER FABRICATED |
| 3508 | 63mm PVC 4 KSC |
| 3509 | 75mm PVC 4KSC |
| 3510 | 90mm PVC 4KSC |
| 3511 | 110mm PVC 4 KSC |
| 3512 | 140mm PVC 4 KSC |
| 3513 | 160mm PVC 4KSC |
| 3514 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3515 | PVC Pipes of various sizes |
| 3516 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3517 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3518 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3519 | For 3HP |
| 3520 | For 10HP |
| 3521 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3522 | 10-20 Amps COST OF CHEMICALS |
| 3523 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3524 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3525 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3526 | 63mm PVC 4 KSC |
| 3527 | 90mm PVC 4KSC |
| 3528 | 140mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3529 | 63mm PVC 4 KSC |
| 3530 | 90mm PVC 4KSC |
| 3531 | 140mm PVC 4 KSC |
| 3532 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3533 | PVC Pipes of various sizes |
| 3534 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3535 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3536 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3537 | For 10HP |
| 3538 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3539 | 9 Amps |
| 3540 | 12 Amps |
| 3541 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3542 | Upto 5 Amps |
| 3543 | 10-20 Amps |
| 3544 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3545 | 0.60 LL capacity Sump @ Muruganenthal COST OF CHEMICALS |
| 3546 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3547 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3548 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3549 | 75mm PVC 4 KSC |
| 3550 | 90mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3551 | 75mm PVC 4 KSC |
| 3552 | 90mm PVC 4 KSC |
| 3553 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3554 | PVC Pipes of various sizes |
| 3555 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3556 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 3557 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3558 | For 5HP |
| 3559 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3560 | 9 Amps |
| 3561 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3562 | Upto 5 Amps |
| 3563 | THREE PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO STARTSupply and delivery of direct online starter confirming to IS13947, IEC60947-1 andas amended thereafter with suitable KW rating for operation in AC/ThreePhase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, ThermalOverload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection,Indication lamp, starting capacitor, running capacitor and On/Off Push buttonswitches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulatedcable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers |
| 3564 | For 5 HP COST OF CHEMICALS |
| 3565 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3566 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3567 | For the Year 2026-2027 (From 01.01.2026 - 31.03.2027) |
| 3568 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3569 | 63mm PVC 4 KSC |
| 3570 | 75mm PVC 4KSC PVC COUPLER FABRICATED |
| 3571 | 63mm PVC 4 KSC |
| 3572 | 75mm PVC 4KSC |
| 3573 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3574 | PVC Pipes of various sizes |
| 3575 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3576 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 3577 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3578 | For 5HP |
| 3579 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3580 | 10HP COST OF CHEMICALS |
| 3581 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3582 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3583 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3584 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3585 | 63mm PVC 4 KSC |
| 3586 | 75mm PVC 4KSC |
| 3587 | 90mm PVC 4KSC |
| 3588 | 110mm PVC 4 KSC |
| 3589 | 140mm PVC 4 KSC |
| 3590 | 160mm PVC 4KSC |
| 3591 | 200mm PVC 4KSC PVC COUPLER FABRICATED |
| 3592 | 63mm PVC 4 KSC |
| 3593 | 75mm PVC 4KSC |
| 3594 | 90mm PVC 4KSC |
| 3595 | 110mm PVC 4 KSC |
| 3596 | 140mm PVC 4 KSC |
| 3597 | 160mm PVC 4KSC |
| 3598 | 200mm PVC 4KSC |
| 3599 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3600 | PVC Pipes of various sizes |
| 3601 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3602 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. |
| 3603 | Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3604 | For 5HP |
| 3605 | For 7.5HP |
| 3606 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3607 | 3.00 core 10 Sq. mm |
| 3608 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3609 | 3.00 core 10 Sq. mm |
| 3610 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3611 | 3.00 core 10 Sq. mm |
| 3612 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3613 | 3core 6 Sq. mm copper cable |
| 3614 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3615 | 50mm UPVC Pipe |
| 3616 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3617 | 0.60 LL capacity Sump @ A.Manakudi |
| 3618 | 1.00 LL capacity Sump @ Arasur and AR Mangalam COST OF CHEMICALS |
| 3619 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3620 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. |
| 3621 | For the Year 2026-2027 (From 01.01.2027 - 31.03.2027) |
| 3622 | Supply and delivery of the following sizes of unplastisized PVC Rigid pipes and specials confirming to IS other specifications as amended from time to time with ISI marking as specified in ISI and having the required working pressure and delivery at site of work including loading, unloading, freight, stacking and transportation, insurance charges, etc., complete and as directed by TWAD Board officers. |
| 3623 | 63mm PVC 4 KSC |
| 3624 | 75mm PVC 4KSC |
| 3625 | 90mm PVC 4KSC |
| 3626 | 110mm PVC 4 KSC |
| 3627 | 140mm PVC 4 KSC PVC COUPLER FABRICATED |
| 3628 | 63mm PVC 4 KSC |
| 3629 | 75mm PVC 4KSC |
| 3630 | 90mm PVC 4KSC |
| 3631 | 110mm PVC 4 KSC |
| 3632 | 140mm PVC 4 KSC |
| 3633 | Attending Leaks in the Pipelines of this CWSS for the following items, as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges, etc complete within the stipulated time limit as specified in Clause 2.2.5 of General conditions of Contract - Part II. etc., complete and as directed by TWAD Board officers. Earth work excavation and depositing on bank in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., for leak rectification works for the following sizes of PSC pipes with standard trench width and depth etc., complete and as directed by the TWAD Board officers. |
| 3634 | PVC Pipes of various sizes |
| 3635 | Refilling with excavated soil (other than sand)complying with standard specification in layers of 15cm watered well rammed and consolidated after the pipes and specials are laid,jointed and tested etc. and removing and depositing the surplus earth at the places shown by the TWAD Board Officers. |
| 3636 | PVC Pipes of various sizes REPAIR AND RENEWAL OF PUMPSETS |
| 3637 | Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers. Rewinding of motor and reconditioning pump and repair works to various capacity Open well Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3638 | For 5HP |
| 3639 | Rewinding of motor and reconditioning pump and repair works to various capacity Vertical borewell Submersible Pump Set including cost of all material ,conveyance ,labour charges for removing and re-erection of Submersible pumpset etc, complete and as directed by the TWAD Board officers. |
| 3640 | For 7.5HP |
| 3641 | Supply and delivery of following Range AMPS 3 Pole & 4 Pole MCCB Switch (Moulted case circuit breakers) to control EB supply from E.B Pole to Main Panel Board 3 Pole MCCB |
| 3642 | 32 Amps 3 Pole MCCB Switch |
| 3643 | Supply and delivery of 440V Electro magnetic Contactors Suitable for Starter in AC Three Phase rating Conforming to IS/IEC 60947-4-1 etc., complete and as directed by TWAD Board Officers |
| 3644 | 12 Amps |
| 3645 | Supply and delivery of over load relays.. Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode etc., complete and as directed by TWAD Board Officers |
| 3646 | 5-10 Amps |
| 3647 | THREE PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO STARTSupply and delivery of direct online starter confirming to IS13947, IEC60947-1 andas amended thereafter with suitable KW rating for operation in AC/ThreePhase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, ThermalOverload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection,Indication lamp, starting capacitor, running capacitor and On/Off Push buttonswitches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulatedcable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately) etc., complete and as directed by TWAD Board Officers |
| 3648 | For 5 HP |
| 3649 | Supply, delivery of 1.1 KV Grade Armoured aluminium Conductor cross Linked Poly ethylene insulated PVC sheathed cables confirmaing to IS etc., complete and as directed by TWAD board Officers. for following Wells submersible motor to main panel board. |
| 3650 | 3.00 core 10 Sq. mm |
| 3651 | Laying of 1.1 KV Grade PVC insulated steel Armoured aluminium cable as per I.E. rules to be laid in between Well Submersible motor and main panel board. |
| 3652 | 3.00 core 10 Sq. mm |
| 3653 | Jonting the 1.1KV grade PVC Insulated Steel armoured aluminum cable as per I E Rules including Jointing materials, Labour etc complete directed by the TWAD Board officers |
| 3654 | 3.00 core 10 Sq. mm |
| 3655 | Supply, delivery of following size of PVC insulated and sheathed 3 core flat type Copper cable conforming to IS 694/1990 and as Amended there after well submersible motor to main panel board. |
| 3656 | 3core 4 Sq. mm copper cable |
| 3657 | Supply and delivery of UPVC column pipe for Bore well complete and as directed by TWAD Board Officers |
| 3658 | 50mm UPVC Pipe |
| 3659 | Supply, delivery and fixing of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications inclusive of transportation charges anywhere in Tamilnadu etc., complete and as directed by TWAD Board officers |
| 3660 | 80mm GM Gate valve |
| 3661 | Removal of sediments and depositions of sludge, silt,Particles inside the sump at various capacities by engaging required labours and diesel pumpsets and cleaning the side wall and bottom of sump using wire brushes, brooms, collecting , lifting of the deposited slit particles outside the sump, washing side wall and floor slab using bleaching powder including lighting arrangements and safety arrangements inside the sump, hire charges for the buckets, rope etc and supply of bleaching powder for cleaning purposes etc., complete and as directed by TWAD Board officers |
| 3662 | 0.30 LL capacity Sump @ Ayankudi |
| 3663 | 0.60 LL capacity Sump @ Pulichavayal COST OF CHEMICALS |
| 3664 | Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of all disinfectents (such as bleaching powder, chlorine cylinder, silver ionization rods as applicable to this CWSS), labour charges and all incidental charges for disinfection of the water supplied from this CWSS to ensure the portable quality of disinfected water at all delivery points / tail ends, testing of water samples including additional / required / instructed dosage during the period of Flood/ Calamities etc., complete and as directed by TWAD Board officers. |
| 3665 | Supply, delivery of stable Bleaching Powder anywhere in the schemes maintained by TWAD Board as per IS 1065:1989 (Grade I) and amended from time to time including freight, loading, unloading, transporation, transit insurance, all other incidental charges at site of work etc., complete and as directed by TWAD Board officers. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender