Power Boards / Undertakings / PSU Closing in 4 days TDR #58444185

Tender For Mtps-Ii - Bm - Coh 2026-27 - Buck Stay - Removing Of Old Refractory, Inspection Of Buck Stay, Strengthening Of Buck Stay By Welding, Renewal / Reconditioning Of Cotter Pin, Renewal Of Damaged Buck Stay Leveller Beam With New Leveller Beam,

Issued by Boards / Undertakings / PSU · Salem, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Nov 2026
4 days left
EMD
14700
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Mtps-Ii - Bm - Coh 2026-27 - Buck Stay - Removing Of Old Refractory, Inspection Of Buck Stay, Strengthening Of Buck Stay By Welding, Renewal / Reconditioning Of Cotter Pin, Renewal Of Damaged Buck Stay Leveller Beam With New Leveller Beam, Applying New Refractory In Required Buck Stay, Removal & Refixing Insulation In Buck Stay Area And Its Allied Works

BOQ

Name of Work:- MTPS-II – BM – COH 2026-27 - Buck stay - Removing of old refractory, inspection of buck stay, Strengthening of buck stay by welding, renewal / reconditioning of cotter pin, Renewal of damaged buck stay leveller beam with new leveller beam, applying new refractory in required buck stay, removal & Refixing insulation in buck stay area and its allied works
Sl. No. Item Description
1Transporting the refractory from MTPS-II central store to boiler \\"0\\" mtr, leading and lifting to the required elevation of boiler by providing chain block, pulley and rope.
2Removing of old refractory and bringing to ‘0’m, including cost of all consumables, tools and plants etc.,
3Cutting and welding of clamp and arresting the buck stay plate, renewal/ reconditioning of cotter pin in the buckstay connecting corner plate including consumables and hire charges for T&Ps
4Providing shuttering for refractory and applying new refractory in the required area of buckstay location including consumables and hire charges for T&Ps.
5Removing the damaged leveller beam and providing new one at required elevation after removing the arresting clamps, positioning the beam, cutting and welding of leveller beam stiffner plates and its allied works, restoration of the clamps after renewal work and preparing scaffolding arrangements. Devoluting the scrap to store if required.
6Removing the damaged leveller beam in front & rear side of boiler Right side of water wall ('S') panel 55 deg slope area in boiler 1st pass and providing new one at required elevation after removing the arresting clamps, positioning the beam inclined of 55°, cutting and welding of leveller beam stiffener plates and its allied works, restoration of the clamps after renewal work and preparing scaffolding arrangements with highest safety provision in 'S' panel 55 deg slope area. Devoluting the scrap to store if required
7Transporting of new Leveller Beam from '0'mtr to various required elevation and bringing the damaged one to '0'mtr.
8Lifting the buckstay connecting corner plate and hinge pin wherever needed in the boiler by providing proper chain block supports for re-fixing the cotter pin including the charges like consumables, T&P’s and etc.,
9Removal of G.I sheet and insulation three layer (60mm x 3 = 180mm thick) from front, rear, left and right side water wall panels outside buck stay from 43 mtr to 65 mtr elevation, whichever required area in Boiler 1st pass and refixing after completion of rectification works
10Cost for Required I-Beam (Size 250 X125 6.9mm) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58444185
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 16-11-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Mtps-Ii - Bm - Coh 2026-27 - Buck Stay - Removing Of Old Refractory, Inspection Of Buck Stay, Strengthening Of Buck Stay By Welding, Renewal / Reconditioning Of Cotter Pin, Renewal Of Damaged Buck Stay Leveller Beam With New Leveller Beam, Applying New Refractory In Required Buck Stay, Removal & Refixing Insulation In Buck Stay Area And Its Allied Works
Basic Detail
Tender No OT73 Applying new refractory in required buck stay
Bidding Type Tender
Location
City Salem
State Tamil Nadu
Key Dates
Publish Date 07 Nov 2026
Submission Date 16 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 14700
Exemption Available
Document List
442e43a7-0044-445a-90a5-a841529d5432.html
BOQ_869381.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

442e43a7-0044-445a-90a5-a841529d5432.html

xls

BOQ_869381.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender