Supply Of Supply of SS Tubes and DFF for Amrit Bharat 3.0 Coaches
Tender Overview
Project Description
Supply Of supply of ss tubes and dff for amrit bharat 3.0 coaches , supply of stainless steel tubes, double ferrule fittings and pipe clamps for under-fram e fiba and air brake of llrrmpp amrit bharat 3.0 coaches. as per set-list no. mcf/ab/ dff/uf/mat. s ch/ llrrmpp, ver-0 , dtd: 01.09.2026. packing instructions-spi042 (dff) [ warranty period: 48 mo nths after the date of delivery ] ] , supply of stainless steel tubes and double ferrule fittings for bogie brake piping & bog ie air spring of llrrmpp amrit bharat 3.0 coaches. as per set-list no. mcf/ab/dff/bogie/mat sch/ll rrmpp, ver-01, dtd: 01.10.2026. packing instructions-spi042 (dff) [ warranty period: 48 months af ter the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply of Stainless Steel Tubes, Double Ferrule Fittings and Pipe Clamps for Under-fram e FIBA and Air Brake of LLRRMPP Amrit Bharat 3.0 Coaches. As per set-list no. MCF/AB/ DFF/UF/MAT. S CH/ LLRRMPP, VER-0 , Dtd: 01.09.2026. Packing Instructions-SPI042 (DFF) [ Warranty Period: 48 Mo nths after the date of delivery ] ] |
| 2 | Supply of Stainless Steel Tubes and Double Ferrule Fittings for Bogie Brake piping & Bog ie Air Spring of LLRRMPP Amrit Bharat 3.0 Coaches. As per set-list no. MCF/AB/DFF/BOGIE/MAT SCH/LL RRMPP, Ver-01, Dtd: 01.10.2026. Packing Instructions-SPI042 (DFF) [ Warranty Period: 48 Months af ter the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender