Civil Aviation Boards / Undertakings / PSU Closing in 16 days TDR #58437007

Bids Are invited for Operation And Maintenance Of Water Supply Systems - As Per Atc/Nit/Nib - Providing Operation And Routine Maintenance Of Mbbr Based Sewage Treatment Plant (Stp) Of 1400 Kld Capacity And Water Supply System Including Borewells, Wat

Issued by Boards / Undertakings / PSU · Udaipur, Rajasthan
Tender Value
63.31 Lakhs
Estimated cost
Bid Submission
28 Nov 2026
16 days left
EMD
1.26 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Udaipur → Rajasthan
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Operation And Maintenance Of Water Supply Systems - As Per Atc/Nit/Nib - Providing Operation And Routine Maintenance Of Mbbr Based Sewage Treatment Plant (Stp) Of 1400 Kld Capacity And Water Supply System Including Borewells, Water Treatment Plant (Wtp) Of Capacity 1248 Kld, Ro Of Capacity 58.7 M3/H, Uv, Hydropneumatic Pumping System, Drinking Water Coolers And Drinking Water Fountain Systems In Strict Compliance With Latest Government Norms, Including The Maintainance Of Operational Records And Deployment Of The Required Manpower Complete As Required.The Scope Of This Item Includes Round The Clock Operation, Monitoring, Recording Of Operational Parameters, Routine Switching Operations, Operation Of Equipment, Maintaining Operational Log Books/Registers, Deployment Of Manpower, Tools & Tackles And Other Incidental Activities Necessary For Uninterrupted Operation Of The Installations.The Contractor Shall Deploy The Following Minimum Manpower In Shift Duty On All Days Including Sundays, Holidays, National Holidays But Excluding Weekly Offs For Operation Of The Above Installations:• Supervisor (Highly Skilled) - 01 Nos.• Technician Cum Plumber (Skilled) - 03 Nos.• Operators (Semi Skilled) - 07 Nos.• Helpers (Unskilled) - 04 Nos. , Supply Of Following Consumables As And When Required:Sodium Hypochlorite(10% Av. Cl2)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Limenote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Alumnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Ro Antiscalantnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Sodium Metabisulphite (Smbs)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Naoh/Caustic Soda Flakesnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Hydrochloric Acid (33%)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Citric Acidnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Ro Alkaline Cleaner(Edta / Sls Based)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Anionic Polyelectrolytenote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Salt For Regenerationnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:2T Engine Oil Suitable For Blowernote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:V-Belt (B-1800) Suitable For Blowernote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Carrying Out Testing From Nabl Accredited Laboratory As Per Relevant Is Codes & Latest Guidelines Of The Government Including Sample Collection From Site For Inlet And Outlet Of Stp For Parameters Like Ph, Bod, Cod, Tss, Oil & Grease, Nh4-N, Coliform Etc And Submission Of Test Reports Complete As Required. (All Requirements Such As Sampling Containers/Bottles, Arrangement Of Qualified Manpower For Sample Collection, Transportation Of Samples To The Nabl Testing Laboratory, And Associated Logistics Shall Be Strictly Within The Scope Of The Contractor. Nothing Extra Shall Be Paid On This Account By Aai.)

BOQ

Sl. No. Item TitleItem Description
1Providing operation and routine maintenance of MBBR based Sewage Treatment Plant (STP) of 1400 KLD capacity and Water supply system including Borewells, Water Treatment Plant (WTP) of capacity 1248 KLD, RO of capacity 58.7 m3/h, UV, Hydropneumatic Pumping System, Drinking Water Coolers and Drinking Water Fountain Systems in strict compliance with latest government norms, including the maintainance of operational records and deployment of the required manpower complete as required.The scope of this item includes round the clock operation, monitoring, recording of operational parameters, routine switching operations, operation of equipment, maintaining operational log books/registers, deployment of manpower, tools & tackles and other incidental activities necessary for uninterrupted operation of the installations.The contractor shall deploy the following minimum manpower in shift duty on all days including sundays, holidays, national holidays but excluding weekly offs for operation of the above installations:• Supervisor (Highly Skilled) - 01 Nos.• Technician cum plumber (Skilled) - 03 Nos.• Operators (Semi Skilled) - 07 Nos.• Helpers (Unskilled) - 04 Nos.Providing operation and routine maintenance of MBBR based Sewage Treatment Plant (STP) of 1400 KLD capacity and Water supply system including Borewells, Water Treatment Plant (WTP) of capacity 1248 KLD, RO of capacity 58.7 m3/h, UV, Hydropneumatic Pumping System, Drinking Water Coolers and Drinking Water Fountain Systems in strict compliance with latest government norms, including the maintainance of operational records and deployment of the required manpower complete as required.The scope of this item includes round the clock operation, monitoring, recording of operational parameters, routine switching operations, operation of equipment, maintaining operational log books/registers, deployment of manpower, tools & tackles and other incidental activities necessary for uninterrupted operation of the installations.The contractor shall deploy the following minimum manpower in shift duty on all days including sundays, holidays, national holidays but excluding weekly offs for operation of the above installations:• Supervisor (Highly Skilled) - 01 Nos.• Technician cum plumber (Skilled) - 03 Nos.• Operators (Semi Skilled) - 07 Nos.• Helpers (Unskilled) - 04 Nos.
2Supply of following consumables as and when required:Sodium hypochlorite(10% av. Cl2)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Sodium hypochlorite(10% av. Cl2)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
3Supply of following consumables as and when required:LimeNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:LimeNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
4Supply of following consumables as and when required:AlumNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:AlumNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
5Supply of following consumables as and when required:RO AntiscalantNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:RO AntiscalantNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
6Supply of following consumables as and when required:Sodium metabisulphite (SMBS)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Sodium metabisulphite (SMBS)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
7Supply of following consumables as and when required:NaOH/Caustic soda flakesNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:NaOH/Caustic soda flakesNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
8Supply of following consumables as and when required:Hydrochloric acid (33%)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Hydrochloric acid (33%)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
9Supply of following consumables as and when required:Citric acidNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Citric acidNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
10Supply of following consumables as and when required:RO alkaline cleaner(EDTA / SLS based)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:RO alkaline cleaner(EDTA / SLS based)Note: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
11Supply of following consumables as and when required:Anionic PolyelectrolyteNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Anionic PolyelectrolyteNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
12Supply of following consumables as and when required:Salt for regenerationNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:Salt for regenerationNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
13Supply of following consumables as and when required:2T engine oil suitable for blowerNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:2T engine oil suitable for blowerNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
14Supply of following consumables as and when required:V-Belt (B-1800) suitable for blowerNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.Supply of following consumables as and when required:V-Belt (B-1800) suitable for blowerNote: The agency has to maintain minimum inventory for one month at site. Payment shall be released based on actual consumption.
15Carrying out testing from NABL accredited laboratory as per relevant IS codes & latest guidelines of the government including sample collection from site for inlet and outlet of STP for parameters like pH, BOD, COD, TSS, oil & grease, NH4-N, coliform etc and submission of test reports complete as required. (All requirements such as sampling containers/bottles, arrangement of qualified manpower for sample collection, transportation of samples to the NABL testing laboratory, and associated logistics shall be strictly within the scope of the contractor. Nothing extra shall be paid on this account by AAI.)Carrying out testing from NABL accredited laboratory as per relevant IS codes & latest guidelines of the government including sample collection from site for inlet and outlet of STP for parameters like pH, BOD, COD, TSS, oil & grease, NH4-N, coliform etc and submission of test reports complete as required. (All requirements such as sampling containers/bottles, arrangement of qualified manpower for sample collection, transportation of samples to the NABL testing laboratory, and associated logistics shall be strictly within the scope of the contractor. Nothing extra shall be paid on this account by AAI.)

AI Tender Summary

OUR REF NO 58437007
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 63.31 Lakhs
LAST DATE 28-11-2026
Authority
Authority Name Airports Authority Of India
Work Description Bids Are invited for Operation And Maintenance Of Water Supply Systems - As Per Atc/Nit/Nib - Providing Operation And Routine Maintenance Of Mbbr Based Sewage Treatment Plant (Stp) Of 1400 Kld Capacity And Water Supply System Including Borewells, Water Treatment Plant (Wtp) Of Capacity 1248 Kld, Ro Of Capacity 58.7 M3/H, Uv, Hydropneumatic Pumping System, Drinking Water Coolers And Drinking Water Fountain Systems In Strict Compliance With Latest Government Norms, Including The Maintainance Of Operational Records And Deployment Of The Required Manpower Complete As Required.The Scope Of This Item Includes Round The Clock Operation, Monitoring, Recording Of Operational Parameters, Routine Switching Operations, Operation Of Equipment, Maintaining Operational Log Books/Registers, Deployment Of Manpower, Tools & Tackles And Other Incidental Activities Necessary For Uninterrupted Operation Of The Installations.The Contractor Shall Deploy The Following Minimum Manpower In Shift Duty On All Days Including Sundays, Holidays, National Holidays But Excluding Weekly Offs For Operation Of The Above Installations:• Supervisor (Highly Skilled) - 01 Nos.• Technician Cum Plumber (Skilled) - 03 Nos.• Operators (Semi Skilled) - 07 Nos.• Helpers (Unskilled) - 04 Nos. , Supply Of Following Consumables As And When Required:Sodium Hypochlorite(10% Av. Cl2)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Limenote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Alumnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Ro Antiscalantnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Sodium Metabisulphite (Smbs)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Naoh/Caustic Soda Flakesnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Hydrochloric Acid (33%)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Citric Acidnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Ro Alkaline Cleaner(Edta / Sls Based)Note: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Anionic Polyelectrolytenote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:Salt For Regenerationnote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:2T Engine Oil Suitable For Blowernote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Supply Of Following Consumables As And When Required:V-Belt (B-1800) Suitable For Blowernote: The Agency Has To Maintain Minimum Inventory For One Month At Site. Payment Shall Be Released Based On Actual Consumption. , Carrying Out Testing From Nabl Accredited Laboratory As Per Relevant Is Codes & Latest Guidelines Of The Government Including Sample Collection From Site For Inlet And Outlet Of Stp For Parameters Like Ph, Bod, Cod, Tss, Oil & Grease, Nh4-N, Coliform Etc And Submission Of Test Reports Complete As Required. (All Requirements Such As Sampling Containers/Bottles, Arrangement Of Qualified Manpower For Sample Collection, Transportation Of Samples To The Nabl Testing Laboratory, And Associated Logistics Shall Be Strictly Within The Scope Of The Contractor. Nothing Extra Shall Be Paid On This Account By Aai.)
Basic Detail
Tender No GEM/2026/B/8240366
Bidding Type Tender
Location
City Udaipur
State Rajasthan
Key Dates
Publish Date 07 Nov 2026
Submission Date 28 Nov 2026
Open Date 29 Nov 2026
Finance
Tender Value 63.31 Lakhs
Tender Fee Ref. Documents
EMD 1.26 Lakhs
Exemption Not Available
Document List
d51fac42-9805-40af-843c-ef5976c71ed8.pdf
1794054686.xlsx
1794054755.pdf
1794054758.pdf
1794054765.pdf
ATC_534347e0-64d7-42f4-833b1794055181157_ENGG_EE_UDAIPUR.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Nov 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
pdf

d51fac42-9805-40af-843c-ef5976c71ed8.pdf

xlsx

1794054686.xlsx

pdf

1794054755.pdf

pdf

1794054758.pdf

pdf

1794054765.pdf

pdf

ATC_534347e0-64d7-42f4-833b1794055181157_ENGG_EE_UDAIPUR.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender