Tender For 1. Construction Of Community Soak Pit In Samy Reddy Kandigai Pums At Peddikuppam Panchayat, 2. Construction Of Community Soak Pit In Anganwadi At Athupakkam Colony In Athupakkam Panchayat, 3. Construction Of Community Soak Pit At Pums Kitc
Tender Overview
Project Description
Tender for 1. Construction Of Community Soak Pit In Samy Reddy Kandigai Pums At Peddikuppam Panchayat, 2. Construction Of Community Soak Pit In Anganwadi At Athupakkam Colony In Athupakkam Panchayat, 3. Construction Of Community Soak Pit At Pums Kitchen Shed In Ayanallur Panchayat, 4. Construction Of Community Soak Pit At Pues School Kitchen Shed At Enathimelpakkam School In Enathimelpakkam Panchayat, 5. Construction Of Community Soak Pit At Pues School Kitchen Shed At Periyasoliyambakkam School In Enathimelpakkam Panchayat, 6.Construction Of Community Soak Pit At Pues School Kitchen Shed At Chinnasoliyambakkam School In Enathimelpakkam Panchayat, 7. Construction Of Community Soak Pit At Kuruvatucheri Pums In Kuruvatucheri Panchayat, 8. Construction Of Community Soak Pit At Pues School Kitchen Shed At Rettambedu School In Rettambedu Panchayat, 9. Construction Of Community Soak Pit At Pues School Kitchen Shed At Kuruviyagaram School At Rettambedu Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | 1. Construction of Community Soak Pit in Samy reddy kandigai PUMS at Peddikuppam Panchayat |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 3 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 4 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 5 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 6 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 7 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 8 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 9 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 10 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 11 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 12 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 13 | 2. Construction of Community soak pit in Anganwadi at Athupakkam colony in Athupakkam Panchayat |
| 14 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 15 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 16 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 17 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 18 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 19 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 20 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 21 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 22 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 23 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 24 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 25 | 3. Construction of Community soak pit at PUMS Kitchen shed in Ayanallur Panchayat |
| 26 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 27 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 28 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 29 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 30 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 31 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 32 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 33 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 34 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 35 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 36 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 37 | 4. Construction of Community soak pit at PUES school kitchen shed at Enathimelpakkam school in Enathimelpakkam Panchayat |
| 38 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 39 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 40 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 41 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 42 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 43 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 44 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 45 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 46 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 47 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 48 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 49 | 5. Construction of Community soak pit at PUES school kitchen shed at Periyasoliyambakkam school in Enathimelpakkam Panchayat |
| 50 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 51 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 52 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 53 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 54 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 55 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 56 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 57 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 58 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 59 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 60 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 61 | 6.Construction of Community soak pit at PUES school kitchen shed at Chinnasoliyambakkam school in Enathimelpakkam Panchayat |
| 62 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 63 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 64 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 65 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 66 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 67 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 68 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 69 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 70 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 71 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 72 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 73 | 7. Construction of Community soak pit at Kuruvatucheri PUMS in Kuruvatucheri panchayat |
| 74 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 75 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 76 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 77 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 78 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 79 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 80 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 81 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 82 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 83 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 84 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 85 | 8. Construction of Community soak pit at PUES school kitchen shed at Rettambedu School in Rettambedu Panchayat |
| 86 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 87 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 88 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 89 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 90 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 91 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 92 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 93 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 94 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 95 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 96 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 97 | 9. Construction of Community soak pit at PUES school kitchen shed at Kuruviyagaram School at Rettambedu Panchayat |
| 98 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 99 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 100 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 101 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 102 | Filling the soak pit with 225 mm boulders as per drawing and as directed by departmental officer as per standard specifications |
| 103 | Filling the soak pit with 63/65mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 104 | Filling the soak pit with 20mm metal as per drawing and as directed by departmental officer as per standard specifications |
| 105 | Supply and fixing of cement tank of 0.60m dia (made with RCC rings - 0.3m depth and having holes for cement tank along with top cover and base closed) including cost and conveyance to site and all labour charges etc., |
| 106 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 107 | Supply of PVC pipes of 110mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 108 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 109 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender