Tender For Operation And Maintenance Of 01 Nos Of Cwss Under Maintenance Division, Salem In Salem District Including Repairs, Rectification Works And Supply Of Chemicals For Period Of 27 Months From 01.01.2027 To 31.03.2029 - (Package-1A)
Tender Overview
Project Description
Tender for Operation And Maintenance Of 01 Nos Of Cwss Under Maintenance Division, Salem In Salem District Including Repairs, Rectification Works And Supply Of Chemicals For Period Of 27 Months From 01.01.2027 To 31.03.2029 - (Package-1A)
BOQ
| Sl. No. | Item Description |
| 1 | TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD CHIEF ENGINEER, COIMBATORE. Name of work:- Operation and Maintenance of 01 Nos of CWSS under Maintenance Division, Salem in Salem District including repairs, rectification works and Supply of Chemicals for period of 27 Months from 01.01.2027 to 31.03.2029 - (Package-1A) PRICE BID (COVER -II) BILL OF QUANTITY BILL OF QUANTITIES 1) The Bill of Quantities shall contain items for the construction, installation, testing, commissioning and maintenance of the Works to be carried out by the Contractor 2) The Bill of Quantities will be used to calculate the Contract Price. The contractor shall be paid for the quantum of work done at the rate quoted for each item in the Bill of Quantities. 3) The bidder shall fill in rates and prices and line item total (both in figures and words) for all items of works described in the Bill of quantities along with total bid price (both in figures and words). Items for which no rate or price is entered by the bidder will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities 4) The rates quoted in the BOQ shall be for carrying out the work in conformity to the BIS, TNBP and Technical Specifications and other Terms and Conditions set out in the Bid Document. 5) All pages in the BOQ should be signed without omission. All corrections/over writing should be properly attested by the Bidder. Changes in the Probable of Probable of Quantity 6) If the final Quantity of the work done differs from the Probable of Quantity in the Bill of Quantities for the particular item/items, the rates as in the agreement for the relevant items shall be paid. Goods & Service Tax 7) The bid value is inclusive of GST @ 18% (or) at the rates as may be notified by the Government from time to time. The bidder should quote basic price of each item in the Bill of Quantity. The GST amount should be arrived for the Total basic cost of all the items. TDS - GST 8) From every individual periodic payment made to the firm/Contractor, TDS - GST will be deducted at the rates as may be notified from time to time by the Government 9) The Executive Engineer has to show restraint in execution of works under the following category by duly observance of procedure. i. Items quoted with violent excess percentage i.e.,(+) 25% and above over the departmental rate should not ordinarily exceed the departmental quantity during execution. Departement rates shall only be allowed for the excess quantity if any involved during execution on these items. ii. The items quoted with violent less percentage i.e., (-) 10 % and below than the departmental value shall not be ordinarily omitted or reduced during execution. Name of Work: Operation and Maintenance of 01 Nos of CWSS under Maintenance Division, Salem in Salem District including repairs, rectification works and Supply of Chemicals for period of 27 Months from 01.01.2027 to 31.03.2029 - (Package-1A) Sl. No. Description of work Probable quantity Figures TNBP No. Other specification Units in Rates in Amount in figures Figures Words 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Vide separate sheets attached. Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: The Chief Engineer, TWAD Board, Coimbatore Name of Work: Operation and Maintenance of 01 Nos of CWSS under Maintenance Division, Salem in Salem District including repairs, rectification works and Supply of Chemicals for period of 27 Months from 01.01.2027 to 31.03.2029 - (Package-1A) Contract No: 04 to 05 / F. O&M of CWSS - Salem & Karur / SDO(T6) / CE / CBE / 2026 / Dated. 04.11.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Work Item Code / Make Probable quantity Figures Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Operation and maintenance of 1 No of CWSS to Attur, Narasingapuram Municipalities, 20 Town panchayats and 1345 Rural Habitations in 12 Unions of Salem District including repairs, rectification works and supply of Chemicals for a period of 27 Months (i.e.,) from 01.01.2027 to 31.03.2029 - Package 1A |
| 3 | Part :- 1 - Operation and maintenance of 1 No of CWSS to Attur, Narasingapuram Municipalities, 20 Town panchayats and 1345 Rural Habitations in 12 Unions of Salem District including repairs, rectification works and supply of Chemicals for a period of 27 Months (i.e.,) from 01.01.2027 to 31.03.2029 - Package 1A |
| 4 | Add GST 18% Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only |
| 5 | Operation and maintenance of 1 No of CWSS to Attur, Narasingapuram Municipalities, 20 Town panchayats and 1345 Rural Habitations in 12 Unions of Salem District including repairs, rectification works and supply of Chemicals for a period of 27 Months (i.e.,) from 01.01.2027 to 31.03.2029 - Package 1A |
| 6 | Operation and Maintenance of CWSS |
| 7 | Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines valves and appurtenances, water retaining structures including protecton of all schemee components from damages/ theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries as per Annexure -I, carrying out the O&M as per standard operating procedures, Acts and rules in force and as directed by TWAD Board Oficers and excluding cost towards attending leak, burst repair and replacement works to electro mechanical installations consumables for disinfection of water, cleaning of all water retaining structure, electricity . |
| 8 | For a period from 01.01.2027 to 31.03.2027( 66.813 ML *90 Days = 6013.170 ML) |
| 9 | For a period from 01.04.2027 to 31.03.2028 |
| 10 | For a period from 01.04.2028 to 30.04.2029 (1- Month) |
| 11 | For a period from 01.05.2028 to 31.03.2029 (11- Months) |
| 12 | Repairs and Renewals for the period 01.01.2027 to 31.03.2027 |
| 13 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 14 | USING MS BARREL PIPE |
| 15 | 400mm PSC pipe |
| 16 | 450mm PSC pipe |
| 17 | 500mm PSC pipe |
| 18 | 700mm PSC pipe |
| 19 | 1100mm PSC pipe |
| 20 | PSC pipe leak using MS plain collar |
| 21 | 400mm PSC pipe |
| 22 | 450mm PSC pipe |
| 23 | 500mm PSC pipe |
| 24 | 700mm PSC pipe |
| 25 | 1100mm PSC pipe |
| 26 | PSC Pipe using MS Step Collar |
| 27 | 400mm PSC pipe |
| 28 | 450mm PSC pipe |
| 29 | 500mm PSC pipe |
| 30 | 700mm PSC pipe |
| 31 | 1100mm PSC pipe |
| 32 | PSC Pipe Cement joint leak |
| 33 | 400mm PSC pipe |
| 34 | 450mm PSC pipe |
| 35 | 500mm PSC pipe |
| 36 | 700mm PSC pipe |
| 37 | 1100mm PSC pipe |
| 38 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (MS pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of MS Pipes, MS specials without inside lining and outside coating but with anti-rust painting, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 39 | Attending MS pipe line MS plate in MS pipe |
| 40 | 350mm MS pipe |
| 41 | 400mm MS pipe |
| 42 | 450mm MS pipe |
| 43 | 700mm MS pipe |
| 44 | 900mm MS pipe |
| 45 | 1000mm MS pipe |
| 46 | 1100mm MS pipe |
| 47 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 48 | Leaks in PVC pipes |
| 49 | 50mm 6 KSC pipe |
| 50 | 63mm 4KSC PVC pipe |
| 51 | 63mm 6 KSC PVC pipe |
| 52 | 63mm 10 ksc PVC pipe |
| 53 | 75mm 4ksc PVC pipe |
| 54 | 75mm 6ksc PVC pipe |
| 55 | 90mm 4ksc PVC pipe |
| 56 | 90mm 6ksc PVC pipe |
| 57 | 110mm 4ksc PVC pipe |
| 58 | 110mm 6ksc PVC pipe |
| 59 | 110mm 10 ksc PVC pipe |
| 60 | 140mm 4 ksc PVC pipe |
| 61 | 140mm 6 ksc PVC pipe |
| 62 | 140mm 10 ksc PVC pipe |
| 63 | 160mm 4 ksc PVC pipe |
| 64 | 160mm 6 ksc PVC pipe |
| 65 | 160mm 10 ksc PVC pipe |
| 66 | 200mm 4 ksc PVC pipe |
| 67 | 200mm 6 ksc PVC pipe |
| 68 | Bursts in PVC pipes |
| 69 | 50mm 6 KSC pipe |
| 70 | 63mm 4KSC PVC pipe |
| 71 | 63mm 6 KSC PVC pipe |
| 72 | 63mm 10 ksc PVC pipe |
| 73 | 75mm 4ksc PVC pipe |
| 74 | 75mm 6ksc PVC pipe |
| 75 | 90mm 4ksc PVC pipe |
| 76 | 90mm 6ksc PVC pipe |
| 77 | 110mm 4ksc PVC pipe |
| 78 | 110mm 6ksc PVC pipe |
| 79 | 110mm 10 ksc PVC pipe |
| 80 | 140mm 4 ksc PVC pipe |
| 81 | 140mm 6 ksc PVC pipe |
| 82 | 140mm 10 ksc PVC pipe |
| 83 | 160mm 4 ksc PVC pipe |
| 84 | 160mm 6 ksc PVC pipe |
| 85 | 160mm 10 ksc PVC pipe |
| 86 | 200mm 4 ksc PVC pipe |
| 87 | 200mm 6 ksc PVC pipe |
| 88 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 89 | Type of Leak- Burst Pipe Replacement |
| 90 | 100 mm DI Pipe |
| 91 | 150 mm DI Pipe |
| 92 | 200 mm DI Pipe |
| 93 | 250 mm DI Pipe |
| 94 | 300 mm DI Pipe |
| 95 | 350 mm DI Pipe |
| 96 | 400 mm DI Pipe |
| 97 | 450 mm DI Pipe |
| 98 | 600 mm DI Pipe |
| 99 | Type of Leak- Single MJ Collar |
| 100 | 100 mm DI Pipe |
| 101 | 150 mm DI Pipe |
| 102 | 200 mm DI Pipe |
| 103 | 250 mm DI Pipe |
| 104 | 300 mm DI Pipe |
| 105 | 350 mm DI Pipe |
| 106 | 400 mm DI Pipe |
| 107 | 450 mm DI Pipe |
| 108 | 600 mm DI Pipe |
| 109 | Type of Leak- Cut Barrel & MJ Collar |
| 110 | 100 mm DI Pipe |
| 111 | 150 mm DI Pipe |
| 112 | 200 mm DI Pipe |
| 113 | 250 mm DI Pipe |
| 114 | 300 mm DI Pipe |
| 115 | 350 mm DI Pipe |
| 116 | 400 mm DI Pipe |
| 117 | 450 mm DI Pipe |
| 118 | 600 mm DI Pipe |
| 119 | Type of Leak- specials cement joint |
| 120 | 100 mm DI Pipe |
| 121 | 150 mm DI Pipe |
| 122 | 200 mm DI Pipe |
| 123 | 250 mm DI Pipe |
| 124 | 300 mm DI Pipe |
| 125 | 350 mm DI Pipe |
| 126 | 400 mm DI Pipe |
| 127 | 450 mm DI Pipe |
| 128 | 600 mm DI Pipe |
| 129 | Type of Leak- Gasket joint |
| 130 | 100 mm DI Pipe |
| 131 | 150 mm DI Pipe |
| 132 | 200 mm DI Pipe |
| 133 | 250 mm DI Pipe |
| 134 | 300 mm DI Pipe |
| 135 | 350 mm DI Pipe |
| 136 | 400 mm DI Pipe |
| 137 | 450 mm DI Pipe |
| 138 | 600 mm DI Pipe |
| 139 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes, couplers, union, jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 140 | Type of Leak- Gasket joint |
| 141 | 50 mm |
| 142 | 65 mm |
| 143 | 80 mm |
| 144 | 100 mm |
| 145 | 125 mm |
| 146 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 147 | Type of Leak- using MS STEP COLLAR |
| 148 | Ø100mm AC pipe |
| 149 | Ø150mm AC pipe |
| 150 | Ø200mm AC pipe |
| 151 | Ø600mm AC pipe |
| 152 | Type of Leak- using MS BARREL PIPE |
| 153 | Ø100mm AC pipe |
| 154 | Ø150mm AC pipe |
| 155 | Ø200mm AC pipe |
| 156 | Ø600mm AC pipe |
| 157 | Type of Leak- COUPLER BURST USING MS PLAIN COLLER |
| 158 | Ø100mm AC pipe |
| 159 | Ø150mm AC pipe |
| 160 | Ø200mm AC pipe |
| 161 | Ø600mm AC pipe |
| 162 | Type of Leak- using COUPLER LEAK |
| 163 | Ø100mm AC pipe |
| 164 | Ø150mm AC pipe |
| 165 | Ø200mm AC pipe |
| 166 | Ø600mm AC pipe |
| 167 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 168 | Type of Leak- HDPE Fusion Joint |
| 169 | 63 mm PN 6 HDPE pipe |
| 170 | 75 mm PN 6 HDPE pipe |
| 171 | 90mm PN 6 HDPE pipe |
| 172 | 110 mm PN 6 HDPE pipe |
| 173 | 140 mm PN 6 HDPE pipe |
| 174 | 160 mm PN 6 HDPE pipe |
| 175 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (CI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 176 | Type of Leak- specials cement joint |
| 177 | 150mm |
| 178 | 250mm |
| 179 | 350mm |
| 180 | Type of Leak- Cut Barrel & MJ Collar |
| 181 | 150mm |
| 182 | 250mm |
| 183 | 350mm |
| 184 | Repair and Reconditioning of Sluice Valves |
| 185 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials and as directed by the TWAD Board officers. |
| 186 | 400mm DI D/F Gate Valve |
| 187 | 350mm DI D/F Gate Valve |
| 188 | 300mm DI D/F Gate Valve |
| 189 | 250mm DI D/F Gate Valve |
| 190 | 200mm DI D/F Gate Valve |
| 191 | 150mm DI D/F Gate Valve |
| 192 | 100mm DI D/F Gate Valve |
| 193 | 80mm DI D/F Gate Valve |
| 194 | Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc., and as directed by the TWAD Board officers. |
| 195 | 400mm DI D/F Gate Valve |
| 196 | 350mm DI D/F Gate Valve |
| 197 | 300mm DI D/F Gate Valve |
| 198 | 250mm DI D/F Gate Valve |
| 199 | 200mm DI D/F Gate Valve |
| 200 | 150mm DI D/F Gate Valve |
| 201 | 100mm DI D/F Gate Valve |
| 202 | 80mm DI D/F Gate Valve |
| 203 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 204 | 400mm DI D/F Gate Valve |
| 205 | 350mm DI D/F Gate Valve |
| 206 | 300mm DI D/F Gate Valve |
| 207 | 250mm DI D/F Gate Valve |
| 208 | 200mm DI D/F Gate Valve |
| 209 | 150mm DI D/F Gate Valve |
| 210 | 100mm DI D/F Gate Valve |
| 211 | 80mm DI D/F Gate Valve |
| 212 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 213 | 400mm DI D/F Gate Valve |
| 214 | 350mm DI D/F Gate Valve |
| 215 | 300mm DI D/F Gate Valve |
| 216 | 250mm DI D/F Gate Valve |
| 217 | 200mm DI D/F Gate Valve |
| 218 | 150mm DI D/F Gate Valve |
| 219 | 100mm DI D/F Gate Valve |
| 220 | 80mm DI D/F Gate Valve |
| 221 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 222 | 400mm DI D/F Gate Valve |
| 223 | 350mm DI D/F Gate Valve |
| 224 | 300mm DI D/F Gate Valve |
| 225 | 250mm DI D/F Gate Valve |
| 226 | 200mm DI D/F Gate Valve |
| 227 | 150mm DI D/F Gate Valve |
| 228 | 100mm DI D/F Gate Valve |
| 229 | 80mm DI D/F Gate Valve |
| 230 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 231 | 400mm DI D/F Gate Valve |
| 232 | 350mm DI D/F Gate Valve |
| 233 | 300mm DI D/F Gate Valve |
| 234 | 250mm DI D/F Gate Valve |
| 235 | 200mm DI D/F Gate Valve |
| 236 | 150mm DI D/F Gate Valve |
| 237 | 100mm DI D/F Gate Valve |
| 238 | 80mm DI D/F Gate Valve |
| 239 | Repair and Reconditioning of Air Valves |
| 240 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the TWAD Board officers. |
| 241 | 200mm Single Chamber Air Valve |
| 242 | 150mm Single Chamber Air Valve |
| 243 | 100mm Single Chamber Air Valve |
| 244 | 80mm Single Chamber Air Valve |
| 245 | 50mm Single Chamber Air Valve |
| 246 | 20mm Single Chamber Air Valve |
| 247 | Replacement of Sluice Valves |
| 248 | Supply and Delivery of DI D/F Gate (sluice) valves (Soft Seated) resilient seated soft sealing gate valves (sluice valves) with body bonnet of ductile cast iron of grade GGG40 or equivalent grade, wedge fully rubber lined with EPDM, replaceable spindle nut, without gland packing and with 3 O-Ring protection on the shaft and seals of NBR and the valves should be of vaccum tight and 100% leak proof with face to face dimentions as per BS 5163-89/ ISI 14846-2000/ DIN 3202 F 4. All the valves should be with electrostatic powder coating both inside and outside with pocket less straight through body passage. All the valves are to be compatible for burried application with pressure rating PN 10/16 and with 5 years warranty and as directed by the TWAD Board officers. |
| 249 | 50 mm DI D/F Gate Valve |
| 250 | 65 mm DI D/F Gate Valve |
| 251 | 80 mm DI D/F Gate Valve |
| 252 | 100 mm DI D/F Gate Valve |
| 253 | 125 mm DI D/F Gate Valve |
| 254 | 150 mm DI D/F Gate Valve |
| 255 | 200 mm DI D/F Gate Valve |
| 256 | 250 mm DI D/F Gate Valve |
| 257 | 300 mm DI D/F Gate Valve |
| 258 | 350 mm DI D/F Gate Valve |
| 259 | 400 mm DI D/F Gate Valve |
| 260 | 450 mm DI D/F Gate Valve |
| 261 | 500 mm DI D/F Gate Valve |
| 262 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 263 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 264 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 265 | 125 mm dia C.I./D.I. Double flanged pipes and special |
| 266 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 267 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 268 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 269 | 300 mm dia C.I./D.I. Double flanged pipes and special |
| 270 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 271 | 400 mm dia C.I./D.I. Double flanged pipes and special |
| 272 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 273 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 274 | Air Valves |
| 275 | Manufacture, Supply and Delivery of Tamper proof DI single chamber double orifice triple function (ventilating, admitting & ventilating during operation) air release valve with pressure rating PN 10/16 with body and cover made of Ductile Iron of Grade GGG 40 or GGG 50, conforming to IS 1865 with Food Grade Epoxy Powder coating (EP-P) inside and for outside of colour blue RAL 5005. All internal parts such as float, shell etc., cover bolts, made of Austenitic alloy steel of SS AISI 304/316. The float shall be made of Polytetrafluroethylene/ Austenitic alloy steel of AISI 304/316. Gaskets and seals of EPDM / Neoprene rubber for TWAD Board works anywhere in Tamil Nadu and with 5 years warranty and as directed by the TWAD Board officers. |
| 276 | 50 mm DI Single Chamber Air release valve |
| 277 | 80 mm DI Single Chamber Air release valve |
| 278 | 100 mm DI Single Chamber Air release valve |
| 279 | 150 mm DI Single Chamber Air release valve |
| 280 | 200 mm DI Single Chamber Air release valve |
| 281 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 282 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 283 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 284 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 285 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 286 | Non Return Valves |
| 287 | Manufacture, Supply and Delivery of DI D/F Slanted seat Swing Check Valve. Body of ductile cast iron of Grade GGG 40 or GGG 50 and disc of ductile cast iron GGG 40 or GGG 50 with fully encapsulated EPDM rubber, where both faces can be used. Electrostatic epoxy powder/liquid coating (EP-P) inside and outside color blue RAL 5005 with minimum coating thickness of 250 microns. The EPDM rubber & Epoxy Powder should be approved by W 270. (EP-P) it is a resi coat powder approved for drinking water application, applied through fusion bonding process by dipping the shot-blasted casted components heated up to 200 deg C). Face to face dimensions as per EN558-1, series 48 and flange connections as per EN 1092-2/IS 1538 and with 5 years warranty and as directed by TWAD board officers |
| 288 | 200 mm DI Non Return Valve |
| 289 | 250 mm DI Non Return Valve |
| 290 | 350 mm DI Non Return Valve |
| 291 | 450 mm DI Non Return Valve |
| 292 | 500 mm DI Non Return Valve |
| 293 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete. and as directed by TWAD board officers |
| 294 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 295 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 296 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 297 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 298 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 299 | Butterfly Valves |
| 300 | Supply and delivery of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2) 1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the disc and body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 and with 5 years warranty and as directed by TWAD Board Officers. |
| 301 | 450 mm DI Non Return Valve PN 10 |
| 302 | 600 mm DI Butterfly Valve PN 10 |
| 303 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete and as directed by TWAD Board Officers. |
| 304 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 305 | 600 mm dia C.I./D.I. Double flanged pipes and special |
| 306 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 307 | Attending the Repair and Renewal works in Open well Submersible Pumpset |
| 308 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 309 | 1.5 HP |
| 310 | 7.5 HP |
| 311 | 10 HP |
| 312 | 12.5 HP |
| 313 | 15 HP |
| 314 | 20 HP |
| 315 | 25 HP |
| 316 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 317 | 1.5 HP |
| 318 | 7.5 HP |
| 319 | 10 HP |
| 320 | 12.5 HP |
| 321 | 15 HP |
| 322 | 20 HP |
| 323 | 25 HP |
| 324 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 325 | 1.5 HP |
| 326 | 7.5 HP |
| 327 | 10 HP |
| 328 | 12.5 HP |
| 329 | 15 HP |
| 330 | 20 HP |
| 331 | 25 HP |
| 332 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 333 | 1.5 HP |
| 334 | 7.5 HP |
| 335 | 10 HP |
| 336 | 12.5 HP |
| 337 | 15 HP |
| 338 | 20 HP |
| 339 | 25 HP |
| 340 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 341 | 1.5 HP |
| 342 | 7.5 HP |
| 343 | 10 HP |
| 344 | 12.5 HP |
| 345 | 15 HP |
| 346 | 20 HP |
| 347 | 25 HP |
| 348 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 349 | 1.5 HP |
| 350 | 7.5 HP |
| 351 | 10 HP |
| 352 | 12.5 HP |
| 353 | 15 HP |
| 354 | 20 HP |
| 355 | 25 HP |
| 356 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 357 | 1.5 HP |
| 358 | 7.5 HP |
| 359 | 10 HP |
| 360 | 12.5 HP |
| 361 | 15 HP |
| 362 | 20 HP |
| 363 | 25 HP |
| 364 | Attending the Repair and Renewal works in Monoblock pumpsets |
| 365 | Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.and as directed by TWAD Board officers |
| 366 | 1.5 HP |
| 367 | 7.5 HP |
| 368 | Transporting the pumpset from the Pumping Station to work shop.and as directed by TWAD Board officers |
| 369 | 1.5 HP |
| 370 | 7.5 HP |
| 371 | Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials and as directed by TWAD Board officers |
| 372 | 1.5 HP |
| 373 | 7.5 HP |
| 374 | Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,and as directed by TWAD Board officers |
| 375 | 1.5 HP |
| 376 | 7.5 HP |
| 377 | Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.and as directed by TWAD Board officers |
| 378 | 1.5 HP |
| 379 | 7.5 HP |
| 380 | Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 381 | 1.5 HP |
| 382 | 7.5 HP |
| 383 | Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 384 | 1.5 HP |
| 385 | 7.5 HP |
| 386 | Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.and as directed by TWAD Board officers |
| 387 | 1.5 HP |
| 388 | 7.5 HP |
| 389 | Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.and as directed by TWAD Board officers |
| 390 | 1.5 HP |
| 391 | 7.5 HP |
| 392 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 393 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 394 | 60 HP |
| 395 | 90 HP |
| 396 | 167 HP |
| 397 | 180 HP |
| 398 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 399 | 60 HP |
| 400 | 90 HP |
| 401 | 167 HP |
| 402 | 180 HP |
| 403 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.and as directed by TWAD Board officers |
| 404 | 60 HP |
| 405 | 90 HP |
| 406 | 167 HP |
| 407 | 180 HP |
| 408 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 409 | 60 HP |
| 410 | 90 HP |
| 411 | 167 HP |
| 412 | 180 HP |
| 413 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 414 | 60 HP |
| 415 | 90 HP |
| 416 | 167 HP |
| 417 | 180 HP |
| 418 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor and as directed by TWAD Board officers |
| 419 | 60 HP |
| 420 | 90 HP |
| 421 | 167 HP |
| 422 | 180 HP |
| 423 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 424 | 60 HP |
| 425 | 90 HP |
| 426 | 167 HP |
| 427 | 180 HP |
| 428 | Transportation charges for conveying the motor from work shop to Pumping Station and as directed by TWAD Board officers |
| 429 | 60 HP |
| 430 | 90 HP |
| 431 | 167 HP |
| 432 | 180 HP |
| 433 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 434 | 60 HP |
| 435 | 90 HP |
| 436 | 167 HP |
| 437 | 180 HP |
| 438 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 439 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 440 | 60 HP |
| 441 | 90 HP |
| 442 | 167 HP |
| 443 | 180 HP |
| 444 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 445 | 60 HP |
| 446 | 90 HP |
| 447 | 167 HP |
| 448 | 180 HP |
| 449 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by TWAD Board officers |
| 450 | 60 HP |
| 451 | 90 HP |
| 452 | 167 HP |
| 453 | 180 HP |
| 454 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,and as directed by TWAD Board officers |
| 455 | 60 HP |
| 456 | 90 HP |
| 457 | 167 HP |
| 458 | 180 HP |
| 459 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by TWAD Board officers |
| 460 | 60 HP |
| 461 | 90 HP |
| 462 | 167 HP |
| 463 | 180 HP |
| 464 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by TWAD Board officers |
| 465 | 60 HP |
| 466 | 90 HP |
| 467 | 167 HP |
| 468 | 180 HP |
| 469 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by TWAD Board officers |
| 470 | 60 HP |
| 471 | 90 HP |
| 472 | 167 HP |
| 473 | 180 HP |
| 474 | Supply and delivery of Driven End and Non Driven End bearings and as directed by TWAD Board officers |
| 475 | 60 HP |
| 476 | 90 HP |
| 477 | 167 HP |
| 478 | 180 HP |
| 479 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 480 | 60 HP |
| 481 | 90 HP |
| 482 | 167 HP |
| 483 | 180 HP |
| 484 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station.and as directed by TWAD Board officers |
| 485 | 60 HP |
| 486 | 90 HP |
| 487 | 167 HP |
| 488 | 180 HP |
| 489 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 490 | 60 HP |
| 491 | 90 HP |
| 492 | 167 HP |
| 493 | 180 HP |
| 494 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 495 | Vinayaga Nagar BS |
| 496 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. and as directed by TWAD Board officers |
| 497 | 200 HP |
| 498 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 499 | 200 HP |
| 500 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.and as directed by TWAD Board officers |
| 501 | 200 HP |
| 502 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 503 | 200 HP |
| 504 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 505 | 200 HP |
| 506 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.and as directed by TWAD Board officers |
| 507 | 200 HP |
| 508 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 509 | 200 HP |
| 510 | Transportation charges for conveying the motor from work shop to pumping Station and as directed by TWAD Board officers |
| 511 | 200 HP |
| 512 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 513 | 200 HP |
| 514 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 515 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD Board officers |
| 516 | 200 HP |
| 517 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)and as directed by TWAD Board officers |
| 518 | 200 HP |
| 519 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly and as directed by TWAD Board officers |
| 520 | 200 HP |
| 521 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 522 | 200 HP |
| 523 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)and as directed by TWAD Board officers |
| 524 | 200 HP |
| 525 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 526 | 200 HP |
| 527 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 528 | 200 HP |
| 529 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 530 | 200 HP |
| 531 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 532 | 200 HP |
| 533 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset and as directed by TWAD Board officers |
| 534 | 200 HP |
| 535 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 536 | 200 HP |
| 537 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 538 | 200 HP |
| 539 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 540 | 200 HP |
| 541 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components and as directed by TWAD Board officers |
| 542 | 200 HP |
| 543 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 544 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by TWAD Board officers |
| 545 | 200 HP |
| 546 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works and as directed by TWAD Board officers |
| 547 | 200 HP |
| 548 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 549 | 200 HP |
| 550 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.and as directed by TWAD Board officers |
| 551 | 200 HP |
| 552 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete and as directed by TWAD Board officers |
| 553 | 200 HP |
| 554 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 555 | 200 HP |
| 556 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by TWAD Board officers |
| 557 | 200 HP |
| 558 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete and as directed by TWAD Board officers |
| 559 | 200 HP |
| 560 | 350 HP Kirloskar make V.T Pump and Motor |
| 561 | Charges for Dismantling the 350 HP V.T Turbine motor disconnecting thr stator cable,pulley,motor stool by loosening the fasteners and carefully lifting the motor and as directed by the TWAD Board officers |
| 562 | charges for removing of 260KW/350 HP Motor both side and end shield covers removing ,cleaning the stator and rotor with compressed air and checking the healthiness and applying the special varnish,DE and NDE side worn out bearings removing by using heavy duty puller,gas cutting torch and special tool arrangements and assembeling the motor complte overhauling and servicing etc., complete and as directed by the TWAD Board officers |
| 563 | Charges for wornout rotor bearing seating area on both drive and non drive end side welding with suitable welding with suitable welding electrode and maching the rotor shaft and dynamic balancing the rotor complete and as directed by the TWAD Board officers |
| 564 | Supply,delivery and fixing of DE and NDE side bearings (Rate quated after deduting the old worn out scrap and as directed by the TWAD Board officers |
| 565 | DE side bearing No.6322/C3 IMP (8482) Make SKF |
| 566 | NDE side bearing No.6319/C3vl 0241 IMP (84821013) SKF Make |
| 567 | Charge towards lifting the Pump stool and loosing the fasteners and carefully lifting of discharge tee,7 Nos of column pipes,Pump shaft ,shaft coupling,line shaft bearing one by one complete and as directed by the TWAD Board officers |
| 568 | Dismantling of 4 stage impleer assembly removing the section bowl,impleeer bowl,impleer shaft by removing locknuts and bolt & nuts one by one complet and as directed by the TWAD Board officers |
| 569 | Charges for cleaning of column pipes bowl assembly oil lubricated pipes,discharge casing and tee joint for removing the rust over which one coat of applying rust concerter and apply two coats of corrossive black painting complete and as directed by the TWAD Board officers |
| 570 | Charges for welding ,machining and lathe work roughning aligning and reconditining the line shafts and as directed by the TWAD Board officers |
| 571 | Charges for welding ,machining and lathe work roughning aligning and reconditining thekeyway of head shaft completely and as directed by the TWAD Board officers |
| 572 | Charges for supply and delivery of stuffing boz and as directed by the TWAD Board officers |
| 573 | Charges for supply, delivery and fixing of Kirloshkar make pump stuffing box bearing bush with oil lubricated check nut( phosphor bronze) ( rate quated after detecting the cost of old and wornout parts or materials) and as directed by the TWAD Board officers |
| 574 | Charges for supply and delivery and fixing of bowl bearing ( bearing made of neupreme rubber with phospher bronze metal casings and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portionn and etc, complete (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 575 | Charges for supply of fabricated bowl reducer bush (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 576 | Charges for supply of bowl reducer bush bearing (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 577 | Charges for supply, delivery new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 578 | Charges for supply and delivery of new special fasteners including washers for all bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 579 | Charges for supply of fire ply gasket for all joints etc., complete and as directed by the TWAD Board officers |
| 580 | Charges for supply, delivery and fixing of pump thrust bearing No:29322E (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 581 | Charges for supply, delivery and fixing of thrust bearing cooling copper coil as per original (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 582 | Charges for supply, delivery and fixing of stainer suitable for the bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 583 | Charges for assembling and erection of all column pipe with flang gasket, oil lubricated pipes and main shaft coupling one by one complete and as directed by TWAD board officers |
| 584 | Charges for supply and fixing of rubber spider (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 585 | Charges for fixing of phospher bronze bowl neck ring to suit the bowl, cutting, grinding , machining and all allied works including cost of phospher bronze materials (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 586 | Charges for assembling and erection of distance head Tee and connecting with main pipe line and as directed by the TWAD Board officers |
| 587 | Charges for assembling of pump stool with correct allignment and as directed by the TWAD Board officers |
| 588 | Charges for assembling the motor unit to fixing pump stool with correct alignment , pump motor pully coupling, motor connecting socket grimping , connecting of terminals and successful commissioning and as directed by the TWAD Board officers |
| 589 | 400 HP/425 HP Kirloskar make Vertical Turbine motor in Clear Water Pump House |
| 590 | charges towards dismantling of 300 KW/ 400 HP V.T motor Unit disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool loosing the fasteners and carefully lifting the motor both side DE, NDE side and shield covers and rotor removing, cleaning the stator and rotor winding complete and as directed by the TWAD Board officers |
| 591 | Charges for damaged and rotor winding burned 400 HP clear water Unit , rotor both side steel bindings, end connection and burnt slot windings flat copper bars complete removing and cleaning the rotor core class \\"F\\" style slot insulation providing and rewinding by using class \\"F\\" insulated copper bars as in the original winding and all end connections silver brazing, insulation providing conducting necessary all tests of the rotor windings pre-heating, varnishing, backing in oven and applying finishing varnishes and removing the existing worn-out DE and NDE side bearings by using special tool arrangements and applying grease and etc., complete (Rate quoted after deducting the retrieved copper wire cost) and as directed by the TWAD Board officers |
| 592 | Charges for worn-out rotor bearing seating area on both driving side and non driving end side welding with suitable welding electrode and machining the rotor shaft and dynamic balancing and etc complete and as directed by the TWAD Board officers |
| 593 | Charges for worn-out rotor DE side end shield cover bearing house fixing, logging and machining to suit the bearing OD size and fixing the bearing and etc complete )and as directed by the TWAD Board officers |
| 594 | Charges for supply and fixing of DE side bearing with special tool arrangements bearing No: SKF make 322 EM with all allied works complete (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 595 | Charges for supply and fixing of NDE side bearing No: 6320 FR (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 596 | Charges for dismantling the short circuited and damaged slip ring 3 phase limbs part to part providing the new special hylam insulation providing and fixing with necessary insulation compund of all slip ring and maching the surface of the rings and complete reconditioning the slip ring and as directed by the TWAD Board officers |
| 597 | Charges for supply, delivery and fixing of carbon brush, brass holders with necessary class \\"F\\" flame proof partition providing (Rate quoted after deducting the old scrap material cost) and as directed by the TWAD Board officers |
| 598 | Assembling the motor unit to fixing pump stool with correct alignment pump and motor pulley coupled connecting of motor and rotor terminals and successful commissioning and as directed by the TWAD Board officers |
| 599 | 400 HP kirloskar Vertical Turbine Pump in Clear Water Pump House |
| 600 | Charges for dismantling the 300 KW/ 400 HP V.T motor Unit, disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool by loosing the fasteners and carefully lifting the motor and loading the pump in the truck, using mobile crane to the Clear Water Pump House to work shop and unloading etc., complete and as directed by the TWAD Board officers |
| 601 | Charges for slipring machining, reinsulating and reconditioning etc., complete and as directed by the TWAD Board officers |
| 602 | Charges for supply and fixing of Carbon Brushes (Size: Height- 50 mm, Width- 32 mm, Thickness- 22 mm)and as directed by the TWAD Board officers |
| 603 | Charges for supply, delivery and fixing of bowl bearing (Bearing made of neoprene rubber with phosphor bronze metal castings and reconditioning the bowl inner portion complete sand blasting for smooth of the bowl inner portion and etc., complete (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 604 | Charges for cleaning of column pipes, bowl assembly oil lubricated pipes, discharge casing and Tee joint for removing the rust over which one coat of applying rust converter and apply two coats of anti-corrosive black painting complete.and as directed by the TWAD Board officers |
| 605 | Charges for fabrication, supply and fixing of SS metal Head Shaft as per the original shaft (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 606 | Charges for fabrication, supply and fixing of SS metal intermediate shaft as per the original shaft (Rate quoted after deducting the old scrap value) and as directed by the TWAD Board officers |
| 607 | Charges for supply and fixing of line shaft SS sleeves (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 608 | Charges for supply and fixing of pump thrust bearing no: 29322E (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 609 | Charges for welding, machining and reconditioning the 2 Nos of line shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 610 | Charges for welding, machining and reconditioning the 1 No impeller shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 611 | Charges for supply, delivery and fixing of bronze bowl reducer bush to suit the bowl, cutting, grinding, lathe works and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 612 | Charges for supply, delivery and fixing of spider bearing, bearing made of neoprene rubber with phosphor bronze metal castings (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 613 | Charges for supply and fixing of phosphor bronze neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 614 | Charges for supply, delivery and fixing of SS shaft coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 615 | Charges for reconditioning of stuffing box and as directed by the TWAD Board officers |
| 616 | Charges for supply, delivery and fixing of stuffing box bearing, bearing made of phosphor bronze oil lubricated type with cast iron flange coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 617 | Charges for supply and fixing of pump shaft covering pipe coupling, coupling made of phosphor bronze metal with all machining, threading complete and as directed by the TWAD Board officers |
| 618 | Charges for dynamic balancing of all impellers to avoid pump vibration and as directed by the TWAD Board officers |
| 619 | Charges for supply and fixing of suitable bowl bottom strainer (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 620 | Supply, delivery and fixing of new fasteners, washers for all column pipes, Tee joints, pulley bolts & nuts (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 621 | Charges for supply and fixing of firely gaskets for all joints and as directed by the TWAD Board officers |
| 622 | Assembling the pump to fixing pumpstool for one by one fixing of all column pipe and line shaft and covering pipe and all allied works complete with correct alignment of pump and assembling of the motor with motor stool with correct alignment, pump & motor pulley coupled motor input supply cable sockets 6 Nos providing, grimping connecting of termination and successful commissioning etc., complete and as directed by the TWAD Board officers |
| 623 | 315 KW / 425 HP VT pumpset |
| 624 | Charges for Dismantling of clear water unit - 1 pump of the 315 KW/ 425 HP Kirloskar motor disconnecting the power cable, pulley bolts and nuts, motor stool loosing the fasteners and carefully lifting the motor and charges towards dismantling the pump bearing assembly set discharged tee pipes, column pipes, 4 stage bowl assembly set, flange bolt, impeller shaft complete and dynamic balancing the motor the cost includes conveyance of tools and labour charges ect., complete and charges for assembling the motor unit to fixing pump stool with correct alignment, pump motor pulley coupling, motor connecting socket gripping, connecting of terminals and successful commisssioning and as directed by TWAD Board officers |
| 625 | charges for cleaning of column pipes, bowl assembly oil lubricted pipes, discharges casing and tee joint for removing the tust over which one coat of applying rust converter and apply two coats two coats of anti-crrosive black painting complete and as directed by TWAD Board officers |
| 626 | Charges for Supply and delivery of stuffing box and as directed by TWAD Board officers |
| 627 | Charges for Supply, delivery and fixing of Kirloskar make pump stuffing box bearing bush (phosphor bronze) with oil lubricated check nut ( Phosphor bronze) (Rate quoted after deducting the cost of old and won-out parts (or) materies and as directed by TWAD Board officers |
| 628 | Charges for Supply, delivery and fixing of spider flange bearing (Phosphoser bronze) (rate quoted after deducting the cost of old won-out parts or materieals) and as directed by TWAD Board officers |
| 629 | Charges for Supply, delivery and fixing of SS Shaft sleeves (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 630 | Charges for Supply, delivery and fixing of SS Shaft Coupling (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 631 | Charges for welding, machining and lathe works thoroughness checking pin aligning reconditioning the line shaft and impeller shaft and dynamic balancing for all shafts and as directed by TWAD Board officers |
| 632 | Charges for Supply, delivery and fixing of bowl bearing (beaning made of neoprene rubber with Phosphoser bronze mental casting and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portion ect., complete (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 633 | Charges for Supply of fabricated bowl reducer bush (Phosphoser bronze) (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 634 | Charges for supply of bowl reducer bush bearing (Phosphor bronze) (Rate quoted after deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 635 | Charges for fixing of Phosphor bronze bowl neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of Phosphof bronze materials (Rate quotedafter deducting the cost of old and worn-out parts (or)materials) and as directed by TWAD Board officers |
| 636 | Charges for supply and delivery of new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by TWAD Board officers |
| 637 | Charges for supply and delivery of new special fasteners including washers for bowl assembly (Rate quoted after deducting the cost of old and woni-out parts (or) materials) and as directed by TWAD Board officers |
| 638 | Charges for supply of fire ply gasket for all joints and as directed by TWAD Board officers |
| 639 | Charges for supply, delivery and fixing of pump thrust bearing No: 29322E (Rate quoted after deducting the costof old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 640 | Charges for supply, delivery and fixing of strainer suitablefor the bowl assembly (Rate quoted dafter deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 641 | Attending the repair works in DOL Starter |
| 642 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter and as directed by the TWAD Board officers |
| 643 | 1.5 HP |
| 644 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 645 | 1.5 HP |
| 646 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 647 | 1.5 HP |
| 648 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers.and as directed by the TWAD Board officers |
| 649 | 1.5 HP |
| 650 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 651 | 1.5 HP |
| 652 | Attending the repair works in Star Delta Starter |
| 653 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 654 | 7.5 HP |
| 655 | 10 HP |
| 656 | 12.5 HP |
| 657 | 15 HP |
| 658 | 20 HP |
| 659 | 25 HP |
| 660 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 661 | 7.5 HP |
| 662 | 10 HP |
| 663 | 12.5 HP |
| 664 | 15 HP |
| 665 | 20 HP |
| 666 | 25 HP |
| 667 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 668 | 7.5 HP |
| 669 | 10 HP |
| 670 | 12.5 HP |
| 671 | 15 HP |
| 672 | 20 HP |
| 673 | 25 HP |
| 674 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 675 | 7.5 HP |
| 676 | 10 HP |
| 677 | 12.5 HP |
| 678 | 15 HP |
| 679 | 20 HP |
| 680 | 25 HP |
| 681 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 682 | 7.5 HP |
| 683 | 10 HP |
| 684 | 12.5 HP |
| 685 | 15 HP |
| 686 | 20 HP |
| 687 | 25 HP |
| 688 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 689 | 7.5 HP |
| 690 | 10 HP |
| 691 | 12.5 HP |
| 692 | 15 HP |
| 693 | 20 HP |
| 694 | 25 HP |
| 695 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 696 | 7.5 HP |
| 697 | 10 HP |
| 698 | 12.5 HP |
| 699 | 15 HP |
| 700 | 20 HP |
| 701 | 25 HP |
| 702 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 703 | 7.5 HP |
| 704 | 10 HP |
| 705 | 12.5 HP |
| 706 | 15 HP |
| 707 | 20 HP |
| 708 | 25 HP |
| 709 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 710 | 7.5 HP |
| 711 | 10 HP |
| 712 | 12.5 HP |
| 713 | 15 HP |
| 714 | 20 HP |
| 715 | 25 HP |
| 716 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 717 | 7.5 HP |
| 718 | 10 HP |
| 719 | 12.5 HP |
| 720 | 15 HP |
| 721 | 20 HP |
| 722 | 25 HP |
| 723 | Attending the repair works in Soft Starter |
| 724 | Labour Charges for removing the Burnt FCMA Coil, After Disconnecting the terminal connection and fixing the FCMA Coil after attending the rewinding work.and as directed by the TWAD Board officers |
| 725 | 60 HP |
| 726 | 167 HP |
| 727 | 180 HP |
| 728 | 200 HP |
| 729 | 350 HP |
| 730 | 400 HP |
| 731 | Charges for Conveying the FCMA Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the TWAD Board officers |
| 732 | 60 HP |
| 733 | 167 HP |
| 734 | 180 HP |
| 735 | 200 HP |
| 736 | 350 HP |
| 737 | 400 HP |
| 738 | Labour Charges for Removal of unservicable contactor with all terminal connection suitable for the starter and as directed by the TWAD Board officers |
| 739 | 60 HP |
| 740 | 167 HP |
| 741 | 180 HP |
| 742 | 200 HP |
| 743 | 350 HP |
| 744 | 400 HP |
| 745 | Labour Charges for Removal of Single Phase Preventer, Timer, CT Coil, Volt Meter, Ammeter, Selector Switch and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 746 | 60 HP |
| 747 | 167 HP |
| 748 | 180 HP |
| 749 | 200 HP |
| 750 | 350 HP |
| 751 | 400 HP |
| 752 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 753 | 60 HP |
| 754 | 167 HP |
| 755 | 180 HP |
| 756 | 200 HP |
| 757 | 350 HP |
| 758 | 400 HP |
| 759 | Charges for Removing the old wire from the FCMA Coil ,Cleaning, Rewinding of FCMA Coil and supply and delivery of Double Coated Enamel Copper Wire and all insulation materials after deducting old scrap materials etc., complete and as directed by the TWAD Board officers |
| 760 | 60 HP |
| 761 | 167 HP |
| 762 | 180 HP |
| 763 | 200 HP |
| 764 | 350 HP |
| 765 | 400 HP |
| 766 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 767 | 60 HP |
| 768 | 167 HP |
| 769 | 180 HP |
| 770 | 200 HP |
| 771 | 350 HP |
| 772 | 400 HP |
| 773 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 774 | 60 HP |
| 775 | 167 HP |
| 776 | 180 HP |
| 777 | 200 HP |
| 778 | 350 HP |
| 779 | 400 HP |
| 780 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 781 | 60 HP |
| 782 | 167 HP |
| 783 | 180 HP |
| 784 | 200 HP |
| 785 | 350 HP |
| 786 | 400 HP |
| 787 | Replacement of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 788 | 60 HP |
| 789 | 167 HP |
| 790 | 180 HP |
| 791 | 200 HP |
| 792 | 350 HP |
| 793 | 400 HP |
| 794 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 795 | 60 HP |
| 796 | 167 HP |
| 797 | 180 HP |
| 798 | 200 HP |
| 799 | 350 HP |
| 800 | 400 HP |
| 801 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 802 | 60 HP |
| 803 | 167 HP |
| 804 | 180 HP |
| 805 | 200 HP |
| 806 | 350 HP |
| 807 | 400 HP |
| 808 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 809 | 60 HP |
| 810 | 167 HP |
| 811 | 180 HP |
| 812 | 200 HP |
| 813 | 350 HP |
| 814 | 400 HP |
| 815 | Common Electical Items -2026-2027 |
| 816 | Supply & Delivery of TP Three Phase moulded case circuit breaker ( ACB)with thermo magnetic release 4 pole /3 Pole for Incoming/Outgoing/ and as directed by TWAD Board officers |
| 817 | 630A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 818 | 800A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 819 | Supply,Delivery of the following fuse units and its accessories etc., complete |
| 820 | 32 Amps Porcelain Fuse Unit (500V) |
| 821 | 63 Amps Porcelain Fuse Unit (500V) |
| 822 | 100 Amps Porcelain Fuse Unit (500V) |
| 823 | 200 Amps Porcelain Fuse Unit (500V) |
| 824 | Supply and Delivery of heavy duty 1.1 KV grade 3/3.5 core PVC insulated PVC outer and inner sheath galvanised steel armoured aluminium conductor cable as per IS 1554 ( Part -1 ) to be laid in between M.V.Switch board and lighting sub switch board.and as directed by TWAD Board officers |
| 825 | 6 Sq.mm |
| 826 | 10 Sq.mm |
| 827 | 25 Sq.mm |
| 828 | 35 Sq.mm |
| 829 | 50 Sq.mm |
| 830 | 70 Sq.mm |
| 831 | 95 Sq.mm |
| 832 | 120 Sq.mm |
| 833 | 150 Sq.mm |
| 834 | 185 Sq.mm |
| 835 | 240 Sq.mm |
| 836 | 300 Sq.mm |
| 837 | 400 Sq.mm |
| 838 | Laying the above cable etc., complete.and as directed by TWAD Board officers |
| 839 | upto 95 sq.mm |
| 840 | 95-240 sq.mm |
| 841 | 240-400 sq,mm |
| 842 | RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR JOINTING OF L.T. CABLES- 3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING and as directed by TWAD Board officers |
| 843 | 6 sq.mm |
| 844 | 10 sq.mm |
| 845 | 25 sq.mm |
| 846 | 35 sq.mm |
| 847 | 50 sq.mm |
| 848 | 70 sq.mm |
| 849 | 95 sq.mm |
| 850 | 120 sq.mm |
| 851 | 150 sq.mm |
| 852 | 185 sq.mm |
| 853 | 240 sq.mm |
| 854 | 300 sq.mm |
| 855 | 400 sq.mm |
| 856 | Supply and Delivery of cable glands suitable for 3.50 /3.0 core UG cable.and as directed by TWAD Board officers |
| 857 | 70 sq.mm |
| 858 | 95 sq.mm |
| 859 | 120 sq.mm |
| 860 | 150 sq.mm |
| 861 | 185 sq.mm |
| 862 | 240 sq.mm |
| 863 | 300 sq.mm |
| 864 | 400 sq.mm |
| 865 | LED INDOOR FITTINGS (LIGHT EMITTING DIODE) - 18W LED 3000K Square Type Recessed Fitting with LED and as directed by TWAD Board officers |
| 866 | LED OUTDOOR FITTINGS (LIGHT EMITTINGDIODE) 30W LED Street Light Fitting with LED and as directed by TWAD Board officers |
| 867 | BOX TYPE TWIN FLUORESCENT FITTING WITH COPPER CHOKE AND CONDENSOR[HPF] COMPLETE WITH ISI MARK 4 Ft. 40 Watts with Ballast (Lower end) and as directed by TWAD Board officers |
| 868 | Transformers |
| 869 | Charges for improving of IR Value of Transformer using electric oven - Heat Champer (LT winding, HT winding and Transformer core) etc., complete as directed by TWAD Board officers. |
| 870 | 200 KVA Transformer |
| 871 | 400 KVA Transformer |
| 872 | 500 KVA Transformer |
| 873 | Charges for two coats of painting the 6 Pole Structure and yard fencing etc,. complete as directed by TWAD Board officers. |
| 874 | 200 KVA Transformer |
| 875 | 400 KVA Transformer |
| 876 | 500 KVA Transformer |
| 877 | Charges for Eart Pit Value Checking with Certificate |
| 878 | 200 KVA Transformer |
| 879 | 400 KVA Transformer |
| 880 | 500 KVA Transformer |
| 881 | Charges for transformer oil filtration using hot air vacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity etc .complete and as directed by TWAD board officers. |
| 882 | 200 KVA Transformer |
| 883 | 400 KVA Transformer |
| 884 | 500 KVA Transformer |
| 885 | Supply of transformer oil grade “A” for using cooling purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc complete) Directed by TWAD board officers. |
| 886 | 200 KVA Transformer |
| 887 | 400 KVA Transformer |
| 888 | 500 KVA Transformer |
| 889 | Supply and delivery of Drop Out fuse fixing unit set |
| 890 | 200 KVA Transformer |
| 891 | 400 KVA Transformer |
| 892 | 500 KVA Transformer |
| 893 | Supply, delivery and fixing of Drop Out fuse Top Contact and bottom Contact |
| 894 | 200 KVA Transformer |
| 895 | 400 KVA Transformer |
| 896 | 500 KVA Transformer |
| 897 | Supply and delivery of Breather with Silica gel of required size for the Transfomer |
| 898 | 200 KVA Transformer |
| 899 | 400 KVA Transformer |
| 900 | 500 KVA Transformer |
| 901 | Supply and delivery of Silica gel |
| 902 | 200 KVA Transformer |
| 903 | 400 KVA Transformer |
| 904 | 500 KVA Transformer |
| 905 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor |
| 906 | 200 KVA Transformer |
| 907 | 400 KVA Transformer |
| 908 | 500 KVA Transformer |
| 909 | 800 KVA Transformers |
| 910 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 911 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 912 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 913 | Charges for oil circulation and as directed by the TWAD Board officers |
| 914 | 1250 KVA Transformers |
| 915 | Oil Filtration of 1250 KVA Transformer |
| 916 | Charges for Attending oil leakage in 1250 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 917 | Charges for oil filteration for one number of 1250 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 918 | Charges for testing of 1250 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 919 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1250 KVA Transformer and as directed by the TWAD Board officers |
| 920 | Charges for oil circulation and as directed by the TWAD Board officers |
| 921 | Oil Filtration of 1500 KVA Transformer |
| 922 | Charges for Attending oil leakage in 1500 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 923 | Charges for oil filteration for 2 number of 1500 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 924 | Charges for testing of 1500 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 925 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1500 KVA Transformer and as directed by the TWAD Board officers |
| 926 | Charges for oil circulation and as directed by the TWAD Board officers |
| 927 | Oil Filtration of 1600 KVA Transformer |
| 928 | Charges for Attending oil leakage in 1600 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 929 | Charges for oil filteration for one number of 1600 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 930 | Charges for testing of 1600 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 931 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1600 KVA Transformer and as directed by the TWAD Board officers |
| 932 | Charges for oil circulation and as directed by the TWAD Board officers |
| 933 | Oil Filtration of 2000 KVA Transformer |
| 934 | Charges for Attending oil leakage in 2000 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 935 | Charges for oil filteration for 2 number of 2000 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 936 | Charges for testing of 2000 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 937 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 2000 KVA Transformer and as directed by the TWAD Board officers |
| 938 | Charges for oil circulation and as directed by the TWAD Board officers |
| 939 | Charges for supply and fixing of 1,2,3,4 transformers exisiting wornout breather and pink colour silica gel removal and replacing with new transparent cover and blue silica gel and as directed by the TWAD Board officers |
| 940 | Spraying with compressor unit at site in all portions of transformers, cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 941 | Cleaning the 2000 KVA Transformer body rust by special tool and applying two coat of enamel paint by spraying with compressor unit at site in all portions of transformers cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 942 | Marking of cable size and incoming, outgoing supply directions with the help of durable paints on the transformers MV cable boxes and as directed by the TWAD Board officers |
| 943 | Charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the TWAD Board officers |
| 944 | Rural & Town Panchayts Sumps |
| 945 | 0.10 LL |
| 946 | 0.15 LL |
| 947 | 0.20 LL |
| 948 | 0.25 LL |
| 949 | 0.30 LL |
| 950 | 0.35 LL |
| 951 | 0.40 LL |
| 952 | 0.45 LL |
| 953 | 0.50 LL |
| 954 | 0.55 LL |
| 955 | 0.60 LL |
| 956 | 0.65 LL |
| 957 | 0.70 LL |
| 958 | 0.75 LL |
| 959 | 0.80 LL |
| 960 | 0.85 LL |
| 961 | 0.90 LL |
| 962 | 1.00 LL |
| 963 | 1.05 LL |
| 964 | 1.10 LL |
| 965 | 1.15 LL |
| 966 | 1.20 LL |
| 967 | 1.25 LL |
| 968 | 1.30 LL |
| 969 | 1.35 LL |
| 970 | 1.40 LL |
| 971 | 1.45 LL |
| 972 | 1.50 LL |
| 973 | 1.55 LL |
| 974 | 1.60LL |
| 975 | 1.65 LL |
| 976 | 1.75 LL |
| 977 | 1.90 LL |
| 978 | 2.00 LL |
| 979 | 2.10 LL |
| 980 | 2.25 LL |
| 981 | 2.30 LL |
| 982 | 2.35 LL |
| 983 | 2.55 LL |
| 984 | 2.80 LL |
| 985 | 2.85 LL |
| 986 | 3.60 LL |
| 987 | 3.75 LL |
| 988 | 3.85 LL |
| 989 | 4.00 LL |
| 990 | 4.40 LL |
| 991 | 5.00 LL |
| 992 | 5.35 LL |
| 993 | 6.00LL |
| 994 | 7.75 LL |
| 995 | 9.00LL |
| 996 | 13.10LL |
| 997 | 27.75 LL |
| 998 | 35.00LL |
| 999 | Repairs and Renewals for the period 01.04.2027 to 31.03.2028 |
| 1000 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1001 | USING MS BARREL PIPE |
| 1002 | 400mm PSC pipe |
| 1003 | 450mm PSC pipe |
| 1004 | 500mm PSC pipe |
| 1005 | 700mm PSC pipe |
| 1006 | 1100mm PSC pipe |
| 1007 | PSC pipe leak using MS plain collar |
| 1008 | 400mm PSC pipe |
| 1009 | 450mm PSC pipe |
| 1010 | 500mm PSC pipe |
| 1011 | 700mm PSC pipe |
| 1012 | 1100mm PSC pipe |
| 1013 | PSC Pipe using MS Step Collar |
| 1014 | 400mm PSC pipe |
| 1015 | 450mm PSC pipe |
| 1016 | 500mm PSC pipe |
| 1017 | 700mm PSC pipe |
| 1018 | 1100mm PSC pipe |
| 1019 | PSC Pipe Cement joint leak |
| 1020 | 400mm PSC pipe |
| 1021 | 450mm PSC pipe |
| 1022 | 500mm PSC pipe |
| 1023 | 700mm PSC pipe |
| 1024 | 1100mm PSC pipe |
| 1025 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (MS pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of MS Pipes, MS specials without inside lining and outside coating but with anti-rust painting, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 1026 | Attending MS pipe line MS plate in MS pipe |
| 1027 | 350mm MS pipe |
| 1028 | 400mm MS pipe |
| 1029 | 450mm MS pipe |
| 1030 | 700mm MS pipe |
| 1031 | 900mm MS pipe |
| 1032 | 1000mm MS pipe |
| 1033 | 1100mm MS pipe |
| 1034 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1035 | Leaks in PVC pipes |
| 1036 | 50mm 6 KSC pipe |
| 1037 | 63mm 4KSC PVC pipe |
| 1038 | 63mm 6 KSC PVC pipe |
| 1039 | 63mm 10 ksc PVC pipe |
| 1040 | 75mm 4ksc PVC pipe |
| 1041 | 75mm 6ksc PVC pipe |
| 1042 | 90mm 4ksc PVC pipe |
| 1043 | 90mm 6ksc PVC pipe |
| 1044 | 110mm 4ksc PVC pipe |
| 1045 | 110mm 6ksc PVC pipe |
| 1046 | 110mm 10 ksc PVC pipe |
| 1047 | 140mm 4 ksc PVC pipe |
| 1048 | 140mm 6 ksc PVC pipe |
| 1049 | 140mm 10 ksc PVC pipe |
| 1050 | 160mm 4 ksc PVC pipe |
| 1051 | 160mm 6 ksc PVC pipe |
| 1052 | 160mm 10 ksc PVC pipe |
| 1053 | 200mm 4 ksc PVC pipe |
| 1054 | 200mm 6 ksc PVC pipe |
| 1055 | Bursts in PVC pipes |
| 1056 | 50mm 6 KSC pipe |
| 1057 | 63mm 4KSC PVC pipe |
| 1058 | 63mm 6 KSC PVC pipe |
| 1059 | 63mm 10 ksc PVC pipe |
| 1060 | 75mm 4ksc PVC pipe |
| 1061 | 75mm 6ksc PVC pipe |
| 1062 | 90mm 4ksc PVC pipe |
| 1063 | 90mm 6ksc PVC pipe |
| 1064 | 110mm 4ksc PVC pipe |
| 1065 | 110mm 6ksc PVC pipe |
| 1066 | 110mm 10 ksc PVC pipe |
| 1067 | 140mm 4 ksc PVC pipe |
| 1068 | 140mm 6 ksc PVC pipe |
| 1069 | 140mm 10 ksc PVC pipe |
| 1070 | 160mm 4 ksc PVC pipe |
| 1071 | 160mm 6 ksc PVC pipe |
| 1072 | 160mm 10 ksc PVC pipe |
| 1073 | 200mm 4 ksc PVC pipe |
| 1074 | 200mm 6 ksc PVC pipe |
| 1075 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1076 | Type of Leak- Burst Pipe Replacement |
| 1077 | 100 mm DI Pipe |
| 1078 | 150 mm DI Pipe |
| 1079 | 200 mm DI Pipe |
| 1080 | 250 mm DI Pipe |
| 1081 | 300 mm DI Pipe |
| 1082 | 350 mm DI Pipe |
| 1083 | 400 mm DI Pipe |
| 1084 | 450 mm DI Pipe |
| 1085 | 600 mm DI Pipe |
| 1086 | Type of Leak- Single MJ Collar |
| 1087 | 100 mm DI Pipe |
| 1088 | 150 mm DI Pipe |
| 1089 | 200 mm DI Pipe |
| 1090 | 250 mm DI Pipe |
| 1091 | 300 mm DI Pipe |
| 1092 | 350 mm DI Pipe |
| 1093 | 400 mm DI Pipe |
| 1094 | 450 mm DI Pipe |
| 1095 | 600 mm DI Pipe |
| 1096 | Type of Leak- Cut Barrel & MJ Collar |
| 1097 | 100 mm DI Pipe |
| 1098 | 150 mm DI Pipe |
| 1099 | 200 mm DI Pipe |
| 1100 | 250 mm DI Pipe |
| 1101 | 300 mm DI Pipe |
| 1102 | 350 mm DI Pipe |
| 1103 | 400 mm DI Pipe |
| 1104 | 450 mm DI Pipe |
| 1105 | 600 mm DI Pipe |
| 1106 | Type of Leak- specials cement joint |
| 1107 | 100 mm DI Pipe |
| 1108 | 150 mm DI Pipe |
| 1109 | 200 mm DI Pipe |
| 1110 | 250 mm DI Pipe |
| 1111 | 300 mm DI Pipe |
| 1112 | 350 mm DI Pipe |
| 1113 | 400 mm DI Pipe |
| 1114 | 450 mm DI Pipe |
| 1115 | 600 mm DI Pipe |
| 1116 | Type of Leak- Gasket joint |
| 1117 | 100 mm DI Pipe |
| 1118 | 150 mm DI Pipe |
| 1119 | 200 mm DI Pipe |
| 1120 | 250 mm DI Pipe |
| 1121 | 300 mm DI Pipe |
| 1122 | 350 mm DI Pipe |
| 1123 | 400 mm DI Pipe |
| 1124 | 450 mm DI Pipe |
| 1125 | 600 mm DI Pipe |
| 1126 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes, couplers, union, jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 1127 | Type of Leak- Gasket joint |
| 1128 | 50 mm |
| 1129 | 65 mm |
| 1130 | 80 mm |
| 1131 | 100 mm |
| 1132 | 125 mm |
| 1133 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1134 | Type of Leak- using MS STEP COLLAR |
| 1135 | Ø100mm AC pipe |
| 1136 | Ø150mm AC pipe |
| 1137 | Ø200mm AC pipe |
| 1138 | Ø600mm AC pipe |
| 1139 | Type of Leak- using MS BARREL PIPE |
| 1140 | Ø100mm AC pipe |
| 1141 | Ø150mm AC pipe |
| 1142 | Ø200mm AC pipe |
| 1143 | Ø600mm AC pipe |
| 1144 | Type of Leak- COUPLER BURST USING MS PLAIN COLLER |
| 1145 | Ø100mm AC pipe |
| 1146 | Ø150mm AC pipe |
| 1147 | Ø200mm AC pipe |
| 1148 | Ø600mm AC pipe |
| 1149 | Type of Leak- using COUPLER LEAK |
| 1150 | Ø100mm AC pipe |
| 1151 | Ø150mm AC pipe |
| 1152 | Ø200mm AC pipe |
| 1153 | Ø600mm AC pipe |
| 1154 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1155 | Type of Leak- HDPE Fusion Joint |
| 1156 | 63 mm PN 6 HDPE pipe |
| 1157 | 75 mm PN 6 HDPE pipe |
| 1158 | 90mm PN 6 HDPE pipe |
| 1159 | 110 mm PN 6 HDPE pipe |
| 1160 | 140 mm PN 6 HDPE pipe |
| 1161 | 160 mm PN 6 HDPE pipe |
| 1162 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (CI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 1163 | Type of Leak- specials cement joint |
| 1164 | 150mm |
| 1165 | 250mm |
| 1166 | 350mm |
| 1167 | Type of Leak- Cut Barrel & MJ Collar |
| 1168 | 150mm |
| 1169 | 250mm |
| 1170 | 350mm |
| 1171 | Repair and Reconditioning of Sluice Valves |
| 1172 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials and as directed by the TWAD Board officers. |
| 1173 | 400mm DI D/F Gate Valve |
| 1174 | 350mm DI D/F Gate Valve |
| 1175 | 300mm DI D/F Gate Valve |
| 1176 | 250mm DI D/F Gate Valve |
| 1177 | 200mm DI D/F Gate Valve |
| 1178 | 150mm DI D/F Gate Valve |
| 1179 | 100mm DI D/F Gate Valve |
| 1180 | 80mm DI D/F Gate Valve |
| 1181 | Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc., and as directed by the TWAD Board officers. |
| 1182 | 400mm DI D/F Gate Valve |
| 1183 | 350mm DI D/F Gate Valve |
| 1184 | 300mm DI D/F Gate Valve |
| 1185 | 250mm DI D/F Gate Valve |
| 1186 | 200mm DI D/F Gate Valve |
| 1187 | 150mm DI D/F Gate Valve |
| 1188 | 100mm DI D/F Gate Valve |
| 1189 | 80mm DI D/F Gate Valve |
| 1190 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 1191 | 400mm DI D/F Gate Valve |
| 1192 | 350mm DI D/F Gate Valve |
| 1193 | 300mm DI D/F Gate Valve |
| 1194 | 250mm DI D/F Gate Valve |
| 1195 | 200mm DI D/F Gate Valve |
| 1196 | 150mm DI D/F Gate Valve |
| 1197 | 100mm DI D/F Gate Valve |
| 1198 | 80mm DI D/F Gate Valve |
| 1199 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 1200 | 400mm DI D/F Gate Valve |
| 1201 | 350mm DI D/F Gate Valve |
| 1202 | 300mm DI D/F Gate Valve |
| 1203 | 250mm DI D/F Gate Valve |
| 1204 | 200mm DI D/F Gate Valve |
| 1205 | 150mm DI D/F Gate Valve |
| 1206 | 100mm DI D/F Gate Valve |
| 1207 | 80mm DI D/F Gate Valve |
| 1208 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 1209 | 400mm DI D/F Gate Valve |
| 1210 | 350mm DI D/F Gate Valve |
| 1211 | 300mm DI D/F Gate Valve |
| 1212 | 250mm DI D/F Gate Valve |
| 1213 | 200mm DI D/F Gate Valve |
| 1214 | 150mm DI D/F Gate Valve |
| 1215 | 100mm DI D/F Gate Valve |
| 1216 | 80mm DI D/F Gate Valve |
| 1217 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 1218 | 400mm DI D/F Gate Valve |
| 1219 | 350mm DI D/F Gate Valve |
| 1220 | 300mm DI D/F Gate Valve |
| 1221 | 250mm DI D/F Gate Valve |
| 1222 | 200mm DI D/F Gate Valve |
| 1223 | 150mm DI D/F Gate Valve |
| 1224 | 100mm DI D/F Gate Valve |
| 1225 | 80mm DI D/F Gate Valve |
| 1226 | Repair and Reconditioning of Air Valves |
| 1227 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the TWAD Board officers. |
| 1228 | 200mm Single Chamber Air Valve |
| 1229 | 150mm Single Chamber Air Valve |
| 1230 | 100mm Single Chamber Air Valve |
| 1231 | 80mm Single Chamber Air Valve |
| 1232 | 50mm Single Chamber Air Valve |
| 1233 | 20mm Single Chamber Air Valve |
| 1234 | Replacement of Sluice Valves |
| 1235 | Supply and Delivery of DI D/F Gate (sluice) valves (Soft Seated) resilient seated soft sealing gate valves (sluice valves) with body bonnet of ductile cast iron of grade GGG40 or equivalent grade, wedge fully rubber lined with EPDM, replaceable spindle nut, without gland packing and with 3 O-Ring protection on the shaft and seals of NBR and the valves should be of vaccum tight and 100% leak proof with face to face dimentions as per BS 5163-89/ ISI 14846-2000/ DIN 3202 F 4. All the valves should be with electrostatic powder coating both inside and outside with pocket less straight through body passage. All the valves are to be compatible for burried application with pressure rating PN 10/16 and with 5 years warranty and as directed by the TWAD Board officers. |
| 1236 | 50 mm DI D/F Gate Valve |
| 1237 | 65 mm DI D/F Gate Valve |
| 1238 | 80 mm DI D/F Gate Valve |
| 1239 | 100 mm DI D/F Gate Valve |
| 1240 | 125 mm DI D/F Gate Valve |
| 1241 | 150 mm DI D/F Gate Valve |
| 1242 | 200 mm DI D/F Gate Valve |
| 1243 | 250 mm DI D/F Gate Valve |
| 1244 | 300 mm DI D/F Gate Valve |
| 1245 | 350 mm DI D/F Gate Valve |
| 1246 | 400 mm DI D/F Gate Valve |
| 1247 | 450 mm DI D/F Gate Valve |
| 1248 | 500 mm DI D/F Gate Valve |
| 1249 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 1250 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 1251 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 1252 | 125 mm dia C.I./D.I. Double flanged pipes and special |
| 1253 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 1254 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 1255 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 1256 | 300 mm dia C.I./D.I. Double flanged pipes and special |
| 1257 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 1258 | 400 mm dia C.I./D.I. Double flanged pipes and special |
| 1259 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 1260 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 1261 | Air Valves |
| 1262 | Manufacture, Supply and Delivery of Tamper proof DI single chamber double orifice triple function (ventilating, admitting & ventilating during operation) air release valve with pressure rating PN 10/16 with body and cover made of Ductile Iron of Grade GGG 40 or GGG 50, conforming to IS 1865 with Food Grade Epoxy Powder coating (EP-P) inside and for outside of colour blue RAL 5005. All internal parts such as float, shell etc., cover bolts, made of Austenitic alloy steel of SS AISI 304/316. The float shall be made of Polytetrafluroethylene/ Austenitic alloy steel of AISI 304/316. Gaskets and seals of EPDM / Neoprene rubber for TWAD Board works anywhere in Tamil Nadu and with 5 years warranty and as directed by the TWAD Board officers. |
| 1263 | 50 mm DI Single Chamber Air release valve |
| 1264 | 80 mm DI Single Chamber Air release valve |
| 1265 | 100 mm DI Single Chamber Air release valve |
| 1266 | 150 mm DI Single Chamber Air release valve |
| 1267 | 200 mm DI Single Chamber Air release valve |
| 1268 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 1269 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 1270 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 1271 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 1272 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 1273 | Non Return Valves |
| 1274 | Manufacture, Supply and Delivery of DI D/F Slanted seat Swing Check Valve. Body of ductile cast iron of Grade GGG 40 or GGG 50 and disc of ductile cast iron GGG 40 or GGG 50 with fully encapsulated EPDM rubber, where both faces can be used. Electrostatic epoxy powder/liquid coating (EP-P) inside and outside color blue RAL 5005 with minimum coating thickness of 250 microns. The EPDM rubber & Epoxy Powder should be approved by W 270. (EP-P) it is a resi coat powder approved for drinking water application, applied through fusion bonding process by dipping the shot-blasted casted components heated up to 200 deg C). Face to face dimensions as per EN558-1, series 48 and flange connections as per EN 1092-2/IS 1538 and with 5 years warranty and as directed by TWAD board officers |
| 1275 | 200 mm DI Non Return Valve |
| 1276 | 250 mm DI Non Return Valve |
| 1277 | 350 mm DI Non Return Valve |
| 1278 | 450 mm DI Non Return Valve |
| 1279 | 500 mm DI Non Return Valve |
| 1280 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete. and as directed by TWAD board officers |
| 1281 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 1282 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 1283 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 1284 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 1285 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 1286 | Butterfly Valves |
| 1287 | Supply and delivery of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2) 1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the disc and body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 and with 5 years warranty and as directed by TWAD Board Officers. |
| 1288 | 450 mm DI Non Return Valve PN 10 |
| 1289 | 600 mm DI Butterfly Valve PN 10 |
| 1290 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete and as directed by TWAD Board Officers. |
| 1291 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 1292 | 600 mm dia C.I./D.I. Double flanged pipes and special |
| 1293 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 1294 | Attending the Repair and Renewal works in Open well Submersible Pumpset |
| 1295 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 1296 | 1.5 HP |
| 1297 | 7.5 HP |
| 1298 | 10 HP |
| 1299 | 12.5 HP |
| 1300 | 15 HP |
| 1301 | 20 HP |
| 1302 | 25 HP |
| 1303 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 1304 | 1.5 HP |
| 1305 | 7.5 HP |
| 1306 | 10 HP |
| 1307 | 12.5 HP |
| 1308 | 15 HP |
| 1309 | 20 HP |
| 1310 | 25 HP |
| 1311 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 1312 | 1.5 HP |
| 1313 | 7.5 HP |
| 1314 | 10 HP |
| 1315 | 12.5 HP |
| 1316 | 15 HP |
| 1317 | 20 HP |
| 1318 | 25 HP |
| 1319 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 1320 | 1.5 HP |
| 1321 | 7.5 HP |
| 1322 | 10 HP |
| 1323 | 12.5 HP |
| 1324 | 15 HP |
| 1325 | 20 HP |
| 1326 | 25 HP |
| 1327 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 1328 | 1.5 HP |
| 1329 | 7.5 HP |
| 1330 | 10 HP |
| 1331 | 12.5 HP |
| 1332 | 15 HP |
| 1333 | 20 HP |
| 1334 | 25 HP |
| 1335 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 1336 | 1.5 HP |
| 1337 | 7.5 HP |
| 1338 | 10 HP |
| 1339 | 12.5 HP |
| 1340 | 15 HP |
| 1341 | 20 HP |
| 1342 | 25 HP |
| 1343 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 1344 | 1.5 HP |
| 1345 | 7.5 HP |
| 1346 | 10 HP |
| 1347 | 12.5 HP |
| 1348 | 15 HP |
| 1349 | 20 HP |
| 1350 | 25 HP |
| 1351 | Attending the Repair and Renewal works in Monoblock pumpsets |
| 1352 | Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.and as directed by TWAD Board officers |
| 1353 | 1.5 HP |
| 1354 | 7.5 HP |
| 1355 | Transporting the pumpset from the Pumping Station to work shop.and as directed by TWAD Board officers |
| 1356 | 1.5 HP |
| 1357 | 7.5 HP |
| 1358 | Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials and as directed by TWAD Board officers |
| 1359 | 1.5 HP |
| 1360 | 7.5 HP |
| 1361 | Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,and as directed by TWAD Board officers |
| 1362 | 1.5 HP |
| 1363 | 7.5 HP |
| 1364 | Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.and as directed by TWAD Board officers |
| 1365 | 1.5 HP |
| 1366 | 7.5 HP |
| 1367 | Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 1368 | 1.5 HP |
| 1369 | 7.5 HP |
| 1370 | Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 1371 | 1.5 HP |
| 1372 | 7.5 HP |
| 1373 | Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.and as directed by TWAD Board officers |
| 1374 | 1.5 HP |
| 1375 | 7.5 HP |
| 1376 | Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.and as directed by TWAD Board officers |
| 1377 | 1.5 HP |
| 1378 | 7.5 HP |
| 1379 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 1380 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 1381 | 60 HP |
| 1382 | 90 HP |
| 1383 | 167 HP |
| 1384 | 180 HP |
| 1385 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 1386 | 60 HP |
| 1387 | 90 HP |
| 1388 | 167 HP |
| 1389 | 180 HP |
| 1390 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.and as directed by TWAD Board officers |
| 1391 | 60 HP |
| 1392 | 90 HP |
| 1393 | 167 HP |
| 1394 | 180 HP |
| 1395 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 1396 | 60 HP |
| 1397 | 90 HP |
| 1398 | 167 HP |
| 1399 | 180 HP |
| 1400 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 1401 | 60 HP |
| 1402 | 90 HP |
| 1403 | 167 HP |
| 1404 | 180 HP |
| 1405 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor and as directed by TWAD Board officers |
| 1406 | 60 HP |
| 1407 | 90 HP |
| 1408 | 167 HP |
| 1409 | 180 HP |
| 1410 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 1411 | 60 HP |
| 1412 | 90 HP |
| 1413 | 167 HP |
| 1414 | 180 HP |
| 1415 | Transportation charges for conveying the motor from work shop to Pumping Station and as directed by TWAD Board officers |
| 1416 | 60 HP |
| 1417 | 90 HP |
| 1418 | 167 HP |
| 1419 | 180 HP |
| 1420 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 1421 | 60 HP |
| 1422 | 90 HP |
| 1423 | 167 HP |
| 1424 | 180 HP |
| 1425 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 1426 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 1427 | 60 HP |
| 1428 | 90 HP |
| 1429 | 167 HP |
| 1430 | 180 HP |
| 1431 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 1432 | 60 HP |
| 1433 | 90 HP |
| 1434 | 167 HP |
| 1435 | 180 HP |
| 1436 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by TWAD Board officers |
| 1437 | 60 HP |
| 1438 | 90 HP |
| 1439 | 167 HP |
| 1440 | 180 HP |
| 1441 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,and as directed by TWAD Board officers |
| 1442 | 60 HP |
| 1443 | 90 HP |
| 1444 | 167 HP |
| 1445 | 180 HP |
| 1446 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by TWAD Board officers |
| 1447 | 60 HP |
| 1448 | 90 HP |
| 1449 | 167 HP |
| 1450 | 180 HP |
| 1451 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by TWAD Board officers |
| 1452 | 60 HP |
| 1453 | 90 HP |
| 1454 | 167 HP |
| 1455 | 180 HP |
| 1456 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by TWAD Board officers |
| 1457 | 60 HP |
| 1458 | 90 HP |
| 1459 | 167 HP |
| 1460 | 180 HP |
| 1461 | Supply and delivery of Driven End and Non Driven End bearings and as directed by TWAD Board officers |
| 1462 | 60 HP |
| 1463 | 90 HP |
| 1464 | 167 HP |
| 1465 | 180 HP |
| 1466 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 1467 | 60 HP |
| 1468 | 90 HP |
| 1469 | 167 HP |
| 1470 | 180 HP |
| 1471 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station.and as directed by TWAD Board officers |
| 1472 | 60 HP |
| 1473 | 90 HP |
| 1474 | 167 HP |
| 1475 | 180 HP |
| 1476 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 1477 | 60 HP |
| 1478 | 90 HP |
| 1479 | 167 HP |
| 1480 | 180 HP |
| 1481 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 1482 | Vinayaga Nagar BS |
| 1483 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. and as directed by TWAD Board officers |
| 1484 | 200 HP |
| 1485 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 1486 | 200 HP |
| 1487 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.and as directed by TWAD Board officers |
| 1488 | 200 HP |
| 1489 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 1490 | 200 HP |
| 1491 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 1492 | 200 HP |
| 1493 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.and as directed by TWAD Board officers |
| 1494 | 200 HP |
| 1495 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 1496 | 200 HP |
| 1497 | Transportation charges for conveying the motor from work shop to pumping Station and as directed by TWAD Board officers |
| 1498 | 200 HP |
| 1499 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 1500 | 200 HP |
| 1501 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1502 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD Board officers |
| 1503 | 200 HP |
| 1504 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)and as directed by TWAD Board officers |
| 1505 | 200 HP |
| 1506 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly and as directed by TWAD Board officers |
| 1507 | 200 HP |
| 1508 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 1509 | 200 HP |
| 1510 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)and as directed by TWAD Board officers |
| 1511 | 200 HP |
| 1512 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1513 | 200 HP |
| 1514 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1515 | 200 HP |
| 1516 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 1517 | 200 HP |
| 1518 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 1519 | 200 HP |
| 1520 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset and as directed by TWAD Board officers |
| 1521 | 200 HP |
| 1522 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 1523 | 200 HP |
| 1524 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 1525 | 200 HP |
| 1526 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 1527 | 200 HP |
| 1528 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components and as directed by TWAD Board officers |
| 1529 | 200 HP |
| 1530 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 1531 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by TWAD Board officers |
| 1532 | 200 HP |
| 1533 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works and as directed by TWAD Board officers |
| 1534 | 200 HP |
| 1535 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 1536 | 200 HP |
| 1537 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.and as directed by TWAD Board officers |
| 1538 | 200 HP |
| 1539 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete and as directed by TWAD Board officers |
| 1540 | 200 HP |
| 1541 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 1542 | 200 HP |
| 1543 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by TWAD Board officers |
| 1544 | 200 HP |
| 1545 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete and as directed by TWAD Board officers |
| 1546 | 200 HP |
| 1547 | 350 HP Kirloskar make V.T Pump and Motor |
| 1548 | Charges for Dismantling the 350 HP V.T Turbine motor disconnecting thr stator cable,pulley,motor stool by loosening the fasteners and carefully lifting the motor and as directed by the TWAD Board officers |
| 1549 | charges for removing of 260KW/350 HP Motor both side and end shield covers removing ,cleaning the stator and rotor with compressed air and checking the healthiness and applying the special varnish,DE and NDE side worn out bearings removing by using heavy duty puller,gas cutting torch and special tool arrangements and assembeling the motor complte overhauling and servicing etc., complete and as directed by the TWAD Board officers |
| 1550 | Charges for wornout rotor bearing seating area on both drive and non drive end side welding with suitable welding with suitable welding electrode and maching the rotor shaft and dynamic balancing the rotor complete and as directed by the TWAD Board officers |
| 1551 | Supply,delivery and fixing of DE and NDE side bearings (Rate quated after deduting the old worn out scrap and as directed by the TWAD Board officers |
| 1552 | DE side bearing No.6322/C3 IMP (8482) Make SKF |
| 1553 | NDE side bearing No.6319/C3vl 0241 IMP (84821013) SKF Make |
| 1554 | Charge towards lifting the Pump stool and loosing the fasteners and carefully lifting of discharge tee,7 Nos of column pipes,Pump shaft ,shaft coupling,line shaft bearing one by one complete and as directed by the TWAD Board officers |
| 1555 | Dismantling of 4 stage impleer assembly removing the section bowl,impleeer bowl,impleer shaft by removing locknuts and bolt & nuts one by one complet and as directed by the TWAD Board officers |
| 1556 | Charges for cleaning of column pipes bowl assembly oil lubricated pipes,discharge casing and tee joint for removing the rust over which one coat of applying rust concerter and apply two coats of corrossive black painting complete and as directed by the TWAD Board officers |
| 1557 | Charges for welding ,machining and lathe work roughning aligning and reconditining the line shafts and as directed by the TWAD Board officers |
| 1558 | Charges for welding ,machining and lathe work roughning aligning and reconditining thekeyway of head shaft completely and as directed by the TWAD Board officers |
| 1559 | Charges for supply and delivery of stuffing boz and as directed by the TWAD Board officers |
| 1560 | Charges for supply, delivery and fixing of Kirloshkar make pump stuffing box bearing bush with oil lubricated check nut( phosphor bronze) ( rate quated after detecting the cost of old and wornout parts or materials) and as directed by the TWAD Board officers |
| 1561 | Charges for supply and delivery and fixing of bowl bearing ( bearing made of neupreme rubber with phospher bronze metal casings and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portionn and etc, complete (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 1562 | Charges for supply of fabricated bowl reducer bush (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 1563 | Charges for supply of bowl reducer bush bearing (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 1564 | Charges for supply, delivery new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 1565 | Charges for supply and delivery of new special fasteners including washers for all bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 1566 | Charges for supply of fire ply gasket for all joints etc., complete and as directed by the TWAD Board officers |
| 1567 | Charges for supply, delivery and fixing of pump thrust bearing No:29322E (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 1568 | Charges for supply, delivery and fixing of thrust bearing cooling copper coil as per original (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 1569 | Charges for supply, delivery and fixing of stainer suitable for the bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 1570 | Charges for assembling and erection of all column pipe with flang gasket, oil lubricated pipes and main shaft coupling one by one complete and as directed by TWAD board officers |
| 1571 | Charges for supply and fixing of rubber spider (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 1572 | Charges for fixing of phospher bronze bowl neck ring to suit the bowl, cutting, grinding , machining and all allied works including cost of phospher bronze materials (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 1573 | Charges for assembling and erection of distance head Tee and connecting with main pipe line and as directed by the TWAD Board officers |
| 1574 | Charges for assembling of pump stool with correct allignment and as directed by the TWAD Board officers |
| 1575 | Charges for assembling the motor unit to fixing pump stool with correct alignment , pump motor pully coupling, motor connecting socket grimping , connecting of terminals and successful commissioning and as directed by the TWAD Board officers |
| 1576 | 400 HP/425 HP Kirloskar make Vertical Turbine motor in Clear Water Pump House |
| 1577 | charges towards dismantling of 300 KW/ 400 HP V.T motor Unit disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool loosing the fasteners and carefully lifting the motor both side DE, NDE side and shield covers and rotor removing, cleaning the stator and rotor winding complete and as directed by the TWAD Board officers |
| 1578 | Charges for damaged and rotor winding burned 400 HP clear water Unit , rotor both side steel bindings, end connection and burnt slot windings flat copper bars complete removing and cleaning the rotor core class \\"F\\" style slot insulation providing and rewinding by using class \\"F\\" insulated copper bars as in the original winding and all end connections silver brazing, insulation providing conducting necessary all tests of the rotor windings pre-heating, varnishing, backing in oven and applying finishing varnishes and removing the existing worn-out DE and NDE side bearings by using special tool arrangements and applying grease and etc., complete (Rate quoted after deducting the retrieved copper wire cost) and as directed by the TWAD Board officers |
| 1579 | Charges for worn-out rotor bearing seating area on both driving side and non driving end side welding with suitable welding electrode and machining the rotor shaft and dynamic balancing and etc complete and as directed by the TWAD Board officers |
| 1580 | Charges for worn-out rotor DE side end shield cover bearing house fixing, logging and machining to suit the bearing OD size and fixing the bearing and etc complete )and as directed by the TWAD Board officers |
| 1581 | Charges for supply and fixing of DE side bearing with special tool arrangements bearing No: SKF make 322 EM with all allied works complete (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 1582 | Charges for supply and fixing of NDE side bearing No: 6320 FR (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 1583 | Charges for dismantling the short circuited and damaged slip ring 3 phase limbs part to part providing the new special hylam insulation providing and fixing with necessary insulation compund of all slip ring and maching the surface of the rings and complete reconditioning the slip ring and as directed by the TWAD Board officers |
| 1584 | Charges for supply, delivery and fixing of carbon brush, brass holders with necessary class \\"F\\" flame proof partition providing (Rate quoted after deducting the old scrap material cost) and as directed by the TWAD Board officers |
| 1585 | Assembling the motor unit to fixing pump stool with correct alignment pump and motor pulley coupled connecting of motor and rotor terminals and successful commissioning and as directed by the TWAD Board officers |
| 1586 | 400 HP kirloskar Vertical Turbine Pump in Clear Water Pump House |
| 1587 | Charges for dismantling the 300 KW/ 400 HP V.T motor Unit, disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool by loosing the fasteners and carefully lifting the motor and loading the pump in the truck, using mobile crane to the Clear Water Pump House to work shop and unloading etc., complete and as directed by the TWAD Board officers |
| 1588 | Charges for slipring machining, reinsulating and reconditioning etc., complete and as directed by the TWAD Board officers |
| 1589 | Charges for supply and fixing of Carbon Brushes (Size: Height- 50 mm, Width- 32 mm, Thickness- 22 mm)and as directed by the TWAD Board officers |
| 1590 | Charges for supply, delivery and fixing of bowl bearing (Bearing made of neoprene rubber with phosphor bronze metal castings and reconditioning the bowl inner portion complete sand blasting for smooth of the bowl inner portion and etc., complete (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1591 | Charges for cleaning of column pipes, bowl assembly oil lubricated pipes, discharge casing and Tee joint for removing the rust over which one coat of applying rust converter and apply two coats of anti-corrosive black painting complete.and as directed by the TWAD Board officers |
| 1592 | Charges for fabrication, supply and fixing of SS metal Head Shaft as per the original shaft (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1593 | Charges for fabrication, supply and fixing of SS metal intermediate shaft as per the original shaft (Rate quoted after deducting the old scrap value) and as directed by the TWAD Board officers |
| 1594 | Charges for supply and fixing of line shaft SS sleeves (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1595 | Charges for supply and fixing of pump thrust bearing no: 29322E (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1596 | Charges for welding, machining and reconditioning the 2 Nos of line shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 1597 | Charges for welding, machining and reconditioning the 1 No impeller shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 1598 | Charges for supply, delivery and fixing of bronze bowl reducer bush to suit the bowl, cutting, grinding, lathe works and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1599 | Charges for supply, delivery and fixing of spider bearing, bearing made of neoprene rubber with phosphor bronze metal castings (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1600 | Charges for supply and fixing of phosphor bronze neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1601 | Charges for supply, delivery and fixing of SS shaft coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1602 | Charges for reconditioning of stuffing box and as directed by the TWAD Board officers |
| 1603 | Charges for supply, delivery and fixing of stuffing box bearing, bearing made of phosphor bronze oil lubricated type with cast iron flange coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1604 | Charges for supply and fixing of pump shaft covering pipe coupling, coupling made of phosphor bronze metal with all machining, threading complete and as directed by the TWAD Board officers |
| 1605 | Charges for dynamic balancing of all impellers to avoid pump vibration and as directed by the TWAD Board officers |
| 1606 | Charges for supply and fixing of suitable bowl bottom strainer (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1607 | Supply, delivery and fixing of new fasteners, washers for all column pipes, Tee joints, pulley bolts & nuts (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 1608 | Charges for supply and fixing of firely gaskets for all joints and as directed by the TWAD Board officers |
| 1609 | Assembling the pump to fixing pumpstool for one by one fixing of all column pipe and line shaft and covering pipe and all allied works complete with correct alignment of pump and assembling of the motor with motor stool with correct alignment, pump & motor pulley coupled motor input supply cable sockets 6 Nos providing, grimping connecting of termination and successful commissioning etc., complete and as directed by the TWAD Board officers |
| 1610 | 315 KW / 425 HP VT pumpset |
| 1611 | Charges for Dismantling of clear water unit - 1 pump of the 315 KW/ 425 HP Kirloskar motor disconnecting the power cable, pulley bolts and nuts, motor stool loosing the fasteners and carefully lifting the motor and charges towards dismantling the pump bearing assembly set discharged tee pipes, column pipes, 4 stage bowl assembly set, flange bolt, impeller shaft complete and dynamic balancing the motor the cost includes conveyance of tools and labour charges ect., complete and charges for assembling the motor unit to fixing pump stool with correct alignment, pump motor pulley coupling, motor connecting socket gripping, connecting of terminals and successful commisssioning and as directed by TWAD Board officers |
| 1612 | charges for cleaning of column pipes, bowl assembly oil lubricted pipes, discharges casing and tee joint for removing the tust over which one coat of applying rust converter and apply two coats two coats of anti-crrosive black painting complete and as directed by TWAD Board officers |
| 1613 | Charges for Supply and delivery of stuffing box and as directed by TWAD Board officers |
| 1614 | Charges for Supply, delivery and fixing of Kirloskar make pump stuffing box bearing bush (phosphor bronze) with oil lubricated check nut ( Phosphor bronze) (Rate quoted after deducting the cost of old and won-out parts (or) materies and as directed by TWAD Board officers |
| 1615 | Charges for Supply, delivery and fixing of spider flange bearing (Phosphoser bronze) (rate quoted after deducting the cost of old won-out parts or materieals) and as directed by TWAD Board officers |
| 1616 | Charges for Supply, delivery and fixing of SS Shaft sleeves (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 1617 | Charges for Supply, delivery and fixing of SS Shaft Coupling (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 1618 | Charges for welding, machining and lathe works thoroughness checking pin aligning reconditioning the line shaft and impeller shaft and dynamic balancing for all shafts and as directed by TWAD Board officers |
| 1619 | Charges for Supply, delivery and fixing of bowl bearing (beaning made of neoprene rubber with Phosphoser bronze mental casting and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portion ect., complete (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 1620 | Charges for Supply of fabricated bowl reducer bush (Phosphoser bronze) (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 1621 | Charges for supply of bowl reducer bush bearing (Phosphor bronze) (Rate quoted after deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 1622 | Charges for fixing of Phosphor bronze bowl neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of Phosphof bronze materials (Rate quotedafter deducting the cost of old and worn-out parts (or)materials) and as directed by TWAD Board officers |
| 1623 | Charges for supply and delivery of new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by TWAD Board officers |
| 1624 | Charges for supply and delivery of new special fasteners including washers for bowl assembly (Rate quoted after deducting the cost of old and woni-out parts (or) materials) and as directed by TWAD Board officers |
| 1625 | Charges for supply of fire ply gasket for all joints and as directed by TWAD Board officers |
| 1626 | Charges for supply, delivery and fixing of pump thrust bearing No: 29322E (Rate quoted after deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 1627 | Charges for supply, delivery and fixing of strainer suitablefor the bowl assembly (Rate quoted dafter deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 1628 | Attending the repair works in DOL Starter |
| 1629 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter and as directed by the TWAD Board officers |
| 1630 | 1.5 HP |
| 1631 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1632 | 1.5 HP |
| 1633 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1634 | 1.5 HP |
| 1635 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers.and as directed by the TWAD Board officers |
| 1636 | 1.5 HP |
| 1637 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 1638 | 1.5 HP |
| 1639 | Attending the repair works in Star Delta Starter |
| 1640 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 1641 | 7.5 HP |
| 1642 | 10 HP |
| 1643 | 12.5 HP |
| 1644 | 15 HP |
| 1645 | 20 HP |
| 1646 | 25 HP |
| 1647 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1648 | 7.5 HP |
| 1649 | 10 HP |
| 1650 | 12.5 HP |
| 1651 | 15 HP |
| 1652 | 20 HP |
| 1653 | 25 HP |
| 1654 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 1655 | 7.5 HP |
| 1656 | 10 HP |
| 1657 | 12.5 HP |
| 1658 | 15 HP |
| 1659 | 20 HP |
| 1660 | 25 HP |
| 1661 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 1662 | 7.5 HP |
| 1663 | 10 HP |
| 1664 | 12.5 HP |
| 1665 | 15 HP |
| 1666 | 20 HP |
| 1667 | 25 HP |
| 1668 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 1669 | 7.5 HP |
| 1670 | 10 HP |
| 1671 | 12.5 HP |
| 1672 | 15 HP |
| 1673 | 20 HP |
| 1674 | 25 HP |
| 1675 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1676 | 7.5 HP |
| 1677 | 10 HP |
| 1678 | 12.5 HP |
| 1679 | 15 HP |
| 1680 | 20 HP |
| 1681 | 25 HP |
| 1682 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 1683 | 7.5 HP |
| 1684 | 10 HP |
| 1685 | 12.5 HP |
| 1686 | 15 HP |
| 1687 | 20 HP |
| 1688 | 25 HP |
| 1689 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 1690 | 7.5 HP |
| 1691 | 10 HP |
| 1692 | 12.5 HP |
| 1693 | 15 HP |
| 1694 | 20 HP |
| 1695 | 25 HP |
| 1696 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 1697 | 7.5 HP |
| 1698 | 10 HP |
| 1699 | 12.5 HP |
| 1700 | 15 HP |
| 1701 | 20 HP |
| 1702 | 25 HP |
| 1703 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 1704 | 7.5 HP |
| 1705 | 10 HP |
| 1706 | 12.5 HP |
| 1707 | 15 HP |
| 1708 | 20 HP |
| 1709 | 25 HP |
| 1710 | Attending the repair works in Soft Starter |
| 1711 | Labour Charges for removing the Burnt FCMA Coil, After Disconnecting the terminal connection and fixing the FCMA Coil after attending the rewinding work.and as directed by the TWAD Board officers |
| 1712 | 60 HP |
| 1713 | 167 HP |
| 1714 | 180 HP |
| 1715 | 200 HP |
| 1716 | 350 HP |
| 1717 | 400 HP |
| 1718 | Charges for Conveying the FCMA Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the TWAD Board officers |
| 1719 | 60 HP |
| 1720 | 167 HP |
| 1721 | 180 HP |
| 1722 | 200 HP |
| 1723 | 350 HP |
| 1724 | 400 HP |
| 1725 | Labour Charges for Removal of unservicable contactor with all terminal connection suitable for the starter and as directed by the TWAD Board officers |
| 1726 | 60 HP |
| 1727 | 167 HP |
| 1728 | 180 HP |
| 1729 | 200 HP |
| 1730 | 350 HP |
| 1731 | 400 HP |
| 1732 | Labour Charges for Removal of Single Phase Preventer, Timer, CT Coil, Volt Meter, Ammeter, Selector Switch and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 1733 | 60 HP |
| 1734 | 167 HP |
| 1735 | 180 HP |
| 1736 | 200 HP |
| 1737 | 350 HP |
| 1738 | 400 HP |
| 1739 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1740 | 60 HP |
| 1741 | 167 HP |
| 1742 | 180 HP |
| 1743 | 200 HP |
| 1744 | 350 HP |
| 1745 | 400 HP |
| 1746 | Charges for Removing the old wire from the FCMA Coil ,Cleaning, Rewinding of FCMA Coil and supply and delivery of Double Coated Enamel Copper Wire and all insulation materials after deducting old scrap materials etc., complete and as directed by the TWAD Board officers |
| 1747 | 60 HP |
| 1748 | 167 HP |
| 1749 | 180 HP |
| 1750 | 200 HP |
| 1751 | 350 HP |
| 1752 | 400 HP |
| 1753 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 1754 | 60 HP |
| 1755 | 167 HP |
| 1756 | 180 HP |
| 1757 | 200 HP |
| 1758 | 350 HP |
| 1759 | 400 HP |
| 1760 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 1761 | 60 HP |
| 1762 | 167 HP |
| 1763 | 180 HP |
| 1764 | 200 HP |
| 1765 | 350 HP |
| 1766 | 400 HP |
| 1767 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 1768 | 60 HP |
| 1769 | 167 HP |
| 1770 | 180 HP |
| 1771 | 200 HP |
| 1772 | 350 HP |
| 1773 | 400 HP |
| 1774 | Replacement of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 1775 | 60 HP |
| 1776 | 167 HP |
| 1777 | 180 HP |
| 1778 | 200 HP |
| 1779 | 350 HP |
| 1780 | 400 HP |
| 1781 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 1782 | 60 HP |
| 1783 | 167 HP |
| 1784 | 180 HP |
| 1785 | 200 HP |
| 1786 | 350 HP |
| 1787 | 400 HP |
| 1788 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 1789 | 60 HP |
| 1790 | 167 HP |
| 1791 | 180 HP |
| 1792 | 200 HP |
| 1793 | 350 HP |
| 1794 | 400 HP |
| 1795 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 1796 | 60 HP |
| 1797 | 167 HP |
| 1798 | 180 HP |
| 1799 | 200 HP |
| 1800 | 350 HP |
| 1801 | 400 HP |
| 1802 | Common Electical Items -2026-2027 |
| 1803 | Supply & Delivery of TP Three Phase moulded case circuit breaker ( ACB)with thermo magnetic release 4 pole /3 Pole for Incoming/Outgoing/ and as directed by TWAD Board officers |
| 1804 | 630A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 1805 | 800A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 1806 | Supply,Delivery of the following fuse units and its accessories etc., complete |
| 1807 | 32 Amps Porcelain Fuse Unit (500V) |
| 1808 | 63 Amps Porcelain Fuse Unit (500V) |
| 1809 | 100 Amps Porcelain Fuse Unit (500V) |
| 1810 | 200 Amps Porcelain Fuse Unit (500V) |
| 1811 | Supply and Delivery of heavy duty 1.1 KV grade 3/3.5 core PVC insulated PVC outer and inner sheath galvanised steel armoured aluminium conductor cable as per IS 1554 ( Part -1 ) to be laid in between M.V.Switch board and lighting sub switch board.and as directed by TWAD Board officers |
| 1812 | 6 Sq.mm |
| 1813 | 10 Sq.mm |
| 1814 | 25 Sq.mm |
| 1815 | 35 Sq.mm |
| 1816 | 50 Sq.mm |
| 1817 | 70 Sq.mm |
| 1818 | 95 Sq.mm |
| 1819 | 120 Sq.mm |
| 1820 | 150 Sq.mm |
| 1821 | 185 Sq.mm |
| 1822 | 240 Sq.mm |
| 1823 | 300 Sq.mm |
| 1824 | 400 Sq.mm |
| 1825 | Laying the above cable etc., complete.and as directed by TWAD Board officers |
| 1826 | upto 95 sq.mm |
| 1827 | 95-240 sq.mm |
| 1828 | 240-400 sq,mm |
| 1829 | RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR JOINTING OF L.T. CABLES- 3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING and as directed by TWAD Board officers |
| 1830 | 6 sq.mm |
| 1831 | 10 sq.mm |
| 1832 | 25 sq.mm |
| 1833 | 35 sq.mm |
| 1834 | 50 sq.mm |
| 1835 | 70 sq.mm |
| 1836 | 95 sq.mm |
| 1837 | 120 sq.mm |
| 1838 | 150 sq.mm |
| 1839 | 185 sq.mm |
| 1840 | 240 sq.mm |
| 1841 | 300 sq.mm |
| 1842 | 400 sq.mm |
| 1843 | Supply and Delivery of cable glands suitable for 3.50 /3.0 core UG cable.and as directed by TWAD Board officers |
| 1844 | 70 sq.mm |
| 1845 | 95 sq.mm |
| 1846 | 120 sq.mm |
| 1847 | 150 sq.mm |
| 1848 | 185 sq.mm |
| 1849 | 240 sq.mm |
| 1850 | 300 sq.mm |
| 1851 | 400 sq.mm |
| 1852 | LED INDOOR FITTINGS (LIGHT EMITTING DIODE) - 18W LED 3000K Square Type Recessed Fitting with LED and as directed by TWAD Board officers |
| 1853 | LED OUTDOOR FITTINGS (LIGHT EMITTINGDIODE) 30W LED Street Light Fitting with LED and as directed by TWAD Board officers |
| 1854 | BOX TYPE TWIN FLUORESCENT FITTING WITH COPPER CHOKE AND CONDENSOR[HPF] COMPLETE WITH ISI MARK 4 Ft. 40 Watts with Ballast (Lower end) and as directed by TWAD Board officers |
| 1855 | Transformers |
| 1856 | Charges for removing the Transformer from the plinth after disconnecting the incomming & outgoing supply terminations, earthing, neutral connection in the Transformer loading to vehicle with mobile grane and conveying to workshop unloading the transformer with mobile crane as per site condition and as directed by TWAD Board Officers. |
| 1857 | 200 KVA Transformer |
| 1858 | 400 KVA Transformer |
| 1859 | 500 KVA Transformer |
| 1860 | Charges for disconnecting the incomming & outgoing (LT & HT Side) supply terminations, earthing, neutral connection in the Transformer and drain out the oil from the conservator Tank and Transformer tank up to the required level and stacking the containers to attend the repair works/ Oil leakages and as directed by TWAD Board Officers. |
| 1861 | 200 KVA Transformer |
| 1862 | 400 KVA Transformer |
| 1863 | 500 KVA Transformer |
| 1864 | Charges Opening the Transformer Top cover after disconnecting the inside terminal connections, weakening / damaged bushes, brash stud bolt & Nuts and lifting Transformer core & winding without damages etc., complete. |
| 1865 | 200 KVA Transformer |
| 1866 | 400 KVA Transformer |
| 1867 | 500 KVA Transformer |
| 1868 | Charges for cleaning the winding coils of the Transformer free from moisture and cleaning the inside walls of the Transformer by using required new Transformer oil without any damage to the Transformer Coil |
| 1869 | 200 KVA Transformer |
| 1870 | 400 KVA Transformer |
| 1871 | 500 KVA Transformer |
| 1872 | Charges for fixing the required capacity brass LT terminal bush 3nos, copper connecting plate,3 nos using necessary bushes, screws bolt nuts etc., complete |
| 1873 | 200 KVA Transformer |
| 1874 | 400 KVA Transformer |
| 1875 | 500 KVA Transformer |
| 1876 | Charges for re-fixing the Transformer Top cover with conservator tank on the Transformer and connecting with all inside terminal connections including HT terminals by using required bolt & nuts and filling the tapped oil upto the mark of level indicator and charging the transformers, testing with load etc., complete |
| 1877 | 200 KVA Transformer |
| 1878 | 400 KVA Transformer |
| 1879 | 500 KVA Transformer |
| 1880 | Charges for rewinding of Three phase of 11KV/22KV/ 433V Transformer in the suitable core assembly including charges for removing the burnt coil and allining of core assembly and including required insulating materials etc complete after deducting the cost burned scrap. |
| 1881 | 200 KVA Transformer |
| 1882 | 400 KVA Transformer |
| 1883 | 500 KVA Transformer |
| 1884 | Charges for improving of IR Value of Transformer using electric oven - Heat Champer (LT winding, HT winding and Transformer core) etc., complete as directed by TWAD Board officers. |
| 1885 | 200 KVA Transformer |
| 1886 | 400 KVA Transformer |
| 1887 | 500 KVA Transformer |
| 1888 | Charges for two coats of painting the Transformer as directed by TWAD Board officers. |
| 1889 | 200 KVA Transformer |
| 1890 | 400 KVA Transformer |
| 1891 | 500 KVA Transformer |
| 1892 | Charges for two coats of painting the 6 Pole Structure and yard fencing etc,. complete as directed by TWAD Board officers. |
| 1893 | 200 KVA Transformer |
| 1894 | 400 KVA Transformer |
| 1895 | 500 KVA Transformer |
| 1896 | Charges for Eart Pit Value Checking with Certificate |
| 1897 | 200 KVA Transformer |
| 1898 | 400 KVA Transformer |
| 1899 | 500 KVA Transformer |
| 1900 | Charges for 11KV/433V Transformer loading to vehicle with mobile grane and conveying to Pumphouse Unloading the above transformer with mobile crane Re-erection of transformer with cable termination earthing and neutral connection testing of No Load and Load testing at pumphouse as per site condition and existing arrangements and as directed by TWAD Board Officers. |
| 1901 | 200 KVA Transformer |
| 1902 | 400 KVA Transformer |
| 1903 | 500 KVA Transformer |
| 1904 | Charges for transformer oil filtration using hot air vacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity etc .complete and as directed by TWAD board officers. |
| 1905 | 200 KVA Transformer |
| 1906 | 400 KVA Transformer |
| 1907 | 500 KVA Transformer |
| 1908 | Supply and delivery of required size of LT Brass rod with terminal bushing with 4 no of nuts, washers and insulating sleeves etc., complete |
| 1909 | 200 KVA Transformer |
| 1910 | 400 KVA Transformer |
| 1911 | 500 KVA Transformer |
| 1912 | Supply and delivery of required capacity copper,connecting plate for cable termination . |
| 1913 | 200 KVA Transformer |
| 1914 | 400 KVA Transformer |
| 1915 | 500 KVA Transformer |
| 1916 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers |
| 1917 | 200 KVA Transformer |
| 1918 | 400 KVA Transformer |
| 1919 | 500 KVA Transformer |
| 1920 | Supply and Delivery of Cork Packing Sheet, Cork Bush for LT and HT side, oil level Indicator as directed by TWAD Board officers after deducting the cost of old scraps |
| 1921 | 200 KVA Transformer |
| 1922 | 400 KVA Transformer |
| 1923 | 500 KVA Transformer |
| 1924 | Supply and delivery of new LT/HT Coil made EC Grade DP coveriong copper wire for winding of 11KV/22KV/433V Transformer and required insulating materials etc., complete |
| 1925 | 200 KVA Transformer |
| 1926 | 400 KVA Transformer |
| 1927 | 500 KVA Transformer |
| 1928 | Supply of transformer oil grade “A” for using cooling purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc complete) Directed by TWAD board officers. |
| 1929 | 200 KVA Transformer |
| 1930 | 400 KVA Transformer |
| 1931 | 500 KVA Transformer |
| 1932 | Supply and delivery of Drop Out fuse fixing unit set |
| 1933 | 200 KVA Transformer |
| 1934 | 400 KVA Transformer |
| 1935 | 500 KVA Transformer |
| 1936 | Supply, delivery and fixing of Drop Out fuse Top Contact and bottom Contact |
| 1937 | 200 KVA Transformer |
| 1938 | 400 KVA Transformer |
| 1939 | 500 KVA Transformer |
| 1940 | Supply and delivery of Breather with Silica gel of required size for the Transfomer |
| 1941 | 200 KVA Transformer |
| 1942 | 400 KVA Transformer |
| 1943 | 500 KVA Transformer |
| 1944 | Supply and delivery of Silica gel |
| 1945 | 200 KVA Transformer |
| 1946 | 400 KVA Transformer |
| 1947 | 500 KVA Transformer |
| 1948 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor |
| 1949 | 200 KVA Transformer |
| 1950 | 400 KVA Transformer |
| 1951 | 500 KVA Transformer |
| 1952 | 800 KVA Transformers |
| 1953 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 1954 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 1955 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1956 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1957 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 1958 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 1959 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 1960 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 1961 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 1962 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 1963 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 1964 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 1965 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 1966 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 1967 | Charges for oil circulation and as directed by the TWAD Board officers |
| 1968 | 1250 KVA Transformers |
| 1969 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 1970 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 1971 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1972 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1973 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 1974 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 1975 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 1976 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 1977 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 1978 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 1979 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 1980 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 1981 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 1982 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 1983 | 1600 KVA Transformer |
| 1984 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 1985 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 1986 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1987 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 1988 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 1989 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 1990 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 1991 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 1992 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 1993 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 1994 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 1995 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 1996 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 1997 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 1998 | 2000 KVA Transformer |
| 1999 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 2000 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 2001 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 2002 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 2003 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 2004 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 2005 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 2006 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 2007 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 2008 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 2009 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 2010 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 2011 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 2012 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 2013 | Oil Filtration of 1250 KVA Transformer |
| 2014 | Charges for Attending oil leakage in 1250 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 2015 | Charges for oil filteration for one number of 1250 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 2016 | Charges for testing of 1250 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 2017 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1250 KVA Transformer and as directed by the TWAD Board officers |
| 2018 | Charges for oil circulation and as directed by the TWAD Board officers |
| 2019 | Oil Filtration of 1500 KVA Transformer |
| 2020 | Charges for Attending oil leakage in 1500 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 2021 | Charges for oil filteration for 2 number of 1500 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 2022 | Charges for testing of 1500 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 2023 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1500 KVA Transformer and as directed by the TWAD Board officers |
| 2024 | Charges for oil circulation and as directed by the TWAD Board officers |
| 2025 | Oil Filtration of 1600 KVA Transformer |
| 2026 | Charges for Attending oil leakage in 1600 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 2027 | Charges for oil filteration for one number of 1600 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 2028 | Charges for testing of 1600 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 2029 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1600 KVA Transformer and as directed by the TWAD Board officers |
| 2030 | Charges for oil circulation and as directed by the TWAD Board officers |
| 2031 | Oil Filtration of 2000 KVA Transformer |
| 2032 | Charges for Attending oil leakage in 2000 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 2033 | Charges for oil filteration for 2 number of 2000 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 2034 | Charges for testing of 2000 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 2035 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 2000 KVA Transformer and as directed by the TWAD Board officers |
| 2036 | Charges for oil circulation and as directed by the TWAD Board officers |
| 2037 | Charges for supply and fixing of 1,2,3,4 transformers exisiting wornout breather and pink colour silica gel removal and replacing with new transparent cover and blue silica gel and as directed by the TWAD Board officers |
| 2038 | Spraying with compressor unit at site in all portions of transformers, cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 2039 | Cleaning the 2000 KVA Transformer body rust by special tool and applying two coat of enamel paint by spraying with compressor unit at site in all portions of transformers cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 2040 | Marking of cable size and incoming, outgoing supply directions with the help of durable paints on the transformers MV cable boxes and as directed by the TWAD Board officers |
| 2041 | Charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the TWAD Board officers |
| 2042 | Rural & Town Panchayts Sumps |
| 2043 | 0.10 LL |
| 2044 | 0.15 LL |
| 2045 | 0.20 LL |
| 2046 | 0.25 LL |
| 2047 | 0.30 LL |
| 2048 | 0.35 LL |
| 2049 | 0.40 LL |
| 2050 | 0.45 LL |
| 2051 | 0.50 LL |
| 2052 | 0.55 LL |
| 2053 | 0.60 LL |
| 2054 | 0.65 LL |
| 2055 | 0.70 LL |
| 2056 | 0.75 LL |
| 2057 | 0.80 LL |
| 2058 | 0.85 LL |
| 2059 | 0.90 LL |
| 2060 | 1.00 LL |
| 2061 | 1.05 LL |
| 2062 | 1.10 LL |
| 2063 | 1.15 LL |
| 2064 | 1.20 LL |
| 2065 | 1.25 LL |
| 2066 | 1.30 LL |
| 2067 | 1.35 LL |
| 2068 | 1.40 LL |
| 2069 | 1.45 LL |
| 2070 | 1.50 LL |
| 2071 | 1.55 LL |
| 2072 | 1.60LL |
| 2073 | 1.65 LL |
| 2074 | 1.75 LL |
| 2075 | 1.90 LL |
| 2076 | 2.00 LL |
| 2077 | 2.10 LL |
| 2078 | 2.25 LL |
| 2079 | 2.30 LL |
| 2080 | 2.35 LL |
| 2081 | 2.55 LL |
| 2082 | 2.80 LL |
| 2083 | 2.85 LL |
| 2084 | 3.60 LL |
| 2085 | 3.75 LL |
| 2086 | 3.85 LL |
| 2087 | 4.00 LL |
| 2088 | 4.40 LL |
| 2089 | 5.00 LL |
| 2090 | 5.35 LL |
| 2091 | 6.00LL |
| 2092 | 7.75 LL |
| 2093 | 9.00LL |
| 2094 | 13.10LL |
| 2095 | 27.75 LL |
| 2096 | 35.00LL |
| 2097 | Repairs and Renewals for the period 01.04.2028 to 31.03.2029 |
| 2098 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PSC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound socket and spigot machine end MS fittings including supply and delivery rolling, cutting, welding, turning, facing, grinding, jointing materials and required specials, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2099 | USING MS BARREL PIPE |
| 2100 | 400mm PSC pipe |
| 2101 | 450mm PSC pipe |
| 2102 | 500mm PSC pipe |
| 2103 | 700mm PSC pipe |
| 2104 | 1100mm PSC pipe |
| 2105 | PSC pipe leak using MS plain collar |
| 2106 | 400mm PSC pipe |
| 2107 | 450mm PSC pipe |
| 2108 | 500mm PSC pipe |
| 2109 | 700mm PSC pipe |
| 2110 | 1100mm PSC pipe |
| 2111 | PSC Pipe using MS Step Collar |
| 2112 | 400mm PSC pipe |
| 2113 | 450mm PSC pipe |
| 2114 | 500mm PSC pipe |
| 2115 | 700mm PSC pipe |
| 2116 | 1100mm PSC pipe |
| 2117 | PSC Pipe Cement joint leak |
| 2118 | 400mm PSC pipe |
| 2119 | 450mm PSC pipe |
| 2120 | 500mm PSC pipe |
| 2121 | 700mm PSC pipe |
| 2122 | 1100mm PSC pipe |
| 2123 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (MS pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of MS Pipes, MS specials without inside lining and outside coating but with anti-rust painting, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 2124 | Attending MS pipe line MS plate in MS pipe |
| 2125 | 350mm MS pipe |
| 2126 | 400mm MS pipe |
| 2127 | 450mm MS pipe |
| 2128 | 700mm MS pipe |
| 2129 | 900mm MS pipe |
| 2130 | 1000mm MS pipe |
| 2131 | 1100mm MS pipe |
| 2132 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (PVC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of PVC Pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2133 | Leaks in PVC pipes |
| 2134 | 50mm 6 KSC pipe |
| 2135 | 63mm 4KSC PVC pipe |
| 2136 | 63mm 6 KSC PVC pipe |
| 2137 | 63mm 10 ksc PVC pipe |
| 2138 | 75mm 4ksc PVC pipe |
| 2139 | 75mm 6ksc PVC pipe |
| 2140 | 90mm 4ksc PVC pipe |
| 2141 | 90mm 6ksc PVC pipe |
| 2142 | 110mm 4ksc PVC pipe |
| 2143 | 110mm 6ksc PVC pipe |
| 2144 | 110mm 10 ksc PVC pipe |
| 2145 | 140mm 4 ksc PVC pipe |
| 2146 | 140mm 6 ksc PVC pipe |
| 2147 | 140mm 10 ksc PVC pipe |
| 2148 | 160mm 4 ksc PVC pipe |
| 2149 | 160mm 6 ksc PVC pipe |
| 2150 | 160mm 10 ksc PVC pipe |
| 2151 | 200mm 4 ksc PVC pipe |
| 2152 | 200mm 6 ksc PVC pipe |
| 2153 | Bursts in PVC pipes |
| 2154 | 50mm 6 KSC pipe |
| 2155 | 63mm 4KSC PVC pipe |
| 2156 | 63mm 6 KSC PVC pipe |
| 2157 | 63mm 10 ksc PVC pipe |
| 2158 | 75mm 4ksc PVC pipe |
| 2159 | 75mm 6ksc PVC pipe |
| 2160 | 90mm 4ksc PVC pipe |
| 2161 | 90mm 6ksc PVC pipe |
| 2162 | 110mm 4ksc PVC pipe |
| 2163 | 110mm 6ksc PVC pipe |
| 2164 | 110mm 10 ksc PVC pipe |
| 2165 | 140mm 4 ksc PVC pipe |
| 2166 | 140mm 6 ksc PVC pipe |
| 2167 | 140mm 10 ksc PVC pipe |
| 2168 | 160mm 4 ksc PVC pipe |
| 2169 | 160mm 6 ksc PVC pipe |
| 2170 | 160mm 10 ksc PVC pipe |
| 2171 | 200mm 4 ksc PVC pipe |
| 2172 | 200mm 6 ksc PVC pipe |
| 2173 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (DI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2174 | Type of Leak- Burst Pipe Replacement |
| 2175 | 100 mm DI Pipe |
| 2176 | 150 mm DI Pipe |
| 2177 | 200 mm DI Pipe |
| 2178 | 250 mm DI Pipe |
| 2179 | 300 mm DI Pipe |
| 2180 | 350 mm DI Pipe |
| 2181 | 400 mm DI Pipe |
| 2182 | 450 mm DI Pipe |
| 2183 | 600 mm DI Pipe |
| 2184 | Type of Leak- Single MJ Collar |
| 2185 | 100 mm DI Pipe |
| 2186 | 150 mm DI Pipe |
| 2187 | 200 mm DI Pipe |
| 2188 | 250 mm DI Pipe |
| 2189 | 300 mm DI Pipe |
| 2190 | 350 mm DI Pipe |
| 2191 | 400 mm DI Pipe |
| 2192 | 450 mm DI Pipe |
| 2193 | 600 mm DI Pipe |
| 2194 | Type of Leak- Cut Barrel & MJ Collar |
| 2195 | 100 mm DI Pipe |
| 2196 | 150 mm DI Pipe |
| 2197 | 200 mm DI Pipe |
| 2198 | 250 mm DI Pipe |
| 2199 | 300 mm DI Pipe |
| 2200 | 350 mm DI Pipe |
| 2201 | 400 mm DI Pipe |
| 2202 | 450 mm DI Pipe |
| 2203 | 600 mm DI Pipe |
| 2204 | Type of Leak- specials cement joint |
| 2205 | 100 mm DI Pipe |
| 2206 | 150 mm DI Pipe |
| 2207 | 200 mm DI Pipe |
| 2208 | 250 mm DI Pipe |
| 2209 | 300 mm DI Pipe |
| 2210 | 350 mm DI Pipe |
| 2211 | 400 mm DI Pipe |
| 2212 | 450 mm DI Pipe |
| 2213 | 600 mm DI Pipe |
| 2214 | Type of Leak- Gasket joint |
| 2215 | 100 mm DI Pipe |
| 2216 | 150 mm DI Pipe |
| 2217 | 200 mm DI Pipe |
| 2218 | 250 mm DI Pipe |
| 2219 | 300 mm DI Pipe |
| 2220 | 350 mm DI Pipe |
| 2221 | 400 mm DI Pipe |
| 2222 | 450 mm DI Pipe |
| 2223 | 600 mm DI Pipe |
| 2224 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (GI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe, including supply and delivery of GI Pipes, couplers, union, jointing materials and required specials, cutting, threading, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers |
| 2225 | Type of Leak- Gasket joint |
| 2226 | 50 mm |
| 2227 | 65 mm |
| 2228 | 80 mm |
| 2229 | 100 mm |
| 2230 | 125 mm |
| 2231 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (AC pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound C.I/ D.I-S/S pipes including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2232 | Type of Leak- using MS STEP COLLAR |
| 2233 | Ø100mm AC pipe |
| 2234 | Ø150mm AC pipe |
| 2235 | Ø200mm AC pipe |
| 2236 | Ø600mm AC pipe |
| 2237 | Type of Leak- using MS BARREL PIPE |
| 2238 | Ø100mm AC pipe |
| 2239 | Ø150mm AC pipe |
| 2240 | Ø200mm AC pipe |
| 2241 | Ø600mm AC pipe |
| 2242 | Type of Leak- COUPLER BURST USING MS PLAIN COLLER |
| 2243 | Ø100mm AC pipe |
| 2244 | Ø150mm AC pipe |
| 2245 | Ø200mm AC pipe |
| 2246 | Ø600mm AC pipe |
| 2247 | Type of Leak- using COUPLER LEAK |
| 2248 | Ø100mm AC pipe |
| 2249 | Ø150mm AC pipe |
| 2250 | Ø200mm AC pipe |
| 2251 | Ø600mm AC pipe |
| 2252 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (HDPE pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound pipe including supply and delivery of HDPE Pipes, couplers jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2253 | Type of Leak- HDPE Fusion Joint |
| 2254 | 63 mm PN 6 HDPE pipe |
| 2255 | 75 mm PN 6 HDPE pipe |
| 2256 | 90mm PN 6 HDPE pipe |
| 2257 | 110 mm PN 6 HDPE pipe |
| 2258 | 140 mm PN 6 HDPE pipe |
| 2259 | 160 mm PN 6 HDPE pipe |
| 2260 | Towards the charges for attending Leak and Bursts in the following the various size of pipelines (CI pipe) of CWSS as per the standard procedure damaged during earthwork excavation in all soil strata, removal of slushy soil, dewatering and replacing the pipeline with sound D.I pipe including supply and delivery of C.I/ D.I-S/S pipes D/S collars, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling and all incidental charges, etc complete within the stipulated time limit and as directed by the TWAD Board officers. |
| 2261 | Type of Leak- specials cement joint |
| 2262 | 150mm |
| 2263 | 250mm |
| 2264 | 350mm |
| 2265 | Type of Leak- Cut Barrel & MJ Collar |
| 2266 | 150mm |
| 2267 | 250mm |
| 2268 | 350mm |
| 2269 | Repair and Reconditioning of Sluice Valves |
| 2270 | Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials and as directed by the TWAD Board officers. |
| 2271 | 400mm DI D/F Gate Valve |
| 2272 | 350mm DI D/F Gate Valve |
| 2273 | 300mm DI D/F Gate Valve |
| 2274 | 250mm DI D/F Gate Valve |
| 2275 | 200mm DI D/F Gate Valve |
| 2276 | 150mm DI D/F Gate Valve |
| 2277 | 100mm DI D/F Gate Valve |
| 2278 | 80mm DI D/F Gate Valve |
| 2279 | Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc., and as directed by the TWAD Board officers. |
| 2280 | 400mm DI D/F Gate Valve |
| 2281 | 350mm DI D/F Gate Valve |
| 2282 | 300mm DI D/F Gate Valve |
| 2283 | 250mm DI D/F Gate Valve |
| 2284 | 200mm DI D/F Gate Valve |
| 2285 | 150mm DI D/F Gate Valve |
| 2286 | 100mm DI D/F Gate Valve |
| 2287 | 80mm DI D/F Gate Valve |
| 2288 | Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 2289 | 400mm DI D/F Gate Valve |
| 2290 | 350mm DI D/F Gate Valve |
| 2291 | 300mm DI D/F Gate Valve |
| 2292 | 250mm DI D/F Gate Valve |
| 2293 | 200mm DI D/F Gate Valve |
| 2294 | 150mm DI D/F Gate Valve |
| 2295 | 100mm DI D/F Gate Valve |
| 2296 | 80mm DI D/F Gate Valve |
| 2297 | Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials. and as directed by the TWAD Board officers. |
| 2298 | 400mm DI D/F Gate Valve |
| 2299 | 350mm DI D/F Gate Valve |
| 2300 | 300mm DI D/F Gate Valve |
| 2301 | 250mm DI D/F Gate Valve |
| 2302 | 200mm DI D/F Gate Valve |
| 2303 | 150mm DI D/F Gate Valve |
| 2304 | 100mm DI D/F Gate Valve |
| 2305 | 80mm DI D/F Gate Valve |
| 2306 | Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 2307 | 400mm DI D/F Gate Valve |
| 2308 | 350mm DI D/F Gate Valve |
| 2309 | 300mm DI D/F Gate Valve |
| 2310 | 250mm DI D/F Gate Valve |
| 2311 | 200mm DI D/F Gate Valve |
| 2312 | 150mm DI D/F Gate Valve |
| 2313 | 100mm DI D/F Gate Valve |
| 2314 | 80mm DI D/F Gate Valve |
| 2315 | Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,and as directed by the TWAD Board officers. |
| 2316 | 400mm DI D/F Gate Valve |
| 2317 | 350mm DI D/F Gate Valve |
| 2318 | 300mm DI D/F Gate Valve |
| 2319 | 250mm DI D/F Gate Valve |
| 2320 | 200mm DI D/F Gate Valve |
| 2321 | 150mm DI D/F Gate Valve |
| 2322 | 100mm DI D/F Gate Valve |
| 2323 | 80mm DI D/F Gate Valve |
| 2324 | Repair and Reconditioning of Air Valves |
| 2325 | Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete and as directed by the TWAD Board officers. |
| 2326 | 200mm Single Chamber Air Valve |
| 2327 | 150mm Single Chamber Air Valve |
| 2328 | 100mm Single Chamber Air Valve |
| 2329 | 80mm Single Chamber Air Valve |
| 2330 | 50mm Single Chamber Air Valve |
| 2331 | 20mm Single Chamber Air Valve |
| 2332 | Replacement of Sluice Valves |
| 2333 | Supply and Delivery of DI D/F Gate (sluice) valves (Soft Seated) resilient seated soft sealing gate valves (sluice valves) with body bonnet of ductile cast iron of grade GGG40 or equivalent grade, wedge fully rubber lined with EPDM, replaceable spindle nut, without gland packing and with 3 O-Ring protection on the shaft and seals of NBR and the valves should be of vaccum tight and 100% leak proof with face to face dimentions as per BS 5163-89/ ISI 14846-2000/ DIN 3202 F 4. All the valves should be with electrostatic powder coating both inside and outside with pocket less straight through body passage. All the valves are to be compatible for burried application with pressure rating PN 10/16 and with 5 years warranty and as directed by the TWAD Board officers. |
| 2334 | 50 mm DI D/F Gate Valve |
| 2335 | 65 mm DI D/F Gate Valve |
| 2336 | 80 mm DI D/F Gate Valve |
| 2337 | 100 mm DI D/F Gate Valve |
| 2338 | 125 mm DI D/F Gate Valve |
| 2339 | 150 mm DI D/F Gate Valve |
| 2340 | 200 mm DI D/F Gate Valve |
| 2341 | 250 mm DI D/F Gate Valve |
| 2342 | 300 mm DI D/F Gate Valve |
| 2343 | 350 mm DI D/F Gate Valve |
| 2344 | 400 mm DI D/F Gate Valve |
| 2345 | 450 mm DI D/F Gate Valve |
| 2346 | 500 mm DI D/F Gate Valve |
| 2347 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 2348 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 2349 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 2350 | 125 mm dia C.I./D.I. Double flanged pipes and special |
| 2351 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 2352 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 2353 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 2354 | 300 mm dia C.I./D.I. Double flanged pipes and special |
| 2355 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 2356 | 400 mm dia C.I./D.I. Double flanged pipes and special |
| 2357 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 2358 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 2359 | Air Valves |
| 2360 | Manufacture, Supply and Delivery of Tamper proof DI single chamber double orifice triple function (ventilating, admitting & ventilating during operation) air release valve with pressure rating PN 10/16 with body and cover made of Ductile Iron of Grade GGG 40 or GGG 50, conforming to IS 1865 with Food Grade Epoxy Powder coating (EP-P) inside and for outside of colour blue RAL 5005. All internal parts such as float, shell etc., cover bolts, made of Austenitic alloy steel of SS AISI 304/316. The float shall be made of Polytetrafluroethylene/ Austenitic alloy steel of AISI 304/316. Gaskets and seals of EPDM / Neoprene rubber for TWAD Board works anywhere in Tamil Nadu and with 5 years warranty and as directed by the TWAD Board officers. |
| 2361 | 50 mm DI Single Chamber Air release valve |
| 2362 | 80 mm DI Single Chamber Air release valve |
| 2363 | 100 mm DI Single Chamber Air release valve |
| 2364 | 150 mm DI Single Chamber Air release valve |
| 2365 | 200 mm DI Single Chamber Air release valve |
| 2366 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS- 638(1979) and M.S. bolts and nuts of IS 1364-1(2002), including cost of jointing materials suchas bolt and nuts Rubber insertion and labour charges etc., complete.and as directed by the TWAD Board officers. |
| 2367 | 80 mm dia C.I/ D.I Double flanged pipes and specials |
| 2368 | 100 mm dia C.I./D.I. Double flanged pipes and special |
| 2369 | 150 mm dia C.I./D.I. Double flanged pipes and special |
| 2370 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 2371 | Non Return Valves |
| 2372 | Manufacture, Supply and Delivery of DI D/F Slanted seat Swing Check Valve. Body of ductile cast iron of Grade GGG 40 or GGG 50 and disc of ductile cast iron GGG 40 or GGG 50 with fully encapsulated EPDM rubber, where both faces can be used. Electrostatic epoxy powder/liquid coating (EP-P) inside and outside color blue RAL 5005 with minimum coating thickness of 250 microns. The EPDM rubber & Epoxy Powder should be approved by W 270. (EP-P) it is a resi coat powder approved for drinking water application, applied through fusion bonding process by dipping the shot-blasted casted components heated up to 200 deg C). Face to face dimensions as per EN558-1, series 48 and flange connections as per EN 1092-2/IS 1538 and with 5 years warranty and as directed by TWAD board officers |
| 2373 | 200 mm DI Non Return Valve |
| 2374 | 250 mm DI Non Return Valve |
| 2375 | 350 mm DI Non Return Valve |
| 2376 | 450 mm DI Non Return Valve |
| 2377 | 500 mm DI Non Return Valve |
| 2378 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete. and as directed by TWAD board officers |
| 2379 | 200 mm dia C.I./D.I. Double flanged pipes and special |
| 2380 | 250 mm dia C.I./D.I. Double flanged pipes and special |
| 2381 | 350 mm dia C.I./D.I. Double flanged pipes and special |
| 2382 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 2383 | 500 mm dia C.I./D.I. Double flanged pipes and special |
| 2384 | Butterfly Valves |
| 2385 | Supply and delivery of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2) 1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the disc and body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 and with 5 years warranty and as directed by TWAD Board Officers. |
| 2386 | 450 mm DI Non Return Valve PN 10 |
| 2387 | 600 mm DI Butterfly Valve PN 10 |
| 2388 | Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to with IS-638(1979) and M.S. bolts and nuts of IS 1364-1 (2002), including cost of jointing materials such as bolt and nuts Rubber insertion and labour charges etc., complete and as directed by TWAD Board Officers. |
| 2389 | 450 mm dia C.I./D.I. Double flanged pipes and special |
| 2390 | 600 mm dia C.I./D.I. Double flanged pipes and special |
| 2391 | Towards the charges for refilling the trench after attending the leak/burst in NHAI, TNRSP, SH and Railway using CC 1:2:4 including Cost of materials, Transportation, labour charges and other incidental etc., complete CC and BT road cutting for leak attending works and as directed by TWAD Board Officers |
| 2392 | Attending the Repair and Renewal works in Open well Submersible Pumpset |
| 2393 | Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings etc., complete and as directed by TWAD Board officers |
| 2394 | 1.5 HP |
| 2395 | 7.5 HP |
| 2396 | 10 HP |
| 2397 | 12.5 HP |
| 2398 | 15 HP |
| 2399 | 20 HP |
| 2400 | 25 HP |
| 2401 | Transporting the pumpset from Pump House to work shop etc., complete and as directed by TWAD Board officers |
| 2402 | 1.5 HP |
| 2403 | 7.5 HP |
| 2404 | 10 HP |
| 2405 | 12.5 HP |
| 2406 | 15 HP |
| 2407 | 20 HP |
| 2408 | 25 HP |
| 2409 | Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials etc., complete and as directed by TWAD Board officers |
| 2410 | 1.5 HP |
| 2411 | 7.5 HP |
| 2412 | 10 HP |
| 2413 | 12.5 HP |
| 2414 | 15 HP |
| 2415 | 20 HP |
| 2416 | 25 HP |
| 2417 | Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc., complete and as directed by TWAD Board officers |
| 2418 | 1.5 HP |
| 2419 | 7.5 HP |
| 2420 | 10 HP |
| 2421 | 12.5 HP |
| 2422 | 15 HP |
| 2423 | 20 HP |
| 2424 | 25 HP |
| 2425 | Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material etc., complete and as directed by TWAD Board officers |
| 2426 | 1.5 HP |
| 2427 | 7.5 HP |
| 2428 | 10 HP |
| 2429 | 12.5 HP |
| 2430 | 15 HP |
| 2431 | 20 HP |
| 2432 | 25 HP |
| 2433 | Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works etc., complete and as directed by TWAD Board officers |
| 2434 | 1.5 HP |
| 2435 | 7.5 HP |
| 2436 | 10 HP |
| 2437 | 12.5 HP |
| 2438 | 15 HP |
| 2439 | 20 HP |
| 2440 | 25 HP |
| 2441 | Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping etc., complete and as directed by TWAD Board officers |
| 2442 | 1.5 HP |
| 2443 | 7.5 HP |
| 2444 | 10 HP |
| 2445 | 12.5 HP |
| 2446 | 15 HP |
| 2447 | 20 HP |
| 2448 | 25 HP |
| 2449 | Attending the Repair and Renewal works in Monoblock pumpsets |
| 2450 | Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.and as directed by TWAD Board officers |
| 2451 | 1.5 HP |
| 2452 | 7.5 HP |
| 2453 | Transporting the pumpset from the Pumping Station to work shop.and as directed by TWAD Board officers |
| 2454 | 1.5 HP |
| 2455 | 7.5 HP |
| 2456 | Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials and as directed by TWAD Board officers |
| 2457 | 1.5 HP |
| 2458 | 7.5 HP |
| 2459 | Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,and as directed by TWAD Board officers |
| 2460 | 1.5 HP |
| 2461 | 7.5 HP |
| 2462 | Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.and as directed by TWAD Board officers |
| 2463 | 1.5 HP |
| 2464 | 7.5 HP |
| 2465 | Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 2466 | 1.5 HP |
| 2467 | 7.5 HP |
| 2468 | Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.and as directed by TWAD Board officers |
| 2469 | 1.5 HP |
| 2470 | 7.5 HP |
| 2471 | Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.and as directed by TWAD Board officers |
| 2472 | 1.5 HP |
| 2473 | 7.5 HP |
| 2474 | Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.and as directed by TWAD Board officers |
| 2475 | 1.5 HP |
| 2476 | 7.5 HP |
| 2477 | Attending the Rewinding and replacement of bearings of Induction Motor for HSC Pumpset(Various HSC Motor) |
| 2478 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 2479 | 60 HP |
| 2480 | 90 HP |
| 2481 | 167 HP |
| 2482 | 180 HP |
| 2483 | Transportation charges for conveying the motor from the Booster Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 2484 | 60 HP |
| 2485 | 90 HP |
| 2486 | 167 HP |
| 2487 | 180 HP |
| 2488 | Labour Charges for removing the two end side cover with fan arrangements and the damaged driven end and non driven end bearings.and as directed by TWAD Board officers |
| 2489 | 60 HP |
| 2490 | 90 HP |
| 2491 | 167 HP |
| 2492 | 180 HP |
| 2493 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 2494 | 60 HP |
| 2495 | 90 HP |
| 2496 | 167 HP |
| 2497 | 180 HP |
| 2498 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 2499 | 60 HP |
| 2500 | 90 HP |
| 2501 | 167 HP |
| 2502 | 180 HP |
| 2503 | Supply and delivery of Driven End and Non Driven End bearings suitable for the required Induction Motor and as directed by TWAD Board officers |
| 2504 | 60 HP |
| 2505 | 90 HP |
| 2506 | 167 HP |
| 2507 | 180 HP |
| 2508 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 2509 | 60 HP |
| 2510 | 90 HP |
| 2511 | 167 HP |
| 2512 | 180 HP |
| 2513 | Transportation charges for conveying the motor from work shop to Pumping Station and as directed by TWAD Board officers |
| 2514 | 60 HP |
| 2515 | 90 HP |
| 2516 | 167 HP |
| 2517 | 180 HP |
| 2518 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 2519 | 60 HP |
| 2520 | 90 HP |
| 2521 | 167 HP |
| 2522 | 180 HP |
| 2523 | Attending the Repair and Replacement of bearings in various HSC Pump |
| 2524 | Charges for removing the motor from bed assembly after dismantling of Coupling arrangements and removing the pump assembly and including the provision of dummy flange arrangements by using contractor tools and materials.and as directed by TWAD Board officers |
| 2525 | 60 HP |
| 2526 | 90 HP |
| 2527 | 167 HP |
| 2528 | 180 HP |
| 2529 | Transportation charges for conveying the Pump assembly from the Pumping Station to work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 2530 | 60 HP |
| 2531 | 90 HP |
| 2532 | 167 HP |
| 2533 | 180 HP |
| 2534 | Labour Charges for removing the impeller by using hydralic system, DE and NDE Bearings and as directed by TWAD Board officers |
| 2535 | 60 HP |
| 2536 | 90 HP |
| 2537 | 167 HP |
| 2538 | 180 HP |
| 2539 | Labour Charges for reconditioning the worn out shaft including welding the shaft to suit the impeller and suit the driven end and non driven end bearing seating, knurling, bend checking and etc.,and as directed by TWAD Board officers |
| 2540 | 60 HP |
| 2541 | 90 HP |
| 2542 | 167 HP |
| 2543 | 180 HP |
| 2544 | Supply, delivery and fixing of Shaft sleeves in Gun metal including machining charges and making key ways after deducting the scrap materials and as directed by TWAD Board officers |
| 2545 | 60 HP |
| 2546 | 90 HP |
| 2547 | 167 HP |
| 2548 | 180 HP |
| 2549 | Balancing of Rotor with impeller both dyanamically and Hydralically by using required dyanamic balancing machine and as directed by TWAD Board officers |
| 2550 | 60 HP |
| 2551 | 90 HP |
| 2552 | 167 HP |
| 2553 | 180 HP |
| 2554 | Supply, delivery and fixing of Gunmetal seal rings for impeller neck including machining charges after deducting the scrap materials and as directed by TWAD Board officers |
| 2555 | 60 HP |
| 2556 | 90 HP |
| 2557 | 167 HP |
| 2558 | 180 HP |
| 2559 | Supply and delivery of Driven End and Non Driven End bearings and as directed by TWAD Board officers |
| 2560 | 60 HP |
| 2561 | 90 HP |
| 2562 | 167 HP |
| 2563 | 180 HP |
| 2564 | Labour Charges fixing the DE and NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 2565 | 60 HP |
| 2566 | 90 HP |
| 2567 | 167 HP |
| 2568 | 180 HP |
| 2569 | Transportation charges for conveying the Pump assembly from work shop to Pumping Station.and as directed by TWAD Board officers |
| 2570 | 60 HP |
| 2571 | 90 HP |
| 2572 | 167 HP |
| 2573 | 180 HP |
| 2574 | Charges for reassembling the Pump with Motor by using pulley and alignment checking, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 2575 | 60 HP |
| 2576 | 90 HP |
| 2577 | 167 HP |
| 2578 | 180 HP |
| 2579 | Attending the Rewinding and replacement of bearings of Induction Motor for Vertical Turbine Pumpset |
| 2580 | Vinayaga Nagar BS |
| 2581 | Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials. and as directed by TWAD Board officers |
| 2582 | 200 HP |
| 2583 | Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.and as directed by TWAD Board officers |
| 2584 | 200 HP |
| 2585 | Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.and as directed by TWAD Board officers |
| 2586 | 200 HP |
| 2587 | Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor and as directed by TWAD Board officers |
| 2588 | 200 HP |
| 2589 | Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,and as directed by TWAD Board officers |
| 2590 | 200 HP |
| 2591 | Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.and as directed by TWAD Board officers |
| 2592 | 200 HP |
| 2593 | Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials and as directed by TWAD Board officers |
| 2594 | 200 HP |
| 2595 | Transportation charges for conveying the motor from work shop to pumping Station and as directed by TWAD Board officers |
| 2596 | 200 HP |
| 2597 | Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,and as directed by TWAD Board officers |
| 2598 | 200 HP |
| 2599 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 2600 | Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD Board officers |
| 2601 | 200 HP |
| 2602 | Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)and as directed by TWAD Board officers |
| 2603 | 200 HP |
| 2604 | Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly and as directed by TWAD Board officers |
| 2605 | 200 HP |
| 2606 | Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers. |
| 2607 | 200 HP |
| 2608 | Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)and as directed by TWAD Board officers |
| 2609 | 200 HP |
| 2610 | Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2611 | 200 HP |
| 2612 | Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2613 | 200 HP |
| 2614 | Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers. |
| 2615 | 200 HP |
| 2616 | Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth (Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers. |
| 2617 | 200 HP |
| 2618 | Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset and as directed by TWAD Board officers |
| 2619 | 200 HP |
| 2620 | Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers |
| 2621 | 200 HP |
| 2622 | Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers |
| 2623 | 200 HP |
| 2624 | Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers |
| 2625 | 200 HP |
| 2626 | Supply and delivery of Top Load Bearing with Ratchet assembly including Required Grade lubricating components and as directed by TWAD Board officers |
| 2627 | 200 HP |
| 2628 | Supply of Materials for attending the Repair and Renewal works of various capacities of VT Pump |
| 2629 | Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well / Collection Sump and as directed by TWAD Board officers |
| 2630 | 200 HP |
| 2631 | Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works and as directed by TWAD Board officers |
| 2632 | 200 HP |
| 2633 | Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 2634 | 200 HP |
| 2635 | Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.and as directed by TWAD Board officers |
| 2636 | 200 HP |
| 2637 | Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete and as directed by TWAD Board officers |
| 2638 | 200 HP |
| 2639 | Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van and as directed by TWAD Board officers |
| 2640 | 200 HP |
| 2641 | Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly and as directed by TWAD Board officers |
| 2642 | 200 HP |
| 2643 | Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete and as directed by TWAD Board officers |
| 2644 | 200 HP |
| 2645 | 350 HP Kirloskar make V.T Pump and Motor |
| 2646 | Charges for Dismantling the 350 HP V.T Turbine motor disconnecting thr stator cable,pulley,motor stool by loosening the fasteners and carefully lifting the motor and as directed by the TWAD Board officers |
| 2647 | charges for removing of 260KW/350 HP Motor both side and end shield covers removing ,cleaning the stator and rotor with compressed air and checking the healthiness and applying the special varnish,DE and NDE side worn out bearings removing by using heavy duty puller,gas cutting torch and special tool arrangements and assembeling the motor complte overhauling and servicing etc., complete and as directed by the TWAD Board officers |
| 2648 | Charges for wornout rotor bearing seating area on both drive and non drive end side welding with suitable welding with suitable welding electrode and maching the rotor shaft and dynamic balancing the rotor complete and as directed by the TWAD Board officers |
| 2649 | Supply,delivery and fixing of DE and NDE side bearings (Rate quated after deduting the old worn out scrap and as directed by the TWAD Board officers |
| 2650 | DE side bearing No.6322/C3 IMP (8482) Make SKF |
| 2651 | NDE side bearing No.6319/C3vl 0241 IMP (84821013) SKF Make |
| 2652 | Charge towards lifting the Pump stool and loosing the fasteners and carefully lifting of discharge tee,7 Nos of column pipes,Pump shaft ,shaft coupling,line shaft bearing one by one complete and as directed by the TWAD Board officers |
| 2653 | Dismantling of 4 stage impleer assembly removing the section bowl,impleeer bowl,impleer shaft by removing locknuts and bolt & nuts one by one complet and as directed by the TWAD Board officers |
| 2654 | Charges for cleaning of column pipes bowl assembly oil lubricated pipes,discharge casing and tee joint for removing the rust over which one coat of applying rust concerter and apply two coats of corrossive black painting complete and as directed by the TWAD Board officers |
| 2655 | Charges for welding ,machining and lathe work roughning aligning and reconditining the line shafts and as directed by the TWAD Board officers |
| 2656 | Charges for welding ,machining and lathe work roughning aligning and reconditining thekeyway of head shaft completely and as directed by the TWAD Board officers |
| 2657 | Charges for supply and delivery of stuffing boz and as directed by the TWAD Board officers |
| 2658 | Charges for supply, delivery and fixing of Kirloshkar make pump stuffing box bearing bush with oil lubricated check nut( phosphor bronze) ( rate quated after detecting the cost of old and wornout parts or materials) and as directed by the TWAD Board officers |
| 2659 | Charges for supply and delivery and fixing of bowl bearing ( bearing made of neupreme rubber with phospher bronze metal casings and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portionn and etc, complete (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 2660 | Charges for supply of fabricated bowl reducer bush (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 2661 | Charges for supply of bowl reducer bush bearing (Phospher bronze) (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 2662 | Charges for supply, delivery new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 2663 | Charges for supply and delivery of new special fasteners including washers for all bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by the TWAD Board officers |
| 2664 | Charges for supply of fire ply gasket for all joints etc., complete and as directed by the TWAD Board officers |
| 2665 | Charges for supply, delivery and fixing of pump thrust bearing No:29322E (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 2666 | Charges for supply, delivery and fixing of thrust bearing cooling copper coil as per original (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 2667 | Charges for supply, delivery and fixing of stainer suitable for the bowl assembly (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 2668 | Charges for assembling and erection of all column pipe with flang gasket, oil lubricated pipes and main shaft coupling one by one complete and as directed by TWAD board officers |
| 2669 | Charges for supply and fixing of rubber spider (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 2670 | Charges for fixing of phospher bronze bowl neck ring to suit the bowl, cutting, grinding , machining and all allied works including cost of phospher bronze materials (Rate quoted after deducting the cost of old and worn-out parts (or) materials)and as directed by the TWAD Board officers |
| 2671 | Charges for assembling and erection of distance head Tee and connecting with main pipe line and as directed by the TWAD Board officers |
| 2672 | Charges for assembling of pump stool with correct allignment and as directed by the TWAD Board officers |
| 2673 | Charges for assembling the motor unit to fixing pump stool with correct alignment , pump motor pully coupling, motor connecting socket grimping , connecting of terminals and successful commissioning and as directed by the TWAD Board officers |
| 2674 | 400 HP/425 HP Kirloskar make Vertical Turbine motor in Clear Water Pump House |
| 2675 | charges towards dismantling of 300 KW/ 400 HP V.T motor Unit disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool loosing the fasteners and carefully lifting the motor both side DE, NDE side and shield covers and rotor removing, cleaning the stator and rotor winding complete and as directed by the TWAD Board officers |
| 2676 | Charges for damaged and rotor winding burned 400 HP clear water Unit , rotor both side steel bindings, end connection and burnt slot windings flat copper bars complete removing and cleaning the rotor core class \\"F\\" style slot insulation providing and rewinding by using class \\"F\\" insulated copper bars as in the original winding and all end connections silver brazing, insulation providing conducting necessary all tests of the rotor windings pre-heating, varnishing, backing in oven and applying finishing varnishes and removing the existing worn-out DE and NDE side bearings by using special tool arrangements and applying grease and etc., complete (Rate quoted after deducting the retrieved copper wire cost) and as directed by the TWAD Board officers |
| 2677 | Charges for worn-out rotor bearing seating area on both driving side and non driving end side welding with suitable welding electrode and machining the rotor shaft and dynamic balancing and etc complete and as directed by the TWAD Board officers |
| 2678 | Charges for worn-out rotor DE side end shield cover bearing house fixing, logging and machining to suit the bearing OD size and fixing the bearing and etc complete )and as directed by the TWAD Board officers |
| 2679 | Charges for supply and fixing of DE side bearing with special tool arrangements bearing No: SKF make 322 EM with all allied works complete (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 2680 | Charges for supply and fixing of NDE side bearing No: 6320 FR (Rate quoted after deducting the old bearing cost) and as directed by the TWAD Board officers |
| 2681 | Charges for dismantling the short circuited and damaged slip ring 3 phase limbs part to part providing the new special hylam insulation providing and fixing with necessary insulation compund of all slip ring and maching the surface of the rings and complete reconditioning the slip ring and as directed by the TWAD Board officers |
| 2682 | Charges for supply, delivery and fixing of carbon brush, brass holders with necessary class \\"F\\" flame proof partition providing (Rate quoted after deducting the old scrap material cost) and as directed by the TWAD Board officers |
| 2683 | Assembling the motor unit to fixing pump stool with correct alignment pump and motor pulley coupled connecting of motor and rotor terminals and successful commissioning and as directed by the TWAD Board officers |
| 2684 | 400 HP kirloskar Vertical Turbine Pump in Clear Water Pump House |
| 2685 | Charges for dismantling the 300 KW/ 400 HP V.T motor Unit, disconnecting the stator and rotor cable and pulley, pulley bolts, motor stool by loosing the fasteners and carefully lifting the motor and loading the pump in the truck, using mobile crane to the Clear Water Pump House to work shop and unloading etc., complete and as directed by the TWAD Board officers |
| 2686 | Charges for slipring machining, reinsulating and reconditioning etc., complete and as directed by the TWAD Board officers |
| 2687 | Charges for supply and fixing of Carbon Brushes (Size: Height- 50 mm, Width- 32 mm, Thickness- 22 mm)and as directed by the TWAD Board officers |
| 2688 | Charges for supply, delivery and fixing of bowl bearing (Bearing made of neoprene rubber with phosphor bronze metal castings and reconditioning the bowl inner portion complete sand blasting for smooth of the bowl inner portion and etc., complete (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2689 | Charges for cleaning of column pipes, bowl assembly oil lubricated pipes, discharge casing and Tee joint for removing the rust over which one coat of applying rust converter and apply two coats of anti-corrosive black painting complete.and as directed by the TWAD Board officers |
| 2690 | Charges for fabrication, supply and fixing of SS metal Head Shaft as per the original shaft (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2691 | Charges for fabrication, supply and fixing of SS metal intermediate shaft as per the original shaft (Rate quoted after deducting the old scrap value) and as directed by the TWAD Board officers |
| 2692 | Charges for supply and fixing of line shaft SS sleeves (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2693 | Charges for supply and fixing of pump thrust bearing no: 29322E (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2694 | Charges for welding, machining and reconditioning the 2 Nos of line shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 2695 | Charges for welding, machining and reconditioning the 1 No impeller shaft by cleaning of entire shaft threaded portion, removing of bend by hydraulic pressing and checking alignment in lathe and etc., complete and as directed by the TWAD Board officers |
| 2696 | Charges for supply, delivery and fixing of bronze bowl reducer bush to suit the bowl, cutting, grinding, lathe works and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2697 | Charges for supply, delivery and fixing of spider bearing, bearing made of neoprene rubber with phosphor bronze metal castings (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2698 | Charges for supply and fixing of phosphor bronze neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of phosphor bronze materials (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2699 | Charges for supply, delivery and fixing of SS shaft coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2700 | Charges for reconditioning of stuffing box and as directed by the TWAD Board officers |
| 2701 | Charges for supply, delivery and fixing of stuffing box bearing, bearing made of phosphor bronze oil lubricated type with cast iron flange coupling (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2702 | Charges for supply and fixing of pump shaft covering pipe coupling, coupling made of phosphor bronze metal with all machining, threading complete and as directed by the TWAD Board officers |
| 2703 | Charges for dynamic balancing of all impellers to avoid pump vibration and as directed by the TWAD Board officers |
| 2704 | Charges for supply and fixing of suitable bowl bottom strainer (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2705 | Supply, delivery and fixing of new fasteners, washers for all column pipes, Tee joints, pulley bolts & nuts (Rate quoted after deducting the old scrap value)and as directed by the TWAD Board officers |
| 2706 | Charges for supply and fixing of firely gaskets for all joints and as directed by the TWAD Board officers |
| 2707 | Assembling the pump to fixing pumpstool for one by one fixing of all column pipe and line shaft and covering pipe and all allied works complete with correct alignment of pump and assembling of the motor with motor stool with correct alignment, pump & motor pulley coupled motor input supply cable sockets 6 Nos providing, grimping connecting of termination and successful commissioning etc., complete and as directed by the TWAD Board officers |
| 2708 | 315 KW / 425 HP VT pumpset |
| 2709 | Charges for Dismantling of clear water unit - 1 pump of the 315 KW/ 425 HP Kirloskar motor disconnecting the power cable, pulley bolts and nuts, motor stool loosing the fasteners and carefully lifting the motor and charges towards dismantling the pump bearing assembly set discharged tee pipes, column pipes, 4 stage bowl assembly set, flange bolt, impeller shaft complete and dynamic balancing the motor the cost includes conveyance of tools and labour charges ect., complete and charges for assembling the motor unit to fixing pump stool with correct alignment, pump motor pulley coupling, motor connecting socket gripping, connecting of terminals and successful commisssioning and as directed by TWAD Board officers |
| 2710 | charges for cleaning of column pipes, bowl assembly oil lubricted pipes, discharges casing and tee joint for removing the tust over which one coat of applying rust converter and apply two coats two coats of anti-crrosive black painting complete and as directed by TWAD Board officers |
| 2711 | Charges for Supply and delivery of stuffing box and as directed by TWAD Board officers |
| 2712 | Charges for Supply, delivery and fixing of Kirloskar make pump stuffing box bearing bush (phosphor bronze) with oil lubricated check nut ( Phosphor bronze) (Rate quoted after deducting the cost of old and won-out parts (or) materies and as directed by TWAD Board officers |
| 2713 | Charges for Supply, delivery and fixing of spider flange bearing (Phosphoser bronze) (rate quoted after deducting the cost of old won-out parts or materieals) and as directed by TWAD Board officers |
| 2714 | Charges for Supply, delivery and fixing of SS Shaft sleeves (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 2715 | Charges for Supply, delivery and fixing of SS Shaft Coupling (Rate quoted after deducting the cost of old and wom-out parts or materials) and as directed by TWAD Board officers |
| 2716 | Charges for welding, machining and lathe works thoroughness checking pin aligning reconditioning the line shaft and impeller shaft and dynamic balancing for all shafts and as directed by TWAD Board officers |
| 2717 | Charges for Supply, delivery and fixing of bowl bearing (beaning made of neoprene rubber with Phosphoser bronze mental casting and reconditioning the bowl inner portion complete and sand blasting for smooth of the bowl inner portion ect., complete (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 2718 | Charges for Supply of fabricated bowl reducer bush (Phosphoser bronze) (rate quoted after deducting the cost of old and won-out or materials) and as directed by TWAD Board officers |
| 2719 | Charges for supply of bowl reducer bush bearing (Phosphor bronze) (Rate quoted after deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 2720 | Charges for fixing of Phosphor bronze bowl neck ring to suit the bowl, cutting, grinding, machining and all allied works including cost of Phosphof bronze materials (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by TWAD Board officers |
| 2721 | Charges for supply and delivery of new fasteners including washers for all column pipe, Tee joints, NRV joint (Rate quoted after deducting the cost of old and worn-out parts (or) materials) and as directed by TWAD Board officers |
| 2722 | Charges for supply and delivery of new special fasteners including washers for bowl assembly (Rate quoted after deducting the cost of old and woni-out parts (or) materials) and as directed by TWAD Board officers |
| 2723 | Charges for supply of fire ply gasket for all joints and as directed by TWAD Board officers |
| 2724 | Charges for supply, delivery and fixing of pump thrust bearing No: 29322E (Rate quoted after deducting the costof old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 2725 | Charges for supply, delivery and fixing of strainer suitablefor the bowl assembly (Rate quoted dafter deducting the cost of old and wom-out parts (or) materials) and as directed by TWAD Board officers |
| 2726 | Attending the repair works in DOL Starter |
| 2727 | Labour Charges for Removal and Re-fixing of unserviceable or burnt Single phase Preventer, MCB, Over load Relay, terminal block , Contactor and capacitor for the starter and as directed by the TWAD Board officers |
| 2728 | 1.5 HP |
| 2729 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2730 | 1.5 HP |
| 2731 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2732 | 1.5 HP |
| 2733 | Replacement of Terminal block Suitable for the starter as directed by TWAD Board Officers.and as directed by the TWAD Board officers |
| 2734 | 1.5 HP |
| 2735 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 2736 | 1.5 HP |
| 2737 | Attending the repair works in Star Delta Starter |
| 2738 | Labour Charges for Removal of unservicable / burnt contactor with terminal connection Single Phase Preventer, Timer, CT Coil and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 2739 | 7.5 HP |
| 2740 | 10 HP |
| 2741 | 12.5 HP |
| 2742 | 15 HP |
| 2743 | 20 HP |
| 2744 | 25 HP |
| 2745 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2746 | 7.5 HP |
| 2747 | 10 HP |
| 2748 | 12.5 HP |
| 2749 | 15 HP |
| 2750 | 20 HP |
| 2751 | 25 HP |
| 2752 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 2753 | 7.5 HP |
| 2754 | 10 HP |
| 2755 | 12.5 HP |
| 2756 | 15 HP |
| 2757 | 20 HP |
| 2758 | 25 HP |
| 2759 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 2760 | 7.5 HP |
| 2761 | 10 HP |
| 2762 | 12.5 HP |
| 2763 | 15 HP |
| 2764 | 20 HP |
| 2765 | 25 HP |
| 2766 | Supply and Delivery and fixing of required capacity Over load relay suitable for the starter as directed by TWAD Board officers. |
| 2767 | 7.5 HP |
| 2768 | 10 HP |
| 2769 | 12.5 HP |
| 2770 | 15 HP |
| 2771 | 20 HP |
| 2772 | 25 HP |
| 2773 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2774 | 7.5 HP |
| 2775 | 10 HP |
| 2776 | 12.5 HP |
| 2777 | 15 HP |
| 2778 | 20 HP |
| 2779 | 25 HP |
| 2780 | Replacement of Front Mounting unit including the cost of material (NO and NC Element) suitable for the starter as directed by TWAD Board Officers. |
| 2781 | 7.5 HP |
| 2782 | 10 HP |
| 2783 | 12.5 HP |
| 2784 | 15 HP |
| 2785 | 20 HP |
| 2786 | 25 HP |
| 2787 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 2788 | 7.5 HP |
| 2789 | 10 HP |
| 2790 | 12.5 HP |
| 2791 | 15 HP |
| 2792 | 20 HP |
| 2793 | 25 HP |
| 2794 | Replacement of of required amps Terminal block Suitable for the starter as directed by TWAD Board Officers. |
| 2795 | 7.5 HP |
| 2796 | 10 HP |
| 2797 | 12.5 HP |
| 2798 | 15 HP |
| 2799 | 20 HP |
| 2800 | 25 HP |
| 2801 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 2802 | 7.5 HP |
| 2803 | 10 HP |
| 2804 | 12.5 HP |
| 2805 | 15 HP |
| 2806 | 20 HP |
| 2807 | 25 HP |
| 2808 | Attending the repair works in Soft Starter |
| 2809 | Labour Charges for removing the Burnt FCMA Coil, After Disconnecting the terminal connection and fixing the FCMA Coil after attending the rewinding work.and as directed by the TWAD Board officers |
| 2810 | 60 HP |
| 2811 | 167 HP |
| 2812 | 180 HP |
| 2813 | 200 HP |
| 2814 | 350 HP |
| 2815 | 400 HP |
| 2816 | Charges for Conveying the FCMA Coil from pumping Station to workshop and Workshop to pumping Station and as directed by the TWAD Board officers |
| 2817 | 60 HP |
| 2818 | 167 HP |
| 2819 | 180 HP |
| 2820 | 200 HP |
| 2821 | 350 HP |
| 2822 | 400 HP |
| 2823 | Labour Charges for Removal of unservicable contactor with all terminal connection suitable for the starter and as directed by the TWAD Board officers |
| 2824 | 60 HP |
| 2825 | 167 HP |
| 2826 | 180 HP |
| 2827 | 200 HP |
| 2828 | 350 HP |
| 2829 | 400 HP |
| 2830 | Labour Charges for Removal of Single Phase Preventer, Timer, CT Coil, Volt Meter, Ammeter, Selector Switch and PLA safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 2831 | 60 HP |
| 2832 | 167 HP |
| 2833 | 180 HP |
| 2834 | 200 HP |
| 2835 | 350 HP |
| 2836 | 400 HP |
| 2837 | Charges for Replacement of burnt control circuit wire, ON / OFF Switch and required Main Wire including required cable crimping work in the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2838 | 60 HP |
| 2839 | 167 HP |
| 2840 | 180 HP |
| 2841 | 200 HP |
| 2842 | 350 HP |
| 2843 | 400 HP |
| 2844 | Charges for Removing the old wire from the FCMA Coil ,Cleaning, Rewinding of FCMA Coil and supply and delivery of Double Coated Enamel Copper Wire and all insulation materials after deducting old scrap materials etc., complete and as directed by the TWAD Board officers |
| 2845 | 60 HP |
| 2846 | 167 HP |
| 2847 | 180 HP |
| 2848 | 200 HP |
| 2849 | 350 HP |
| 2850 | 400 HP |
| 2851 | Supply and Delivery of PLA Safety Relay suitable for the starter and as directed by the TWAD Board officers |
| 2852 | 60 HP |
| 2853 | 167 HP |
| 2854 | 180 HP |
| 2855 | 200 HP |
| 2856 | 350 HP |
| 2857 | 400 HP |
| 2858 | Replacement of On delay / OFF Delay Timer including the cost of material suitable for the starter as directed by TWAD Board officers. |
| 2859 | 60 HP |
| 2860 | 167 HP |
| 2861 | 180 HP |
| 2862 | 200 HP |
| 2863 | 350 HP |
| 2864 | 400 HP |
| 2865 | Replacement of required capacity moving kit of Contactor, and No Volt Coil suitable for the starter including the cost of materials etc., complete and as directed by the TWAD Board officers |
| 2866 | 60 HP |
| 2867 | 167 HP |
| 2868 | 180 HP |
| 2869 | 200 HP |
| 2870 | 350 HP |
| 2871 | 400 HP |
| 2872 | Replacement of Tin Copper Fibre Glass Wire for Main Control Wire suitable for the starter after deducting the old scrap value as directed by TWAD Board Officers. |
| 2873 | 60 HP |
| 2874 | 167 HP |
| 2875 | 180 HP |
| 2876 | 200 HP |
| 2877 | 350 HP |
| 2878 | 400 HP |
| 2879 | Replacement of Side mounting Add-on Auxillary Contact Block including the cost of material Suitable for the starter, as directed by TWAD Board Officers. |
| 2880 | 60 HP |
| 2881 | 167 HP |
| 2882 | 180 HP |
| 2883 | 200 HP |
| 2884 | 350 HP |
| 2885 | 400 HP |
| 2886 | Replacement of CT Coil with suitable Clamp Suitable for the starter as directed by TWAD Board Officers. |
| 2887 | 60 HP |
| 2888 | 167 HP |
| 2889 | 180 HP |
| 2890 | 200 HP |
| 2891 | 350 HP |
| 2892 | 400 HP |
| 2893 | Replacement of power supply Phase indicator, ON / OFF Indicator suitable for the starter.and as directed by the TWAD Board officers |
| 2894 | 60 HP |
| 2895 | 167 HP |
| 2896 | 180 HP |
| 2897 | 200 HP |
| 2898 | 350 HP |
| 2899 | 400 HP |
| 2900 | Common Electical Items -2026-2027 |
| 2901 | Supply & Delivery of TP Three Phase moulded case circuit breaker ( ACB)with thermo magnetic release 4 pole /3 Pole for Incoming/Outgoing/ and as directed by TWAD Board officers |
| 2902 | 630A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 2903 | 800A, 4 Pole 50kA, Microprocessor Based, EDO Breaker |
| 2904 | Supply,Delivery of the following fuse units and its accessories etc., complete |
| 2905 | 32 Amps Porcelain Fuse Unit (500V) |
| 2906 | 63 Amps Porcelain Fuse Unit (500V) |
| 2907 | 100 Amps Porcelain Fuse Unit (500V) |
| 2908 | 200 Amps Porcelain Fuse Unit (500V) |
| 2909 | Supply and Delivery of heavy duty 1.1 KV grade 3/3.5 core PVC insulated PVC outer and inner sheath galvanised steel armoured aluminium conductor cable as per IS 1554 ( Part -1 ) to be laid in between M.V.Switch board and lighting sub switch board.and as directed by TWAD Board officers |
| 2910 | 6 Sq.mm |
| 2911 | 10 Sq.mm |
| 2912 | 25 Sq.mm |
| 2913 | 35 Sq.mm |
| 2914 | 50 Sq.mm |
| 2915 | 70 Sq.mm |
| 2916 | 95 Sq.mm |
| 2917 | 120 Sq.mm |
| 2918 | 150 Sq.mm |
| 2919 | 185 Sq.mm |
| 2920 | 240 Sq.mm |
| 2921 | 300 Sq.mm |
| 2922 | 400 Sq.mm |
| 2923 | Laying the above cable etc., complete.and as directed by TWAD Board officers |
| 2924 | upto 95 sq.mm |
| 2925 | 95-240 sq.mm |
| 2926 | 240-400 sq,mm |
| 2927 | RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR JOINTING OF L.T. CABLES- 3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING and as directed by TWAD Board officers |
| 2928 | 6 sq.mm |
| 2929 | 10 sq.mm |
| 2930 | 25 sq.mm |
| 2931 | 35 sq.mm |
| 2932 | 50 sq.mm |
| 2933 | 70 sq.mm |
| 2934 | 95 sq.mm |
| 2935 | 120 sq.mm |
| 2936 | 150 sq.mm |
| 2937 | 185 sq.mm |
| 2938 | 240 sq.mm |
| 2939 | 300 sq.mm |
| 2940 | 400 sq.mm |
| 2941 | Supply and Delivery of cable glands suitable for 3.50 /3.0 core UG cable.and as directed by TWAD Board officers |
| 2942 | 70 sq.mm |
| 2943 | 95 sq.mm |
| 2944 | 120 sq.mm |
| 2945 | 150 sq.mm |
| 2946 | 185 sq.mm |
| 2947 | 240 sq.mm |
| 2948 | 300 sq.mm |
| 2949 | 400 sq.mm |
| 2950 | LED INDOOR FITTINGS (LIGHT EMITTING DIODE) - 18W LED 3000K Square Type Recessed Fitting with LED and as directed by TWAD Board officers |
| 2951 | LED OUTDOOR FITTINGS (LIGHT EMITTINGDIODE) 30W LED Street Light Fitting with LED and as directed by TWAD Board officers |
| 2952 | BOX TYPE TWIN FLUORESCENT FITTING WITH COPPER CHOKE AND CONDENSOR[HPF] COMPLETE WITH ISI MARK 4 Ft. 40 Watts with Ballast (Lower end) and as directed by TWAD Board officers |
| 2953 | Transformers |
| 2954 | Charges for removing the Transformer from the plinth after disconnecting the incomming & outgoing supply terminations, earthing, neutral connection in the Transformer loading to vehicle with mobile grane and conveying to workshop unloading the transformer with mobile crane as per site condition and as directed by TWAD Board Officers. |
| 2955 | 200 KVA Transformer |
| 2956 | 400 KVA Transformer |
| 2957 | 500 KVA Transformer |
| 2958 | Charges for disconnecting the incomming & outgoing (LT & HT Side) supply terminations, earthing, neutral connection in the Transformer and drain out the oil from the conservator Tank and Transformer tank up to the required level and stacking the containers to attend the repair works/ Oil leakages and as directed by TWAD Board Officers. |
| 2959 | 200 KVA Transformer |
| 2960 | 400 KVA Transformer |
| 2961 | 500 KVA Transformer |
| 2962 | Charges Opening the Transformer Top cover after disconnecting the inside terminal connections, weakening / damaged bushes, brash stud bolt & Nuts and lifting Transformer core & winding without damages etc., complete. |
| 2963 | 200 KVA Transformer |
| 2964 | 400 KVA Transformer |
| 2965 | 500 KVA Transformer |
| 2966 | Charges for cleaning the winding coils of the Transformer free from moisture and cleaning the inside walls of the Transformer by using required new Transformer oil without any damage to the Transformer Coil |
| 2967 | 200 KVA Transformer |
| 2968 | 400 KVA Transformer |
| 2969 | 500 KVA Transformer |
| 2970 | Charges for fixing the required capacity brass LT terminal bush 3nos, copper connecting plate,3 nos using necessary bushes, screws bolt nuts etc., complete |
| 2971 | 200 KVA Transformer |
| 2972 | 400 KVA Transformer |
| 2973 | 500 KVA Transformer |
| 2974 | Charges for re-fixing the Transformer Top cover with conservator tank on the Transformer and connecting with all inside terminal connections including HT terminals by using required bolt & nuts and filling the tapped oil upto the mark of level indicator and charging the transformers, testing with load etc., complete |
| 2975 | 200 KVA Transformer |
| 2976 | 400 KVA Transformer |
| 2977 | 500 KVA Transformer |
| 2978 | Charges for rewinding of Three phase of 11KV/22KV/ 433V Transformer in the suitable core assembly including charges for removing the burnt coil and allining of core assembly and including required insulating materials etc complete after deducting the cost burned scrap. |
| 2979 | 200 KVA Transformer |
| 2980 | 400 KVA Transformer |
| 2981 | 500 KVA Transformer |
| 2982 | Charges for improving of IR Value of Transformer using electric oven - Heat Champer (LT winding, HT winding and Transformer core) etc., complete as directed by TWAD Board officers. |
| 2983 | 200 KVA Transformer |
| 2984 | 400 KVA Transformer |
| 2985 | 500 KVA Transformer |
| 2986 | Charges for two coats of painting the Transformer as directed by TWAD Board officers. |
| 2987 | 200 KVA Transformer |
| 2988 | 400 KVA Transformer |
| 2989 | 500 KVA Transformer |
| 2990 | Charges for two coats of painting the 6 Pole Structure and yard fencing etc,. complete as directed by TWAD Board officers. |
| 2991 | 200 KVA Transformer |
| 2992 | 400 KVA Transformer |
| 2993 | 500 KVA Transformer |
| 2994 | Charges for Eart Pit Value Checking with Certificate |
| 2995 | 200 KVA Transformer |
| 2996 | 400 KVA Transformer |
| 2997 | 500 KVA Transformer |
| 2998 | Charges for 11KV/433V Transformer loading to vehicle with mobile grane and conveying to Pumphouse Unloading the above transformer with mobile crane Re-erection of transformer with cable termination earthing and neutral connection testing of No Load and Load testing at pumphouse as per site condition and existing arrangements and as directed by TWAD Board Officers. |
| 2999 | 200 KVA Transformer |
| 3000 | 400 KVA Transformer |
| 3001 | 500 KVA Transformer |
| 3002 | Charges for transformer oil filtration using hot air vacuum filtering unit up to the required BDV value and submitting test result of both BDV and Acidity etc .complete and as directed by TWAD board officers. |
| 3003 | 200 KVA Transformer |
| 3004 | 400 KVA Transformer |
| 3005 | 500 KVA Transformer |
| 3006 | Supply and delivery of required size of LT Brass rod with terminal bushing with 4 no of nuts, washers and insulating sleeves etc., complete |
| 3007 | 200 KVA Transformer |
| 3008 | 400 KVA Transformer |
| 3009 | 500 KVA Transformer |
| 3010 | Supply and delivery of required capacity copper,connecting plate for cable termination . |
| 3011 | 200 KVA Transformer |
| 3012 | 400 KVA Transformer |
| 3013 | 500 KVA Transformer |
| 3014 | Supply and delivery of required size copper HT terminal rod with Bushing and required Bolt & Nuts with washers |
| 3015 | 200 KVA Transformer |
| 3016 | 400 KVA Transformer |
| 3017 | 500 KVA Transformer |
| 3018 | Supply and Delivery of Cork Packing Sheet, Cork Bush for LT and HT side, oil level Indicator as directed by TWAD Board officers after deducting the cost of old scraps |
| 3019 | 200 KVA Transformer |
| 3020 | 400 KVA Transformer |
| 3021 | 500 KVA Transformer |
| 3022 | Supply and delivery of new LT/HT Coil made EC Grade DP coveriong copper wire for winding of 11KV/22KV/433V Transformer and required insulating materials etc., complete |
| 3023 | 200 KVA Transformer |
| 3024 | 400 KVA Transformer |
| 3025 | 500 KVA Transformer |
| 3026 | Supply of transformer oil grade “A” for using cooling purpose of transformer winding AS per IS 335/1983, HT 11KV/ 22KV/ 415 V transformer (including transport , loading an unloading etc complete) Directed by TWAD board officers. |
| 3027 | 200 KVA Transformer |
| 3028 | 400 KVA Transformer |
| 3029 | 500 KVA Transformer |
| 3030 | Supply and delivery of Drop Out fuse fixing unit set |
| 3031 | 200 KVA Transformer |
| 3032 | 400 KVA Transformer |
| 3033 | 500 KVA Transformer |
| 3034 | Supply, delivery and fixing of Drop Out fuse Top Contact and bottom Contact |
| 3035 | 200 KVA Transformer |
| 3036 | 400 KVA Transformer |
| 3037 | 500 KVA Transformer |
| 3038 | Supply and delivery of Breather with Silica gel of required size for the Transfomer |
| 3039 | 200 KVA Transformer |
| 3040 | 400 KVA Transformer |
| 3041 | 500 KVA Transformer |
| 3042 | Supply and delivery of Silica gel |
| 3043 | 200 KVA Transformer |
| 3044 | 400 KVA Transformer |
| 3045 | 500 KVA Transformer |
| 3046 | Supply and delivery of 11 KV / 22 KV Lightning Arrestor |
| 3047 | 200 KVA Transformer |
| 3048 | 400 KVA Transformer |
| 3049 | 500 KVA Transformer |
| 3050 | 800 KVA Transformers |
| 3051 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 3052 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 3053 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3054 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3055 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 3056 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 3057 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 3058 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 3059 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 3060 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 3061 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 3062 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 3063 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 3064 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 3065 | Charges for oil circulation and as directed by the TWAD Board officers |
| 3066 | 1250 KVA Transformers |
| 3067 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 3068 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 3069 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3070 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3071 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 3072 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 3073 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 3074 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 3075 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 3076 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 3077 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 3078 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 3079 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 3080 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 3081 | 1600 KVA Transformer |
| 3082 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 3083 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 3084 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3085 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3086 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 3087 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 3088 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 3089 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 3090 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 3091 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 3092 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 3093 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 3094 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 3095 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 3096 | 2000 KVA Transformer |
| 3097 | Removing and Disconnecting UG cables , blot and nuts Dropout fuse from the Pole structure and loading transformer Using Hydra , chain block pullyes and special tools inculding convenance charges etc.,and as directed by the TWAD Board officers |
| 3098 | Charges for Dismantling of 400 KVA tranformer top cover , perimary and secondary insulator , drain old carbonized oil , buchholz relay , Tempature guages find out faluts and other releated works etc.,and as directed by the TWAD Board officers |
| 3099 | Rewinding of perimary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3100 | Rewinding of Secondary coil 3 Phase charges for material supply like EC grade copper wire with TPC converting HV/LV insulation materials inter layer insulation for winding. MPC insulation for tapping leads ( Rated Quoted for Deducted old scarp materials )and as directed by the TWAD Board officers |
| 3101 | Supply and delivery of All type of gasket and as directed by the TWAD Board officers |
| 3102 | Oven charges for insulation Dry and value improving.and as directed by the TWAD Board officers |
| 3103 | Supply and delivery of new transformer oil charges inculding oil filtration and refilling.and as directed by the TWAD Board officers |
| 3104 | Supply and delivery of Insulator in HV side with Assembly.and as directed by the TWAD Board officers |
| 3105 | Supply and delivery of Insulator in LV side with Assembly.and as directed by the TWAD Board officers |
| 3106 | Supply and delivery of New breather and as directed by the TWAD Board officers |
| 3107 | Charges for complete servicing and replacement of wornout spares of buchholz relay (Rate Quoted for deducted old materials )and as directed by the TWAD Board officers |
| 3108 | Labour charges for reassembling of core and winding , wounding the all 3 perimary and secondary windings, buliding of insulation for all area, replacing of all gaskets and oil seals , IR value setup for and windings, boxing of core and winding at workshop.and as directed by the TWAD Board officers |
| 3109 | Charges for painting outside the transformer with 2 coats of grey paints.and as directed by the TWAD Board officers |
| 3110 | Charges for Erection of transformer cables , bus ducts cover with gasket , drop out fuses, interlock connection and running transformer peroperly cost inculding crane hire charges , chain block pulley and labour charges etc.,and as directed by the TWAD Board officers |
| 3111 | Oil Filtration of 1250 KVA Transformer |
| 3112 | Charges for Attending oil leakage in 1250 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 3113 | Charges for oil filteration for one number of 1250 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 3114 | Charges for testing of 1250 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 3115 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1250 KVA Transformer and as directed by the TWAD Board officers |
| 3116 | Charges for oil circulation and as directed by the TWAD Board officers |
| 3117 | Oil Filtration of 1500 KVA Transformer |
| 3118 | Charges for Attending oil leakage in 1500 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 3119 | Charges for oil filteration for 2 number of 1500 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 3120 | Charges for testing of 1500 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 3121 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1500 KVA Transformer and as directed by the TWAD Board officers |
| 3122 | Charges for oil circulation and as directed by the TWAD Board officers |
| 3123 | Oil Filtration of 1600 KVA Transformer |
| 3124 | Charges for Attending oil leakage in 1600 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 3125 | Charges for oil filteration for one number of 1600 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 3126 | Charges for testing of 1600 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 3127 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 1600 KVA Transformer and as directed by the TWAD Board officers |
| 3128 | Charges for oil circulation and as directed by the TWAD Board officers |
| 3129 | Oil Filtration of 2000 KVA Transformer |
| 3130 | Charges for Attending oil leakage in 2000 KVA Transformer Unit-I in HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket,Oil seal and other accessories of the transformer.(HT Side -3 Nos ,LT Side- 3 Nos ,Total= 6 Nos)and as directed by the TWAD Board officers |
| 3131 | Charges for oil filteration for 2 number of 2000 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV,Acidity test for all Transformer and as directed by the TWAD Board officers |
| 3132 | Charges for testing of 2000 KVA Transformer Insulation resistance value ratio test, Resistance test, H.V test, Open circuit test, Low voltage test and earth resistance test for all earth pits at site including transport charges and other etc..and as directed by the TWAD Board officers |
| 3133 | Charges for removing the Carbonized oil and refilling the new transformer oil to the 2000 KVA Transformer and as directed by the TWAD Board officers |
| 3134 | Charges for oil circulation and as directed by the TWAD Board officers |
| 3135 | Charges for supply and fixing of 1,2,3,4 transformers exisiting wornout breather and pink colour silica gel removal and replacing with new transparent cover and blue silica gel and as directed by the TWAD Board officers |
| 3136 | Spraying with compressor unit at site in all portions of transformers, cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 3137 | Cleaning the 2000 KVA Transformer body rust by special tool and applying two coat of enamel paint by spraying with compressor unit at site in all portions of transformers cooling radiators, conservator explosion vent, breather pipe, primary and secondary side, complete including painting etc and as directed by the TWAD Board officers |
| 3138 | Marking of cable size and incoming, outgoing supply directions with the help of durable paints on the transformers MV cable boxes and as directed by the TWAD Board officers |
| 3139 | Charges for cleaning the sumps, booster stations, elevated reservoirs of TWAD Board by clearing the sludge and disposing it to near by boundary of the sump site including baling out the sludge water by using diesel pumpset of required capacity and removing the algae and scaling by scrapping, flushing the sump finally with bleaching powder and spreading bleaching powder around the sump, etc., complete and as directed by the TWAD Board officers |
| 3140 | Rural & Town Panchayts Sumps |
| 3141 | 0.10 LL |
| 3142 | 0.15 LL |
| 3143 | 0.20 LL |
| 3144 | 0.25 LL |
| 3145 | 0.30 LL |
| 3146 | 0.35 LL |
| 3147 | 0.40 LL |
| 3148 | 0.45 LL |
| 3149 | 0.50 LL |
| 3150 | 0.55 LL |
| 3151 | 0.60 LL |
| 3152 | 0.65 LL |
| 3153 | 0.70 LL |
| 3154 | 0.75 LL |
| 3155 | 0.80 LL |
| 3156 | 0.85 LL |
| 3157 | 0.90 LL |
| 3158 | 1.00 LL |
| 3159 | 1.05 LL |
| 3160 | 1.10 LL |
| 3161 | 1.15 LL |
| 3162 | 1.20 LL |
| 3163 | 1.25 LL |
| 3164 | 1.30 LL |
| 3165 | 1.35 LL |
| 3166 | 1.40 LL |
| 3167 | 1.45 LL |
| 3168 | 1.50 LL |
| 3169 | 1.55 LL |
| 3170 | 1.60LL |
| 3171 | 1.65 LL |
| 3172 | 1.75 LL |
| 3173 | 1.90 LL |
| 3174 | 2.00 LL |
| 3175 | 2.10 LL |
| 3176 | 2.25 LL |
| 3177 | 2.30 LL |
| 3178 | 2.35 LL |
| 3179 | 2.55 LL |
| 3180 | 2.80 LL |
| 3181 | 2.85 LL |
| 3182 | 3.60 LL |
| 3183 | 3.75 LL |
| 3184 | 3.85 LL |
| 3185 | 4.00 LL |
| 3186 | 4.40 LL |
| 3187 | 5.00 LL |
| 3188 | 5.35 LL |
| 3189 | 6.00LL |
| 3190 | 7.75 LL |
| 3191 | 9.00LL |
| 3192 | 13.10LL |
| 3193 | 27.75 LL |
| 3194 | 35.00LL |
| 3195 | Cost of Chemicals |
| 3196 | Supply and delivery of Alum (Sulphate of Alumino Ferric) required for Water Treatment Plants confirming to IS specification 299/ 1980 and as amended from time to time for delivery at anywhere in Coimbatore District including loading, freight, unloading, transit, insurance and all other incidental charges. |
| 3197 | For a period from 01.01.2027 to 31.03.2027-3 months( 0.33411MTx90 Days) = 30.07 MT |
| 3198 | For a period from 01.04.2027 to 31.03.2028 |
| 3199 | For a period from 01.04.2028 to 31.03.2029 |
| 3200 | Supply and delivery of Liquid Chlorine as per IS Specification (with Chlorine 99.8%, Moisture, Na2O3, Hydrogen and Carbondioxide are to be nil) required for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 3201 | For a period from 01.01.2027 to 31.03.2027( 0.33411 MTx90 Days) = 30.07MT |
| 3202 | For a period from 01.04.2027 to 31.03.2028 |
| 3203 | For a period from 01.04.2028 to 31.03.2029 |
| 3204 | Supply and delivery of Stable Bleaching Powder as per IS Specification 1065/ 1989 and as amended from time to time for Grade I for Water Treatment Plants in TWAD Board, and to delivery at anywhere in Coimbatore District including loading, freight, unloading, stacking transit, insurance and all other incidental charges. |
| 3205 | For a period from 01.01.2027 to 31.03.2027( 0.13367 MTx90Days) = 12.03 MT |
| 3206 | For a period from 01.04.2027 to 31.03.2028 |
| 3207 | For a period from 01.04.2028 to 31.03.2029 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender