Power Boards / Undertakings / PSU Closing in 2 days TDR #58432520

Tender For Installation Of Additional 12.5 Mva Power Transformer At 33/11 Kv S/S Sector-07, Sidcul Under Edsd Sidcul, Under Electricity Distribution Division-I, Rudrapur Under The Head Capital (S.I.).( Rates Should Be Quoted Without Gst) (Gst Will Pa

Issued by Boards / Undertakings / PSU · Udam Singh Nagar, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Nov 2026
2 days left
EMD
77000
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Udam Singh Nagar → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Installation Of Additional 12.5 Mva Power Transformer At 33/11 Kv S/S Sector-07, Sidcul Under Edsd Sidcul, Under Electricity Distribution Division-I, Rudrapur Under The Head Capital (S.I.).( Rates Should Be Quoted Without Gst) (Gst Will Paid Extra)

BOQ

Name of Work:- Installation of additional 12.5 MVA Power Transformer at 33/11 KV S/s Sector-07, SIDCUL under EDSD SIDCUL, under Electricity Distribution Division-I, Rudrapur under the head Capital (S.I.).( Rates Should be Quoted without GST) (GST will paid extra)
Sl. No. Item Description
1Annexure-A (LABOUR CHARGES)
2Excavation in foundation for Retaining, Breast walls etc., in all type of soils and rocks including all lead, lift and disposal of surplus material as per direction of Engineer in charge as per drawing and technial specification clause 305.1 of MORD Specification.
3Cleaning, Dressing and labling of Switch yard and carry out from yard to out side.
4Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor), connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm for a minimum lenght 6 m. treatment of soil with highly condctive substance as per I S 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
5Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel ,bracing and special type bracket etc. as per RESPO schedule and local approved drawing.
6Painting of Yard i.e. Isolator / LA/CT/Structure complete.
7Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast.
8Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 33 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast.
9Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth
10Cement concreting work in ratio 1:4:8 for DTR Plinth
11Brick work in 1:4 ratio for DTR Plinth
12RR massonary work in 1:6 ratio for DTR Plinth
13Cement Plaster on side walls in 1:4 ratio on DTR Plinth.
14Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPE heat shrinkable cable boxes.
15Jointing and fixing of cable jointing kit indoor/outdoor 33 KV XLPE heat shrinkable cable boxes.
16Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
17Cartage of the feeder panels(O/D),T/F Control panel from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
18Cartage of 12.5 MVA Power transformer by road (loading/unloading/shifting to be charged extra) (21-50 KM)
19Head load cartage of small material (distance 0-1 Km)
20Dismantling of Fencing and Gate of S/S including fabrication cutting and welding works at 33/11 KV Sub Station
21Loading of 12.5 MVA Transformer in Vehicle.
22Unloading of 12.5 MVA Transformer at Sub Station complete.
23Erection of 12.5 MVA T/F at transformer plinth & erection of all accessories i.e. radiators, conservator tank, vent pipee etc. , with the help of special type of T&P / crane etc. fitting cable etc. and refilling the fresh oil in radiator and conservator.
24Re-erection of fencing and gate complete all work.
25Grouting of structure in CC 1:3:6 in size (2x1.1x0.3x0.3) mtr.
26Installation of 33 KV CT with all connections
27Erection of 11 KV VCB Pannel as per direction of Engineer in Charge.
28Erection of 33 KV control panel ( feeder /transformer) in all respect, making connection complete including testing and commissioning.
29Service of Hydra Machine for Lines and Transformer related work because of busy traffic in Town area for safety purpose.
30Opening of Busbar Conductor and Other yard jumper and Fixing clamp
31Cartage of 11 KV XLPE Cable 0-20 Km.
32Cartage of 33 KV VCB
33Head load cartage of 33 KV VCB
34Laying of Control cable of all sizes through trench, proper connection at both ends outside in switchyard equipments and inside control room in VCB, control and relay Panels with proper marking, lugs , labelling and ferrules etc
35Cartage of 11 KV VCB I/C
36Erection of 11 KV VCB I/C as per direction of Engineer in Charge.
37Head Load Cartage of 11 KV VCB I/C
38Foundation work at base PCC (1:4:8) with dimensions (2.6x2.6x.1m=0.678 cubm) and RCC work for pedestal using 8mm, 10mm, 12mm steel bars with dimensions(0.9x0.9x1.4m +2.4x2.4x.3m= 2.86 cum)
39Erection of Bus Isolator Structure with installation.
40Laying of Earth mate with Earthing Rod and GI STRIP
41Fixing of E.S.E. in the yard of Sub-Station with grouting of high mast pole, connecting withCopper cable from Lightning Arrestor to earth pit in direction of Engineer in charge complete work in all respect.
42Erection of 33KV VCB 1250A-3P O/D Pannel.
43Errection of Insulator for C Pannel Bus Bar.
44Filling of Fresh oil in Power T/F.
45Supply and fixing of oil temperature and winding temperature meter of reputed make.
46Annexure-B (SUPPLY ITEMS)(As per UPCL Norms)
47Supply of Digital WTI & OTI for Power Transformer
48Supply of 33 KV VCB Clamps for Panther
49Supply of 33 KV CT Clamp for Panther with N&B
50Supply of Cable Connector for 10 MVA & 12.5 MVA
51Supply of 11 KV Bus Bar (Copper)
52Supply of Bolt & Nuts off size
53Supply of Chemical Earthing
54Supply of Panther to Panther C-type wedge Connector-D
55Supply of G.I. Earthing Strip 50x5 mm
56Supply of Multistrand PVC Copper wire 1.5 Sq.mm
57Supply of Multistrand PVC Copper wire 2.5 Sq.mm
58Supply of PVC Tape
59Supply of HT Tape
60Supply of HT conector of Brass for 12.5 MVA T/F Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58432520
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 25-11-2026
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Tender for Installation Of Additional 12.5 Mva Power Transformer At 33/11 Kv S/S Sector-07, Sidcul Under Edsd Sidcul, Under Electricity Distribution Division-I, Rudrapur Under The Head Capital (S.I.).( Rates Should Be Quoted Without Gst) (Gst Will Paid Extra)
Basic Detail
Tender No EDC(USN)84/2026-27
Bidding Type Tender
Location
City Udam Singh Nagar
State Uttarakhand
Key Dates
Publish Date 07 Nov 2026
Submission Date 25 Nov 2026
Open Date 26 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee 2360
EMD 77000
Exemption Not Available
Document List
8aef4585-ae63-4835-ba7e-0ab6596f9c3f.html
BOQ_120391.xls
FormAandB.pdf
GeneralInstruction842627.pdf
Tendernotice_1.pdf
TN842627tenderdocument12M_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Nov 26, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

8aef4585-ae63-4835-ba7e-0ab6596f9c3f.html

xls

BOQ_120391.xls

pdf

FormAandB.pdf

pdf

GeneralInstruction842627.pdf

pdf

Tendernotice_1.pdf

pdf

TN842627tenderdocument12M_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender