Tender For Widening And Strengthening Work Of Bulandshahr Link Road From Chainage 0.000 To 3.680 In District Bulandshahr
Tender Overview
Project Description
Tender for Widening And Strengthening Work Of Bulandshahr Link Road From Chainage 0.000 To 3.680 In District Bulandshahr
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Nov-2026 | corrigendum | Other | 17-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers trimming cutting and loading in accordances with requirements of lines,grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 2 | Removal of unserviceable soil including excavation ,loading and disposal upto 1000 metres lead upto excluding replacement by suitable soil which shall be paid separately as per clause 305.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC & compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 4 | Providing, laying,spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site,laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 Sr No 4.14,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 5 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 6 | Providing and laying dense graded bituminous macadam grading 1 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 7 | Providing & applying tack coat with VG-10 bitumen using bitumen pressure distributor @ 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 8 | Providing & laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.5 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydro static paver finisher with sensor control to the required grade, level & alignment,rolling with smooth wheeled, vibratory & tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 9 | Providing & applying tack coat with VG-10 bitumen using bitumen pressure distributor @ 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H specification 503. Including cost of all material,labour,T&P,& all taxes complete ,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 10 | Providing & laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4 per cent of mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade,level, alignment, rolling with smooth wheeled, vibratory & tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects,,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 11 | Providing and laying of Interlocking concrete block (compressive strength more than 30MPa) pavement having thickness 100 mm as per drawing and Technical specification clause 1504.,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 12 | Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days as per Drawing and Technical Specifications 2100 SI no. 9.03/12.04,,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 13 | RCC (M-20) in super-structure complete as per Drawing & Technical Specifications Clause 1500, 1600 & 1700 etc. complete as per SOR Ch.6 SNo- 13.05,,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 14 | Supplying,fitting & placing HYSD bar reinforcement in sub-structure complete as per drawing & Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6,,including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST |
| 15 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date, including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST.IInd Year 0.00% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 16 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IInd Year 0.25% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 17 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date, including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST.IIIrd Year 0.50% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 18 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date, including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST. IVrth Year 0.75% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 19 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date, including cost of all material, labour,T&P, labour cess, royality & all taxes complete.But Excluding GST.Vth Year 1.00% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 9 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender