Tender For Design, Detailed Engineering, Manufacture, Supply Of 220Kv Single Core Copper Conductor Corrugated Aluminium Sheathed Xlpe Cable With Accessories, Cable Laying, Erection Of Joints & Terminations And Final Testing & Commissioning Of Ug Port
Tender Overview
Project Description
Tender for Design, Detailed Engineering, Manufacture, Supply Of 220Kv Single Core Copper Conductor Corrugated Aluminium Sheathed Xlpe Cable With Accessories, Cable Laying, Erection Of Joints & Terminations And Final Testing & Commissioning Of Ug Portion Of 220 Kv Greater Noida(765 Kv,Wupptcl)-M/S Sael Line On Turn-Key Basis
BOQ
| Sl. No. | Item Description |
| 1 | VOLUME-03 (SUMMARY OF PRICE SCHEDULE) SCHEDULE-3 Name of Work: DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220kV SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS & TERMINATIONS AND FINAL TESTING & COMMISSIONING OF UG portion of 220 KV Greater Noida(765 KV,WUPPTCL)-M/s SAEL Line ON TURN-KEY BASIS Tender No: TD-572/26 Sl.No. Description Amount (in Rs.) |
| 2 | Total Price for Supply [Schedule-1] |
| 3 | Total Price for Erection [Schedule-2] |
| 4 | Total Bid Prices (1+2) ( without GST) |
| 5 | GST @18% (on S.N. 3) |
| 6 | Total Bid Prices (3+4) ( with GST) Name of Firm Address VOLUME-03 (SUMMARY OF PRICE SCHEDULE) SCHEDULE-3(A) Name of Work: DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220 KV SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS & TERMINATIONS AND FINAL TESTING & COMMISSIONING OF UNGERGROUND CABLE LINE ON TURN-KEY BASIS Tender No: TD-508/25 M/s NIDP 1000sqmm M/s NTT 630sqmm unidentified Sl.No. Description Amount (in Rs.) |
| 7 | Total Price for Supply [Schedule-1 (A)] |
| 8 | Total Price for Erection [Schedule-2 (A)] |
| 9 | Total Bid Prices (1+2) ( without GST) |
| 10 | GST @18% (on S.N. 3) |
| 11 | Total Bid Prices (3+4) ( with GST) SCHEDULE-1 Name of Work: DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220kV SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS & TERMINATIONS AND FINAL TESTING & COMMISSIONING OF UG portion of 220 KV Greater Noida(765 KV,WUPPTCL)-M/s SAEL Line ON TURN-KEY BASIS Tender No: TD-572/26 SCHEDULE OF QUANTITIES AND PRICES FOR SUPPLY S. No. Item Description Unit Quantity Ex-Work (Rs.) Freight (Rs.) P&F (Rs.) INS (Rs.) Unit FOR Destination rate(Rs.) Total( Rs.) |
| 12 | 220KV Single core 1000 sqmm Copper conductor XLPE insulated corrugated Aluminium sheathed power cable (Cosntruction as per IEC-60502-2 and testing as per IEC-62067) (For CTT Pole/Line Gantry to GIS at 400kV GIS end) |
| 13 | Outdoor type complete end termination kit suitable for above cable with all accessories |
| 14 | Normal straight through joint/insulated joint suitable for above cable with all accessories |
| 15 | Single phase link box with/without SVL as required |
| 16 | Three phase link box with/without SVL as required |
| 17 | Single Core 500sq. mm Copper Conductor PVC insulated 6.6KV grade Earthig Cable. |
| 18 | Aluminium alloy Single clamp. |
| 19 | Aluminium alloy trefoil clamp. |
| 20 | Surge arrestor for 220KV Line with terminal connector |
| 21 | Warning Tape |
| 22 | Route marker,220KV |
| 23 | Steel Support Structure for outdoor Termination at S/s end |
| 24 | HDPE Pipe suitable for above XLPE cable |
| 25 | HDPE Pipe suitable for laying approach cable in trenchless crossing |
| 26 | Approach Cable (48 F) Total 0.0 Name of firm Address SCHEDULE-2 Name of Work: DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220kV SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS & TERMINATIONS AND FINAL TESTING & COMMISSIONING OF UG portion of 220 KV Greater Noida(765 KV,WUPPTCL)-M/s SAEL Line ON TURN-KEY BASIS Tender No: TD-572/26 SCHEDULE OF QUANTITIES AND PRICES FOR Erection Work S. No. Item Description Unit Quantity UNIT RATES Total(Rs.) |
| 27 | Route survey and prepration of drawings including digging of trial pits for specified of route length. |
| 28 | Civil work Excaution of trench and construction of 800 mm sqmm wide open Trench |
| 29 | Civil work Excaution of trench and construction of 400 mm sqmm wide open Trench |
| 30 | Misc civil work as drain dismantling , jungle clealing |
| 31 | laying of single core power cable in wide open trench. (including aproach cable) |
| 32 | Formation of trenchless road crossing with HDPE pipes (3+0) |
| 33 | Laying of all (3+0) single core cable through HDPE pipes in road/rail crossing along with installation of approach cable |
| 34 | Excavation of Trench |
| 35 | Sand bedding and laying of three (3) single core cable along with approach cable in excavated trench (including installation of Approach cable) |
| 36 | Backfilling of trench with sand, RCC cover and installation of warning tape, route marker & filling and leveling of excacated earth. Thre work site shall be left as clean as possible |
| 37 | Installation of Outdoor termination kit suitable for 220 KV cable at CT Monopole |
| 38 | Civil foundation and erection of structure with Installation of outdoor end termination |
| 39 | Civil foundation and erection of structure and all associated work including installation of LA |
| 40 | Installation of straight through joint kit including earthing |
| 41 | Installation of three phases link boxes with/without SVL |
| 42 | Installation of single phase link boxes with/without SVL |
| 43 | Testing & commissioning Total 0.0 Name of Firm Address Pakage-1 Pakage-2 Q-1 23 Q-1 23 Q-2 0.0 Q-2 23 Q-3 23 Q-3 23 Total 23 Total 23 GST 23 GST 23 G TOTAL 23 G TOTAL 23 supply erection Total NTT-Jalpura Cable 134969426.0 39058373.47 174027799.47 NTT-KP-5 Cable 134969426.0 39058373.47 174027799.47 Cable work for Bay 8260236.0 619517.7 8879753.7 278199088.0 78736264.64 356935352.64 23 121520131.0 350669785.0 -181068.79999999702 -6265567.639999986 -0.0014878144200514039 -0.017553788364357815 supply erection Total NIDP-Jalpura Cable 44992773.419999994 11417949.629999999 56410723.05 23 23 97445623.66 NIDP-KP-5 Cable 44992773.419999994 11417949.629999999 56410723.05 23 23 24074507.5 Cable work for Bay 8260236.0 619517.7 8879753.7 23 23 121520131.16 twc 98245782.83999999 23455416.959999997 121701199.8 23 23 23 23 23 23 23 23 23 200.0 VOLUME-03 (SUMMARY OF PRICE SCHEDULE) SCHEDULE-3(B) Name of Work: DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220 KV SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS & TERMINATIONS AND FINAL TESTING & COMMISSIONING OF UNGERGROUND CABLE LINE ON TURN-KEY BASIS Tender No: TD-508/25 M/s NIDP 1000sqmm M/s NTT 630sqmm unidentified Sl.No. Description Amount (in Rs.) |
| 44 | Total Price for Supply [Schedule-1(B) ] |
| 45 | Total Price for Erection [Schedule-2(B)] |
| 46 | Total Bid Prices (1+2) ( without GST) |
| 47 | GST @18% (on S.N. 3) |
| 48 | Total Bid Prices (3+4) ( with GST) 18.25 14.58 3.67 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender