Tender For Repairing & Replacement Of Shabby 33 Kv, 11 Kv, Lt Lines & Its Associated Pcc/St Poles In The Area Of Under Jurisdiction Of Electricity Distribution Sub Division- Sandila, Hardoi.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Nov 2026
10 days left
EMD
8390
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hardoi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repairing & Replacement Of Shabby 33 Kv, 11 Kv, Lt Lines & Its Associated Pcc/St Poles In The Area Of Under Jurisdiction Of Electricity Distribution Sub Division- Sandila, Hardoi.
BOQ
| Sl. No. | Item Description |
| 1 | Supply and erection of following material |
| 2 | Clamp for PCC and STP pole with Nut bolt with washer |
| 3 | LT Clamp |
| 4 | Stay Clamp 50x6mm MS Flat for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 5 | Safe loading Carriage & unloading of following material fromstore centre to pit site/JE dump store. |
| 6 | PCC Pole of size 8.5 mtr long |
| 7 | ST/PCC pole 11 mtr. Long. |
| 8 | Stay Set Complete |
| 9 | 11, 33 KV Pin with Net |
| 10 | Disc insulator With fitting (B&S) 70KN |
| 11 | MS Earthing Rod (2540x20 mm) With Fitting |
| 12 | ACSR Weasel Conductuctor |
| 13 | GI Wire |
| 14 | Dog/Rabbit conductor |
| 15 | ABC (1X16+1X25)Sq mm |
| 16 | ABC (3X50+1X35+1X16)Sq mm |
| 17 | ABC (3X95+1X70+1X16 Sq mm) |
| 18 | ABC (3X120+1X95+1X16 Sq mm) |
| 19 | Replacement of Broken PCC single Pole and Erection of PCC Pole 8.5 mtr long with all accessories |
| 20 | Replacement of Broken PCC double Pole and Erection of PCC Pole 8.5 mtr long with all accessories |
| 21 | Replacement of Broken ST/PCC single Pole and Erection of ST/PCC Pole 11 mtr long with all accessories |
| 22 | Replacement of Broken ST/PCC double Pole and Erection of ST/PCC Pole 11 mtr long with Grouting & with all accessories |
| 23 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:6 in cement sand & bla ST |
| 24 | Muffing Plinth 300mmX45mm Above ground level in Ratio 1:2:4 in cement coarse sand & stone grit |
| 25 | Straightening tilted double Pole |
| 26 | Re-Stringing of three phase ACSR Weasel Conductor for 11 KV line. |
| 27 | Re-Stringing & Sagging ABC (1x16+1x25) Sqmm. |
| 28 | Re-Stringing & Sagging ABC (3x50+1x35+1x16) Sqmm. |
| 29 | Re-Stringing & Sagging ABC (3x95+1x70+1x16) Sqmm. |
| 30 | Re-Stringing & Sagging ABC (3x120+1x95+1x16) Sqmm. |
| 31 | Straightening Tillted of single PCC/ST Pole |
| 32 | Rebinding of Stay Set |
| 33 | Stringing & Sagging ABC (1X16+1X25)Sq mm |
| 34 | Stringing & Sagging ABC (3X50+1X35+1X16)Sq mm |
| 35 | Stringing & Sagging ABC (3X95+1X70+1X16 Sq mm) |
| 36 | Stringing & Sagging ABC (3X120+1X95+1X16 Sq mm) |
| 37 | Placement of 11/0.4 KV T/Fs with the help of crane sleepers and man power etc. from dump place to newly constructed T/Fs plinth & erection & commissioning of 250/400/630 KVA T/Fs of T/F Plinth and including jump ring with the system (All the required martial for above work shall be provided by contractor except T/Fs) |
| 38 | Fabrication erection and commissioning of 25/16/10 KVA T/F on double/single pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor. |
| 39 | Complete repairing of T/F plinth of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimeter below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimeter. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the required material fo repairing to be arranged by the contractor. |
| 40 | Erection of Stay Set Complete. |
| 41 | Fixing of Ordinary Earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. |
| 42 | Stringing of ACSR Weasel Conductor for 11 KV line |
| 43 | Stringing of Dog/Rabbit conductor for 33 KV line |
| 44 | Guarding of 33 KV Line |
| 45 | Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site (Approx 3 Km). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysNov 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender