Power Boards / Undertakings / PSU Closing in 4 days TDR #58429230

Tender For Tnpgcl - Nctpp-Iii (1X800 Mw) - Se/M-Ii Circle - Tm Division - Overhauling And Servicing Of M/S.Atlas Copco (India) Ltd Make Zr 355 Model Service Air -& Instrument Air Compressors In The Plant Air Compressor System And Checking, Renewal Of

Issued by Boards / Undertakings / PSU · Thiruvallur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
12 Nov 2026
4 days left
EMD
18300
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Tnpgcl - Nctpp-Iii (1X800 Mw) - Se/M-Ii Circle - Tm Division - Overhauling And Servicing Of M/S.Atlas Copco (India) Ltd Make Zr 355 Model Service Air -& Instrument Air Compressors In The Plant Air Compressor System And Checking, Renewal Of Spares Of Alignment Works During The Year 2026-2027

BOQ

Name of Work:- TNPGCL - NCTPP-III (1x800 MW) – SE/M-II Circle – TM Division – Overhauling and Servicing of M/s.Atlas Copco (India) Ltd make ZR 355 model Service Air -& Instrument Air Compressors in the Plant Air Compressor system and checking, renewal of spares of alignment works during the year 2026-2027
Sl. No. Item Description
1Charges for Dismantling of Suction filter segment, Oil filters, Cleaning , Suction Air inlet headers and pipes, safety valves. Including cost of consumables and T & P's.
2Charges for dismantling of First stages & Second stage moisture separators, inspection and cleaning of the moisture separators and reassembling. Including cost of consumables and T & P's.
3Charges for dismantling of LP & HP stage suction & discharge valves, inspection, lapping of valve plates and ensuring leak test, and reassembling Including cost of consumables and T & P's.
4Charges for draining of lubrication oil in compressor, cleaning of oil chamber drain Checking of all HP & LP stages safety relief valves and ensuring the set value. Including cost of consumables and T & P's.
5Charges for Dismantling of Loading kit and crank shaft assembly with bearing and cleaning Including cost of consumables and T & P's. (Loading kit, Bull gear drive shaft bearing assembly, Gear wheel, breather valve assembly)
6Charges for dismantling of LP cylinder casing assembly entire internal such as piston, piston rings guide rings radiator lines cylinder head line in LP cylinder from its position Including cost of consumables and T & P's.
7Charges for dismantling of HP cylinder casing assembly entire internal such as piston, piston rings guide rings radiator lines cylinder head line both HP cylinder from its position Including cost of consumables and T & P's.
8\\"Charges for Cutting and dismantling the connected pipe joints of suction & discharge air & water pipeline and also dismantling the connected supports by cutting, lifting the cooler of compressor using lifting arrangement (Dismantling the Inter cooler after isolation of Cooling water line). Including cost of consumables and T & P's
9Charges for Cutting and dismantling the connected pipe joints of suction & discharge air & water pipeline and also dismantling the connected supports by cutting, lifting the cooler of compressor using lifting arrangement. (Dismantling the After cooler after isolation of Cooling water line. Including cost of consumables and T & P's.
10Charges for Cleaning of suction air filter, renewal of lub oil filter, Replacement of cooling water flexible gaskets, drain hoses, damaged pipe lines, insulation of HP Air outlet header etc (Oil Filter, gaskets, drain hose Supply from the Board side). Including cost of consumables and T & P's.
11Charges for Cleaning, Position & Assembling of the cylinder casing, piston rings, guide rings and cylinder head lines in LP Cylinder. Including cost of consumables and T & P's.
12Charges for Cleaning, Position & Assembling of the cylinder casing, piston rings, guide rings and cylinder head lines in HP Cylinder. Including cost of consumables and T & P's.
13Charges for assembly of LP element suction valve body and delivery valve body and valve assembly Including cost of consumables and T & P's.
14Charges for assembly of HP element suction valve body and delivery valve body and valve assembly Including cost of consumables and T & P's.
15Attending crank shaft (Drive shaft) bearing replacement in LP & its spares renewal (Drive shaft bearing replacement kit, inspection of oil draining in the drain port) Drive shaft seal & bearing kit supplied by the board).Including cost of consumables and T & P's.
16Attending crank shaft (Drive shaft) bearing replacement in HP & its spares renewal (Drive shaft bearing replacement kit, Drive shaft seal kit supplied by the board) Including cost of consumables and T & P's.
17Charges for inspection & rectification of Inter Cooler Including cost of consumables and T & P's.
18Charges for inspection & rectification of After Cooler Including cost of consumables and T & P's.
19Charges for recording the critical dimensions, replacement of the damaged parts if required in the Drive shaft and crosshead assemblies & then assembling the other parts like bearings, connecting rod, water, oil pipe lines, oil pump kit & its assemblies and Setting the critical dimensions to the required level as per the site conditions (Oil pump kit supplied by the board side). Including cost of consumables and T & P's.
20Charges for assembly of crank shaft assembly wit bearings into valve body NRV valve, solenoid and breather valve assembly (Solenoid valve, NRV gasket, breather filter supplied by the board side) Including cost of consumables and T & P's.
21Charges for Final inspection of the loading and unloading kit, outer casing cover assembly ensuring free rotation of loading disc portion, then assembled with Air Splitter, checking the required clearance and checking the free rotation of total assembly. Assembly of loading port valve, NRV, loading and unloading valve with valve base necessary new gasket & loading kit rubber sheet supplied from the board side Including cost of consumables and T & P's.
22Assembling of Air outlet headers, replacement of Inter/after cooler drain line, Balance piston diaphragm of HP/LP elements coolers by a new one and Coupling of Compressor with motor. Including cost of consumables and T & P's.
23Charges for cutting and welding of new Gate/Globe valve 1\\" HO/MO valves equivalent joints by IBR.
24Charges for overhauling of 3T EOT in Electro chlorination plant, the scope of work involves dismantling the gear box assembly, cleaning the gears and checking the gear contact & clearance, assembling the gear box, applying the rope compound, checking the long travel track alignment and rectifying, checking the electrical circuits, panels and painting of entire structuresOPEN-6150 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58429230
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 12-11-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Tnpgcl - Nctpp-Iii (1X800 Mw) - Se/M-Ii Circle - Tm Division - Overhauling And Servicing Of M/S.Atlas Copco (India) Ltd Make Zr 355 Model Service Air -& Instrument Air Compressors In The Plant Air Compressor System And Checking, Renewal Of Spares Of Alignment Works During The Year 2026-2027
Basic Detail
Tender No CE/SE/M II/NCTPS III / 29 /2026-27
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 06 Nov 2026
Submission Date 12 Nov 2026
Open Date 13 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 18300
Exemption Available
Document List
BOQ_868987.xls
fdd576b1-cad9-41cc-a7f1-d545a6970b71.html
Spec29.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Nov 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_868987.xls

html

fdd576b1-cad9-41cc-a7f1-d545a6970b71.html

pdf

Spec29.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender