Tender For Consultancy To Conduct Prefeasibility Studies, Preparation Of Detailed Project Report, Bid Documents And Evaluation Of Bids (Bid Processing) For Setting Up Of A 400 Mld Capacity Sea Water Reverse Osmosis Desalination Plant For Chennai City
Tender Overview
Project Description
Tender for Consultancy To Conduct Prefeasibility Studies, Preparation Of Detailed Project Report, Bid Documents And Evaluation Of Bids (Bid Processing) For Setting Up Of A 400 Mld Capacity Sea Water Reverse Osmosis Desalination Plant For Chennai City At Kattupalli Village In Minjur, Chennai, Tamilnadu, India
BOQ
| Sl. No. | Item Description |
| 1 | Bill No A.Conducting prefeasibility studies, preparation of Detailed Project Report |
| 2 | RENUMERATION |
| 3 | Key Professional |
| 4 | Chief Consultant (Team Leader) |
| 5 | Deputy Team Leader |
| 6 | Plant (Process) Design Engineer. |
| 7 | Social safeguard expert |
| 8 | Environmental safeguard expert |
| 9 | Design Engineer (Civil) |
| 10 | Design Engineer (Mechanical) |
| 11 | Design Engineer (Electrical & Instrumental Control System) |
| 12 | Key Professional Sub-Total |
| 13 | Non-Key / Support Expert |
| 14 | SCADA Expert |
| 15 | Quantity Surveyor |
| 16 | CAD Engineer |
| 17 | Field Engineer / support staff |
| 18 | Non-Key Experts Sub-Total |
| 19 | Total Remuneration (I) |
| 20 | Other Expenses |
| 21 | Office set up & Administrative/ Support and Clerical staff |
| 22 | Cost of maintenance of office premises including Electricity, Water, Safety etc. for 6 months |
| 23 | Cost of monthly rental of 1 vehicle for 6 months (ie 6 Vehicle months) including fuel, Maintenance & Insurance, Driver cost and miscellaneous |
| 24 | Insurance & Others |
| 25 | Topo Survey by Total Station in Kms |
| 26 | Geotechnical investigation upto the min depth of 10m below GL in Nos |
| 27 | Soil Investigation (Trial pits / Boreholes) at every 1 Km of pipeline length in Nos |
| 28 | Bathymetric survey |
| 29 | Environmental base line survey |
| 30 | communication and Stakeholders meeting expenses |
| 31 | Cost of printing and submission of documents |
| 32 | Inception Report (10 Copies) |
| 33 | Interim Report (10 Copies) |
| 34 | Draft Final Report and Draft Bid Document (10 Copies) |
| 35 | Dissemination / Stakeholders consultation Report (10 Copies) |
| 36 | Final DPR in complete shape (10 Copies) |
| 37 | Cost of Experts for Round Trips |
| 38 | Total cost of Other expenses (II) |
| 39 | Total for Bill A (I + II) |
| 40 | Bill No B. Preparation of Bid documents and reply to pre-bid queries |
| 41 | RENUMERATION |
| 42 | Key Professional |
| 43 | Chief Consultant (Team Leader) |
| 44 | Deputy Team Leader |
| 45 | Design Engineer (Civil) |
| 46 | Design Engineer (Mechanical) |
| 47 | Design Engineer (Electrical & Instrumental Control System) |
| 48 | Contract Specialist |
| 49 | Key Professional Sub-Total |
| 50 | Non-Key / Support Expert |
| 51 | Field Engineer / support staff |
| 52 | Non-Key Experts Sub-Total |
| 53 | Total Remuneration (I) |
| 54 | Other Expenses |
| 55 | Office set up & Administrative/ Support and Clerical staff |
| 56 | Cost of maintenance of office premises including Electricity, Water, Safety etc. for 6 months |
| 57 | Cost of monthly rental of 1 vehicle for 6 months (ie 6 Vehicle months) including fuel, Maintenance & Insurance, Driver cost and miscellaneous |
| 58 | Cost of Experts for Round Trips |
| 59 | Total cost of Other expenses (II) |
| 60 | Total for Bill B (I + II) |
| 61 | Bill C. Evaluation of bid documents and finalization of agreement |
| 62 | RENUMERATION |
| 63 | Key Professional |
| 64 | Chief Consultant (Team Leader) |
| 65 | Deputy Team Leader |
| 66 | Design Engineer (Civil) |
| 67 | Design Engineer (Mechanical) |
| 68 | Design Engineer (Electrical & Instrumental Control System) |
| 69 | Contract Specialist |
| 70 | Key Professional Sub-Total |
| 71 | Non-Key / Support Expert |
| 72 | Field Engineer / support staff |
| 73 | Non-Key Experts Sub-Total |
| 74 | Total Remuneration (I) |
| 75 | Other Expenses |
| 76 | Cost of Experts for Round Trips |
| 77 | Total cost of Other expenses (II) |
| 78 | Total for Bill C (I +II) |
| 79 | Sub total (excluding GST) |
| 80 | GST @ 18% CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD, CHENNAI- 600 002 INTERNATIONAL COMPETITIVE BIDDING CONTRACT NO: CNT/ICB/MWB/SWRO/CON/ 023/2026-27 FINANCIAL PROPOSAL FOR CONSULTANCY TO CONDUCT PREFEASIBILITY STUDIES, , PREPARATION OF DETAILED PROJECT REPORT, BID DOCUMENTS AND EVALUATION OF BIDs (BID PROCESSING) FOR SETTING UP OF A 400 MLD CAPACITY SEA WATER REVERSE OSMOSIS DESALINATION PLANT FOR CHENNAI CITY AT KATTUPALLI VILLAGE IN MINJUR, CHENNAI, TAMILNADU, INDIA. SUPERINTENDING ENGINEER (CONTRACTS & MONITORING) CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1, Pumping Station Road, Chintadripet, Chennai 600 002. Telephone: 044 – 2845 1300 Fax : 044 – 2845 8181 E-mail : [email protected] Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 44 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 44 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender