Short dated tender - Tender For General-.-S.D.P Pamba-Envtl-M&M Festival 1202 Me - Overhauling And Operation Of Sewage Treatment Plant At Cheriyanavattom, Pamba By Engaging Labour And Supply Of Spares During M&M Festival In 1202 Me And In February 2027 To October 2027- R
Tender Overview
Project Description
Short dated tender - Tender for General-.-S.D.P Pamba-Envtl-M&M Festival 1202 Me - Overhauling And Operation Of Sewage Treatment Plant At Cheriyanavattom, Pamba By Engaging Labour And Supply Of Spares During M&M Festival In 1202 Me And In February 2027 To October 2027- Reg-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | Part-II-Overhauling and operation of Sewage treatment Plant at Cheriyanavattom, Pamba--M&M FESTIVAL 1202- Appendix-1-( overhauling of STP) |
| 2 | OD68831/2026-2027:Dismantling the defective motor part by part, removing burnt winding, recondition the wire and rewinded by using best quality winding materials and assembling the motor in its orginal position.5 HP Motor |
| 3 | OD68830/2026-2027:Terminal changing of 5HP electric motor Including labour charges. |
| 4 | OD68819/2026-2027:Labour charges for checking and necessary repairs of SCADA system at STP Sabarimala ensuring perfect and trouble free operation of all switches, pumps,motors, valves, visual monitors etc of STP.The rate also includes all repairs( software) associated with SCADA throughout the festival period |
| 5 | OD68825/2026-2027:Engaging Scavenger for complete de-sludging of the four chambers of Parallel Plate Separator,2 nos of chambers of grit chamber, 2 nos of equalization Tank, chlorine chamber, sump of sludge drying bed. |
| 6 | OD68823/2026-2027:Engaging Electrician for the complete overhauling of pump sets,electric motor and panel boards at Sewage pumping Stations etc; |
| 7 | OD68815/2026-2027:Engaging plumber for pipeline works at Sewage pumping Stations etc; |
| 8 | OD68813/2026-2027:B-56 type V belt. |
| 9 | OD68826/2026-2027:Ball Bearing SKF No-22308-E |
| 10 | OD68817/2026-2027:Ball Bearing SFK NO- 6307 |
| 11 | OD68816/2026-2027:Rubber gasket (6mm thick) |
| 12 | OD68821/2026-2027:Spider bush for 5HP pump set. |
| 13 | OD68829/2026-2027:Mk-1 DOL starter 230/ 440 V. |
| 14 | OD68827/2026-2027:Mk-1 contractor 230/440 V. |
| 15 | OD68822/2026-2027:MK-1 Over load relay. |
| 16 | OD68820/2026-2027:7/20 wire |
| 17 | OD68818/2026-2027:Hydraulic oil 68 for filter press. |
| 18 | OD199656/2026-2027:Supply of 3" PVC Suction Hose |
| 19 | OD199670/2026-2027:Supply of 1"Pvc Suction Hose 30mtr roll |
| 20 | OD199677/2026-2027:Supply of 1 1/2" Pvc suction Hose |
| 21 | PART-II-Overhauling and operation of Sewage treatment Plant at Cheriyanavattom, Pamba-M&M FESTIVAL 1202-Appendix-2- Operation of STP |
| 22 | OD68803/2026-2027:Operator SCADA (1 no /shift for the 3 shifts per day. for 70 days) |
| 23 | OD68800/2026-2027:Plumber grade -I. (1 no./Shift for 3 shifts per days.1x3x70=210days) |
| 24 | OD68801/2026-2027:Skilled Mazdoor (1 no.per shift for 3 shift s per day. 1x3x70=210days) |
| 25 | OD68804/2026-2027:Pump operators (5 nos . Per shift for 3 shift s per day.5x3x70=1050 nos) |
| 26 | OD68802/2026-2027:coolies (5 nos .per shift for 3 shifts per day 5x3x70=1050nos) |
| 27 | PART-II-Overhauling and operation of Sewage treatment Plant at Cheriyanavattom, Pamba-M&M FESTIVAL 1202-Appendix-3 Supply of Mask and Gloves for Labours |
| 28 | OD68811/2026-2027:Rubber Gloves 14 (DISPOSABLE) |
| 29 | OD68810/2026-2027:Rubber Gloves 18\\" (disposable) |
| 30 | OD68812/2026-2027:Cloth Mask |
| 31 | PART-III-Overhauling and operation of Sewage treatment Plant at Cheriyanavattom, Pamba -MONTHLY POOJA- 2027March to October-Appendix-1-SUPPLY OF CHEMICAL |
| 32 | OD68832/2026-2027:Supply of Ferric Chloride at sewage treatment plant site having the following specification. Assay Iodometric 14.0 %. Iron (II) chloride 1.0 %. Free acid as Hcl.1.0 % Sulphate (So4 ) 0.05 % Heavy Metals as PH 0.005 % Arseric 0.001 % Phosphate (Po4) 0.005 % Total nitrogen 0.005 % |
| 33 | OD68833/2026-2027:\\" Supply of Hydrated lime (Ca2 OH)having the following specification at STP site. Assay (Acidimetric )96.0 % Carbonate (CaCo3) max 3.0 % Chloride (Cl ) max .0.2% Sulphate So4 max .0.005% Heavy Metals 0.05% (as PH) max.Iron FC max 0.05 % Substances not precipitated by Sulphate max 2.5 %.300 kg /day Say 20000 kg for 65 days ( actual consumption as per site requirements) \\" |
| 34 | OD68834/2026-2027:Supply of hypochlorite (80 GPL) at STP site.(20 liter /day ) |
| 35 | PART-III-Overhauling and operation of Sewage treatment Plant at Cheriyanavattom, Pamba -MONTHLY POOJA- 2027 FEB to October-Appendix-2 operation of STP ( Feb 2027- October 2027) Labours |
| 36 | OD68807/2026-2027: Operators (SCADA) (1 no./day ) |
| 37 | OD68808/2026-2027:Fitter-Grade-1. (1 no./day ) |
| 38 | OD68809/2026-2027:Technician (1 no./day for) |
| 39 | OD68806/2026-2027:Bhisti. (skilled Mazdoor) |
| 40 | OD68805/2026-2027:Coolie. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender