Tender For Widening From Two Lane To Four Lane And Strengthening At Km 1/0-2/2 And 5/0-6/4 And Widening From Multi Lane To Four Lane And Strengthening At Km 2/2-4/4 And Strengthening At Km 4/4-5/0 Of Madurai - Melakkal - Samayanallur Road (Sh73B) Includin
Tender Overview
Project Description
Tender For Widening From Two Lane To Four Lane And Strengthening At Km 1/0-2/2 And 5/0-6/4 And Widening From Multi Lane To Four Lane And Strengthening At Km 2/2-4/4 And Strengthening At Km 4/4-5/0 Of Madurai - Melakkal - Samayanallur Road (Sh73B) Including Cd Works @ Km 2/4,3/10, 4/2, 4/10 & 5/6 And Construction Of Centre Median.Sub Work : Shifting Of Eb Poles At Km 2/900 - 3/120 (Lhs &Rhs) , 2/350 - 2/440 (Lhs&Rhs) , 2/440 - 2/510 (Lhs & Rhs) & 2/440 (Rhs) Of Madurai - Melakkal - Samayanallur Road (Sh73B).
BOQ
| Sl. No. | Item Description |
| 1 | Electrical Work |
| 2 | Shifting of EB Poles at KM 2/900 - 3/120 (LHS &RHS) of Madurai - Melakkal - Samayanallur Road (SH73B) Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No:CE/D/MDU/14.696/C/054/2025-26 Dt.06.03.2026 |
| 3 | RSJ 42' Fabricated Pole |
| 4 | Joist RS 250x125 mm 42' Length 500kg x Rs.64.00 |
| 5 | PSC 9.0Mtr Pole300 Kg |
| 6 | Base Plate |
| 7 | Tapping Channel Cross Arm 11kv |
| 8 | HT V X'Arm 4'x5'' |
| 9 | Guarding X Arm |
| 10 | LT 3 ph Angle cross arm |
| 11 | LT S ph Angle cross arm |
| 12 | HT TI Fitting |
| 13 | Back Clamp Spl RSJ Pole |
| 14 | Back Clamp PSC 9.0 Mtr Pole |
| 15 | Stay Clamp Ord RSJ Pole |
| 16 | Insulator 11kv Polymer Composite Disc(W)Mp (188.88 +121.70) |
| 17 | Insulator 11kv Polymer Composite Pin Type |
| 18 | Insulator LT Shackle (W) Mp (19.00+48.07) |
| 19 | LT Gi Pin (W) Insulator (21.14+41.50) |
| 20 | Aluminium Knob |
| 21 | Stay Set Complete |
| 22 | Guy Insulator HT |
| 23 | Guarding Arrangements |
| 24 | Pole concreting |
| 25 | Pole Earthing |
| 26 | M.S.Bolt & Nuts |
| 27 | AAAC 7/2.50 mm Conductor |
| 28 | AAAC 7/3.15 mm Conductor |
| 29 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 30 | Labours and Transport Charges 15% |
| 31 | Shifting of 1 Ph Service connections |
| 32 | Shifting of 3 Ph Service connections |
| 33 | Shifting of Street light SwitchBox |
| 34 | Shifting of Street light fittings |
| 35 | Transport Charges Part - D of Credit estimate |
| 36 | Shifting of EB Poles at KM 2/350 - 2/440 (LHS &RHS) of Madurai - Melakkal - Samayanallur Road (SH73B) Supplying and fixing of DP STRUCTURE ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No:SE/MEDC/METRO/MDU/14.696/S/ DCW (GL).44/2025-26 Dt.10.03.2026 |
| 37 | POLE RSJ 250x125 |
| 38 | BASE PLATE |
| 39 | STRUCTURE MATERIALS FOR TRANSFORMER |
| 40 | AB SWITCH 11 kv SB 6 POLE W/INSULATOR |
| 41 | HG FUSE SET 11 kv SET W/ INSULATOR |
| 42 | LAS DISTIN TYPE 9 KV /11KV |
| 43 | Stucture Earthing |
| 44 | STAY SET COMPLETE W/16MM ROD CLAMP 2 NO |
| 45 | GUY SHACKLE HT |
| 46 | Jumpering materials (25sq mm single core) |
| 47 | Concreting per Structure |
| 48 | CONDUCTOR ACSR 7/3.15 |
| 49 | M.S.Bolt & Nut and Binding wire etc |
| 50 | 2.5 Sq mm 4 Core Alu Cables PT CT Connections and Other materials like TT Block Sliding fuse carrier alu lug, PVC Wire and PVC Taps |
| 51 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 52 | Labours and Transport Charges 15% |
| 53 | Labour &Transport Charges Part - A of Credit estimate |
| 54 | Transport Charges Part - D of Credit estimate |
| 55 | Shifting of EB Poles at KM 2/350 - 2/440 (LHS &RHS) of Madurai - Melakkal - Samayanallur Road (SH73B) Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: SE/MEDC/METRO/MDU/14.696/S/ DCW (GL).44/2025-26 Dt.10.03.2026 |
| 56 | FABRICATED RS JOIST POLE 200X100MM 42' |
| 57 | POLE RSJ 250x125 |
| 58 | BASE PLATE |
| 59 | TAPPING CHANNEL CROSS ARM 11KV |
| 60 | CROSS ARM GUARDING |
| 61 | CROSS ARM ANGLE 3 PH |
| 62 | CROSS ARM ANGLE 1 PH |
| 63 | FITTING HT TI |
| 64 | BACK CLAMP RSJ SPL 250x125MM |
| 65 | STAY CLAMP ORD RSJ 250x125MM |
| 66 | STRAIN DISC 11 KV |
| 67 | METAL PARTS FOR RABBIT/WEASEL CONDUCTOR |
| 68 | INSULATOR 11 KV POLYMER COMPOSITE PIN TYPE |
| 69 | LT SHCAKLE |
| 70 | METAL PARTS LT SHACKLE |
| 71 | LT PIN INSULATOR |
| 72 | LT PIN |
| 73 | ALUMINIUM KNOB |
| 74 | STAY SET COMPLETE W/16MM ROD CLAMP 2 NO |
| 75 | GUY SHACKLE |
| 76 | CONDUCTOR FOR AAAC 7/3.15 |
| 77 | CONDUCTOR FOR AAAC 7/2.50 |
| 78 | Guarding Arrangements |
| 79 | M.S.Bolt & Nut |
| 80 | Concreting & Earthing |
| 81 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 82 | Labours and Transport Charges 15% |
| 83 | Shifting of LT 3 Phase Services |
| 84 | Shifting of LT 1 Phase Services |
| 85 | Shifting of Street light fittings |
| 86 | Transport Charges Part - D of Credit estimate |
| 87 | Shifting of EB Poles at KM 2/440 - 2/510 (LHS &RHS) of Madurai - Melakkal - Samayanallur Road (SH73B) Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: SE/MEDC/METRO/MDU/14.696/S/ DCW (GL).45/2025-26 Dt.10.03.2026 |
| 88 | FABRICATED RS JOIST POLE 200x100MM 42' |
| 89 | POLE RSJ 250x125 |
| 90 | BASE PLATE |
| 91 | V CROSS ARM 1373MM 4'6\\" |
| 92 | TAPPING CHANNEL CROSS ARM 11 KV |
| 93 | CROSS ARM GUARDING |
| 94 | CROSS ARM ANGLE 3PH |
| 95 | CROSS ARM ANGLE 1PH |
| 96 | FITTINGS HT TI |
| 97 | BACK CLAMP RSJ SPL 250X125MM |
| 98 | STAY CLAMP ORD RSJ 250X125MM |
| 99 | STRAIN DISC 11KV |
| 100 | METAL PARTS FOR RABBIT/WEASEL CONDUCTOR |
| 101 | INSULATOR 11 KV POLYMER COMPOSITE PIN TYPE |
| 102 | LT SHACKLE |
| 103 | METAL PARTS LT SHACKLE |
| 104 | LT PIN INSULATOR |
| 105 | LT PIN |
| 106 | ALUMINIUM KNOB |
| 107 | STAY SET COMPLETE W/16 MM ROD CLAMP 2 NO |
| 108 | GUY SHACKLE |
| 109 | CONDUCTOR FOR AAAC 7/3.15 |
| 110 | CONDUCTOR FOR AAAC 7/2.50 |
| 111 | Guarding Arrangements |
| 112 | M.S.Bolt & Nuts |
| 113 | Concreting & Earthing |
| 114 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 115 | Labours and Transport Charges 15% |
| 116 | Shifting of LT 3 Phase Services |
| 117 | Shifting of LT 1 Phase Services |
| 118 | Shifting of St. light fitting |
| 119 | Transport Charges Part - D of Credit estimate |
| 120 | Shifting of EB Poles at KM 2/440 (RHS) of Madurai - Melakkal - Samayanallur Road (SH73B) Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No:SE/MEDC/ METRO/MDU/14.696/S/DCW (GL).46/2025-26 Dt.10.03.2026 |
| 121 | RMU Wiring earthing & welding |
| 122 | Mass concrete for RMU blinth |
| 123 | CABLE 3X300SQMM11KV UG ARMALU XLPE |
| 124 | 11 KV Outdoor Termination Kit for 11 KV 3x300 sq.mm XLPE cable |
| 125 | 11 KV Indoor Termination Kit for 11 KV 3x300 sq.mm XLPE cable |
| 126 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 127 | Labours and Transport Charges 15% |
| 128 | Labours and Transport Charges Part - A of Credit estimate |
| 129 | Transport Charges Part - D of Credit estimate |
| 130 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 131 | Basic cost of value put to tender as per estimate |
| 132 | Add GST at 18% |
| 133 | Total Value put to Tender |
| 134 | Quoted Percentage |
| 135 | Quoted Value |
| 136 | Add GST at 18% of Final Quoted Value |
| 137 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 138 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender