Tender For Providing Of 16 X Or Md Accn At K Area Under Equal Value Infrastructure (Evi) Under Ge Chandigarh.
Tender Value
5.55 Crore
Estimated cost
Bid Submission
12 Dec 2026
26 days left
EMD
6.02 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chandigarh → Chandigarh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Providing Of 16 X Or Md Accn At K Area Under Equal Value Infrastructure (Evi) Under Ge Chandigarh.
BOQ
| Sl. No. | Item Description |
| 1 | Total amount of Sch 'A' Sec-I (BUILDING WORKS) Lump sum price worked out by the contractor for \\" BUILDING WORKS \\" as listed in Schedule 'A' Section-I |
| 2 | Total amount of Sch 'A' Sec-II (SITE CLEARANCE AND DEVELOPEMENT ) Lump sum price worked out by the contractor for \\" SITE CLEARANCE AND DEVELOPEMENT \\" as listed in Schedule 'A' Section-II |
| 3 | Total amount of Sch 'A' Sec-III (INTERNAL ELECTRIFICATION ) Lump sum price worked out by the contractor for \\" INTERNAL ELECTRIFICATION \\" as listed in Schedule 'A' Section-III |
| 4 | Total amount of Sch 'A' Sec-IV (INTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for \\" INTERNAL WATER SUPPLY \\" as listed in Schedule 'A' Section-IV |
| 5 | Total amount of Sch 'A' Sec-V (EXTERNAL ELECTRIFICATION ) Lump sum price worked out by the contractor for \\"EXTERNAL ELECTRIFICATION \\" as listed in Schedule 'A' Section-V |
| 6 | Total amount of Sch 'A' Sec-VI (EXTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for \\" EXTERNAL WATER SUPPLY \\" as listed in Schedule 'A' Section-VI |
| 7 | Total amount of Sch 'A' Sec-VII (ROAD, PATH AND CULVERT WORKS) Lump sum price worked out by the contractor for \\" ROAD, PATH AND CULVERT WORKS \\" as listed inSchedule 'A' Section-VII |
| 8 | Total amount of Sch 'A' Sec-VIII (SEWAGE DISPOSAL) Lump sum price worked out by the contractor for \\"SEWAGE DISPOSAL \\" as listed in Schedule 'A' Section-VIII |
| 9 | Total amount of Sch 'A' Sec-IX (AREA DRAINAGE WORKS) Lump sum price worked out by the contractor for \\" AREA DRAINAGE WORKS \\" as listed in Schedule 'A' Section-IX |
| 10 | Total amount of Sch 'A' Sec-X (RAIN WATER HARVESTING) Lump sum price worked out by the contractor for \\" RAIN WATER HARVESTING \\" as listed in Schedule 'A' Section-X |
| 11 | Total amount of Sch 'A' Sec-XI ( LIFTS) Lump sum price worked out by the contractor for \\" LIFTS \\" as listed in Schedule 'A' Section-XI |
| 12 | Total amount of Sch 'A' Sec-XII (FIRE FIGHTING SYSTEM) Lump Sum price worked out by the contractor for \\"FIRE FIGHTING SYSTEM \\" as listed in Schedule 'A' Section-XII |
| 13 | Total amount of Sch 'A' Sec-XIII ( LIGHTENING PROTECTION ) Lump sum price worked out by the contractor for \\" LIGHTENING PROTECTION \\" as listed in Schedule 'A' Section-XIV. |
| 14 | Schedule 'A' Section-XIV (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 5 siginifies this fact only. |
| 15 | ROAD,PATH AND CULVERT |
| 16 | Providing, Laying, compaction of granular sub-base by providing close graded Material confirming to spcifications i.e Grading II, conforming o Clause 401 of MORT&H Specifications for Road and Bridge Works (Fifth Revision), mixing in mechancial mixplant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller of capacity 8 & 12 tonne to achieve the desired density, 150 mm thick compacted thickness , complete all as specified and directed. |
| 17 | Providing, Laying, compaction of wet mix macadam conforming to Clause 406 of MORT&H Specifications for Road and Bridge Works (Fifth Revision),225 mm thick (compacted thickness, 75 mm thick in three separate layers) with mechanically crushed graded stone aggregates and granular material (size range 53 mm to 0.075 mm), grading of aggregates as per Table 400 -13 of MORT&H specification for road and bridge works (fifth Revision) ,including premixing the material with water at OMC in for all leads &lifts laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and comfacting with vibratory roller of 8 to 12 tonne capacity to achieve the desired density , required gradient and camber etc., complete all as specified and directed.Notes : 1 . The WMM shall be laid in two layers i.e each of 125 mm thick (Compacted thickness). 2. For payment purpose, both layers shall be considered as one unit. |
| 18 | Preparation of un-surfacced Wet mix maccadam (WMM) surfaces by sweeping clean by broom or machanical sweepers and removing completely all loose material and other foreign ad finally fanning the cleaned surface with air compressors to remove all loose dirt etc. and applying evenly a priming coat on un-surfaced mix macadam surfaces conforming to Clause 502 of MORT&H Specifications for Road and Bridge Works (Fifth Revision), with ccationic bituminous emulsion SS1 grade,confirming to IS 8887 (latest edition) @ 7.5 kg per 10 sq metres using primer distributor which shall be self-propelled or towed bitumen pressure sprayer complete all as specified and directed. |
| 19 | Providing, laying & compaction of Bituminous Macadam (BM) consolidated thickness 75mm or less compacted thickness conforming to clauses 504 of MORT&H specification for Road and Bridge Works (Fifth Revision), using mechanically crushed stone aggregates and granual material etc. of grading 11 as per table 500-7 of MORT&H specifications for Road and Bridge Works (Fifth Revision) premixed with bituminous binder, bitumen grade VG-30 @ 3.50% (percentage by wait of total mix)prepared in Batch Type Hot Plant of 100-120 TPH capacity transported to site by tibbers , laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete all as specified and directed.Notes : (i) The contractor shall quote the rate against Item considering 3.5% VG-30 bitumen content. Mix Design for bituminous macadam shall be got designed from NIT/CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 3.4% by weight of total mix as per clause 507.2.4 of MORT&H specifications (Fifth Revision). (ii) If qty of binder contents is less than the qty ass specified in respective items of BOQ , it shall be adjusted at supply only rates of paving bitumen @ Rs 45.00 Per Kg and if qty of binder contents is more than the qty as specified in respective items of BOQ no adjustment shall be made. |
| 20 | Providing and laying 30 mm thick (consolidated thickness) Bituminous Concrete (BC) layer conforming to clauses 507 of MORT&H specification for Road and Bridge Works (Fifth Revision), including cost of coarse aggregates fine aggregates, filler, 5.4% binder 9paing Bitumen grade VG-30 content by weight of total mix and crushed aggregaters of grading 2, Anti Stripping Agent, Warm Mix Additives (quantity, quality and garde as per the mineral aggregate, filler & bitumen to the specific temperature, thoroughly mixing with binder of specified bitumen content, Anti Stripping Agent, Warm Mix Additives as per design in Hot Plant (Batch Type) of 100-120 TPH capacity, carrying the hot mixed materials by means of tipper, trucks, or any other a pproved and suitable arrangements, laying the hot premixed materials over the prepared surface by means of paver finisher including manual operation as and when required for proper grade, level and camber thorough rolling with power roller 8 to 12 tonnes smooth wheeled , vibratory and tandem roller with necessary hand packing and pinning to give an even surface, including running expense of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer-in-Charge, required quality contorl tests at required interval etc complete in all respects complete all as specified . Note -(i) The contractor shall quote the rate against Item considering 5.5% VG-30 bitumen content. Job mix formula as per clause for bituminous concrete shall be got designed from NIT/CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen cntent shall not be less than 5.4% by weight of total mix as per clause 507.2.5 of MORT&H specifications (FifthRevision). Please Enable Macros to View BoQ information |
| 21 | Providing and laying 30 mm thick (consolidated thickness) Bituminous Concrete (BC) layer conforming to clauses 507 of MORT&H specification for Road and Bridge Works (Fifth Revision), including cost of coarse aggregates fine aggregates, filler, 5.4% binder 9paing Bitumen grade VG-30 content by weight of total mix and crushed aggregaters of grading 2, Anti Stripping Agent, Warm Mix Additives (quantity, quality and garde as per the mineral aggregate, filler & bitumen to the specific temperature, thoroughly mixing with binder of specified bitumen content, Anti Stripping Agent, Warm Mix Additives as per design in Hot Plant (Batch Type) of 100-120 TPH capacity, carrying the hot mixed materials by means of tipper, trucks, or any other a pproved and suitable arrangements, laying the hot premixed materials over the prepared surface by means of paver finisher including manual operation as and when required for proper grade, level and camber thorough rolling with power roller 8 to 12 tonnes smooth wheeled , vibratory and tandem roller with necessary hand packing and pinning to give an even surface, including running expense of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer-in-Charge, required quality contorl tests at required interval etc complete in all respects complete all as specified . Note -(i) The contractor shall quote the rate against Item considering 5.5% VG-30 bitumen content. Job mix formula as per clause for bituminous concrete shall be got designed from NIT/CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen cntent shall not be less than 5.4% by weight of total mix as per clause 507.2.5 of MORT&H specifications (FifthRevision). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 12, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 26 daysDec 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 28 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender