Tender For Shifting Of Electrical Equipment And Undergrounding Of Ht & Lt Lines Near Dilaram Chowk.
Tender Value
6.49 Crore
Estimated cost
Bid Submission
13 Nov 2026
3 days left
EMD
13 Lakhs
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dehradun → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Electrical Equipment And Undergrounding Of Ht & Lt Lines Near Dilaram Chowk.
BOQ
| Sl. No. | Item Description |
| 1 | (A) undergrounding of existing HT/LT line at New Cantt Road on request of PWD- Annexure-1 |
| 2 | (B) Laying of 33 KV XLPE underground cable in Duct bank provided by PWD from Dilaram -Annexure-2 |
| 3 | (C) u existing 11 KV and LT line N/W by laying underground cable and reapcing existing- Annexure-3 |
| 4 | (D) Shifting, Dismentaling and Reinstallation of 1 Nos 1000 KVA 11/0.433 KV Dry Type C |
| 5 | Decentralized Material |
| 6 | 11/0.433kV 990 KVA Compact S/s |
| 7 | STAY CLMAP SP-21 /23 WITH NUT &BOLT |
| 8 | G.S. STRIP 25x3mm |
| 9 | HDPE PIPE 140mm |
| 10 | CABLE HOLDING GI CLAMP |
| 11 | HDPE PIPE PE80 PN6 160mm |
| 12 | Concrete route marker for HT cable |
| 13 | Concrete route marker for LT cable |
| 14 | Polycarbonate Empty Meter Box for 1 Ph. |
| 15 | Polycarbonate Empty Meter Box for 3 Ph. |
| 16 | LT Cable Box for Arm Cable 3.5x400sq.mm |
| 17 | LT Cable Box for Arm Cable 3.5x240sq.mm |
| 18 | LT Cable Box for Arm Cable 3.5x120sq.mm |
| 19 | 65 mm HDPE Pipe |
| 20 | 11 KV STRAIGHT THRU KIT 3X120SQMM XLPE |
| 21 | 11kV XLPE HS CABLE J/K 3X300mm²STRAIGHT |
| 22 | 11KV CABLE T/K 3X300mm² XLPE I/D |
| 23 | 11kV XLPE HS J/K 3X50 SQ.mmSTRAIGHT |
| 24 | 11KV HS Cable Jointing Kit3X50 sqmm O/D |
| 25 | 11 KV H/S JOINTING KIT 120 SQ MM (I/D) |
| 26 | 11 KV H/S JOINTING KIT 120 SQ MM (O/ D) |
| 27 | 11 KV H/S JOINTING KIT 50 SQ MM (I/D) |
| 28 | LT XLPE Al. Armoud Cable 3.5X400sq.mm. |
| 29 | LT XLPE Al. Armoud Cable 3.5X240sq.mm. |
| 30 | LT XLPE Al. Armoud Cable 3.5X120sq.mm. |
| 31 | LT PVC Cable 4X25sq.mm Al Armoured |
| 32 | LT XLPE Al. Armoured Cable 4X10 sq.mm. |
| 33 | LT XLPE Al. Armoured Cable 2X10 sq.mm. |
| 34 | 11KV O/D RMU 3 WAY TYPE |
| 35 | 11KV O/D RMU 1 WAY TYPE (LBS) |
| 36 | 11KV O/D RMU 1 WAY VCB |
| 37 | Feeder Piller having 400Amps MCCBTYPE-A |
| 38 | Feeder Piller having 250Amp MCCBTYPE-B |
| 39 | Feeder Piller having 400Amps TYPE-C1 |
| 40 | HDPE PIPE 40MM |
| 41 | LABOUR CHARGES |
| 42 | CEMENT CONCRETING WORK IN RATIO1:2:4 |
| 43 | MAKING FOUND. & CABLE TRENCH990KVA CSS |
| 44 | MANUAL DIGGING OF TRENCH OF SIZE300X100 |
| 45 | ERECTION OF 6\\" HDPE PIPE |
| 46 | ERECTION OF 4\\" HDPE PIPE |
| 47 | ERECTION OF 2\\" HDPE PIPE |
| 48 | ERECTION OF CC ROUTE MARKER FORHT CABLE |
| 49 | ERECTION OF CC ROUTE MARKER FORLT CABLE |
| 50 | FABRICATION OF STEEL |
| 51 | ERECTION OF 11 KV STAY SET |
| 52 | EXCAVATION OF PIT FOR POLE |
| 53 | ERECTION OF SINGLE SP-23 POLE |
| 54 | GROUTING OF POLE |
| 55 | MUFFING OF POLE |
| 56 | DISMANTLING OF PCC SINGLE POLE |
| 57 | DISMANTLING OF SP-21/SP-23 SINGLEPOLE |
| 58 | DISMANTLING OF SP-55 SINGLE POLE |
| 59 | DISMANTLING OF SP-55 DOUBLE POLE |
| 60 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 61 | DISMANTLING OF LT LINE 3 P 5W(WEASEL) |
| 62 | DISMANTLING OF 100 KVA DTR |
| 63 | DISMANTLING OF STAY SET |
| 64 | DISMANTLING OF GUARDING IN 11 KVLINE |
| 65 | CARTAGE SP-21/23 POLE, 0-20 KM |
| 66 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 67 | HEADLOAD CARTAGE SP-21/23POLE(1-3 KM) |
| 68 | DISMANTLING OF AB CABLE |
| 69 | DISMANTLE OF EXITING TPMO/GO/ISOLATOR |
| 70 | CHEMICAL EARTHING OF T/F |
| 71 | ERECTION & LAYING LT ARM CABLE3.5X400 |
| 72 | ERECTION & LAYING LT ARM CABLE3.5X240 |
| 73 | ERECTION & LAYING LT ARM CABLE3.5X120 |
| 74 | ERECTION & LAYING LT ARM CABLE4X10 |
| 75 | ERECTION & LAYING OF LT AR. CABLE2x10 |
| 76 | ERECTION & LAYING OF LT AR. CABLE4x25 |
| 77 | ERECTION & COMMISSIONING OF 990KVA CSS |
| 78 | INSTALLATION OF LT O/D FDR PILLER400A |
| 79 | INSTALLATION OF LT O/D FDR PILLER250A |
| 80 | INSTALLATION OF J/KIT 11KV 3X300 I/D |
| 81 | INSTALLATION OF J/KIT 11KV 3X300 O/D |
| 82 | INSTALLATION OF 3 WAY RMU ANDOTHER WORK |
| 83 | ERECTION OF 11KV O/D RMU 1 WAYVCB |
| 84 | ERECTION OF 11KV O/D RMU 1 WAYTYPE(LBS) |
| 85 | ERECTION & LAYING OF 11KV 3X50 INHDPE |
| 86 | INSTALLATION OF STRAIGHT THR.11KV 3X300 |
| 87 | INSTALLATION OF J/KIT 11KV 3X50 I/D |
| 88 | INSTALLATION OF J/KIT 11KV 3X50 O/D |
| 89 | INSTALLATION OF STRAIGHT THR.11KV 3X50 |
| 90 | INSTALLATION OF LT O/D FDR PILLER100A |
| 91 | ERECTION OF LT CABLE BOX FOR3.5X400 |
| 92 | ERECTION OF LT CABLE BOX FOR3.5X240 |
| 93 | ERECTION OF LT CABLE BOX FOR3.5X120 |
| 94 | ERECTION OF EARTH STRIP 25X3 MM. |
| 95 | ERECTION OF EMPTY POLY. METERBOX |
| 96 | DISMANTLING OF 11 KVSECTIONALIZER |
| 97 | ERECTION & LAYING OF 11KV 3X300 INHDPE |
| 98 | FILLING & FIXING OF LT STRAIGHTTHROUGH |
| 99 | SUPPLY & FIXING OF G.I. PIPE 6 INCH |
| 100 | ERRECTION OF HDPE PIPE 160/90/65 |
| 101 | ERECTION & LAYING 11KV CABLE3X120 SQMM |
| 102 | FIXING OF 11KV O/D CABLE J/KIT3X120SQMM |
| 103 | FIXING OF 11KV I/D CABLE J/KIT3X120SQMM |
| 104 | BACK CARRIAGE OF SCRAP MATERIAL |
| 105 | CONSTRUCTION OF 3 WAY RMUPLINTH |
| 106 | Decentralized Material |
| 107 | Cable Holding clamp with N&B |
| 108 | PP CLAMP FOR SP-45 WITH N&B |
| 109 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 110 | Stay Clamp for SP-55 With Nut & Bolt |
| 111 | AL LUGS SUITABLE FOR DOGCONDUCTOR |
| 112 | GI EARTHING STRIP 50X5 MM |
| 113 | 33 KV HS cable END T/K 3x400 mm² O/D |
| 114 | 33kV XLPE HS J/K 3X400mm² STRAIGHT |
| 115 | AL LUG CRIMPPING (400)SQ MM |
| 116 | Hardware(Nut, Washer, Cripclip) |
| 117 | LABOUR CHARGES |
| 118 | NSI_SPECIAL EARTHING |
| 119 | MANUAL DIGGING OF TRENCH OF SIZE300X100 |
| 120 | ERECTION OF EARTHING ROD |
| 121 | FABRICATION OF STEEL |
| 122 | FIXING OF RCC CABLE ROUTE MARKER |
| 123 | EXCAVATION OF PIT FOR POLE |
| 124 | ERECTION OF SINGLE SP-55 POLE |
| 125 | GROUTING OF POLE |
| 126 | MUFFING OF POLE |
| 127 | PAINTING OF SP-55 POLE |
| 128 | LAYING OF U/G 33 KV CABLE INTRENCH |
| 129 | CONST.,INST.OF DANGER BOARD/NUMBER PLATE |
| 130 | MAKING OF SECTION POLE |
| 131 | CARTAGE SP-55 POLE, 0-20 KM |
| 132 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 133 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 134 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 135 | SUPPLY AND LAYING OF HDPE PIPE |
| 136 | FIXING OF ACCESSORIES |
| 137 | LAYING OF 33KV CABLE FOR POLERISING O/H |
| 138 | GROUTING OF STAY SET |
| 139 | INSTALLATION OF J/KIT 33KV 3X400 O/D |
| 140 | EXCAV. OF PIT & FIXING OF STR THR.J/KIT |
| 141 | LAYING 33KV CABLE IN HDPE PIPE HDDMACH. |
| 142 | SUPPLY,FIXING B-CLASS 150MM GIPIPE D-CL |
| 143 | Decentralized Material |
| 144 | 11/0.433kV 1000KVA Compact S/s |
| 145 | ALUMINIUM FLEXIBLE EARTH BOND |
| 146 | CHEMICAL EARTHING |
| 147 | Straight Through LT O/D 3.5x400 sq.mm. |
| 148 | Straight Through LT O/D 3.5x240 sq.mm. |
| 149 | HDPE PIPE PE80 PN6 160mm |
| 150 | Al LT Glands for 400 sq. mm.. Cable |
| 151 | Al LT Glands for 240 sq. mm.. Cable |
| 152 | Concrete route marker for HT cable |
| 153 | LT Cable Box for Arm Cable 3.5x400sq.mm |
| 154 | LT Cable Box for Arm Cable 3.5x240sq.mm |
| 155 | EARTHING ROD MS 20X2500MM-D |
| 156 | HDPE PIPE PE 100 PN6 DIA 160 MM |
| 157 | 65 mm HDPE Pipe |
| 158 | Copper Based Chemical Earthing |
| 159 | J/KIT FOR 3X400mm² 11kV XLPE CABLEI/D-D |
| 160 | 11 KV XLPE Cable Box 3x400 sq.mm (O/ D)-D |
| 161 | LT XLPE Al. Armoud Cable 3.5X400sq.mm. |
| 162 | LT XLPE Al. Armoud Cable 3.5X240sq.mm. |
| 163 | LT XLPE Al. Armoud Cable 4X95 sq.mm. |
| 164 | 11KV XLPE STRAIGHT THROUGH 3X400SQMM-D |
| 165 | LT XLPE Al. Armoured Cable 2X10 sq.mm. |
| 166 | LT XLPE Armoured Cable 4x35 sq mm |
| 167 | LT PVC Cable 4x10 sq mm-D |
| 168 | Feeder Piller having 250Amp MCCBTYPE-B |
| 169 | Feeder Piller having 400Amps TYPE-C1 |
| 170 | Crimping Type Al. Lugs 240 mm |
| 171 | AL CRIMPING TYPE LUGS 400 SQ. mm |
| 172 | GI Strip size 35x6mm |
| 173 | GI EARTHING STRIP 35X3 mm |
| 174 | LABOUR CHARGES |
| 175 | MANUAL DIGGING OF TRENCH OF SIZE300X100 |
| 176 | ERECTION OF 6\\" HDPE PIPE |
| 177 | ERECTION OF 4\\" HDPE PIPE |
| 178 | ERECTION OF 2\\" HDPE PIPE |
| 179 | ERECTION OF CC ROUTE MARKER FORHT CABLE |
| 180 | NSI_LOW CARBON COPPER COATEDEARTH ROD O |
| 181 | CHEMICAL EARTHING |
| 182 | ERECTION OF EARTHING ROD |
| 183 | DISMANTLING OF 400 KVA DTR |
| 184 | LAYING OF U/G 11 KV CABLE INTRENCH |
| 185 | FENCING OF DTR |
| 186 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 187 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 188 | DISMANTLING OF CABLE/NEUTRALSTAND |
| 189 | ESCAVATION OF EARTH FOR STRUCT.ERECTION |
| 190 | BACK CARTAGE OF PETTYMATERIAL,0-20 KM |
| 191 | FINAL TESTING OF CABLE, PANEL ETC. |
| 192 | LAYING OF 11 KV CABLE POLE TOPOLE |
| 193 | ERECTION & LAYING LT ARM CABLE3.5X400 |
| 194 | ERECTION & LAYING LT ARM CABLE3.5X240 |
| 195 | ERECTION & LAYING LT ARM CABLE4X95 |
| 196 | ERECTION & LAYING LT ARM CABLE4X10 |
| 197 | ERECTION & LAYING OF LT AR. CABLE2x10 |
| 198 | INSTALLATION OF LT O/D FDR PILLER400A |
| 199 | INSTALLATION OF 400SQ. MM LT ALLUGS |
| 200 | INSTALLATION OF 240SQ. MM LT ALLUGS |
| 201 | INSTALLATION OF 240 SQ. MM LTGLANDS |
| 202 | ERRECTION OF ST. TH. LT O/DTYPE3.5X400 |
| 203 | ERRECTION OF ST. TH. LT O/DTYPE3.5x240 |
| 204 | TEMPORARY SUPPLY ARRANGEMENTBY TROLLY |
| 205 | ERECTION OF LT CABLE BOX FOR3.5X400 |
| 206 | ERECTION OF LT CABLE BOX FOR3.5X240 |
| 207 | SUPPLY OF GI EARTHING STRIP35X6MM |
| 208 | EARTHING WITH COPPERPLATE,CHARCOAL ETC. |
| 209 | SUPPLY & LAYING OF HDPE PIPE INOPEN CUT |
| 210 | FEEDER PILLER O/D 400A TYPE-C1 |
| 211 | ERECTION & LAYING OF LT XLPECABLE 4X35 |
| 212 | FENCING OF CSS WITH ALLACCESSORIES |
| 213 | ERRECTION OF HDPE PIPE 160/90/65 |
| 214 | ERECTION, TESTING & COMM. OF1000KVA CSS |
| 215 | DISMENTAL & RE-ERECTION OF LT ACBPANEL |
| 216 | ERREC. OF GI EARTHING STRIP 35X6SQMM |
| 217 | INSTALLATION OF 400 SQ. MM LTGLANDS |
| 218 | SUPPLY&LAYING HDPE PIPE OUTERDIA 110MM |
| 219 | SUPPLY & FIXING 11KV J/K 3X400SQMM I/D |
| 220 | SHIFTING REALIGNMENT 11KV SP,DP/LT LINE |
| 221 | LOADING UNLOADING & TRANSPORTOF CSS |
| 222 | Decentralized Material |
| 223 | CHEMICAL EARTHING |
| 224 | SUPPLY OF CABLE CLAMP |
| 225 | HDPE PIPE PE80 PN6 160mm |
| 226 | LT Cable Box for Arm Cable 3.5x400sq.mm |
| 227 | GI STRIP 65MMX6MM |
| 228 | 11KV CABLE T/K 3X300mm² XLPE I/D |
| 229 | 11KV CABLE T/K 3X300mm² XLPE O/D |
| 230 | 11 KV XLPE CABLE AL 3X300 SQ. mm - D |
| 231 | 3x240 sq mm XLPE 11 KV Cable-D |
| 232 | AL CRIMPING TYPE LUGS 300 SQ.mm |
| 233 | LABOUR CHARGES |
| 234 | MAKING FOUNDATION OF RMU WITHALL WORK |
| 235 | MAKING FOUNDATION OF CSS WITHALL WORK |
| 236 | CHEMICAL EARTHING |
| 237 | FIXING OF 11 KV XLPE STRAIGHT THRU |
| 238 | ERECTION & LAYING LT ARM CABLE3.5X400 |
| 239 | INSTALLATION OF J/KIT 11KV 3X300 I/D |
| 240 | INSTALLATION OF J/KIT 11KV 3X300 O/D |
| 241 | INSTALLATION OF 400SQ. MM LT ALLUGS |
| 242 | REMOVING & INSTALATION CSS ATNEW SITE |
| 243 | LAYING OF 11 KV CABLE |
| 244 | FILLING & FIXING OF LT STRAIGHTTHROUGH |
| 245 | FENCING OF CSS WITH ALLACCESSORIES |
| 246 | ERRECTION OF HDPE PIPE 160/90/65 |
| 247 | REMOVING & SHIFTING RMU |
| 248 | DISMANTELING ETC & ASSEMBLINGETC OF CSS Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 13, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender