Tender For Consultancy Services For Preparation Of Detailed Project Reports (Dprs) For The Proposed Road Infrastructure Projects, Namely (A) Western Bypass - Phase Ii; (B) Southern Ring Road At Thirunallar; (C) Elevated Corridor Over Noolar River, Ka
Tender Overview
Project Description
Tender for Consultancy Services For Preparation Of Detailed Project Reports (Dprs) For The Proposed Road Infrastructure Projects, Namely (A) Western Bypass - Phase Ii; (B) Southern Ring Road At Thirunallar; (C) Elevated Corridor Over Noolar River, Karaikal District, Union Territory Of Puducherry.
BOQ
| Sl. No. | Item Description |
| 1 | Stage B - Detailed Surveys and Investigations including reconnaissance survey; topographical survey (DGPS/Total Station/UAV), traffic surveys and analysis, road and structure inventory, geotechnical investigations, hydrological & drainage studies (where applicable) flood level studies for river crossings, utility mapping, GIS base mapping, environmental and social baseline data collection; road safety audit, and preparation of preliminary alignment and layout plans; and preparation and submission of survey and investigation reports for all the proposed projects, complete in all respects necessary for preparation of DPR. |
| 2 | Western Bypass – Phase II: Stage C- Functional and engineering design comprising geometric design, pavement design, structural design of bridges, culverts and cross-drainage works, junction improvements, drainage design, traffic management and road safety measures. The scope shall also include preparation of detailed cost estimates, Bill of Quantities (BOQ), value engineering and alternative analysis, Environmental Management Plan (EMP), Draft Detailed Project Report (DPR), Draft Bid Documents, and safeguard documents such as Environmental Impact Assessment (EIA) / Initial Environmental Examination (IEE), Social Impact Assessment (SIA), Resettlement Plan (RP) / Due Diligence Report (DDR), as applicable, in accordance with the latest applicable MoRTH, IRC, BIS, CPWD, Government of Puducherry, ADB guidelines, and other relevant statutory requirements. |
| 3 | Western Bypass – Phase II: Stage D - Preparation of final Detailed Project Report (DPR) including all components fully complying with scope of works for bypass development, including final engineering designs, GFC drawings, BOQ, cost estimates, alternative analysis, EMP, implementation strategy, and bidding documents. The scope also includes proof checking/vetting of designs from IIT/NIT Also includes final bid documents, final safeguard documents (EIA/IEE, SIA, RP/DDR as applicable), and submission of all supporting documents required for all statutory clearance, applications complete in all aspects and providing full technical support until final approval of the DPR. |
| 4 | Southern Ring Road, Thirunallar: Stage C- Functional and engineering design for road infrastructure including geometric design, pavement design, structural design of bridges, culverts and cross-drainage works, junction improvement works, drainage design, traffic management arrangements, and road safety provisions. The scope shall also include preparation of detailed cost estimates, Bill of Quantities (BOQ), value engineering and alternative analysis, Environmental Management Plan (EMP), and Draft Detailed Project Report (DPR). Further includes preparation of Draft Bid Documents and safeguard reports such as Environmental Impact Assessment (EIA)/Initial Environmental Examination (IEE), Social Impact Assessment (SIA), and Resettlement Plan (RP)/Due Diligence Report (DDR), as applicable, prepared in accordance with the latest applicable MoRTH, IRC, BIS, CPWD, Government of Puducherry, and ADB guidelines and other relevant statutory requirements |
| 5 | Southern Ring Road, Thirunallar: Stage D- Preparation of Detailed Project Report (DPR) including all components fully complying with scope of works for ring road development, including final engineering designs, GFC drawings, BOQ, cost estimates, alternative analysis, implementation strategy, and ADB/MoRTH compliant bidding documents. The scope also includes proof checking/vetting of designs from IIT/NIT. Also includes final bid documents, final safeguard documents (EIA/IEE, SIA, RP/DDR as applicable), and submission of all supporting documents required for all statutory clearance, applications complete in all aspects and providing full technical support until final approval of the DPR. |
| 6 | Elevated Corridor over Noolar River: Stage C- Functional and engineering design for road infrastructure projects covering geometric design, pavement design, structural design of bridges, culverts, and elevated corridor, junction improvement works, drainage design, and traffic management arrangements. Also includes preparation of detailed cost estimates, Bill of Quantities (BOQ), alternative analysis, Environmental Management Plan (EMP), and Draft Detailed Project Report (DPRs) for each project. Further includes preparation of Draft Bid Documents and safeguard reports such as Environmental Impact Assessment (EIA) / Initial Environmental Examination (IEE), Social Impact Assessment (SIA), Resettlement Plan (RP) / Due Diligence Report (DDR), prepared in accordance with the latest applicable MoRTH, IRC, BIS, CPWD, Government of Puducherry, and ADB guidelines and other relevant statutory requirements |
| 7 | Elevated Corridor over Noolar River: Stage D- Preparation of final Detailed Project Report (DPR) including all components fully complying with scope of works for elevated corridor development, including final structural designs, GFC drawings, BOQ, cost estimates, construction methodology, implementation strategy, and bidding documents. The scope also includes proof checking/vetting of designs from IIT/NIT. Also includes final bid documents, final safeguard documents (EIA/IEE, SIA, RP/DDR as applicable), and submission of all supporting documents required for all statutory clearance, applications complete in all aspects and providing full technical support until final approval of the DPR. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender