Housing Urban and Rular Development Government Departments Closing in 9 days TDR #58421542

Tender For Supply Installation Testing and Commissioning of 11Kv Ug & Oh Line For Providing Power Supply To Unit At Mahisapat I.E, Dhenkanal.

Issued by Government Departments · Dhenkanal, Odisha
Tender Value
21.21 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
9 days left
EMD
21217
Bank guarantee accepted
Document Fee
7080
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dhenkanal → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Supply Installation Testing and Commissioning of 11Kv Ug & Oh Line For Providing Power Supply To Unit At Mahisapat I.E, Dhenkanal.

BOQ

Name of Work:- SITC of 11kv UG & OH line for providing power supply to Unit at Mahisapat I.E, Dhenkanal.
Sl. No. Item Description
1Part A- Cost of Supply Of Materials.
2Supply of materials for 11kV, 3Core, 95sqmm Aluminium, XLPE insulation armoured UG cable with Spare and accessories.
3Length of 11kV 3C, 95sqmm cable (HDD - 150 Mtr + 150 Mtr Spare)
4Supply of 11kV,3Core,95sqmm,XLPE insulation armoured UG cable(SC rating of cable in kA-9kA and SC rating of Armour in kA-9kA as per the approved technical specification and direction of EIC
5Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 95 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC.
6Part A- Cost of Erection Of Materials.
7Erection, Commissioning, Testing of 11kV new line by 3core, 95sqmm, XLPE UG cable.
8Laying, Commissioning & Testing of 11kV, 3Core, 95sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC.
9Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 95sqmm, aluminium UG cable kits. as per direction of EIC.
10Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC.
11Part A- Cost of Civil Works.
12Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works.Complete as per the direction of EIC.
13GIS coordinate mapping,drawing preparation and submission of the same for New/Existing line
14Part B-Cost of Material For 11KV DP With AB Switch-2 Nos
15Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
16Supply & installation of GI Channel,angle & flat of different size. Complete in all respect as per the approved technical specification and direction of EIC.
17Supply & installation of DMC Insulator for LA (70/10) Complete in all respect as per the approved technical specification and direction of EIC.
18Supply and installation of Danger Plate Complete in all respect as per the approved technical specification and direction of EIC.
19Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
20Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
21Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
22Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
23Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC.
24Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC.
25SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC.
26Supply & installation of AB switch (11KV,400A.3pole,50Hz).Complete in all respect as per the approved technical specification and direction of EIC.
27Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
28Supply & installation of NON METALLIC TIES-11KV 55 SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
29Supply & installation of IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
30Supply & installation of Wedge connector for 55 sqmm conductor. Complete in all respect as per the approved technical specification and direction of EIC.
31upply & installation of spike GI (2 Nos of spike set in each pole). Complete in all respect as per the approved technical specification and direction of EIC.
32Supply and installation of Dead end assembly with accessories for 55 sqmm AAAC. Complete in all respect as per the approved technical specification and direction of EIC.
33Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
34Supply & installation of Gl Nut, Bolt & Washer of different sizes . Complete in all respect as per the approved technical specification and direction of EIC.
35Part B- Cost of Civil Works.
36Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
37Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
38Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
39Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm including welding of GI flataround pipe as per the specification of TPCODL.
40GIS Mapping ,indexing/numbering of poles.Complete in all respect as per the direction of EIC.
41Painting of pole in Black & Yellow strip/Zebra.Complete in all respect as per the direction of EIC.
42Part C- Cost of Materials for 11KV Cut Point With 180 Degree Angle - 1 Nos
43Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
44Supply & installation of GI Channel,angle & flat of different size. Complete in all respect as per the approved technical specification and direction of EIC.
45Supply & installation of Danger plate,1 no's for each pole. Complete in all respect as per the approved technical specification and direction of EIC.
46Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
47Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
48Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
49Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
50Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC.
51Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
52Supply & installation of NON METALLIC TIES-11KV 55 SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
53Supply & installation of IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
54Supply & installation of Spike (GI) ( 2 nos spike per set in each pole). Complete in all respect as per the approved technical specification and direction of EIC.
55Supply and installation of Dead end assembly with accessories for 55 sq.mm .AAAC Complete in all respect as per the approved technical specification and direction of EIC.
56Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
57Supply & installation of Earthing of support (coil type)Complete in all respect as per the approved technical specification and direction of EIC.
58Supply & installation of GI Nut, Bolt & Washer of different sizes . Complete in all respect as per the approved technical specification and direction of EIC.
59Part C- Cost of Civil Works.
60Concreting pole 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
61Couping pole 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
62Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
63GIS Mapping ,indexing/numbering of poles.Complete in all respect as per the direction of EIC.
64Painting of pole in Black & Yellow strip/Zebra.Complete in all respect as per the direction of EIC.
65Part D- Cost of Materials for 11 KV Pin Points (0.3 CKM)
66Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
67Supply & installation of 11KV V cross Arm(GI) (10.2 Kg. each). Complete in all respect as per the approved technical specification and direction of EIC.
68Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the approved technical specification and direction of EIC.
69Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the approved technical specification and direction of EIC.
70Supply & installation of Back Clamp for danger Plate and barbed wire. Complete in all respect as per the approved technical specification and direction of EIC.
71Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC.
72Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the approved technical specification and direction of EIC.
73Supply & installation of NON METALLIC TIES-11KV 55SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC.
74Supply & installation of Spike (GI) 2 nos spike per set in each pole Complete in all respect as per the approved technical specification and direction of EIC.
75Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the approved technical specification and direction of EIC.
76Supply & installation of GI Nut, Bolt & Washer of different sizes . Complete in all respect as per the approved technical specification and direction of EIC.
77Supply & Stringing of 55 SQ.MM. AAAC XLPE Covered Conductor-11kV. Complete in all respect as per the approved technical specification and direction of EIC.
78Part D- Cost of Civil Works.
79Concreting of pole 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr(Per pole).Complete in all respect as per the direction of EIC.
80Couping of pole 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr(Per pole).Complete in all respect as per the direction of EIC.
81GIS Mapping ,indexing/numbering of poles.Complete in all respect as per the direction of EIC.
82Painting of pole in Black & Yellow strip/Zebra.Complete in all respect as per the direction of EIC.
83GIS coordinate mapping ,drawing preparation and submission of the same for New/Existing lineComplete as per the approved technical specification and direction of EIC.
84N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58421542
AUTHORITY Government Departments
TENDER VALUE 21.21 Lakhs
LAST DATE 16-11-2026
Authority
Authority Name Orissa Industrial Infrastructure Development Corporation
Work Description Tender for Supply Installation Testing and Commissioning of 11Kv Ug & Oh Line For Providing Power Supply To Unit At Mahisapat I.E, Dhenkanal.
Basic Detail
Tender No BBSR/ELECT/e-26/2026-27
Bidding Type Tender
Location
City Dhenkanal
State Odisha
Key Dates
Publish Date 06 Nov 2026
Submission Date 16 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value 21.21 Lakhs
Tender Fee 7080
EMD 21217
Exemption Not Available
Document List
6cd0ac0a-d8a7-41cc-9f28-e1c7109dc694.html
BID.pdf
BOQ_618836.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
html

6cd0ac0a-d8a7-41cc-9f28-e1c7109dc694.html

pdf

BID.pdf

xls

BOQ_618836.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender