Tender For Nctps-Iii - Mechanical- I Circle - Nctps-Iii - Mechanical - I Circle -Mill Plant Maintenance Division - Mill Mrhs - Routine, Preventive And Breakdown Maintenance Works In The Mrhs And Mill Reject Transportation System For A Period Of One Y
Tender Overview
Project Description
Tender for Nctps-Iii - Mechanical- I Circle - Nctps-Iii - Mechanical - I Circle -Mill Plant Maintenance Division - Mill Mrhs - Routine, Preventive And Breakdown Maintenance Works In The Mrhs And Mill Reject Transportation System For A Period Of One Year From The Date Of Handing Over Of Site.
BOQ
| Sl. No. | Item Description |
| 1 | REMOVAL OF MILL REJECTS/COAL AND TRANSPORTATION: |
| 2 | Charges for collection of mill rejects / coal and chocked reject from mill areas and reject hopper, loading, transporting in tractor, weighing in department weigh bridge & unloading the mill rejects at reject yard and coal at coal yard of NCTPP-III including cost of consumables and hire charges for T&P's. |
| 3 | Charges for Dozing and manual leveling of mill rejects at mill reject yard including the hire charges of pay loader, T&P's & cost of consumables. |
| 4 | Charges for Pumping of water for 30 Mtrs from the cooling water outlet canal available near the mill reject yard for water quenching of mill rejects by using diesel pump for avoiding fire incidents in mill reject yard and adjacent areas as per the direction of Engineer in charge including the hire charges for diesel pump, T&P's, cost of fuel & fire hydrant hose etc., |
| 5 | MILL REJECT HANDLING SYSTEM: |
| 6 | Charges for upkeeping and maintenance of Mill Reject Handling System round the clock,including Over size and bypass valve manual operation, removing of accumulated rejects in the trench and cleaning of coal /mill rejects choke in pyrite hoppers, MRS mill reject bunker, bag fillter replacement, maintainence and assisting during MRS compressor servicing etc.,including cost of consumables and hire charges for tools and plants. |
| 7 | Charges for lubricating the valves such as mill reject inlet valves, over size valves, blow tank inlet valves & outlet valves and checking the connected pipelines and valves in mill areas and arresting leaks if required and Checking of mono rail crane rope, lubrication, greasing work if any including cost of consumables and hire charges for tools and plants. |
| 8 | Charges for atteding defects in pyrite hoppers inlet valves, oversize valves and other operating valves by arresting the pipes, dismantling the valves from its position, dismantling and removing the valve seals, cleaning the cylinder, reassembling the new seal kit & lubricating the cylinder, refixing the rectified valves in its position and checking the valve operation including cost of consumables and hire charges for tools and plants. |
| 9 | Charges for clearing the chocked coal from the Blow tank, Discharge bend and conveying pipe line by opening the blow tank top flange, discharge bend & conveing pipe line clearing the chocked coal in blow tank , discharge bend manually, clearing,removing the rejects /chocked coal in blow tank,discharge bend removed of forign material in the blow tank and discharge bend, inspection of conveying pipe line assembly for stage by stage, and carrying out minor welding works if necessary, closing of conveying pipe line, discharge bend and blow tank flange. |
| 10 | Charges for dismantling, cleaning & reassembling the mill reject top gate complete assembly & its reject gate operation hydraulic cylinder shaft assembly from the mill reject system, lowering down to the mill floor, inspectionof reject gate operation hydraulic cylinder internals, renewal of wornout parts, seals, gaskets etc…if necessary after providing of necessary chain block arrangement for leading, lifting and positioning of gate assembly. |
| 11 | Charges for dismantling, cleaning & reassembling the mill reject bottom gate complete assembly with bellow & its reject dome gate operation hydraulic cylinder shaft assembly from the mill reject system, coal collecting box one by one lowering down to the mill floor, inspection of reject gate operation hydraulic cylinder internals, renewal of wornout parts, renewal of man hole frame asbestos rope seals, gaskets etc… if necessary after providing of necessary chain block arrangement for leading, lifting and positioning of gate assembly |
| 12 | Charges for servicing of dewatering Pumps decoupling and dismantling of pumps, cleaning, checking of pump internals such as impeller shaft, bearings, sleeves, casing rings, gland sleeve, coupling, starter etc., replacing the wornout parts, assembling the pump, aligning with motor and trail run. (Pump Capacity:30 m3/Hr.) |
| 13 | Charges for raw coal bunker chock removal by continuous hammering and poking with rod/compressed air with hose at 28 & 32 Mtr level conical portion, clearing of rat holes and sticky coal inside bunker cylindrical portion by using air hoses & long pipes, from bunker top opening at 54 Mtr level including the cost of consumables and T & P etc., Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender